This is a Continuation Sheet (Amendment 0010) to a federal contract that updates drawings, specifications, and project documents as of March 20, 2026. The amendment deletes and replaces 35 drawings across structural, architectural, plumbing, mechanical, and technology disciplines, including updated plans for flooring systems, stair details, door schedules, plumbing configurations across multiple floors and mezzanines, mechanical ductwork, and security systems. Several drawings are revised but not reissued, with modifications to general construction notes regarding attic work requirements, sewer sequence notes, barrier and signage requirements per EM-385-1-1, elevator pit paint specifications, door hardware operability, and color key manufacturer guides.

The specification section revisions encompass changes to Summary of Work, work restrictions regarding outage requirements (extended from 18 to 21 calendar days), coordination procedures, deletion of site safety and health plan requirements, temporary construction facilities standards, demolition procedures (eliminating wood framing jacking and elevator hoisting requirements), masonry cleaning standards, fireproofing inspector qualifications, window and door glass and glazing reuse specifications, acoustical ceiling and carpeting extra materials provisions, paint waste management, resinous flooring preparation humidity levels and moisture mitigation systems, wood floor coating application rates, hydraulic passenger elevator specifications, and fire protection system preconstruction submittal timelines. The amendment also updates submittal requirements for sprinkler systems and fire alarm systems to require SD-01 submissions within 45 days of contract award but no less than 14 days prior to commencing work, with provisions that SD-02, SD-03, and SD-05 submittals received before SD-01 approval will be returned disapproved without review. A revised Price Schedule (Attachment T: PRICE SCHEDULE AMD 0010 rev5) accompanies this amendment.

View the file

Other files

File Type Posted
74_SP101_R1_AMENDMENT 010.pdf PDF
96_AE105_R2_AMENDMENT 010.pdf PDF
114_AE401_R1_AMENDMENT 010.pdf PDF
120_AE441_R1_AMENDMENT 010.pdf PDF
178_P-401_R2_AMENDMENT 010.pdf PDF
179_P-402_R1_AMENDMENT 010.pdf PDF
01 91 19_R1_AMENDMENT 009.pdf PDF
116_AE411_R1_AMENDMENT 009.pdf PDF
238_FX400_R1_AMENDMENT 009.pdf PDF
256_EP502_R1_AMENDMENT 009.pdf PDF
260_EP601_R1_AMENDMENT 009.pdf PDF
Att. T) Price Schedule AMD 0009.pdf PDF
Att.pdf PDF
Solicitation Amendment N6247026R00120008 SF 30.pdf PDF
Att. S) FFE Final Package-R1_AMENDMENT 008.pdf PDF
_ATTAC1.PDF PDF
02 82 00.00 22_R1_AMENDMENT 008.pdf PDF
31_CS101_R1_AMENDMENT 008.pdf PDF
47_SD102_R1_AMENDMENT 008.pdf PDF
65_SF105_R1_AMENDMENT 008.pdf PDF
68_SF502_R1_AMENDMENT 008.pdf PDF
152_G-004B_R1_AMENDMENT 008.pdf PDF
182_P-601_R1_AMENDMENT 008.pdf PDF
190_MD106_R1_AMENDMENT 008.pdf PDF
192_MD108_R1_AMENDMENT 008.pdf PDF
02 83 00.00 22_R1_AMENDMENT 008.pdf PDF
02 84 16.00 22_R1_AMENDMENT 008.pdf PDF
148_AE804_R1_AMENDMENT 008.pdf PDF
193_MD109_R1_AMENDMENT 008.pdf PDF
210_MP107_R1_AMENDMENT 008.pdf PDF
N6247026R00120007 SF 30.pdf PDF
Solicitation Amendment N6247026R00120006 SF 30.pdf PDF
Solicitation Amendment N6247026R00120004 SF 30.pdf PDF
Att. A) Construction and Design Experience Project Data Sheet.doc.docx DOCX document
Att. E) Small Business Participation Commitment Document (SBPCD) AMD 0004.docx DOCX document
Att. F) Individual Small Business Subcontracting Plan AMD 0004.docx DOCX document
Att. Z) B60 Continuation Sheet AMD 004.pdf PDF
Att. X) DBIDS ACCESS REQUEST FORM.docx DOCX document
Amendment N6247026R00120003.pdf PDF
Att. W) DBIDS 5512 FORM.pdf PDF
Solicitation Amendment N6247026R00120002.pdf PDF
Att. T) Price_schedule AMD 0002.pdf PDF
Solicitation Amendment N6247026R00120001.pdf PDF
Att. G) - PIEE Vendor Access Instructions.pdf PDF
Att. M) Drawings Volume 2a.pdf PDF
Att. S) FFE Package.pdf PDF
Att. U) Submittal Register.xlsx XLSX spreadsheet
Att. I) Specifications Volume 2.pdf PDF
Att. L) Drawings Volume 1b.pdf PDF
Att. P) 01 45 35a Statement_of_Special_Inspections.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTINUATION SHEET (Amendment 0010)

