About this file

This is an architectural drawing set for Building 60 repairs at Portsmouth Naval Shipyard in Kittery, Maine, prepared by Naval Facilities Engineering Systems Command (NAVFAC) Mid-Atlantic. The drawings depict enlarged second floor toilet room plans and elevations for the repair and renovation project, with a final submission date of October 1, 2025, and an amendment dated March 20, 2026.

The project scope includes renovation of three toilet rooms (Women 203, Men 204, and an Expressing Room 205) with specific architectural and finishing details. Key materials and products specified include porcelain floor tile with a Schluter's Reno-U transition system, solid vinyl tile flooring, 1/4-inch cementitious backerboard, vinyl subfloor leveler (Johnsonite LS-40-D basis of design), refinished hardwood flooring with existing nosing, exposed brick painted per specification P1, and standard toilet partitions. The drawings require coordination of toilet partition mounting hardware with existing historic masonry, fastening into mortar joints, repair and reinstallation of salvaged interior aluminum storm windows, and repair of wood windows/doors. Additional work includes provision of window guardrail systems, mop sinks, access panels, and mechanical equipment installation. All work must comply with referenced standard mounting heights, door schedules, room finish schedules, and wall type specifications detailed on related architectural sheets (AE002, AE401, AE601, AE641, AE622, and AE626).

View the file

Other files

File Type Posted
Att. Y) PPI responses AMD 0010.pdf PDF
Att. FF) Amendment 0010 Attachment Table of Contents.pdf PDF
01 11 00.00 22_AMENDMENT 010.pdf PDF
14 24 23_AMENDMENT 010.pdf PDF
119_AE440_R1_AMENDMENT 010.pdf PDF
123_AE444_R1_AMENDMENT 010.pdf PDF
138_AE640_R1_AMENDMENT 010.pdf PDF
164_PD102_R1_AMENDMENT 010.pdf PDF
172_P-104_R1_AMENDMENT 010.pdf PDF
174_P-106_R1_AMENDMENT 010.pdf PDF
176_P-108_R1_AMENDMENT 010.pdf PDF
180_P-403_R1_AMENDMENT 010.pdf PDF
183_P-701_R1_AMENDMENT 010.pdf PDF
222_M-703_R1_AMENDMENT 010.pdf PDF
Att. T) Price Schedule AMD 0009.pdf PDF
Att. EE) Amendment 0009 Attachment Table of Contents.pdf PDF
01 91 00.15 22_R1_AMENDMENT 009.pdf PDF
129_AE530_R1_AMENDMENT 009.pdf PDF
246_ES101_R1_AMENDMENT 009.pdf PDF
249_EP102_R1_AMENDMENT 009.pdf PDF
252_EP105_R1_AMENDMENT 009.pdf PDF
255_EP501_R1_AMENDMENT 009.pdf PDF
257_EP503_R1_AMENDMENT 009.pdf PDF
261_EP602_R1_AMENDMENT 009.pdf PDF
266_EL102_R1_AMENDMENT 009.pdf PDF
273_EL702_R1_AMENDMENT 009.pdf PDF
Att.pdf PDF
02 83 00.00 22_R1_AMENDMENT 008.pdf PDF
02 84 16.00 22_R1_AMENDMENT 008.pdf PDF
148_AE804_R1_AMENDMENT 008.pdf PDF
193_MD109_R1_AMENDMENT 008.pdf PDF
210_MP107_R1_AMENDMENT 008.pdf PDF
Att. F) Individual Small Business Subcontracting Plan AMD 0004.docx DOCX document
Att. Z) B60 Continuation Sheet AMD 004.pdf PDF
Att. R) B60 ISRL AMD 0004.XLSX XLSX spreadsheet
Att. Y) PPI responses AMD 0004.pdf PDF
Att. AA) B60 AMD 004 Drawings 012726.pdf PDF
Att. W) DBIDS 5512 FORM.pdf PDF
AMD 0002 PPI responses.pdf PDF
Att. I) Specifications Volume 2.pdf PDF
Att. L) Drawings Volume 1b.pdf PDF
Att. P) 01 45 35a Statement_of_Special_Inspections.xlsx XLSX spreadsheet
Att. A) - Construction Experience Project Data.docx DOCX document
Att. D) - Historical Small Business Utilization.docx DOCX document
Att. E) - Small Business Participation Commitment Document (SBPCD).docx DOCX document
Att. F) - Individual Small Business Subcontracting Plan.docx DOCX document
Att. H) Specifications Volume 1.pdf PDF
Att. J) Specifications Volume 3.pdf PDF
Att. K) Drawings Volume 1a.pdf PDF
Att. R) B60 - ISRL.XLSX XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WOMEN

