About this file

This document is an architectural/mechanical drawing appendix (Annex) for Building 60, specifically an Underslab Plumbing Plan for the East section. The drawing, prepared by Oak Point Contracting and dated March 20, 2026, is rendered at a scale of 1/8" = 1'-0" and is marked as UNCLASSIFIED. The plan illustrates the layout of underground plumbing infrastructure beneath the building's foundation, including pipe routing, connection points, and drainage systems positioned relative to the building's structural grid lines and mechanical rooms.

The drawing includes general notes referencing plumbing legends, abbreviations, and coordination requirements with structural and other trades. A key plan section provides spatial orientation, and the graphic scale enables measurement verification. The document contains standard architectural annotation including grid references (columns A-D and rows 1-5), equipment identification symbols, and directional indicators. This appears to be a construction specification document serving as part of comprehensive building mechanical documentation rather than a federal contract solicitation or procurement vehicle.

View the file

Other files

File Type Posted
Att. GG) Amendment 0011 Attachment Table of Contents.pdf PDF
Solicitation Amendment N6247026R00120010 SF 30.pdf PDF
Att. T) Price Schedule AMD 0010.pdf PDF
01 30 10.00 22_AMENDMENT 010.pdf PDF
115_AE402_R1_AMENDMENT 010.pdf PDF
161_Q-601_R2_AMENDMENT 010.pdf PDF
170_P-102_R1_AMENDMENT 010.pdf PDF
171_P-103_R1_AMENDMENT 010.pdf PDF
175_P-107_R1_AMENDMENT 010.pdf PDF
677 attach Attic_AFPR.pdf PDF
Att. Y) PPI responses AMD 0009.pdf PDF
_B60_Continuation Sheet_Amendment 0009.pdf PDF
07 27 10_AMENDMENT 009.pdf PDF
95_AE104_R1_AMENDMENT 009.pdf PDF
216_M505_R1_AMENDMENT 009.pdf PDF
217_M601_R1_AMENDMENT 009.pdf PDF
262_EP603_R1_AMENDMENT 009.pdf PDF
268_EL104_R1_AMENDMENT 009.pdf PDF
Att. T) Price Schedule AMD 0009.pdf PDF
Att. EE) Amendment 0009 Attachment Table of Contents.pdf PDF
Att.pdf PDF
Att. Y) PPI responses AMD 0008.pdf PDF
_B60_Continuation Sheet_Amendment 008.pdf PDF
01 11 00.00 22_R1_AMENDMENT 008.pdf PDF
72_SF506_R1_AMENDMENT 008.pdf PDF
220_M-701_R1_AMENDMENT 008.pdf PDF
02 83 00.00 22_R1_AMENDMENT 008.pdf PDF
02 84 16.00 22_R1_AMENDMENT 008.pdf PDF
148_AE804_R1_AMENDMENT 008.pdf PDF
193_MD109_R1_AMENDMENT 008.pdf PDF
210_MP107_R1_AMENDMENT 008.pdf PDF
Att. CC) Site Visit Log.pdf PDF
Att. R) B60 ISRL AMD 0004.XLSX XLSX spreadsheet
Att. Y) PPI responses AMD 0004.pdf PDF
Att. AA) B60 AMD 004 Drawings 012726.pdf PDF
Att. F) Individual Small Business Subcontracting Plan AMD 0004.docx DOCX document
Att. Z) B60 Continuation Sheet AMD 004.pdf PDF
Att. W) DBIDS 5512 FORM.pdf PDF
AMD 0002 PPI responses.pdf PDF
Att. A) - Construction Experience Project Data.docx DOCX document
Att. D) - Historical Small Business Utilization.docx DOCX document
Att. E) - Small Business Participation Commitment Document (SBPCD).docx DOCX document
Att. F) - Individual Small Business Subcontracting Plan.docx DOCX document
Att. H) Specifications Volume 1.pdf PDF
Att. J) Specifications Volume 3.pdf PDF
Att. K) Drawings Volume 1a.pdf PDF
Att. R) B60 - ISRL.XLSX XLSX spreadsheet
Att. I) Specifications Volume 2.pdf PDF
Att. L) Drawings Volume 1b.pdf PDF
Att. P) 01 45 35a Statement_of_Special_Inspections.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ANNEX

ANNEX

AA

4" UP

TO FCO

4" e12 e11 o m l i h e10 e9

J.2 J.1

8.3

8.1

7.8

7.1 e8 e7 e6

4" W UP

SATISFACTORY TO DATE

APPROVED

FOR COMMANDER NAVFAC

SEAL

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SHEET

NAVFAC DRAWING NO.

