Attachment 05_AF Form 66.xls

XLS spreadsheet 47 KB Posted

Attached to
Repair (Restore) Bldg. 561 Federal contract opportunity
Solicitation number
FA481920R0016
Issued by
Department of the Air Force Air Combat Command

About this file

This document contains a material submittals schedule template for a federal construction project. The template requires contractors to provide information on required submittals such as shop drawings, samples, manufacturer data and warranties. Columns include due dates for initial submissions from the contractor, dates submissions are received and sent to the civil engineering team, return suspense dates, submittal numbers, and dates for approval or disapproval notifications to the contractor. Resubmittal numbers and final approval dates are also included.

The related federal contract opportunity is a solicitation to repair Building 561 at an Air Force base. Offerors must fill out an attached site visit document with names, places of birth, and ensure prime contractors are limited to two personnel. The solicitation and supporting documents provide relevant details for the repair work required.

View the file

Other files for this federal contract opportunity

Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule

Project Number:
[ enter here ]Project Title:
[ enter here ]Solicitation / Contract Number:

[ enter here ]

Line Number(To be completed by Project Engineer)(To be completed by Contract Administrator)
Number of Copies RequiredRemarks
Item or Description of Item, Contract Reference, Type of SubmittalCertificate of ComplianceShop DrawingsSamplesColor SelectionManufacturer's RecommendationManufacturer's WarrantyCatalog DataOperating InstructionsSchedules, Listings, Reports, PlansTechnical DataTest ReportsField ReportsRequired Submission DateDate Received in ContractingDate to Civil EngineeringReturn Suspense DateSubmittal NumbersDate Contractor
NotifiedContractor ResubmittalFinal Approval
ApprovedDisapproved
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

&L&"Verdana,Bold"&12Schedule of Material Submittals&C&12Print on Legal size paper ( 8 x 14 ).

&R&P of &N Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE

(MM/DD/YY)

Enter the Submittal Number Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

Enter Resubmittal Number Enter the submittal final approval date

(MM/DD/YY)