DRAWINGS:

DELETE and REPLACE the following drawings as of March 20, 2026. These drawings accompany this Amendment:

SP101 – STRUCTURAL PROTECTION PART PLAN AND DETAILS

AE105 – SECOND FLOOR PLAN

AE121 – ROOF PART PLAN - WEST

AE401 – ENLARGED FIRST FLOOR TOILET ROOM AND INTERIOR ELEVATION

AE440 – ENLARGED STAIR PLANS 1

AE441 – ENLARGED STAIR PLANS 2

AE444 – STAIR DETAILS

AE511 – METAL PANEL DETAILS

AE601 – DOOR SCHEDULE AND DETAILS

AE640 – ROOM FINISH SCHEDULE

Q-601 – EQUIPMENT SCHEDULE (OPTION 2)

PD102 – FIRST FLOOR PLUMBING REMOVALS PLAN - EAST

P-101 – UNDERSLAB PLUMBING PLAN – EAST

P-102 – UNDERSLAB PLUMBING PLAN – WEST

P-103 – FIRST FLOOR PLUMBING PLAN – EAST

P-104 – FIRST FLOOR PLUMBING PLAN – WEST

P-105 – FIRST FLOOR MEZZANINE PLUMBING PLAN – EAST

P-106 – FIRST FLOOR MEZZANINE PLUMBING PLAN – WEST

P-107 – SECOND FLOOR PLUMBING PLAN

P-108 – SECOND FLOOR MEZZANINE PLUMBING PLAN

P-109 – ATTIC PLUMBING PLAN

P-401 – ENLARGED PLUMBING PART PLANS 1

P-402 – ENLARGED PLUMBING PART PLANS 2

P-403 – ENLARGED PLUMBING PART PLANS 3

P-601 – PLUMBING SCHEDULES AND DETAIL

P-701 – PLUMBING RISER DIAGRAM

MD102 – FIRST FLOOR MECHANICAL DUCTWORK REMOVALS PLAN – EAST

M-703 – MECHANICAL CONTROL DIAGRAMS 3

ET102 – FIRST FLOOR TECHNOLOGY AND SECURITY PART PLAN - WEST

The following DRAWINGS have been REVISED but NOT REISSUED:

Drawing Detail Summary of Revision PPI Ref

G-004A and G- 004B General Construction Notes

Add note 25 that reads: “WORK IN ATTIC:

ATTIC HAS A SINGULAR CATWALK DOWN

THE CENTER OF THE BUILDING WITH

OPEN CEILING JOISTS TO EITHER SIDE

(REFER TO AE107). CONTRACTOR MUST

PROVIDE TEMPORARY WORK SURFACES

AND FALL PROTECTION FOR WORK IN

THIS SPACE.” NA

Drawing Detail Summary of Revision PPI Ref

G-007 Sewer Sequence Notes Delete Sewer Sequence Note 2 566

G-010 General Construction Barrier

Notes

Revise Note 1 to read: “BARRIERS AND

SIGNAGE MUST MEET THE

REQUIREMENTS OF EM-385-1-1 AND AS

SPECIFIED IN 01 50 00.00 22 TEMPORARY

CONSTRUCTION FACILITIES AND

CONTROLS (PWD ME). NA

AE411 KEYNOTES

Revise Keynote 2 to read: “PAINT (EPOXY)

ELEVATOR PIT WALLS AND FLOOR. COLOR:

GRAY” NA

AE601 DOOR SCHEDULE NOTES

Note I: Add the following text to note: “Adjust existing man door hardware to provide operability and flush door closure.” 595

AE640

COLOR

KEY/MANUFACTURER

GUIDE SVT 1 and SVT 2: Revise size to 18”x36” 580

The following DRAWINGS have been ADDED:

None

The following DRAWINGS have been DELETED:

None

SPECIFICATIONS:

DOCUMENT 00 01 15 LIST OF DRAWINGS

1.2 CONTRACT DRAWINGS

DELETE and REPLACE the following drawings as of March 20, 2026. These drawings accompany this Amendment.

