186_MD102_R1_AMENDMENT 010.pdf
PDF 254 KB Posted
- Solicitation number
- N6247026R0012
About this file
This is a mechanical ductwork removals plan for the first floor of Building 60, presented as an architectural drawing with accompanying keynotes and specifications. The document illustrates the layout and removal locations for existing mechanical equipment and ductwork systems, including baghouse dust collectors, paint booth exhaust systems, blasting room equipment, table saw dust collection, and compressed air drying/filtering units. The plan identifies 14 specific removal items marked with numbered circles, with corresponding detailed keynotes describing removal procedures for equipment such as dust ductwork from paint booths, make-up air ductwork from supply air ducts, shot blast collection systems, blasting room exhaust and dust collection systems, paint booth and associated controls, baghouse assemblies, exhaust fans on elevated wall-mounted platforms, sand blast booth ductwork, and compressed air drying/filtering equipment including controls, wiring, and system piping.
The drawing provides general notes addressing mechanical legend specifications, coordination with architectural drawings for ceiling penetrations, subcontractor identification and loose ductwork documentation, and authorization for removal of salvageable materials. The plan is scaled at 1/8" = 1'-0" and includes a graphic scale reference for measurement purposes. The document carries an "UNCLASSIFIED" designation and indicates the file originates from an REVIT model dated 3/20/2026, suggesting this is a design or planning document for mechanical system removal and remediation work at a federal facility.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AA
LOUVER
10ø FLEX
6ø FLEX
BAGHOUSE DUST
COLLECTOR (TYP 3)
TABLE SAW
SAND BLAST BOOTH
18ø x1
16ø
BAGHOUSE
BAGHOUSE DUST
COLLECTOR
UP TO ROOFTOP
AIR HANDLER
BLASTING
ROOM
PAINT
BOOTH
EF
E
BLASTING ROOM
EXHAUST MANIFOLD
UP TO ROOFTOP
AIR HANDLER 2
S-E
E
S-E
E
PAINT
BOOTH
6ø FLEX
DUCT
METAL 12ø
FLEX DUCT
B1
MD221
B1
MD201
e12 e11 o m l i h e10 e9
8.3
8.1
7.8
7.1 e8 e7 e6
SHOP
SHOP
SHOP
COMPRESSED AIR
DRYING/FILTERING UNIT
SCALE: 1/8" = 1'-0"
A1
FIRST FLOOR MECHANICAL DUCTWORK REMOVALS PLAN - EAST
SATISFACTORY TO DATE
APPROVED
FOR COMMANDER NAVFAC
SEAL
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SHEET
NAVFAC DRAWING NO.
DESIGNER
DRAWN BY
CHECKED BY
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 14 SEP 2023
DESIGN MANAGER
PROJECT MANAGER
FEAD/PM&E
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
T
IC
P O
R T
S M
O U
T H
N A
V A
L S
H
IP
Y A
R D
K
IT
T
E R
Y M
E
UNCLASSIFIED
UNCLASSIFIED
U N
C L
A S
S
IF
IE
D
ACTIVITY
1740579
T. CARLETON
L. LYONS
S. RUCINSKI
/2
/2
:2
:1
P
M
C U s e rs \s ri c h a rd s \D o c u m e n ts
\2
.2
B
L D
G
M
E C
H A
N
IC
A L
-V s w h it e G
Z D
.r v t
MD102
B
R
E P
A
IR
S
F
IR
S T
F L O
O R
M E
C H
A N
IC
A
L D
U C
T W
O R
K R
E M
O V
A L S
P L A
N
E A
S T
MSA
RNC
CBM
K
IT
T E
R Y
M
E P
O R
T S
M O
U T
H N
A V
A L S
H
IP
Y A
R D
R O
IC
C
-M E
M D
1/8" = 1' - 0" 0 5' 10' 15' 30'
GENERAL NOTES
GRAPHIC SCALE
KEY PLAN
REMOVALS KEYNOTES
MATCH LINE
CHECK GRAPHIC SCALE BEFORE USING
PLAN
NORTH
1 [CLIN 002] REMOVE EXHAUST DUCTWORK FROM PAINT BOOTH ON OUT TO
THE WALL OR CEILING. PROVIDE TEMPARARY COVERS FOR WALL
OPENINGS.
[CLIN 002] REMOVE MAKE-UP AIR DUCTWORK IN ENTIRETY FROM SUPPLY
AIR GRILLE TO ROOFTOP AIR HANDLER.
[CLIN 002] REMOVE SHOT BLAST COLLECTION SYSTEM, EXHAUST FAN, AND
ASSOCIATED CONTROLS, WIRING, AND DUCTWORK.
[CLIN 002] REMOVE BLASTING ROOM EXHAUST AND DUST COLLECTION
SYSTEM AND ASSOCIATED CONTROLS, WIRING, AND DUCTWORK.
