Attachment 02_Appendix A_Scope of Work.pdf
PDF 13 KB Posted
- Attached to
- Repair (Restore) Bldg. 561 Federal contract opportunity
- Solicitation number
- FA481920R0016
About this file
This scope of work document outlines repairs and renovations required for Building 561 on an Air Force base. Key work includes replacing 250 linear feet of roof trim; repairing leaks into office walls by replacing 800 square feet of sheet metal and sealing and painting the 82 by 60 foot building; replacing up to eight rollup doors, motors, and controls; replacing the storefront and frame; repairing an exterior door lock; replacing ceiling tiles and tracks in offices and a breakroom; installing LED exit and bay lights; demolishing and mold remediating a bathroom along with installing new partitions, shower, urinal, vanity, sink, exhaust fan, and accessories; and testing and repairing a vehicle exhaust fan system, including installing trunk lines. Related solicitation FA481920R0016 seeks bids for the work, with a site visit required and submissions due according to the solicitation and attachment documents.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Answers (2).pdf | ||
| Attachment 2 RFP APPENDIX A Repair B561 22July2020.pdf | ||
| Questions and Answers.pdf | ||
| Attachment 2_RFP APPENDIX _A Repair B561.pdf | ||
| Bldg. 561_Drawings.pdf | ||
| Attachment 1_SOW Repair B561_XLWU 20-8163.pdf | ||
| Attachment 3_ APPENDIX B Title_XLWU 20-8163.pdf | ||
| Attachment 12_RFP APPENDIX A Repair B561_XLWU 20 8163.pdf | ||
| Attachment 05_AF Form 66.xls | XLS spreadsheet | |
| Attachment 04_Wage Determination.pdf | ||
| Site Visit Document - Fill in.xlsx | XLSX spreadsheet | |
| Attachment 10_General Financial Information.pdf | ||
| Attachment 03_Appendix B_Supporting Documents.pdf | ||
| Attachment 06_AF Form 3000.pdf | ||
| Attachment 01_SOW Repair (Restore) Bldg 561.pdf | ||
| Attachment 11_Other Contract Requirements.pdf | ||
| Attachment 08_AF3065.pdf | ||
| Attachment 09_Sample RFI.PDF | ||
| Attachment 07_AF 3064.pdf | ||
| Solicitation - FA481920R0016 -01.pdf | ||
| Solicitation - FA481920R0016.pdf |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX A – SCOPE OF WORK
Roof
1. Replace trim around roof edge ~ 250 lf
2. Repair exterior leak into Office
Walls
1. Replace wall sheet metal ~ 800 sf above doors and around the building that is patched or has tape over holes.
2. Seal and paint exterior of the building ~ 82’ by 60’ building and mechanical room
3. Repair exterior leak into Office
Doors
1. Replace rollup doors up to ~ 13’ by 20’ (up to 8) 20 gauge with 24 gauge accessories
2. Replace rollup door motors and controls (up to 8). One door may be serviceable
3. Replace store front and frame to the building
4. Repair or replace lock on left side exterior door facing store front door. The door will not unlock.
Ceiling
1. Replace ceiling tiles and track in office
2. Replace ceiling tiles and track in breakroom
Lights
1. Replace or install LED exit lights at bay exits
2. Replace bay lights with LED lights 90 CRI lights with a minimum 4000 K
Bathroom
1. Demo and mold remediate bathroom.
2. Install ceiling tiles or drywall ceiling
3. Prep and paint ceiling if drywall is installed on ceiling
4. Prep and paint walls
5. Install new composite light colored partitions
6. Install new shower
7. Install urinal and hardware
8. Install vanity, sink, and hardware
9. Install bathroom exhaust fan
10. Install bathroom accessories
Vehicle Exhaust System
1. Test and repair vehicle exhaust fan system
2. Install trunk lines as need to support vehicles running inside facility.
File details come from the government source that posted it. Updated .