About this file

This is a B60 Price Schedule for a federal construction contract for B60 Production Facility Repairs. The contract includes a base bid (Line Item 1) valued at an estimated total, broken down into multiple subtotals covering Structural/Architectural work (1B), Fire Protection (1C), Mechanical and Plumbing (1D), Electrical including communications and security systems (1E), Civil Earthwork and Site Improvements (1F), Building Removals/Demolition (1G), removal and abatement of industrial equipment and hazardous materials (1H-1I), utility connections to existing trailers (1J), and various unit-priced hazardous material abatement and testing services including rock removal, lead paint removal, asbestos-containing materials (ACM) abatement, PLM and TEM analysis, RCRA 8 analysis for lead/cadmium/chromium, PCB testing, and masonry crack repairs (1K-1FF). All work must be performed in accordance with referenced drawings and specifications identified as CLIN 001 Base Bid.

The contract includes eleven option line items (Items 2-12) requiring firm fixed pricing with no economic price adjustment provision: Furniture, Furnishings, and Equipment (FF&E) estimated at $233,601 with a maximum allowable rate (HAR) of 5 percent (Item 2); NEW equipment procurement and installation estimated at $1,698,248 with 5 percent HAR (Item 3A); industrial equipment installation (3B); radon fans and wiring (Item 4); Electronic Security Systems and Access Control (Item 5); additional wood window repairs (Item 6); Additional Annex Repairs (Item 8); Additional Finishes (Item 9); Electrical Service Infrastructure (Item 10); Resinous Flooring (Item 11); and Communication Service Routing (Item 12). Award will be made on Line Item 1 alone. The Government reserves unilateral right to exercise Line Items 6-9 and 11-12 within 365 days and Item 10 within 90 days of contract award. The base contract completion date is 622 calendar days after award, with an additional 40 days if Option 3 is exercised. All quantities are estimated and subject to actual measurement verification by the Contracting Officer's Representative prior to work execution, with invoicing based on actual in-place quantities completed.

View the file

Other files

File Type Posted
Att. Y) PPI responses AMD 0010.pdf PDF
Att. FF) Amendment 0010 Attachment Table of Contents.pdf PDF
01 11 00.00 22_AMENDMENT 010.pdf PDF
14 24 23_AMENDMENT 010.pdf PDF
119_AE440_R1_AMENDMENT 010.pdf PDF
123_AE444_R1_AMENDMENT 010.pdf PDF
138_AE640_R1_AMENDMENT 010.pdf PDF
164_PD102_R1_AMENDMENT 010.pdf PDF
172_P-104_R1_AMENDMENT 010.pdf PDF
174_P-106_R1_AMENDMENT 010.pdf PDF
176_P-108_R1_AMENDMENT 010.pdf PDF
180_P-403_R1_AMENDMENT 010.pdf PDF
183_P-701_R1_AMENDMENT 010.pdf PDF
222_M-703_R1_AMENDMENT 010.pdf PDF
Att. T) Price Schedule AMD 0009.pdf PDF
Att. EE) Amendment 0009 Attachment Table of Contents.pdf PDF
01 91 00.15 22_R1_AMENDMENT 009.pdf PDF
129_AE530_R1_AMENDMENT 009.pdf PDF
246_ES101_R1_AMENDMENT 009.pdf PDF
249_EP102_R1_AMENDMENT 009.pdf PDF
252_EP105_R1_AMENDMENT 009.pdf PDF
255_EP501_R1_AMENDMENT 009.pdf PDF
257_EP503_R1_AMENDMENT 009.pdf PDF
261_EP602_R1_AMENDMENT 009.pdf PDF
266_EL102_R1_AMENDMENT 009.pdf PDF
273_EL702_R1_AMENDMENT 009.pdf PDF
Att.pdf PDF
02 83 00.00 22_R1_AMENDMENT 008.pdf PDF
02 84 16.00 22_R1_AMENDMENT 008.pdf PDF
148_AE804_R1_AMENDMENT 008.pdf PDF
193_MD109_R1_AMENDMENT 008.pdf PDF
210_MP107_R1_AMENDMENT 008.pdf PDF
Att. F) Individual Small Business Subcontracting Plan AMD 0004.docx DOCX document
Att. Z) B60 Continuation Sheet AMD 004.pdf PDF
Att. R) B60 ISRL AMD 0004.XLSX XLSX spreadsheet
Att. Y) PPI responses AMD 0004.pdf PDF
Att. AA) B60 AMD 004 Drawings 012726.pdf PDF
Att. W) DBIDS 5512 FORM.pdf PDF
AMD 0002 PPI responses.pdf PDF
Att. I) Specifications Volume 2.pdf PDF
Att. L) Drawings Volume 1b.pdf PDF
Att. P) 01 45 35a Statement_of_Special_Inspections.xlsx XLSX spreadsheet
Att. A) - Construction Experience Project Data.docx DOCX document
Att. D) - Historical Small Business Utilization.docx DOCX document
Att. E) - Small Business Participation Commitment Document (SBPCD).docx DOCX document
Att. F) - Individual Small Business Subcontracting Plan.docx DOCX document
Att. H) Specifications Volume 1.pdf PDF
Att. J) Specifications Volume 3.pdf PDF
Att. K) Drawings Volume 1a.pdf PDF
Att. R) B60 - ISRL.XLSX XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B60 PRICE SCHEDULE

