This document is a Hazardous Waste Determination Worksheet for a solid waste disposal contract. It outlines the four-step process to determine if a solid waste material is considered hazardous waste in accordance with 40 CFR 262.11. The worksheet includes questions to assess if the material is a solid waste, if it is exempt from EPA regulations, if it is listed as a hazardous waste, and if it exhibits any hazardous characteristics such as ignitability, corrosivity, reactivity, or toxicity. The contractor must complete this worksheet and provide the required information including the contract name, number, company name, building number, and description of the waste being determined. The worksheet must be signed by the waste generator.

This Hazardous Waste Determination Worksheet is related to the federal contract opportunity for constructing an Honor Guard Facility at Tyndall Air Force Base, solicitation number FA481924R0014. The Department of the Air Force Air Combat Command is the procuring agency for this project.

View the file

Other files

File Type Posted
Drainage Design Guide.pdf PDF
Solicitation Amendment - FA481924R00140001.pdf PDF
Honor Guard Sign in Sheet.pdf PDF
Solicitation Amendment FA481924R00140001 SF 30.pdf PDF
Honor Guard Facility RFI Responses.xlsx XLSX spreadsheet
Attachment 27- Section L and M.pdf PDF
Attachment 4 - TAFB_MasterPlantPallette.pdf PDF
Attachment 7 - Existing Equipment.pdf PDF
Attachment 12 - HG Topo Area Rev A.pdf PDF
Attachment 14 - Location of Primary Transformer.pdf PDF
Attachment 15 - AF Form 3000.pdf PDF
Attachment 16 - AF 3064 - 3065 XLWU 21-8120 HONOR GUARD_Progress Schedule.xlsx XLSX spreadsheet
Attachment 19 - Proof of Financial Responsibility.pdf PDF
Attachment 21 - AF Form 66.xlsx XLSX spreadsheet
Attachment 5 - FRCS Guide Deliverable Checklist.pdf PDF
Attachment 17 - RFI Template.pdf PDF
Attachment 10 - Tyndall_DFE_Memo.pdf PDF
Attachment 20 - Division Cost Estimate Worksheet.xlsx XLSX spreadsheet
Attachment 22 - Discovery trifold November2021.pdf PDF
Attachment 27- Section L and M.pdf PDF
Attachment 3 - Conceptual Drawings.pdf PDF
Solicitation - FA481924R0014.pdf PDF
Attachment 1 - Description of Work.pdf PDF
Attachment 2 - Additional Requirements.pdf PDF
Attachment 6 - AF 813.pdf PDF
Attachment 8 - SITE PLAN.pdf PDF
Attachment 9 - Tyndall_Design_Wind_Speed_A4C-2_Memo.pdf PDF
Attachment 11 - Exterior Finish Pallettes.pdf PDF
Attachment 13 - XLWU 21-8120 Site Utilities.pdf PDF
Attachment 18 - Base Access Request EAL.xlsx XLSX spreadsheet
Attachment 24 - Environmental Protection Plan Guidance.pdf PDF
Attachment 25 - Wage Determination FL20240105.pdf PDF
Attachment 26 - Past Performance Information Sheet.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Record of Hazardous Waste Determination for Solid Waste Disposal

A Hazardous Waste Determination (HWD) IAW 40 CFR 262.11 is required for all Solid Wastes. The 40 CFR 262.11 procedure can be summarized by answering these four questions.

Contract Name: _________________________________ Contract Number: ______________________

Company Name: ________________________________ Building Number: ______________________

Description of Waste being determined: __________________________________________________

1. Is this material a Solid Waste? Yes No

a. A Solid Waste is and material or waste that one decides to discard.

b. The physical state of the material is insignificant regarding the answer to whether a Solid Waste has been generated because the EPA has defined any material that the decision has been made to discard is a Solid Waste.

2. Is the material Exempt by EPA rule? Yes (Rule: ___________) No

a. The EPA has made many exemptions from the Hazardous Waste Regulations regarding specific wastes.

b. Recycling is an example of using EPA’s exceptions. The material in question and the manner in which it is recycled dictates what the rules that need to be followed. As indicated in Table 1 of 40 CFR 261.2, most materials are Solid Wastes even if they are recycled.

3. Is the Solid Waste listed by the EPA as a Hazardous Waste? Yes No

a. The EPA has created four lists that impose Hazardous Waste Disposal by any waste generated by the processes described on each of the lists.

b. The listed Hazardous Waste is as follows:

i. Waste from Non-Specific Sources (F List)

ii. Waste from Specific Sources (K List)

iii. Commercial Chemical Products that are Acutely Hazardous (P List)

iv. Commercial Chemical Products (U List)

4. Does the waste have any Hazardous Characteristics? Yes No

a. The EPA has created four characteristics that impose Hazardous Waste Disposal by any waste generated that exhibit the characteristics of Ignitability, Corrosively, Reactivity, or Toxicity.

i. The majority of Ignitable Hazardous Waste is those liquids that have a flash point of less than 140 degrees Fahrenheit. Flammable Solids, Flammable Gases or Oxidizers are also ignitable characteristics.

ii. The Characteristic of Corrosivity (COC) is for aqueous liquids that have a pH of less than 2.0 or greater than 12.5. Liquids can also have the COC if the waste can corrode steel at a rate greater than one quarter inch per year.

iii. The Reactive Characteristic are those waste that would undergo a violent chemical reaction that may cause harm to human health or the environment.

iv. A waste has the Toxicity Characteristic when the results of a representative sample of the Toxicity Characteristic Leaching Procedure (TCLP) are greater than any chemical in 40 CFR 261.24 Table 1.

Waste Generator Signature Waste Generator Name (Print) Date

Contract Name:
Contract Number:
Company Name:
Building Number:
Description of Waste being determined:
Yes Rule:
Waste Generator Name Print:
Date:
Check Box3: Off
Check Box4: Off
Check Box5: Off
Check Box6: Off
Check Box7: Off
Check Box9: Off
Check Box10: Off
Check Box11: Off

File details come from the government source that posted it. Updated .