This document is an architectural drawing showing the First Floor Plumbing Removals Plan for the East section of Building 60. The plan is scaled at 1/8" = 1'-0" and displays the layout of multiple mechanical spaces and plumbing infrastructure scheduled for removal or relocation.

The drawing identifies numerous plumbing components to be removed or modified, including compressed air (CA) hose reels, air dryers, refrigerated dryers, mechanical stations, a sandblast booth manifold, and a Spirax SA2CO packaged steam condensate receiver with pressure power pump. The plan indicates multiple 3/4", 1", and 1 1/2" CA (compressed air) lines and CW (chilled water) lines with designated cut and cap locations. Specific shop areas are referenced (Shops 118, 119, and 120), and the document includes general notes regarding plumbing legend abbreviations, pipe removal procedures, sanitary waste handling, and coordination of removal work with existing floor trench constraints. The document is marked UNCLASSIFIED and is dated 3/20/2026, with file references to Building 60 mechanical systems documentation. A key plan and graphic scale are provided for reference.

View the file

Other files

File Type Posted
Att. Y) PPI responses AMD 0010.pdf PDF
Att. FF) Amendment 0010 Attachment Table of Contents.pdf PDF
01 11 00.00 22_AMENDMENT 010.pdf PDF
14 24 23_AMENDMENT 010.pdf PDF
119_AE440_R1_AMENDMENT 010.pdf PDF
123_AE444_R1_AMENDMENT 010.pdf PDF
138_AE640_R1_AMENDMENT 010.pdf PDF
172_P-104_R1_AMENDMENT 010.pdf PDF
174_P-106_R1_AMENDMENT 010.pdf PDF
176_P-108_R1_AMENDMENT 010.pdf PDF
180_P-403_R1_AMENDMENT 010.pdf PDF
183_P-701_R1_AMENDMENT 010.pdf PDF
222_M-703_R1_AMENDMENT 010.pdf PDF
Att. T) Price Schedule AMD 0009.pdf PDF
Att. EE) Amendment 0009 Attachment Table of Contents.pdf PDF
01 91 00.15 22_R1_AMENDMENT 009.pdf PDF
129_AE530_R1_AMENDMENT 009.pdf PDF
246_ES101_R1_AMENDMENT 009.pdf PDF
249_EP102_R1_AMENDMENT 009.pdf PDF
252_EP105_R1_AMENDMENT 009.pdf PDF
255_EP501_R1_AMENDMENT 009.pdf PDF
257_EP503_R1_AMENDMENT 009.pdf PDF
261_EP602_R1_AMENDMENT 009.pdf PDF
266_EL102_R1_AMENDMENT 009.pdf PDF
273_EL702_R1_AMENDMENT 009.pdf PDF
Att.pdf PDF
02 83 00.00 22_R1_AMENDMENT 008.pdf PDF
02 84 16.00 22_R1_AMENDMENT 008.pdf PDF
148_AE804_R1_AMENDMENT 008.pdf PDF
193_MD109_R1_AMENDMENT 008.pdf PDF
210_MP107_R1_AMENDMENT 008.pdf PDF
Att. CC) Site Visit Log.pdf PDF
Att. F) Individual Small Business Subcontracting Plan AMD 0004.docx DOCX document
Att. Z) B60 Continuation Sheet AMD 004.pdf PDF
Att. R) B60 ISRL AMD 0004.XLSX XLSX spreadsheet
Att. Y) PPI responses AMD 0004.pdf PDF
Att. AA) B60 AMD 004 Drawings 012726.pdf PDF
Att. W) DBIDS 5512 FORM.pdf PDF
AMD 0002 PPI responses.pdf PDF
Att. I) Specifications Volume 2.pdf PDF
Att. L) Drawings Volume 1b.pdf PDF
Att. P) 01 45 35a Statement_of_Special_Inspections.xlsx XLSX spreadsheet
Att. A) - Construction Experience Project Data.docx DOCX document
Att. D) - Historical Small Business Utilization.docx DOCX document
Att. E) - Small Business Participation Commitment Document (SBPCD).docx DOCX document
Att. F) - Individual Small Business Subcontracting Plan.docx DOCX document
Att. H) Specifications Volume 1.pdf PDF
Att. J) Specifications Volume 3.pdf PDF
Att. K) Drawings Volume 1a.pdf PDF
Att. R) B60 - ISRL.XLSX XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AA

CA HOSE

REELS

1 1/2" CA

TO TOP OF

AIR DRYER

3/4" CA STATION

W/ REFRIG DRYER

1/2" CA DROP TO SPIRAX SA2CO

PACKAGED STEAM CONDENSATE

RECEIVER / PRESSURE POWER PUMP

1 1/2" CA

SAND

BLAST

BOOTH

3/4" CA STATION W/

REFRIG DRYER

1" CA DROP

3/4" MECH

STATION

CA DRYER

1 1 1/2" CA TO SAND

BLAST MANIFOLD

3/4" CW 1

3/4" CW DN 1

PEDESTAL

EYEWASH

e12 e11 o m l i h e10 e9

J.2 J.1

8.3

8.1

7.8

7.1 e8 e7 e6

1 1/2" CA1

SHOP

SHOP

SHOP

CUT & CAP

CUT &

CAP

W W

FD-E 2

SATISFACTORY TO DATE

APPROVED

FOR COMMANDER NAVFAC

SEAL

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SHEET

NAVFAC DRAWING NO.

