164_PD102_R1_AMENDMENT 010.pdf
PDF 235 KB Posted
- Solicitation number
- N6247026R0012
About this file
This document is an architectural drawing showing the First Floor Plumbing Removals Plan for the East section of Building 60. The plan is scaled at 1/8" = 1'-0" and displays the layout of multiple mechanical spaces and plumbing infrastructure scheduled for removal or relocation.
The drawing identifies numerous plumbing components to be removed or modified, including compressed air (CA) hose reels, air dryers, refrigerated dryers, mechanical stations, a sandblast booth manifold, and a Spirax SA2CO packaged steam condensate receiver with pressure power pump. The plan indicates multiple 3/4", 1", and 1 1/2" CA (compressed air) lines and CW (chilled water) lines with designated cut and cap locations. Specific shop areas are referenced (Shops 118, 119, and 120), and the document includes general notes regarding plumbing legend abbreviations, pipe removal procedures, sanitary waste handling, and coordination of removal work with existing floor trench constraints. The document is marked UNCLASSIFIED and is dated 3/20/2026, with file references to Building 60 mechanical systems documentation. A key plan and graphic scale are provided for reference.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AA
CA HOSE
REELS
1 1/2" CA
TO TOP OF
AIR DRYER
3/4" CA STATION
W/ REFRIG DRYER
1/2" CA DROP TO SPIRAX SA2CO
PACKAGED STEAM CONDENSATE
RECEIVER / PRESSURE POWER PUMP
1 1/2" CA
SAND
BLAST
BOOTH
3/4" CA STATION W/
REFRIG DRYER
1" CA DROP
3/4" MECH
STATION
CA DRYER
1 1 1/2" CA TO SAND
BLAST MANIFOLD
3/4" CW 1
3/4" CW DN 1
PEDESTAL
EYEWASH
e12 e11 o m l i h e10 e9
J.2 J.1
8.3
8.1
7.8
7.1 e8 e7 e6
1 1/2" CA1
SHOP
SHOP
SHOP
CUT & CAP
CUT &
CAP
W W
FD-E 2
SATISFACTORY TO DATE
APPROVED
FOR COMMANDER NAVFAC
SEAL
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SHEET
NAVFAC DRAWING NO.
DESIGNER
DRAWN BY
CHECKED BY
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 14 SEP 2023
DESIGN MANAGER
PROJECT MANAGER
FEAD/PM&E
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
T
IC
P O
R T
S M
O U
T H
N A
V A
L S
H
IP
Y A
R D
K
IT
T
E R
Y M
E
UNCLASSIFIED
UNCLASSIFIED
U N
C L
A S
S
IF
IE
D
ACTIVITY
1740579
T. CARLETON
L. LYONS
S. RUCINSKI
/2
/2
:2
:3
P
M
C U s e rs \s ri c h a rd s \D o c u m e n ts
\2
.2
B
L D
G
M
E C
H A
N
IC
A L
-V s w h it e G
Z D
.r v t
PD102
B
R
E P
A
IR
S
F
IR
S T
F L O
O R
P L U
M B
IN
G
R E
M O
V A
L S
P L A
N
E A
S T
MSA
RNC
SRW
K
IT
T E
R Y
M
E P
O R
T S
M O
U T
H N
A V
A L S
H
IP
Y A
R D
R O
IC
C
-M E
P D
1/8" = 1' - 0" 0 5' 10' 15' 30'
GENERAL NOTES
GRAPHIC SCALE
KEY PLAN
REMOVALS KEYNOTES
MATCH LINE
CHECK GRAPHIC SCALE BEFORE USING
PLAN
NORTH
SCALE: 1/8" = 1'-0"
A1
FIRST FLOOR PLUMBING REMOVALS PLAN - EAST
1 REMOVE FIXTURES AND PIPING.
REMOVE FLOOR DRAIN AND ASSOCIATED WASTE PIPING THAT IS
DIRECTLY BELOW WHERE FLOOR SLAB IS REMOVED. CAP OPEN ENDS
OF PIPING WHERE PIPING RUNS BEYOND THE PERIMETER OF THE
FLOOR CUT AREA. REFER TO SHEET SD101 FOR SLAB CUT DETAILS.
1.
2.
3.
4.
5.
6.
SEE P-001 FOR PLUMBING LEGENDS, ABBREVIATIONS AND GENERAL
NOTES.
CUT AND CAP PIPING THAT CONTINUES BEYOND TRENCH UNDERSLAB
(SAN, CW, CA).
SEE CIVIL SHEET CX101 FOR CONTINUATION.
RECORD OF UNDERSLAB SANITARY, WASTE, AND VENT PIPING IS
UNAVAILABLE. REMOVE UNDERSLAB PIPING THROUGHOUT EXISTING
MENS AND WOMENS ROOMS. REMOVE SANITARY, WASTE, AND VENT
PIPING IN FLOOR TRENCH OR PASSING ACROSS FLOOR TRENCH.
COORDINATE REMOVALS WITH FLOOR SAW CUTTING CONSTRAINTS IN
PLACE TO PRESERVE EXISTING HISTORIC PARTITION WALLS.
EXISTING 3/4" COMPRESSED AIR FROM BUILDING 60 TO BUILDING 292.
CUT AND CAP PIPING BELOW SLAB SURFACE. COORDINATE MATCHING
AND REPAIR OF FLOOR SLAB
(THIS SHEET ONLY)
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
F
IN
A L
S U
B M
IS
S
IO
N
/0
1/
R
S H
A
M E
N D
M E
N T
/2
0/
R
S H
| Sheets |
| M-703 - MECHANICAL CONTROL DIAGRAMS 3 |
| MD102 - FIRST FLOOR MECHANICAL DUCTWORK REMOVALS PLAN - EAST |
| P-101 - UNDERSLAB PLUMBING PLAN - EAST |
| P-102 - UNDERSLAB PLUMBING PLAN - WEST |
| P-103 - FIRST FLOOR PLUMBING PLAN - EAST |
| P-104 - FIRST FLOOR PLUMBING PLAN - WEST |
| P-105 - FIRST FLOOR MEZZANINE PLUMBING PLAN - EAST |
| P-106 - FIRST FLOOR MEZZANINE PLUMBING PLAN - WEST |
| P-107 - SECOND FLOOR PLUMBING PLAN |
| P-108 - SECOND FLOOR MEZZANINE PLUMBING PLAN |
| P-109 - ATTIC PLUMBING PLAN |
| P-401 - ENLARGED PLUMBING PART PLANS 1 |
| P-402 - ENLARGED PLUMBING PART PLANS 2 |
| P-403 - ENLARGED PLUMBING PART PLANS 3 |
| P-601 - PLUMBING SCHEDULES AND DETAIL |
| P-701 - PLUMBING RISER DIAGRAM |
| PD102 - FIRST FLOOR PLUMBING REMOVALS PLAN - EAST |
File details come from the government source that posted it. Updated .