VOL SHEET

NO.

DRAWING

NO.

REV

NO.

NAVFAC

DWG NO.

DRAWING TITLE

PPI Ref

1 74 SP101 1 -

STRUCTURAL

PROTECTION PART PLAN

AND DETAILS

544, 559

1 96 AE105 1 - SECOND FLOOR PLAN 586

1 101 AE121 1 - ROOF PART PLAN - WEST NA

1 114 AE401 1 -

ENLARGED FIRST FLOOR

TOILET ROOM AND

INTERIOR ELEVATION

1 115 AE402 1 -

ENLARGED SECOND

FLOOR TOILET ROOM

PLANS AND INTERIOR

ELEVATIONS

NA

1 119 AE440 1 -

ENLARGED STAIR PLANS

NA

DRAWING

NO.

REV

NO.

1 120 AE441 1 -

ENLARGED STAIR PLANS

1 123 AE444 1 - STAIR DETAILS 671

1 126 AE511 1 - METAL PANEL DETAILS 468

1 132 AE601 1 -

DOOR SCHEDULE AND

DETAILS

592, 606, 607, 608, 634

1 138 AE640 1 - ROOM FINISH SCHEDULE 386, 584

2 161 Q-601 2 -

EQUIPMENT SCHEDULE

(OPTION 2)

2 164 PD102 1 -

FIRST FLOOR PLUMBING

REMOVALS PLAN - EAST

NA

2 169 P-101 1 -

UNDERSLAB PLUMBING

PLAN – EAST

NA

2 170 P-102 1 -

UNDERSLAB PLUMBING

PLAN – WEST

NA

2 171 P-103 1 -

FIRST FLOOR PLUMBING

PLAN – EAST

NA

2 172 P-104 1 -

FIRST FLOOR PLUMBING

PLAN – WEST

NA

2 173 P-105 1 -

FIRST FLOOR

MEZZANINE PLUMBING

PLAN – EAST

NA

2 174 P-106 1 -

FIRST FLOOR

MEZZANINE PLUMBING

PLAN – WEST

NA

2 175 P-107 1 -

SECOND FLOOR

PLUMBING PLAN

NA

2 176 P-108 1 -

SECOND FLOOR

MEZZANINE PLUMBING

PLAN

NA

2 177 P-109 1 - ATTIC PLUMBING PLAN NA

2 178 P-401 2 -

ENLARGED PLUMBING

PART PLANS 1

NA

2 179 P-402 1 -

ENLARGED PLUMBING

PART PLANS 2

NA

2 180 P-403 1 -

ENLARGED PLUMBING

PART PLANS 3

NA

2 182 P-601 2 -

PLUMBING SCHEDULES

AND DETAIL

NA

2 183 P-701 1 -

PLUMBING RISER

DIAGRAM

NA

2 186 MD102 1 -

FIRST FLOOR

MECHANICAL

DUCTWORK REMOVALS

PLAN – EAST

NA

2 222 M-703 1 -

MECHANICAL CONTROL

DIAGRAMS 3

NA

DRAWING

NO.

REV

NO.

2 275 ET102 1 -

FIRST FLOOR

TECHNOLOGY AND

SECURITY PART PLAN -

WEST

SPECIFICATION SECTION REVISIONS:

Spec No. Part / Subpart / Paragraph Summary of Revision PPI Ref 01 11 00.00 22

Summary of Work (PWD-

ME) Entire Section Delete and replace entire section. 479 01 14 00.00 22

Work Restrictions (PWD-ME) 1.5.5.a Outage Requirements

Fifth paragraph: revise “ 18 calendar days” to “21 calendar days” NA

01 30 10.00 22 Coordination

Procedures and Coordination

Drawings (PWD -ME) Entire section Delete and replace entire section. 676

01 35 26.00 22 Governmental

Safety Requirements

1.9.3.12 Site Safety and Health

Plan Delete paragraph 1.9.3.12 379

01 50 00.00 22 Temporary

Construction Facilities and

Controls (PWD- ME) 3.2.2.c

Delete last sentence beginning with: “Under no circumstances…” 516

02 41 00 Demolition and Deconstruction 1.6 Submittals

Delete SD-02 Jacking design drawings; G and SD-05 Jacking design calculations; G NA

