Attachment 21 - AF Form 66.xlsx
XLSX spreadsheet 24 KB Posted
- Attached to
- Construct Honor Guard Facility, Tyndall AFB, FL
- Solicitation number
- FA481924R0014
About this file
This document is an attachment titled "Material Submittals Schedule" that appears to be related to a federal contract opportunity for the construction of a Drug Demand Reduction (DDR) Facility at Tyndall Air Force Base.
The attachment provides a schedule for the submission of various material submittals, including items such as certificates of compliance, shop drawings, samples, manufacturer's recommendations, and test reports. The schedule includes details such as the number of copies required, the due date for submission, the date the submittal was received, and the date it was reviewed and approved or disapproved. The related federal contract opportunity is for the construction of an Honor Guard Facility at Tyndall AFB, with the solicitation number FA481924R0014.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| Project Number: | |||
| XLWU244011 | Project Title: | ||
| Drug Demand Reduction (DDR) Facility | Solicitation / Contract Number: |
FA481924R0013
| Line Number | (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||
| Number of Copies Required | Remarks | |||||||||||||||
| Item or Description of Item, Contract Reference, Type of Submittal | Certificate of Compliance | Shop Drawings | Samples | Color Selection | Manufacturer's Recommendation | Manufacturer's Warranty | Catalog Data | Operating Instructions | Schedules, Listings, Reports, Plans | Technical Data | Test Reports | Field Reports | Required Submission Date |
fergusog: Enter the due date from the Contractor (MM/DD/YY) Date Received in Contracting fergusog: Enter the date received from the Contractor. (MM/DD/YY) Date to Civil Engineering fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY) Return Suspense Date fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
Submittal Numbers fergusog: Enter the Submittal Number
| Date Contractor | ||
| Notified | Contractor Resubmittal |
fergusog: Enter Resubmittal Number Final Approval fergusog: Enter the submittal final approval date
(MM/DD/YY)
Approved fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
fergusog: Enter Resubmittal Number Disapproved fergusog: Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
fergusog: Enter the submittal final approval date
(MM/DD/YY)
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| 6 |
| 7 |
| 8 |
| 9 |
| 10 |
| 11 |
| 12 |
| 13 |
| 14 |
| 15 |
| 16 |
| 17 |
| 18 |
| 19 |
| 20 |
| 21 |
| 22 |
| 23 |
| 24 |
| 25 |
&"Verdana,Bold"&12Schedule of Material Submittals &12Print on Legal size paper ( 8 x 14 ).
&P of &N
File details come from the government source that posted it. Updated .