MEN

CUSTODIAL

EXISTING HISTORIC

MASONRY WALL

A A

F

E

A

AE402

C4

C3

D4

D3

AE402A3 B3

B4

DD

C

CL

B

B

B

AE402

A4

EXPRESSING

6' -6

5'-1 1/4"

C

C

E

F

G

G

G

G

L

ND

NF

ND

1D

ND ND

4'-4 1/4" 6'-1 1/4"

8' -8

/8

7'

-9

5' -9

/8

4'

-7

1D

NF

NF

AE501

B3

4' - 3 1/2" 8' - 8 3/4"

SVT 1 REFINISHED

HARD WOOD

FLOORING

S V

T

E X

IS

T

N O

S

IN

G

SVT 1PFT

SEE DETAIL

A1/AE402

H

M

M

H

H

G

K

'-0

P W

T

6' -0

P1

A

F

E

'-0

P W

T

6' -0

P1

B G10 '-0

" C

A E

F

P W

T

6' -0

P1

A2

AE540

B G

K

G

'-0

P W

T

6' -0

K

P1

A2

AE540

TOILET

PARTITION (TYP)

'-0

B

G

K

EXPOSED BRICK,

PAINT-P1

60E2J

TOILET

PARTITION (TYP)

'-0

C

P W

T

6' -0

EXPOSED BRICK,

PAINT-P1

P1

M

A

D

E

F

TOILET

PARTITION (TYP)

'-0

" PWT ON WING WALL,

PROVIDE EDGE

PROTECTION AT

OUTSIDE CORNERS

P W

T

6' -0

P1

'-0

G B

K

C

RWB

P1

A2

AE540

SOLID VINYL TILE

TRANSITION BASIS OF DESIGN

PRODUCT: SCHLUTER'S RENO-U

PORCELAIN FLOOR TILE

1/4" CEMENTITIOUS BACKERBOARD

VINYL SUBFLOOR LEVELER, BASIS OF

DESIGN; JOHNSONITE LS-40-D

EXIST HARDWOOD FLOORING

SATISFACTORY TO DATE

APPROVED

FOR COMMANDER NAVFAC

SEAL

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SHEET

NAVFAC DRAWING NO.

DESIGNER

DRAWN BY

CHECKED BY

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

DRAWFORM REVISION: 14 SEP 2023

DESIGN MANAGER

PROJECT MANAGER

FEAD/PM&E

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

T

IC

P O

R T

S M

O U

T H

N A

V A

L S

H

IP

Y A

R D

K

IT

T

E R

Y M

E

UNCLASSIFIED

UNCLASSIFIED

U N

C L

A S

S

IF

IE

D

ACTIVITY

1740579

T. CARLETON

L. LYONS

S. RUCINSKI

/2

/2

:4

:1

A

M

C U s e rs \m d o n o v a n \D o c u m e n ts \2

.2

B L

D G

A

R C

H

IT

E C

T U

R A

L -V m d o n o v a n

V F

X R

.r v t

AE402

B

R

E P

A

IR

S

E N

L A

R G

E D

S E

C O

N D

F L O

O R

T O

IL

E

T R

O O

M P

L A

N S

A N

D E

L E

V A

T

IO

N S

RSH

JMR

MJD

K

IT

T E

R Y

M

E P

O R

T S

M O

U T

H N

A V

A L S

H

IP

Y A

R D

R O

IC

C

-M E

A E

SCALE: 1/4" = 1'-0" (AE105)

