This document is an attachment titled "Material Submittals Schedule" that appears to be related to a federal contract opportunity for the construction of a Drug Demand Reduction (DDR) Facility at Tyndall Air Force Base.

The attachment provides a schedule for the submission of various material submittals, including items such as certificates of compliance, shop drawings, samples, manufacturer's recommendations, and test reports. The schedule includes details such as the number of copies required, the due date for submission, the date the submittal was received, and the date it was reviewed and approved or disapproved. The related federal contract opportunity is for the construction of an Honor Guard Facility at Tyndall AFB, with the solicitation number FA481924R0014.

View the file

Other files

File Type Posted
Drainage Design Guide.pdf PDF
Solicitation Amendment - FA481924R00140001.pdf PDF
Honor Guard Sign in Sheet.pdf PDF
Solicitation Amendment FA481924R00140001 SF 30.pdf PDF
Honor Guard Facility RFI Responses.xlsx XLSX spreadsheet
Attachment 27- Section L and M.pdf PDF
Attachment 4 - TAFB_MasterPlantPallette.pdf PDF
Attachment 7 - Existing Equipment.pdf PDF
Attachment 12 - HG Topo Area Rev A.pdf PDF
Attachment 14 - Location of Primary Transformer.pdf PDF
Attachment 15 - AF Form 3000.pdf PDF
Attachment 16 - AF 3064 - 3065 XLWU 21-8120 HONOR GUARD_Progress Schedule.xlsx XLSX spreadsheet
Attachment 19 - Proof of Financial Responsibility.pdf PDF
Attachment 5 - FRCS Guide Deliverable Checklist.pdf PDF
Attachment 17 - RFI Template.pdf PDF
Attachment 10 - Tyndall_DFE_Memo.pdf PDF
Attachment 20 - Division Cost Estimate Worksheet.xlsx XLSX spreadsheet
Attachment 22 - Discovery trifold November2021.pdf PDF
Attachment 27- Section L and M.pdf PDF
Attachment 3 - Conceptual Drawings.pdf PDF
Solicitation - FA481924R0014.pdf PDF
Attachment 1 - Description of Work.pdf PDF
Attachment 2 - Additional Requirements.pdf PDF
Attachment 6 - AF 813.pdf PDF
Attachment 8 - SITE PLAN.pdf PDF
Attachment 9 - Tyndall_Design_Wind_Speed_A4C-2_Memo.pdf PDF
Attachment 11 - Exterior Finish Pallettes.pdf PDF
Attachment 13 - XLWU 21-8120 Site Utilities.pdf PDF
Attachment 18 - Base Access Request EAL.xlsx XLSX spreadsheet
Attachment 23 - HazWaste Determination Worksheet.pdf PDF
Attachment 24 - Environmental Protection Plan Guidance.pdf PDF
Attachment 25 - Wage Determination FL20240105.pdf PDF
Attachment 26 - Past Performance Information Sheet.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule

Project Number:
XLWU244011Project Title:
Drug Demand Reduction (DDR) FacilitySolicitation / Contract Number:

FA481924R0013

Line Number(To be completed by Project Engineer)(To be completed by Contract Administrator)
Number of Copies RequiredRemarks
Item or Description of Item, Contract Reference, Type of SubmittalCertificate of ComplianceShop DrawingsSamplesColor SelectionManufacturer's RecommendationManufacturer's WarrantyCatalog DataOperating InstructionsSchedules, Listings, Reports, PlansTechnical DataTest ReportsField ReportsRequired Submission Date

fergusog: Enter the due date from the Contractor (MM/DD/YY) Date Received in Contracting fergusog: Enter the date received from the Contractor. (MM/DD/YY) Date to Civil Engineering fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY) Return Suspense Date fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

Submittal Numbers fergusog: Enter the Submittal Number

Date Contractor
NotifiedContractor Resubmittal

fergusog: Enter Resubmittal Number Final Approval fergusog: Enter the submittal final approval date

(MM/DD/YY)

Approved fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number Disapproved fergusog: Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

fergusog: Enter the submittal final approval date

(MM/DD/YY)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

&"Verdana,Bold"&12Schedule of Material Submittals &12Print on Legal size paper ( 8 x 14 ).