DESIGNER

DRAWN BY

CHECKED BY

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

DRAWFORM REVISION: 14 SEP 2023

DESIGN MANAGER

PROJECT MANAGER

FEAD/PM&E

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

T

IC

P O

R T

S M

O U

T H

N A

V A

L S

H

IP

Y A

R D

K

IT

T

E R

Y M

E

UNCLASSIFIED

UNCLASSIFIED

U N

C L

A S

S

IF

IE

D

ACTIVITY

1740579

T. CARLETON

L. LYONS

S. RUCINSKI

/2

/2

:2

:3

P

M

C U s e rs \s ri c h a rd s \D o c u m e n ts

\2

.2

B

L D

G

M

E C

H A

N

IC

A L

-V s w h it e G

Z D

.r v t

PD102

B

R

E P

A

IR

S

F

IR

S T

F L O

O R

P L U

M B

IN

G

R E

M O

V A

L S

P L A

N

E A

S T

MSA

RNC

SRW

K

IT

T E

R Y

M

E P

O R

T S

M O

U T

H N

A V

A L S

H

IP

Y A

R D

R O

IC

C

-M E

P D

1/8" = 1' - 0" 0 5' 10' 15' 30'

GENERAL NOTES

GRAPHIC SCALE

KEY PLAN

REMOVALS KEYNOTES

MATCH LINE

CHECK GRAPHIC SCALE BEFORE USING

PLAN

NORTH

SCALE: 1/8" = 1'-0"

A1

FIRST FLOOR PLUMBING REMOVALS PLAN - EAST

1 REMOVE FIXTURES AND PIPING.

REMOVE FLOOR DRAIN AND ASSOCIATED WASTE PIPING THAT IS

DIRECTLY BELOW WHERE FLOOR SLAB IS REMOVED. CAP OPEN ENDS

OF PIPING WHERE PIPING RUNS BEYOND THE PERIMETER OF THE

FLOOR CUT AREA. REFER TO SHEET SD101 FOR SLAB CUT DETAILS.

1.

2.

3.

4.

5.

6.

SEE P-001 FOR PLUMBING LEGENDS, ABBREVIATIONS AND GENERAL

NOTES.

CUT AND CAP PIPING THAT CONTINUES BEYOND TRENCH UNDERSLAB

(SAN, CW, CA).

SEE CIVIL SHEET CX101 FOR CONTINUATION.

RECORD OF UNDERSLAB SANITARY, WASTE, AND VENT PIPING IS

UNAVAILABLE. REMOVE UNDERSLAB PIPING THROUGHOUT EXISTING

MENS AND WOMENS ROOMS. REMOVE SANITARY, WASTE, AND VENT

PIPING IN FLOOR TRENCH OR PASSING ACROSS FLOOR TRENCH.

COORDINATE REMOVALS WITH FLOOR SAW CUTTING CONSTRAINTS IN

PLACE TO PRESERVE EXISTING HISTORIC PARTITION WALLS.

EXISTING 3/4" COMPRESSED AIR FROM BUILDING 60 TO BUILDING 292.

CUT AND CAP PIPING BELOW SLAB SURFACE. COORDINATE MATCHING

AND REPAIR OF FLOOR SLAB

(THIS SHEET ONLY)

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

F

IN

A L

S U

B M

IS

S

IO

N

/0

1/

R

S H

A

M E

N D

M E

N T

/2

0/

R

S H

Sheets
M-703 - MECHANICAL CONTROL DIAGRAMS 3
MD102 - FIRST FLOOR MECHANICAL DUCTWORK REMOVALS PLAN - EAST
P-101 - UNDERSLAB PLUMBING PLAN - EAST
P-102 - UNDERSLAB PLUMBING PLAN - WEST
P-103 - FIRST FLOOR PLUMBING PLAN - EAST
P-104 - FIRST FLOOR PLUMBING PLAN - WEST
P-105 - FIRST FLOOR MEZZANINE PLUMBING PLAN - EAST
P-106 - FIRST FLOOR MEZZANINE PLUMBING PLAN - WEST
P-107 - SECOND FLOOR PLUMBING PLAN
P-108 - SECOND FLOOR MEZZANINE PLUMBING PLAN
P-109 - ATTIC PLUMBING PLAN
P-401 - ENLARGED PLUMBING PART PLANS 1
P-402 - ENLARGED PLUMBING PART PLANS 2
P-403 - ENLARGED PLUMBING PART PLANS 3
P-601 - PLUMBING SCHEDULES AND DETAIL
P-701 - PLUMBING RISER DIAGRAM
PD102 - FIRST FLOOR PLUMBING REMOVALS PLAN - EAST

File details come from the government source that posted it. Updated .