This is a specification section for roof and deck insulation work at Portsmouth Naval Shipyard in Kittery, Maine, as part of Production Facility Repairs project SIOP 1740579. The specification covers Section 07 22 00 and was last updated November 18, 2018, with Amendment 009 dated March 16, 2026.

The specification requires polyisocyanurate board insulation per ASTM C1289 REV A Type II with fibrous felt or glass mat membrane on both sides and a minimum compressive strength of 20 pounds per square inch. Insulation must contain a minimum of 9 percent recovered material and be certified for indoor air quality by UL 2818 (Greenguard) Gold, SCS Global Services Indoor Advantage Gold, or equivalent third-party certification. A 1/2-inch glass mat gypsum cover board per ASTM C1177/C1177M with 0 flame spread rating must be installed over foam insulation. The specification mandates a vapor retarder with 0.02 perm rating and self-adhering SBS-modified adhesive. Roof insulation must achieve a flame spread rating of 75 or less per ASTM E84 and must be FM Class 1 approved when used as part of a specific roof assembly. Fasteners must comply with FM 4450 and FM Approval Guide requirements, with minimum holding power of 120 pounds in steel deck and spacing designed to withstand 90 pounds per square foot uplift pressure. Installation requires two staggered layers when total thickness exceeds 1/2 inch, with joints perpendicular to the roof slope and staggered between courses. Insulation must be completely covered with finished roofing on the same day of installation, with no phased construction permitted. The contractor must provide detailed shop drawings showing board layout and attachment methods, installer qualifications certification from the manufacturer, flame spread test reports, and compliance verification with all referenced standards. Quality control includes inspection of environmental conditions, fastener specifications, vapor retarder application, and verification of proper drainage slope to all roof drains.

View the file

Other files

File Type Posted
_B60_Continuation Sheet_Amendment 010_03-31-26.pdf PDF
74_SP101_R1_AMENDMENT 010.pdf PDF
96_AE105_R2_AMENDMENT 010.pdf PDF
114_AE401_R1_AMENDMENT 010.pdf PDF
120_AE441_R1_AMENDMENT 010.pdf PDF
178_P-401_R2_AMENDMENT 010.pdf PDF
179_P-402_R1_AMENDMENT 010.pdf PDF
01 91 19_R1_AMENDMENT 009.pdf PDF
116_AE411_R1_AMENDMENT 009.pdf PDF
238_FX400_R1_AMENDMENT 009.pdf PDF
256_EP502_R1_AMENDMENT 009.pdf PDF
260_EP601_R1_AMENDMENT 009.pdf PDF
Att.pdf PDF
Solicitation Amendment N6247026R00120008 SF 30.pdf PDF
Att. S) FFE Final Package-R1_AMENDMENT 008.pdf PDF
_ATTAC1.PDF PDF
02 82 00.00 22_R1_AMENDMENT 008.pdf PDF
31_CS101_R1_AMENDMENT 008.pdf PDF
47_SD102_R1_AMENDMENT 008.pdf PDF
65_SF105_R1_AMENDMENT 008.pdf PDF
68_SF502_R1_AMENDMENT 008.pdf PDF
152_G-004B_R1_AMENDMENT 008.pdf PDF
182_P-601_R1_AMENDMENT 008.pdf PDF
190_MD106_R1_AMENDMENT 008.pdf PDF
192_MD108_R1_AMENDMENT 008.pdf PDF
02 83 00.00 22_R1_AMENDMENT 008.pdf PDF
02 84 16.00 22_R1_AMENDMENT 008.pdf PDF
148_AE804_R1_AMENDMENT 008.pdf PDF
193_MD109_R1_AMENDMENT 008.pdf PDF
210_MP107_R1_AMENDMENT 008.pdf PDF
N6247026R00120007 SF 30.pdf PDF
Solicitation Amendment N6247026R00120006 SF 30.pdf PDF
Solicitation Amendment N6247026R00120004 SF 30.pdf PDF
Att. A) Construction and Design Experience Project Data Sheet.doc.docx DOCX document
Att. E) Small Business Participation Commitment Document (SBPCD) AMD 0004.docx DOCX document
Att. F) Individual Small Business Subcontracting Plan AMD 0004.docx DOCX document
Att. Z) B60 Continuation Sheet AMD 004.pdf PDF
Att. X) DBIDS ACCESS REQUEST FORM.docx DOCX document
Amendment N6247026R00120003.pdf PDF
Att. W) DBIDS 5512 FORM.pdf PDF
Solicitation Amendment N6247026R00120002.pdf PDF
Att. T) Price_schedule AMD 0002.pdf PDF
Solicitation Amendment N6247026R00120001.pdf PDF
Att. G) - PIEE Vendor Access Instructions.pdf PDF
Att. M) Drawings Volume 2a.pdf PDF
Att. S) FFE Package.pdf PDF
Att. U) Submittal Register.xlsx XLSX spreadsheet
Att. I) Specifications Volume 2.pdf PDF
Att. L) Drawings Volume 1b.pdf PDF
Att. P) 01 45 35a Statement_of_Special_Inspections.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B60: PRODUCTION FACILITY REPAIRS - SIOP 1740579