[CLIN 002] REMOVE DUCTED EXHAUST SYSTEM WITH BAGHOUSE AIR
FILTRATION, INCLUDING FAN, CONTROLS, WIRING, AND DUCTWORK.
[CLIN 002] REMOVE BLASTING BOOTH AND SHOT BLAST COLLECTION
SYSTEM, INCLUDING ASSOCIATED CONTROLS, WIRING, AND DUCTWORK.
[CLIN 002] REMOVE PAINT BOOTH, AND ASSOCIATED CONTROLS, WIRING,
AND FILTERS.
[CLIN 002] REMOVE BAGHOUSE ASSEMBLY, INCLUDING CONTROLS,
WIRING, AND DUCTWORK.
[CLIN 002] REMOVE EXHAUST FAN ON ELEVATED WALL MOUNTED
PLATFORM AND ASSOCIATED DUCTWORK PLATFORM TO REMAIN IN
PLACE.
[CLIN 002] REMOVE BLASTING ROOM AND ASSOCIATED EQUIPMENT AND
DUCTWORK.
[CLIN 002] REMOVE SAND BLAST BOOTH AND ASSOCIATED DUCTWORK
AND LOUVER.
[CLIN 002] REMOVE COMPRESSED AIR DRYING/FITERING UNIT AND
ASSOCIATED CONTROLS, WIRING, AND SYSTEM PIPING.
[CLIN 002] REMOVE MISCELLANEOUS PROCESS SUPPORT EQUIPMENT AND
ASSOCIATED CONTROLS, WIRING, DUCTWORK AND PIPING.
1.
2.
3.
4.
5.
6.
7.
8.
SEE M-001 FOR MECHANICAL LEGENDS, ABBREVIATIONS AND GENERAL
NOTES.
REMOVE ALL HVAC AND INDUSTRIAL PROCESS EQUIPMENT AND
ASSOCIATED CONTROLS, WIRING AND PIPING THROUGHOUT THE
SPACES SHOWN ON THIS SHEET, UNLESS OTHERWISE NOTED.
COORDINATE WITH ARCHITECTURAL DRAWINGS FOR PATCHING OF
OPEN FLOOR, WALL, AND CEILING PENETRATIONS ASSOCIATED WITH
REMOVALS.
MECHANICAL SUBCONTRACTOR SHALL IDENTIFY, MAKE SAFE CUT
LOOSE AND CAP ALL ITEMS SPECIFIED TO BE DEMOLISHED. THE
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR DEMOLITION AND
REMOVAL OFF SITE TO AN AUTHORIZED SALVAGE FACILITY.
REFER TO CLIN 002 FOR LIST OF INDUSTRIAL EQUIPMENT REMOVAL
REQUIREMENTS.
COORDINATE REMOVAL WITH HAZMAT DRAWINGS AND
REQUIREMENTS.
EXISTING MECHANICAL EQUIPMENT, DUCTWORK, AND PIPING
THROUGHOUT THE BUILDING TO BE REMOVED, UNLESS OTHERWISE
NOTED.
CONDUCT TESTING OF EXISTING PUMPED STEAM CONDENSATE
SYSTEM RETURN LINE BACK PRESSURE AND REPORT RESULTS TO
CONTRACTING OFFICER PRIOR TO COMMENCING WITH REMOVALS IN
BUILDING 60.
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
F
IN
A L
S U
B M
IS
S
IO
N
/0
1/
R
S H
A
M E
N D
M E
N T
/2
0/
R
S H
(THIS SHEET ONLY)
| Sheets |
| M-703 - MECHANICAL CONTROL DIAGRAMS 3 |
| MD102 - FIRST FLOOR MECHANICAL DUCTWORK REMOVALS PLAN - EAST |
| P-101 - UNDERSLAB PLUMBING PLAN - EAST |
| P-102 - UNDERSLAB PLUMBING PLAN - WEST |
| P-103 - FIRST FLOOR PLUMBING PLAN - EAST |
| P-104 - FIRST FLOOR PLUMBING PLAN - WEST |
| P-105 - FIRST FLOOR MEZZANINE PLUMBING PLAN - EAST |
| P-106 - FIRST FLOOR MEZZANINE PLUMBING PLAN - WEST |
| P-107 - SECOND FLOOR PLUMBING PLAN |
| P-108 - SECOND FLOOR MEZZANINE PLUMBING PLAN |
| P-109 - ATTIC PLUMBING PLAN |
| P-401 - ENLARGED PLUMBING PART PLANS 1 |
| P-402 - ENLARGED PLUMBING PART PLANS 2 |
| P-403 - ENLARGED PLUMBING PART PLANS 3 |
| P-601 - PLUMBING SCHEDULES AND DETAIL |
| P-701 - PLUMBING RISER DIAGRAM |
| PD102 - FIRST FLOOR PLUMBING REMOVALS PLAN - EAST |
File details come from the government source that posted it. Updated .