176_P-108_R1_AMENDMENT 010.pdf
PDF 258 KB Posted
- Solicitation number
- N6247026R0012
About this file
This is a mechanical plumbing plan drawing (sheet P-108) for the second floor mezzanine of Building 60, prepared by Oak Point Associates. The drawing is dated March 20, 2026, and is classified as unclassified. It is rendered at a scale of 1/8" = 1'-0" and shows the plumbing layout for the west section of the mezzanine level.
The plan includes general notes and keynotes addressing critical installation requirements and coordination measures. Key specifications require that piping and equipment installation maintain mandatory clearance zones around crane rails and the bridge crane operational travel path. Piping riser offsets must utilize 45-degree angles to avoid conflicts with heating water piping and accommodate hydronic heating piping arrangement. Additionally, 1-inch condensate drains from BCU-2 and BCU-3 must be piped to an open funnel fitting on 2-inch IW (internal waste) positioned just above the planked floor. The drawing incorporates detailed mechanical symbols, equipment callouts, and reference notations that cross-reference a plumbing legends and abbreviations sheet (P-001) for comprehensive specification details.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHOP
UPHOLSTERY
6" R DN
6" R UP
6" R UP
6" R DN
2" V UP & DN
6" R DN
6" R UP
OPEN
OFFICE
MEZZANINE
M201
ELEV
001 TPA
1/2" CW DN W/ BVIV
1/2" TP DN
2" IW
m l i h e7 p e6 n k j g.1 g f.1 f
M3
5.6
4.2 e4 e3
3.5
2.8 n.9 n.5 k.9 k.5
2.5
2.4
2.1 e2 e1 k.1 e d c b a i.1
ROOF BELOW4" V DN &
RISE TO
4" VTR
EXIST BRIDGE CRANE
C D
C D
1"
1"
2" V UP & DN
2" R UP
2" R DN
BLOWER
COIL UNIT
BLOWER
COIL UNIT
SATISFACTORY TO DATE
APPROVED
FOR COMMANDER NAVFAC
SEAL
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SHEET
NAVFAC DRAWING NO.
DESIGNER
DRAWN BY
CHECKED BY
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 14 SEP 2023
DESIGN MANAGER
PROJECT MANAGER
FEAD/PM&E
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
T
IC
P O
R T
S M
O U
T H
N A
V A
L S
H
IP
Y A
R D
K
IT
T
E R
Y M
E
UNCLASSIFIED
UNCLASSIFIED
U N
C L
A S
S
IF
IE
D
ACTIVITY
1740579
T. CARLETON
L. LYONS
S. RUCINSKI
/2
/2
:2
:2
P
M
C U s e rs \s ri c h a rd s \D o c u m e n ts
\2
.2
B
L D
G
M
E C
H A
N
IC
A L
-V s w h it e G
Z D
.r v t
P-108
B
R
E P
A
IR
S
S E
C O
N D
F L O
O R
M E
Z Z
A N
IN
E
P L U
M B
IN
G
P L A
N
MSA
RNC
SRW
K
IT
T E
R Y
M
E P
O R
T S
M O
U T
H N
A V
A L S
H
IP
Y A
R D
R O
IC
C
-M E
P -1
1/8" = 1' - 0" 0 5' 10' 15' 30'
GRAPHIC SCALE
KEY PLAN
CHECK GRAPHIC SCALE BEFORE USING
MATCH LINE
PLAN
NORTH
SCALE: 1/8" = 1'-0"
B1
SECOND FLOOR MEZZANINE PLUMBING PLAN - WEST
GENERAL NOTES KEYNOTES
1SEE P-001 FOR PLUMBING LEGENDS, ABBREVIATIONS AND GENERAL NOTES.
COORDINATE THE INSTALLATION OF PIPING AND EQUIPMENT TO MAINTAIN MANDATORY CLEARANCE ZONES AROUND CRANE RAILS AND BRIDGE CRANE
OPERATIONAL TRAVEL PATH.
PROVIDE PIPING RISER OFFSET USING 45 DEGREE ANGLES TO AVOID CONFLICT WITH HEATING WATER PIPING AND CRANE RAIL. SEE SHEET MP106
FOR HYDRONIC HEATING PIPING ARRANGEMENT.
PIPE 1" CONDENSATE DRAINS FROM BCU-2 AND BCU-3 TO OPEN FUNNEL FITTING ON 2" IW, POSITIONED JUST ABOVE THE EXISTING WOOD
PLANKED FLOOR.
1.
2.
(THIS SHEET ONLY)
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
F
IN
A L
S U
B M
IS
S
IO
N
/0
1/
R
S H
A
M E
N D
M E
N T
/2
0/
R
S H
| Sheets |
| M-703 - MECHANICAL CONTROL DIAGRAMS 3 |
| MD102 - FIRST FLOOR MECHANICAL DUCTWORK REMOVALS PLAN - EAST |
| P-101 - UNDERSLAB PLUMBING PLAN - EAST |
| P-102 - UNDERSLAB PLUMBING PLAN - WEST |
| P-103 - FIRST FLOOR PLUMBING PLAN - EAST |
| P-104 - FIRST FLOOR PLUMBING PLAN - WEST |
| P-105 - FIRST FLOOR MEZZANINE PLUMBING PLAN - EAST |
| P-106 - FIRST FLOOR MEZZANINE PLUMBING PLAN - WEST |
| P-107 - SECOND FLOOR PLUMBING PLAN |
| P-108 - SECOND FLOOR MEZZANINE PLUMBING PLAN |
| P-109 - ATTIC PLUMBING PLAN |
| P-401 - ENLARGED PLUMBING PART PLANS 1 |
| P-402 - ENLARGED PLUMBING PART PLANS 2 |
| P-403 - ENLARGED PLUMBING PART PLANS 3 |
| P-601 - PLUMBING SCHEDULES AND DETAIL |
| P-701 - PLUMBING RISER DIAGRAM |
| PD102 - FIRST FLOOR PLUMBING REMOVALS PLAN - EAST |
File details come from the government source that posted it. Updated .