02 41 00 Demolition and Deconstruction 3.3 Wood Framing Jacking Delete Paragraph 3.3 in its entirety NA

02 41 00 Demolition and Deconstruction 3.1.14 Elevators and Hoists Delete paragraph 3.1.14 530

04 01 00.91 22 Restoration and

Cleaning of Masonry in

Historic Structures

(PWD-ME) 3.4 Masonry Cleaning

Item k: Revise to read: “The work must provide for the complete cleaning of all affected exterior masonry surfaces of the structures, removing traces of moss, dirt, and other contaminants to allow determination of the masonry’s color and shades, finish and texture, and other properties.” 536

07 81 00 Spray Applied

Fireproofing 1.6.2 Inspector Qualifications

Revise third sentence to read: “The inspector must be AMPP (Formerly NACE /SSPC ) Certified Intumescent Coatings Inspector Level 2, be an ICC Fire Inspector 1 Certificate holder, or a Registered Fire Protection Engineer, who has passed the fire protection engineering written examination administered by the National Council of Examiners for Engineering and Surveying

(NCEES).” 384

08 01 52 Operation and

Maintenance of Wood Windows and Doors 2.3 Glass and Glazing

Revise paragraph 2.3 to read: “Reuse existing intact original glass. Reuse removed lights in their original frame and positions. New glass and glazing materials must conform to Section 08 81 00 GLAZING for Tempered Glass or must otherwise match existing glazing” 467

09 51 00 Acoustical Ceilings 1.7 Extra Materials Delete Paragraph 1.7 Extra Materials 578

09 67 23.13 Resinous Flooring 3.1 Preparation

Fourth paragraph: Revise “maximum 75 percent relative humidity” to “ maximum 85% relative humidity”.

388, 09 67 23.13 Resinous Flooring 3.1 Preparation

Add the following paragraph after last paragraph:

If concrete substrates are not within acceptable levels according to the manufacturer's written instructions, i.e., moisture-vapor emissions, anhydrous calcium chloride, and/or relative humidity, provide a fluid-applied, multi-component, moisture mitigation system, formulated for application on new and existing concrete substrates to reduce MVER to level required for installation of floor coverings indicated and acceptable to manufacturers of floor covering products indicated.

388, 09 68 00 Carpeting 3.7.1 Extra Materials Delete Paragraph 3.7.1 Extra Materials 578

09 90 00 Paints and Coatings 3.13 Waste Management

Delete sentence: “Set aside extra paint for future color matches or reuse by the Government.” 578

09 90 00 Paints and Coatings

3.11 Coating Systems for

Wood and Plywood

Item c: Revise beginning of first sentence to read:

“Wood Floors to Receive Natural Finish to Match Existing: Apply all coatings at rate…” 549

14 24 23 Hydraulic Passenger Elevators Entire Section Delete and replace entire section. 666

21 13 13 Wet Pipe Sprinkler Systems, Fire

Protection

1.4.1 Preconstruction

Submittals

Revise paragraph to read: "Within 45 days of contract award but no less than 14 days prior to commencing work on site, the prime Contractor must submit SD-01 submittals for review and approval. Note that SD-02, SD-03, and SD-05 submittals received prior to the review and approval of the SD-01 (qualifications) submittals will be returned Disapproved Without Review.” 660

28 31 76 Interior Fire

Alarm and Mass Notification

System, Addressable

1.8.1.1 Preconstruction

Submittals

Revise first two sentence to read: "Within 45 days of contract award but no less than 14 days prior to commencing work on site, the prime Contractor must submit SD-01 submittals for review and approval. Note that SD-02, SD-03, and SD-05 submittals received prior to the review and approval of the SD-01 (qualifications of the fire alarm subcontractor and QFPE) submittals will be returned Disapproved Without Review.” 669

PROJECT DOCUMENTS:

DELETE and REPLACE the following PROJECT DOCUMENTS as of March 20, 2026. These documents accompany this Amendment.

Attachment T: PRICE SCHEDULE AMD 0010 rev5

--End of Amendment --