DESIGNER

DRAWN BY

CHECKED BY

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

DRAWFORM REVISION: 14 SEP 2023

DESIGN MANAGER

PROJECT MANAGER

FEAD/PM&E

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

T

IC

P O

R T

S M

O U

T H

N A

V A

L S

H

IP

Y A

R D

K

IT

T

E R

Y M

E

UNCLASSIFIED

UNCLASSIFIED

U N

C L

A S

S

IF

IE

D

ACTIVITY

1740579

T. CARLETON

L. LYONS

S. RUCINSKI

/2

/2

:2

:1

P

M

C U s e rs \s ri c h a rd s \D o c u m e n ts

\2

.2

B

L D

G

M

E C

H A

N

IC

A L

-V s w h it e G

Z D

.r v t

P-101

B

R

E P

A

IR

S

U N

D E

R S

L A

B P

L U

M B

IN

G

P L A

N

E A

S T

MSA

RNC

SRW

K

IT

T E

R Y

M

E P

O R

T S

M O

U T

H N

A V

A L S

H

IP

Y A

R D

R O

IC

C

-M E

P -1

SCALE: 1/8" = 1'-0"

A1

UNDERSLAB PLUMBING PLAN - EAST

1/8" = 1' - 0" 0 5' 10' 15' 30'

GENERAL NOTES

GRAPHIC SCALE

KEY PLAN

KEYNOTES

1.

2.

SEE P-001 FOR PLUMBING LEGENDS, ABBREVIATIONS AND GENERAL

NOTES.

COORDINATE THE INSTALLATION OF PIPING AND EQUIPMENT TO

MAINTAIN MANDATORY CLEARANCE ZONES AROUND CRANE RAILS AND

BRIDGE CRANE OPERATIONAL TRAVEL PATH.

MATCH LINE

CHECK GRAPHIC SCALE BEFORE USING

PLAN

NORTH

1 FLOOR SAW CUT INFILL. SEE STRUCTURAL SHEET SB101 FOR INFILL

DETAILS.

REFER TO SHEET P-102 FOR CONTINUATION.

(THIS SHEET ONLY)

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

F

IN

A L

S U

B M

IS

S

IO

N

/0

1/

R

S H

A

M E

N D

M E

N T

/2

0/

R

S H

Sheets
M-703 - MECHANICAL CONTROL DIAGRAMS 3
MD102 - FIRST FLOOR MECHANICAL DUCTWORK REMOVALS PLAN - EAST
P-101 - UNDERSLAB PLUMBING PLAN - EAST
P-102 - UNDERSLAB PLUMBING PLAN - WEST
P-103 - FIRST FLOOR PLUMBING PLAN - EAST
P-104 - FIRST FLOOR PLUMBING PLAN - WEST
P-105 - FIRST FLOOR MEZZANINE PLUMBING PLAN - EAST
P-106 - FIRST FLOOR MEZZANINE PLUMBING PLAN - WEST
P-107 - SECOND FLOOR PLUMBING PLAN
P-108 - SECOND FLOOR MEZZANINE PLUMBING PLAN
P-109 - ATTIC PLUMBING PLAN
P-401 - ENLARGED PLUMBING PART PLANS 1
P-402 - ENLARGED PLUMBING PART PLANS 2
P-403 - ENLARGED PLUMBING PART PLANS 3
P-601 - PLUMBING SCHEDULES AND DETAIL
P-701 - PLUMBING RISER DIAGRAM
PD102 - FIRST FLOOR PLUMBING REMOVALS PLAN - EAST

File details come from the government source that posted it. Updated .