About this file

This is a mechanical plumbing plan drawing (sheet P-108) for the second floor mezzanine of Building 60, prepared by Oak Point Associates. The drawing is dated March 20, 2026, and is classified as unclassified. It is rendered at a scale of 1/8" = 1'-0" and shows the plumbing layout for the west section of the mezzanine level.

The plan includes general notes and keynotes addressing critical installation requirements and coordination measures. Key specifications require that piping and equipment installation maintain mandatory clearance zones around crane rails and the bridge crane operational travel path. Piping riser offsets must utilize 45-degree angles to avoid conflicts with heating water piping and accommodate hydronic heating piping arrangement. Additionally, 1-inch condensate drains from BCU-2 and BCU-3 must be piped to an open funnel fitting on 2-inch IW (internal waste) positioned just above the planked floor. The drawing incorporates detailed mechanical symbols, equipment callouts, and reference notations that cross-reference a plumbing legends and abbreviations sheet (P-001) for comprehensive specification details.

View the file

Other files

File Type Posted
Att. Y) PPI responses AMD 0010.pdf PDF
Att. FF) Amendment 0010 Attachment Table of Contents.pdf PDF
01 11 00.00 22_AMENDMENT 010.pdf PDF
14 24 23_AMENDMENT 010.pdf PDF
119_AE440_R1_AMENDMENT 010.pdf PDF
123_AE444_R1_AMENDMENT 010.pdf PDF
138_AE640_R1_AMENDMENT 010.pdf PDF
164_PD102_R1_AMENDMENT 010.pdf PDF
172_P-104_R1_AMENDMENT 010.pdf PDF
174_P-106_R1_AMENDMENT 010.pdf PDF
180_P-403_R1_AMENDMENT 010.pdf PDF
183_P-701_R1_AMENDMENT 010.pdf PDF
222_M-703_R1_AMENDMENT 010.pdf PDF
Att. T) Price Schedule AMD 0009.pdf PDF
Att. EE) Amendment 0009 Attachment Table of Contents.pdf PDF
01 91 00.15 22_R1_AMENDMENT 009.pdf PDF
129_AE530_R1_AMENDMENT 009.pdf PDF
246_ES101_R1_AMENDMENT 009.pdf PDF
249_EP102_R1_AMENDMENT 009.pdf PDF
252_EP105_R1_AMENDMENT 009.pdf PDF
255_EP501_R1_AMENDMENT 009.pdf PDF
257_EP503_R1_AMENDMENT 009.pdf PDF
261_EP602_R1_AMENDMENT 009.pdf PDF
266_EL102_R1_AMENDMENT 009.pdf PDF
273_EL702_R1_AMENDMENT 009.pdf PDF
Att.pdf PDF
02 83 00.00 22_R1_AMENDMENT 008.pdf PDF
02 84 16.00 22_R1_AMENDMENT 008.pdf PDF
148_AE804_R1_AMENDMENT 008.pdf PDF
193_MD109_R1_AMENDMENT 008.pdf PDF
210_MP107_R1_AMENDMENT 008.pdf PDF
Solicitation Amendment N6247026R00120006 SF 30.pdf PDF
Att. F) Individual Small Business Subcontracting Plan AMD 0004.docx DOCX document
Att. Z) B60 Continuation Sheet AMD 004.pdf PDF
Solicitation Amendment N6247026R00120004 SF 30.pdf PDF
Att. A) Construction and Design Experience Project Data Sheet.doc.docx DOCX document
Att. E) Small Business Participation Commitment Document (SBPCD) AMD 0004.docx DOCX document
Att. W) DBIDS 5512 FORM.pdf PDF
Att. X) DBIDS ACCESS REQUEST FORM.docx DOCX document
Amendment N6247026R00120003.pdf PDF
Solicitation Amendment N6247026R00120002.pdf PDF
Att. T) Price_schedule AMD 0002.pdf PDF
Att. I) Specifications Volume 2.pdf PDF
Att. L) Drawings Volume 1b.pdf PDF
Att. P) 01 45 35a Statement_of_Special_Inspections.xlsx XLSX spreadsheet
Solicitation Amendment N6247026R00120001.pdf PDF
Att. G) - PIEE Vendor Access Instructions.pdf PDF
Att. M) Drawings Volume 2a.pdf PDF
Att. S) FFE Package.pdf PDF
Att. U) Submittal Register.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHOP

UPHOLSTERY

6" R DN

6" R UP

6" R UP

6" R DN

2" V UP & DN

6" R DN

6" R UP

OPEN

OFFICE

MEZZANINE

M201

ELEV

001 TPA

1/2" CW DN W/ BVIV

1/2" TP DN

2" IW

m l i h e7 p e6 n k j g.1 g f.1 f

M3

5.6

4.2 e4 e3

3.5

2.8 n.9 n.5 k.9 k.5

2.5

2.4

2.1 e2 e1 k.1 e d c b a i.1

ROOF BELOW4" V DN &

RISE TO

4" VTR

EXIST BRIDGE CRANE

C D

C D

1"

1"

2" V UP & DN

2" R UP

2" R DN

BLOWER

COIL UNIT

BLOWER

COIL UNIT

SATISFACTORY TO DATE

APPROVED

FOR COMMANDER NAVFAC

SEAL

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SHEET

NAVFAC DRAWING NO.

DESIGNER

DRAWN BY

CHECKED BY

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

DRAWFORM REVISION: 14 SEP 2023

DESIGN MANAGER

PROJECT MANAGER

FEAD/PM&E

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

T

IC

P O

R T

S M

O U

T H

N A

V A

L S

H

IP

Y A

R D

K

IT

T

E R

Y M

E

UNCLASSIFIED

UNCLASSIFIED

U N

C L

A S

S

IF

IE

D

ACTIVITY

1740579

T. CARLETON

L. LYONS

S. RUCINSKI

/2

/2

:2

:2

P

M

C U s e rs \s ri c h a rd s \D o c u m e n ts

\2

.2

B

L D

G

M

E C

H A

N

IC

A L

-V s w h it e G

Z D

.r v t

P-108

B

R

E P

A

IR

S

S E

C O

N D

F L O

O R

M E

Z Z

A N

IN

E

P L U

M B

IN

G

P L A

N

MSA

RNC

SRW

K

IT

T E

R Y

M

E P

O R

T S

M O

U T

H N

A V

A L S

H

IP

Y A

R D

R O

IC

C

-M E

P -1

1/8" = 1' - 0" 0 5' 10' 15' 30'

GRAPHIC SCALE

KEY PLAN

CHECK GRAPHIC SCALE BEFORE USING

MATCH LINE

PLAN

NORTH

SCALE: 1/8" = 1'-0"

B1

SECOND FLOOR MEZZANINE PLUMBING PLAN - WEST

GENERAL NOTES KEYNOTES

1SEE P-001 FOR PLUMBING LEGENDS, ABBREVIATIONS AND GENERAL NOTES.

COORDINATE THE INSTALLATION OF PIPING AND EQUIPMENT TO MAINTAIN MANDATORY CLEARANCE ZONES AROUND CRANE RAILS AND BRIDGE CRANE

OPERATIONAL TRAVEL PATH.

PROVIDE PIPING RISER OFFSET USING 45 DEGREE ANGLES TO AVOID CONFLICT WITH HEATING WATER PIPING AND CRANE RAIL. SEE SHEET MP106

FOR HYDRONIC HEATING PIPING ARRANGEMENT.

PIPE 1" CONDENSATE DRAINS FROM BCU-2 AND BCU-3 TO OPEN FUNNEL FITTING ON 2" IW, POSITIONED JUST ABOVE THE EXISTING WOOD

PLANKED FLOOR.

1.

2.

(THIS SHEET ONLY)

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

F

IN

A L

S U

B M

IS

S

IO

N

/0

1/

R

S H

A

M E

N D

M E

N T

/2

0/

R

S H

Sheets
M-703 - MECHANICAL CONTROL DIAGRAMS 3
MD102 - FIRST FLOOR MECHANICAL DUCTWORK REMOVALS PLAN - EAST
P-101 - UNDERSLAB PLUMBING PLAN - EAST
P-102 - UNDERSLAB PLUMBING PLAN - WEST
P-103 - FIRST FLOOR PLUMBING PLAN - EAST
P-104 - FIRST FLOOR PLUMBING PLAN - WEST
P-105 - FIRST FLOOR MEZZANINE PLUMBING PLAN - EAST
P-106 - FIRST FLOOR MEZZANINE PLUMBING PLAN - WEST
P-107 - SECOND FLOOR PLUMBING PLAN
P-108 - SECOND FLOOR MEZZANINE PLUMBING PLAN
P-109 - ATTIC PLUMBING PLAN
P-401 - ENLARGED PLUMBING PART PLANS 1
P-402 - ENLARGED PLUMBING PART PLANS 2
P-403 - ENLARGED PLUMBING PART PLANS 3
P-601 - PLUMBING SCHEDULES AND DETAIL
P-701 - PLUMBING RISER DIAGRAM
PD102 - FIRST FLOOR PLUMBING REMOVALS PLAN - EAST

File details come from the government source that posted it. Updated .