Attachment 02_Appendix A_Scope of Work.pdf

PDF 13 KB Posted

Attached to
Repair (Restore) Bldg. 561 Federal contract opportunity
Solicitation number
FA481920R0016
Issued by
Department of the Air Force Air Combat Command

About this file

This scope of work document outlines repairs and renovations required for Building 561 on an Air Force base. Key work includes replacing 250 linear feet of roof trim; repairing leaks into office walls by replacing 800 square feet of sheet metal and sealing and painting the 82 by 60 foot building; replacing up to eight rollup doors, motors, and controls; replacing the storefront and frame; repairing an exterior door lock; replacing ceiling tiles and tracks in offices and a breakroom; installing LED exit and bay lights; demolishing and mold remediating a bathroom along with installing new partitions, shower, urinal, vanity, sink, exhaust fan, and accessories; and testing and repairing a vehicle exhaust fan system, including installing trunk lines. Related solicitation FA481920R0016 seeks bids for the work, with a site visit required and submissions due according to the solicitation and attachment documents.

View the file

Other files for this federal contract opportunity

Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX A – SCOPE OF WORK

Roof

1. Replace trim around roof edge ~ 250 lf

2. Repair exterior leak into Office

Walls

1. Replace wall sheet metal ~ 800 sf above doors and around the building that is patched or has tape over holes.

2. Seal and paint exterior of the building ~ 82’ by 60’ building and mechanical room

3. Repair exterior leak into Office

Doors

1. Replace rollup doors up to ~ 13’ by 20’ (up to 8) 20 gauge with 24 gauge accessories

2. Replace rollup door motors and controls (up to 8). One door may be serviceable

3. Replace store front and frame to the building

4. Repair or replace lock on left side exterior door facing store front door. The door will not unlock.

Ceiling

1. Replace ceiling tiles and track in office

2. Replace ceiling tiles and track in breakroom

Lights

1. Replace or install LED exit lights at bay exits

2. Replace bay lights with LED lights 90 CRI lights with a minimum 4000 K

Bathroom

1. Demo and mold remediate bathroom.

2. Install ceiling tiles or drywall ceiling

3. Prep and paint ceiling if drywall is installed on ceiling

4. Prep and paint walls

5. Install new composite light colored partitions

6. Install new shower

7. Install urinal and hardware

8. Install vanity, sink, and hardware

9. Install bathroom exhaust fan

10. Install bathroom accessories

Vehicle Exhaust System

1. Test and repair vehicle exhaust fan system

2. Install trunk lines as need to support vehicles running inside facility.

File details come from the government source that posted it. Updated .