PORTSMOUTH NAVAL SHIPYARD, KITTERY, MAINE

SECTION 07 22 00

ROOF AND DECK INSULATION

02/16, CHG 3: 11/18

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM C1177/C1177M (2017) Standard Specification for Glass Mat Gypsum Substrate for Use as Sheathing

ASTM C1289 (2022a) Standard Specification for Faced Rigid Cellular Polyisocyanurate Thermal Insulation Board

ASTM E84 (2023) Standard Test Method for Surface Burning Characteristics of Building Materials

FM GLOBAL (FM)

FM 4450 (1989) Approval Standard for Class 1 Insulated Steel Deck Roofs

FM APP GUIDE (updated on-line) Approval Guide http://www.approvalguide.com/

INTERNATIONAL CODE COUNCIL (ICC)

ICC IBC (2021) International Building Code

SCIENTIFIC CERTIFICATION SYSTEMS (SCS)

SCS SCS Global Services (SCS) Indoor Advantage

UNDERWRITERS LABORATORIES (UL)

UL 2818 (2013) GREENGUARD Certification Program For Chemical Emissions For Building Materials, Finishes And Furnishings

1.2 SUBMITTALS

Government approval is required for submittals with a "G" classification.

Submittals not having a "G" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00

SUBMITTAL PROCEDURES:

SD-02 Shop Drawings

Insulation Board Layout and Attachment; G

SECTION 07 22 00 Page 1 jriley Typewritten Text

AMENDMENT 009, 03-16-2026

SD-03 Product Data

Insulation ; G

Fasteners ; G

Moisture Control ; G

Recycled Content For Insulation ; S

Cover Board ; G

SD-06 Test Reports

Flame Spread Rating

SD-07 Certificates

Installer Qualifications ; G

Indoor Air Quality For Insulation ; S

SD-08 Manufacturer's Instructions

Nails and Fasteners

Roof Insulation

1.3 SHOP DRAWINGS

Submit insulation board layout and attachment indicating methods of attachment and spacing, transitions, tapered components, thicknesses of materials, and closure and termination conditions. Show locations of ridges, valleys, crickets, interface with, and slope to, roof drains.

Base shop drawings on verified field measurements and include verification of existing conditions. Show location and spacing of wood nailers required for securing of insulation and backnailing of roofing felts.

1.4 PRODUCT DATA

Include data for material descriptions, recommendations for product shelf life, requirements for cover board or coatings, and precautions for flammability and toxicity. Include data to verify compatibility of sealants with insulation.

1.5 MANUFACTURER'S INSTRUCTIONS

Include field of roof and perimeter attachment requirements.

Provide a complete description of installation sequencing for each phase of the roofing system. Include weatherproofing procedures.

1.6 QUALITY CONTROL

Provide certification of installer qualifications from the insulation manufacturer confirming the specific installer has the required qualifications for installing the specific roof insulation system(s) indicated.

SECTION 07 22 00 Page 2

1.7 FIRE PERFORMANCE REQUIREMENTS

1.7.1 Insulation in Roof Systems

Comply with the requirements of ICC IBC . Roof insulation to have a flame spread rating of 75 or less when tested in accordance with ASTM E84.

Additional documentation of compliance with flame spread rating is not required when insulation of the type used for this project as part of the specific roof assembly is listed and labeled as FM Class 1 approved.

1.8 CERTIFICATIONS

Provide products certified to meet indoor air quality requirements by UL 2818 (Greenguard) Gold, SCS Global Services Indoor Advantage Gold or provide certification by other third-party programs.

1.9 DELIVERY, STORAGE, AND HANDLING

1.9.1 Delivery

Deliver materials to the project site in manufacturer's unopened and undamaged standard commercial containers bearing the following legible information:

a. Name of manufacturer

b. Brand designation

c. Specification number, type, and class, as applicable, where materials are covered by a referenced specification

Deliver materials in sufficient quantity to allow continuity of the work.

1.9.2 Storage and Handling

Store and handle materials in accordance with manufacturer's printed instructions. Protect from damage, exposure to open flame or other ignition sources, wetting, condensation, and moisture absorption. Keep materials wrapped and separated from off-gassing materials (such as drying paints and adhesives). Do not use materials that have visible moisture or biological growth. Store in an enclosed building or trailer that provides a dry, adequately ventilated environment. Replace damaged material with new material.