C1

ENLARGED SECOND FLOOR TOILET ROOM PLAN

PLAN

NORTH

1/4" = 1' - 0" 0 5' 10' 15'1'

GENERAL NOTES

GRAPHIC SCALE(S)

KEY PLAN

KEYNOTES

MATCH LINE

WINDOW GUARDRAIL SYSTEM SIMILAR , SEE DETAIL A4/AE626.

MOP SINK, SEE PLUMBING SHEETS.

PROVIDE 1/4" CEMENTITIOUS BACKER BOARD UNDER PORCELAIN

FLOOR TILE.

COORDINATE TOILET PARTITION MOUNTING HARDWARE WITH

HISTORIC MASONRY. FASTEN INTO MORTAR JOINTS.

REPAIR AND REINSTALL SALVAGED INTERIOR ALUMINUM STORM

WINDOW.

REPAIR WOOD WINDOW/DOOR, SEE RESTORATION SCHEDULE ON

SHEET AE622.

MECHANICAL EQUIPMENT, SEE MECHANICAL SHEETS

ACCESS PANEL 8" x 8", COORDINATE WITH PLUMBING SHEETS.

1. SEE AE002 FOR WALL TYPES.

2. SEE SHEET AE401 FOR TOILET ACCESSORY SCHEDULE AND AE002 FOR

STANDARD MOUNTING HEIGHTS.

3. SEE SHEET AE601 FOR DOOR SCHEDULE.

4. SEE SHEET AE641 FOR ROOM FINISH SCHEDULE.

5. PROVIDE SOLID BLOCKING BEHIND SURFACE APPLIED TOILET

ACCESSORIES WHEN MOUNTED ON STUD WALLS.

SCALE: 1/4" = 1'-0" (AE402)

A3

MEN 204 NORTH INTERIOR ELEVATION

SCALE: 1/4" = 1'-0" (AE402)

B3

MEN 204 SOUTH INTERIOR ELEVATION

SCALE: 1/4" = 1'-0" (AE402)

B4

MEN 204 WEST INTERIOR ELEVATION

SCALE: 1/4" = 1'-0" (AE402)

D3

WOMEN 203 NORTH INTERIOR ELEVATION

SCALE: 1/4" = 1'-0" (AE402)

D4

WOMEN 203 EAST INTERIOR ELEVATION

SCALE: 1/4" = 1'-0" (AE402)

C3

WOMEN 203 SOUTH INTERIOR ELEVATION

SCALE: 1/4" = 1'-0" (AE402)

C4

WOMEN 203 WEST INTERIOR ELEVATION 2

SCALE: 1/4" = 1'-0" (AE402)

A4

EXPRESSING ROOM 205 ELEVATION

C2

AE401

SCALE: 1 1/2" = 1'-0"

A1

FLOORING TRANSITION SOLID VINYL TO PORCELAIN TILE

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

F

IN

A L

S U

B M

IS

S

IO

N

/0

1/

R

S H

A

M E

N D

M E

N T

/2

0/

R

S H

Sheets
AE105 - SECOND FLOOR PLAN
AE401 - ENLARGED FIRST FLOOR TOILET ROOM AND INTERIOR ELEVATION
AE402 - ENLARGED SECOND FLOOR TOILET ROOM PLANS AND ELEVATIONS
AE441 - ENLARGED STAIR PLANS 2
AE444 - STAIR DETAILS
AE511 - METAL PANEL DETAILS
AE601 - DOOR SCHEDULE AND DETAILS
AE640 - ROOM FINISH SCHEDULE
SP101 - STRUCTURAL PROTECTION PART PLAN AND DETAILS

File details come from the government source that posted it. Updated .