_B60_Continuation Sheet_Amendment 010_03-31-26.pdf
PDF 100 KB Posted
- Solicitation number
- N6247026R0012
About this file
This is a Continuation Sheet (Amendment 0010) to a federal contract that updates drawings, specifications, and project documents as of March 20, 2026. The amendment deletes and replaces 35 drawings across structural, architectural, plumbing, mechanical, and technology disciplines, including updated plans for flooring systems, stair details, door schedules, plumbing configurations across multiple floors and mezzanines, mechanical ductwork, and security systems. Several drawings are revised but not reissued, with modifications to general construction notes regarding attic work requirements, sewer sequence notes, barrier and signage requirements per EM-385-1-1, elevator pit paint specifications, door hardware operability, and color key manufacturer guides.
The specification section revisions encompass changes to Summary of Work, work restrictions regarding outage requirements (extended from 18 to 21 calendar days), coordination procedures, deletion of site safety and health plan requirements, temporary construction facilities standards, demolition procedures (eliminating wood framing jacking and elevator hoisting requirements), masonry cleaning standards, fireproofing inspector qualifications, window and door glass and glazing reuse specifications, acoustical ceiling and carpeting extra materials provisions, paint waste management, resinous flooring preparation humidity levels and moisture mitigation systems, wood floor coating application rates, hydraulic passenger elevator specifications, and fire protection system preconstruction submittal timelines. The amendment also updates submittal requirements for sprinkler systems and fire alarm systems to require SD-01 submissions within 45 days of contract award but no less than 14 days prior to commencing work, with provisions that SD-02, SD-03, and SD-05 submittals received before SD-01 approval will be returned disapproved without review. A revised Price Schedule (Attachment T: PRICE SCHEDULE AMD 0010 rev5) accompanies this amendment.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTINUATION SHEET (Amendment 0010)
DRAWINGS:
DELETE and REPLACE the following drawings as of March 20, 2026. These drawings accompany this Amendment:
SP101 – STRUCTURAL PROTECTION PART PLAN AND DETAILS
AE105 – SECOND FLOOR PLAN
AE121 – ROOF PART PLAN - WEST
AE401 – ENLARGED FIRST FLOOR TOILET ROOM AND INTERIOR ELEVATION
AE440 – ENLARGED STAIR PLANS 1
AE441 – ENLARGED STAIR PLANS 2
AE444 – STAIR DETAILS
AE511 – METAL PANEL DETAILS
AE601 – DOOR SCHEDULE AND DETAILS
AE640 – ROOM FINISH SCHEDULE
Q-601 – EQUIPMENT SCHEDULE (OPTION 2)
PD102 – FIRST FLOOR PLUMBING REMOVALS PLAN - EAST
P-101 – UNDERSLAB PLUMBING PLAN – EAST
P-102 – UNDERSLAB PLUMBING PLAN – WEST
P-103 – FIRST FLOOR PLUMBING PLAN – EAST
P-104 – FIRST FLOOR PLUMBING PLAN – WEST
P-105 – FIRST FLOOR MEZZANINE PLUMBING PLAN – EAST
P-106 – FIRST FLOOR MEZZANINE PLUMBING PLAN – WEST
P-107 – SECOND FLOOR PLUMBING PLAN
P-108 – SECOND FLOOR MEZZANINE PLUMBING PLAN
P-109 – ATTIC PLUMBING PLAN
P-401 – ENLARGED PLUMBING PART PLANS 1
P-402 – ENLARGED PLUMBING PART PLANS 2
P-403 – ENLARGED PLUMBING PART PLANS 3
P-601 – PLUMBING SCHEDULES AND DETAIL
P-701 – PLUMBING RISER DIAGRAM
MD102 – FIRST FLOOR MECHANICAL DUCTWORK REMOVALS PLAN – EAST
M-703 – MECHANICAL CONTROL DIAGRAMS 3
ET102 – FIRST FLOOR TECHNOLOGY AND SECURITY PART PLAN - WEST
The following DRAWINGS have been REVISED but NOT REISSUED:
Drawing Detail Summary of Revision PPI Ref
G-004A and G- 004B General Construction Notes
Add note 25 that reads: “WORK IN ATTIC:
ATTIC HAS A SINGULAR CATWALK DOWN
THE CENTER OF THE BUILDING WITH
OPEN CEILING JOISTS TO EITHER SIDE
(REFER TO AE107). CONTRACTOR MUST
PROVIDE TEMPORARY WORK SURFACES
AND FALL PROTECTION FOR WORK IN
THIS SPACE.” NA
Drawing Detail Summary of Revision PPI Ref
G-007 Sewer Sequence Notes Delete Sewer Sequence Note 2 566
G-010 General Construction Barrier
Notes
Revise Note 1 to read: “BARRIERS AND
SIGNAGE MUST MEET THE
REQUIREMENTS OF EM-385-1-1 AND AS
SPECIFIED IN 01 50 00.00 22 TEMPORARY
CONSTRUCTION FACILITIES AND
CONTROLS (PWD ME). NA
AE411 KEYNOTES
Revise Keynote 2 to read: “PAINT (EPOXY)
ELEVATOR PIT WALLS AND FLOOR. COLOR:
GRAY” NA
AE601 DOOR SCHEDULE NOTES
Note I: Add the following text to note: “Adjust existing man door hardware to provide operability and flush door closure.” 595
AE640
COLOR
KEY/MANUFACTURER
GUIDE SVT 1 and SVT 2: Revise size to 18”x36” 580
The following DRAWINGS have been ADDED:
None
The following DRAWINGS have been DELETED:
None
SPECIFICATIONS:
DOCUMENT 00 01 15 LIST OF DRAWINGS
1.2 CONTRACT DRAWINGS
DELETE and REPLACE the following drawings as of March 20, 2026. These drawings accompany this Amendment.