1.10 ENVIRONMENTAL CONDITIONS

Do not install roof insulation during inclement weather or when air temperature is below 40 degrees F and interior humidity is 45 percent or greater, or when there is visible ice, frost, or moisture on the roof deck.

1.11 PROTECTION

1.11.1 Special Protection

Provide special protection as approved by the insulation manufacturer.

SECTION 07 22 00 Page 3

1.11.2 Completed Work

Cover completed work with cover board for the duration of construction.

Avoid traffic on completed work particularly when ambient temperature is above 80 degrees F. Replace crushed or damaged insulation prior to roof surface installation.

PART 2 PRODUCTS

2.1 INSULATION

2.1.1 Insulation Types

Provide one of the following roof insulation materials. Provide roof insulation that is compatible with attachment methods for the specified insulation and roof membrane.

a. Polyisocyanurate Board: Provide in accordance with ASTM C1289 REV A Type II, fibrous felt or glass mat membrane both sides, except minimum compressive strength of 20 pounds per square inch (psi).

2.1.2 Recycled Materials

Provide thermal insulation materials containing recycled content. Unless specified otherwise, the minimum required recycled content for listed materials are:

Polyisocyanurate/polyurethane: 9 percent recovered material

2.1.3 Indoor Air Quality

Provide certification of indoor air quality for insulation.

2.1.4 Insulation Thickness

As necessary to provide the thermal resistance (R-value) indicated. Base calculation on the R-value for aged insulation.

2.1.5 Cants and Tapered Edge Strips

Provide preformed cants and tapered edge strips of the same material as the roof insulation. When unavailable, provide pressure-preservative treated wood, wood fiberboard, or rigid perlite board cants and edge strips as recommended by the roofing manufacturer for the specific application, unless otherwise indicated. Face of cant strips to incline at 45 degrees with a minimum vertical height of 4 inches. Taper edge strips at a rate of one to 1 1/2 inch per foot down to approximately 1/8 inch thick.

2.2 COVER BOARD

2.2.1 Glass Mat Gypsum Board (Thermal Barrier)

ASTM C1177/C1177M , 0 Flame Spread and 0 Smoke Developed when tested in accordance with ASTM E84, 500 psi, Class A, non-combustible, 1/2 inch thick, 4 by 8 feet board size.

SECTION 07 22 00 Page 4

2.3 MOISTURE CONTROL

2.3.1 Vapor Retarder

Self adhering SBS modified adhesive factory-laminated to tri-laminated woven, high density polyethylene face with 0.02 perm rating and maximum water absorption less than 0.10. Air permeance must be less than 0.004 CFM/sq.ft. at 75 Pa when tested in accordance with ASTM E2178.

2.4 FASTENERS

Provide flush-driven fasteners through flat round or hexagonal steel or plastic plates. Provide zinc-coated steel plates, flat round not less than 1 3/8 inch diameter, hexagonal not less than 28 gage. Provide high-density plastic plates, molded thermoplastic with smooth top surface, reinforcing ribs and not less than 3 inches in diameter. Fully recess fastener head into plastic plate after it is driven. Form plates to prevent dishing. Do not use bell or cup shaped plates. Provide fasteners in accordance with insulation manufacturer's recommendations for holding power when driven, or a minimum of 120 pounds each in steel deck, whichever is the higher minimum. Provide fasteners for steel or concrete decks in accordance with FM APP GUIDE ( http://www.approvalguide.com/ ) for Class I roof deck construction, and spaced to withstand uplift pressure of 90 pounds per square foot.

2.4.1 Roofing Nails for Wood Decks

Barbed 11 gage, zinc-coated nails with 7/16 to 5/8 inch diameter heads or annular ring shank, square head, one piece composite nails. Provide nails long enough to penetrate wood deck at least 5/8 inch without protruding through underside of decking.

2.4.2 Fasteners for Plywood Decks

Annular ring shank, square head, one piece composite nails long enough to penetrate into plywood decks approximately 1/2 inch without protruding through underside of decking.

2.4.3 Fasteners for Steel Decks

Approved hardened penetrating fasteners or screws in accordance with FM 4450 and listed in FM APP GUIDE for Class I roof deck construction.

Quantity and placement to withstand a minimum uplift pressure of 90 psf in accordance with FM APP GUIDE.

2.4.4 Adhesives

Insulation manufacturer's recommended cold-applied adhesive formulated to attach roof insulation to the indicated substrate or another layer of roof insulation as follows:

a. Modified asphaltic, asbestos free.

b. Bead-applied, low-rise, one component or multicomponent urethane adhesive.

c. Full-spread, spray-applied, low-rise, two component urethane adhesive.

SECTION 07 22 00 Page 5

PART 3 EXECUTION

3.1 EXAMINATION AND PREPARATION

3.1.1 Surface Inspection

Ensure surfaces are clean, smooth, and dry prior to application. Ensure surfaces receiving vapor retarder are free of projections that might puncture the vapor retarder. Check roof deck surfaces for defects before starting work.

The Contractor must inspect and approve the surfaces immediately before starting installation. Prior to installing moisture control and insulation, perform the following:

a. Examine wood decks to ascertain that deck boards have been properly nailed and that exposed nail heads have been set. b. Examine steel decks to ensure that panels are properly secured to structural members and to each other and that surfaces of top flanges are flat or slightly convex.

3.1.2 Surface Preparation

Correct defects and inaccuracies in roof deck surface to eliminate poor drainage from hollow or low spots, perform the following:

a. Provide wood blocking of the same thickness as the insulation at eaves, edges, curbs, walls, and roof openings for securing of cant flashing flanges. On decks with slopes of one in 12 (1 inch per foot) or more, install wood nailers perpendicular to slope for securing insulation and for backnailing of roofing felts.

b. Fill or cover cracks or knot holes larger than 1/2 inch in diameter in wood decks as necessary to form an unyielding surface.

3.2 INSTALLATION OF VAPOR RETARDER

Prime thermal barrier as recommended by vapor retarder manufacturer.

Install self-adhering membrane vapor retarder in direct contact with wood deck. Lay vapor retarder at right angles to the roof slope. Install vapor retarder with 3-inch side laps and 6-inch end laps. Roll vapor retarder as recommended by manufacturer.

3.3 INSULATION INSTALLATION

Apply insulation in two layers with staggered joints when total required thickness of insulation exceeds 1/2 inch. Lay insulation so that continuous longitudinal joints are perpendicular to direction of roofing, and end joints of each course are staggered with those of adjoining courses. When using multiple layers of insulation, provide joints of each succeeding layer that are parallel and offset in both directions with respect to the layer below. Keep insulation 1/2 inch clear of vertical surfaces penetrating and projecting from roof surface. Verify required slopes to each roof drain.

SECTION 07 22 00 Page 6

3.3.1 Special Precautions for Installation of Foam Insulation

3.3.1.1 Polyisocyanurate Insulation

Adhere 1/2 inch high-density polyisocyanurate cover board over top surface of foam board insulation. Stagger joints of cover board insulation with respect to foam board insulation below.

3.3.2 Cant Strips

Where indicated, provide cant strips at intersections of roof with walls, parapets, and curbs extending above roof. Wood cant strips must bear on and be anchored to wood blocking. Fit cant strips flush to vertical surfaces. Where possible, nail cant strips to adjoining surfaces. Where cant strips are installed against non-nailable materials, install in an approved adhesive.

3.4 PROTECTION

3.4.1 Protection of Applied Insulation

Completely cover each day's installation of insulation with finished roofing specified in 07 52 00 MODIFIED BITUMINOUS MEMBRANE ROOFING on same day. Phased construction is not permitted. Protect open spaces between insulation or other walls and spaces at curbs, until permanent roofing and flashing are applied. Storing, walking, wheeling, or trucking directly on insulation or on roofed surfaces is not permitted. Provide smooth, clean board or plank walkways, runways, and platforms near supports, as necessary, to distribute weight in accordance with indicated live load limits of roof construction. Protect exposed edges of insulation with cutoffs at the end of each work day or whenever precipitation is imminent. Cutoffs must be two layers of bituminous-saturated felt set in plastic bituminous cement or single ply set in roof cement. Fill all profile voids in cutoffs to prevent trapping moisture below the membrane.

Remove cutoffs when work resumes.

3.4.2 Damaged Work and Materials

Restore work and materials that become damaged during construction to original condition or replace with new materials.

3.5 INSPECTION

Establish and maintain inspection procedures to assure compliance of the installed roof insulation with contract requirements. Remove, replace, correct in an approved manner, any work found not in compliance. Quality control must include, but is not limited to, the following:

a. Observation of environmental conditions; number and skill level of insulation workers; start and end time of work.

b. Verification of certification, listing or label compliance with FM Data Sheets. ( https://www.fmglobal.com/fmglobalregistration/Downloads.aspx )

c. Verification of proper storage and handling of insulation and vapor retarder materials before, during, and after installation .

d. Inspection of vapor retarder application, including edge envelopes and

SECTION 07 22 00 Page 7 attachment.

e. Inspection of mechanical fasteners; type, number, length, and spacing.

f. Coordination with other materials, cants, sleepers, and blocking.

g. Inspection of insulation joint orientation and laps between layers, joint width and bearing of edges of insulation on deck.

h. Installation of cutoffs and proper joining of work on subsequent days.

i. Continuation of complete roofing system installation to cover insulation installed same day.

j. Verification of required slope to each roof drain.

-- End of Section --