VOL SHEET
NO.
DRAWING
NO.
REV
NO.
NAVFAC
DWG NO.
DRAWING TITLE
PPI Ref
1 74 SP101 1 -
STRUCTURAL
PROTECTION PART PLAN
AND DETAILS
544, 559
1 96 AE105 1 - SECOND FLOOR PLAN 586
1 101 AE121 1 - ROOF PART PLAN - WEST NA
1 114 AE401 1 -
ENLARGED FIRST FLOOR
TOILET ROOM AND
INTERIOR ELEVATION
1 115 AE402 1 -
ENLARGED SECOND
FLOOR TOILET ROOM
PLANS AND INTERIOR
ELEVATIONS
NA
1 119 AE440 1 -
ENLARGED STAIR PLANS
NA
DRAWING
NO.
REV
NO.
1 120 AE441 1 -
ENLARGED STAIR PLANS
1 123 AE444 1 - STAIR DETAILS 671
1 126 AE511 1 - METAL PANEL DETAILS 468
1 132 AE601 1 -
DOOR SCHEDULE AND
DETAILS
592, 606, 607, 608, 634
1 138 AE640 1 - ROOM FINISH SCHEDULE 386, 584
2 161 Q-601 2 -
EQUIPMENT SCHEDULE
(OPTION 2)
2 164 PD102 1 -
FIRST FLOOR PLUMBING
REMOVALS PLAN - EAST
NA
2 169 P-101 1 -
UNDERSLAB PLUMBING
PLAN – EAST
NA
2 170 P-102 1 -
UNDERSLAB PLUMBING
PLAN – WEST
NA
2 171 P-103 1 -
FIRST FLOOR PLUMBING
PLAN – EAST
NA
2 172 P-104 1 -
FIRST FLOOR PLUMBING
PLAN – WEST
NA
2 173 P-105 1 -
FIRST FLOOR
MEZZANINE PLUMBING
PLAN – EAST
NA
2 174 P-106 1 -
FIRST FLOOR
MEZZANINE PLUMBING
PLAN – WEST
NA
2 175 P-107 1 -
SECOND FLOOR
PLUMBING PLAN
NA
2 176 P-108 1 -
SECOND FLOOR
MEZZANINE PLUMBING
PLAN
NA
2 177 P-109 1 - ATTIC PLUMBING PLAN NA
2 178 P-401 2 -
ENLARGED PLUMBING
PART PLANS 1
NA
2 179 P-402 1 -
ENLARGED PLUMBING
PART PLANS 2
NA
2 180 P-403 1 -
ENLARGED PLUMBING
PART PLANS 3
NA
2 182 P-601 2 -
PLUMBING SCHEDULES
AND DETAIL
NA
2 183 P-701 1 -
PLUMBING RISER
DIAGRAM
NA
2 186 MD102 1 -
FIRST FLOOR
MECHANICAL
DUCTWORK REMOVALS
PLAN – EAST
NA
2 222 M-703 1 -
MECHANICAL CONTROL
DIAGRAMS 3
NA
DRAWING
NO.
REV
NO.
2 275 ET102 1 -
FIRST FLOOR
TECHNOLOGY AND
SECURITY PART PLAN -
WEST
SPECIFICATION SECTION REVISIONS:
Spec No. Part / Subpart / Paragraph Summary of Revision PPI Ref 01 11 00.00 22
Summary of Work (PWD-
ME) Entire Section Delete and replace entire section. 479 01 14 00.00 22
Work Restrictions (PWD-ME) 1.5.5.a Outage Requirements
Fifth paragraph: revise “ 18 calendar days” to “21 calendar days” NA
01 30 10.00 22 Coordination
Procedures and Coordination
Drawings (PWD -ME) Entire section Delete and replace entire section. 676
01 35 26.00 22 Governmental
Safety Requirements
1.9.3.12 Site Safety and Health
Plan Delete paragraph 1.9.3.12 379
01 50 00.00 22 Temporary
Construction Facilities and
Controls (PWD- ME) 3.2.2.c
Delete last sentence beginning with: “Under no circumstances…” 516
02 41 00 Demolition and Deconstruction 1.6 Submittals
Delete SD-02 Jacking design drawings; G and SD-05 Jacking design calculations; G NA
02 41 00 Demolition and Deconstruction 3.3 Wood Framing Jacking Delete Paragraph 3.3 in its entirety NA
02 41 00 Demolition and Deconstruction 3.1.14 Elevators and Hoists Delete paragraph 3.1.14 530
04 01 00.91 22 Restoration and
Cleaning of Masonry in
Historic Structures
(PWD-ME) 3.4 Masonry Cleaning
Item k: Revise to read: “The work must provide for the complete cleaning of all affected exterior masonry surfaces of the structures, removing traces of moss, dirt, and other contaminants to allow determination of the masonry’s color and shades, finish and texture, and other properties.” 536
07 81 00 Spray Applied
Fireproofing 1.6.2 Inspector Qualifications
Revise third sentence to read: “The inspector must be AMPP (Formerly NACE /SSPC ) Certified Intumescent Coatings Inspector Level 2, be an ICC Fire Inspector 1 Certificate holder, or a Registered Fire Protection Engineer, who has passed the fire protection engineering written examination administered by the National Council of Examiners for Engineering and Surveying
(NCEES).” 384
08 01 52 Operation and
Maintenance of Wood Windows and Doors 2.3 Glass and Glazing
Revise paragraph 2.3 to read: “Reuse existing intact original glass. Reuse removed lights in their original frame and positions. New glass and glazing materials must conform to Section 08 81 00 GLAZING for Tempered Glass or must otherwise match existing glazing” 467
09 51 00 Acoustical Ceilings 1.7 Extra Materials Delete Paragraph 1.7 Extra Materials 578
09 67 23.13 Resinous Flooring 3.1 Preparation
Fourth paragraph: Revise “maximum 75 percent relative humidity” to “ maximum 85% relative humidity”.
388, 09 67 23.13 Resinous Flooring 3.1 Preparation
Add the following paragraph after last paragraph:
If concrete substrates are not within acceptable levels according to the manufacturer's written instructions, i.e., moisture-vapor emissions, anhydrous calcium chloride, and/or relative humidity, provide a fluid-applied, multi-component, moisture mitigation system, formulated for application on new and existing concrete substrates to reduce MVER to level required for installation of floor coverings indicated and acceptable to manufacturers of floor covering products indicated.
388, 09 68 00 Carpeting 3.7.1 Extra Materials Delete Paragraph 3.7.1 Extra Materials 578
09 90 00 Paints and Coatings 3.13 Waste Management
Delete sentence: “Set aside extra paint for future color matches or reuse by the Government.” 578
09 90 00 Paints and Coatings
3.11 Coating Systems for
Wood and Plywood
Item c: Revise beginning of first sentence to read:
“Wood Floors to Receive Natural Finish to Match Existing: Apply all coatings at rate…” 549
14 24 23 Hydraulic Passenger Elevators Entire Section Delete and replace entire section. 666
21 13 13 Wet Pipe Sprinkler Systems, Fire
Protection
1.4.1 Preconstruction
Submittals
Revise paragraph to read: "Within 45 days of contract award but no less than 14 days prior to commencing work on site, the prime Contractor must submit SD-01 submittals for review and approval. Note that SD-02, SD-03, and SD-05 submittals received prior to the review and approval of the SD-01 (qualifications) submittals will be returned Disapproved Without Review.” 660
28 31 76 Interior Fire
Alarm and Mass Notification
System, Addressable
1.8.1.1 Preconstruction
Submittals
Revise first two sentence to read: "Within 45 days of contract award but no less than 14 days prior to commencing work on site, the prime Contractor must submit SD-01 submittals for review and approval. Note that SD-02, SD-03, and SD-05 submittals received prior to the review and approval of the SD-01 (qualifications of the fire alarm subcontractor and QFPE) submittals will be returned Disapproved Without Review.” 669
PROJECT DOCUMENTS:
DELETE and REPLACE the following PROJECT DOCUMENTS as of March 20, 2026. These documents accompany this Amendment.
Attachment T: PRICE SCHEDULE AMD 0010 rev5
--End of Amendment --