Provide line item prices, where indicated by blank underlines, for the following items:

Line Item

Description Quantity Unit Unit Price

Sub- Total

Total Price

1 BASE PRICE: Total Price for the entire work for B60 Production Facility Repairs for providing Line Items 1A through 1GG as noted below, in accordance with the drawings and specifications, complete, but excluding Option work provided in Priced Line Items 2 through 12.

1 EA $_

1A Subtotal Price for the Base Price Scope that is NOT PRICED in Line Items 1B through 1GG (including, but not limited to conveying systems), in accordance with the drawings and specifications (identified as CLIN 001 Base Bid). Note that the Option pricing identified in Line Items 2 through 12 are specific to those work scopes and are not to be included in the Base Price.

1 EA $_

1B Subtotal of Base Price for the entire Structural/Architectural work complete, in accordance with the drawings and specifications (identified as CLIN 001 Base Bid), but excluding work provided in another line item.

1 EA $_

1C Subtotal of Base Price for the entire Fire Protection work complete, in accordance with the drawings and specifications (identified as CLIN 001 Base Bid), but excluding work provided in another line item.

1 EA $_

1D Subtotal of Base Price for the entire Mechanical and Plumbing work complete, in accordance with the drawings and specifications (identified as CLIN 001 Base Bid), but excluding work provided in another line item.

1 EA $_

1E Subtotal of Base Price for the entire Electrical work complete (including communication and

1 EA $_

electronic safety and security system work), in accordance with the drawings and specifications (identified as CLIN 001 Base Bid), but excluding work provided in another line item.

1F Subtotal of Base Price for the entire Civil Earthwork, Utilities and Site Improvements including Demolition and Excavation work complete outside of building parameters, in accordance with the drawings and specifications (identified as CLIN 001 Base Bid), but excluding work provided in another line item.

1 EA $_

1G Subtotal of Base Price for the entire Building Removals/Demolition work complete, in accordance with the drawings and specifications (identified as CLIN 001 Base Bid), but excluding work provided in another line item.

1 EA $_

1H Subtotal of Base Price for the entire work associated with removal and abatement of existing industrial equipment and process related hazardous materials (identified as CLIN 002), but excluding work provided in another line item.

1 EA $_

1I Subtotal of Base Price for the entire work associated with the management/abatement and removal of hazardous materials (identified as CLIN 003), but excluding work provided in another line item.

1 EA $_

1J Subtotal of Base Price for the entire work associated with providing utility connections to Existing Trailer 1 and Existing Trailer 2 (identified as CLIN 004), but excluding work provided in another line item.

1 EA $_

1K Base Scope Unit Price for Providing 5 CY of removing in situ rock and providing 5 CY backfill in situ, but excluding

6 EA $_ $_

work provided in another line item, and in accordance with Notes Item “f” below.

1L Not applicable. 0 1M Base Scope Unit Price for

Providing 20 SF of Hazardous Material Abatement for Paint Containing Lead, Cadmium, and/or Chromium Removal from existing building surfaces, pricing to include all testing (expedited), hazardous plan development, required controls and implementation, performance of the work, hygienist, monitoring, handling and disposal in coordination with PNSY, complete in accordance with the drawings and specifications, but excluding work provided in another line item, and in accordance with Notes Item “f” below.

10 EA $_ $_

1N Base Scope Unit Price for Providing 10 LF of Hazardous (ACM) Pipe Insulation Glove Bag Removal and Disposal.

Pricing to include all testing (expedited), hazardous plan development, required controls and implementation, performance of the work, hygienist, monitoring, handling and disposal in coordination with PNSY, complete in accordance with the drawings and specifications, but excluding work provided in another line item, and in accordance with Notes Item “f” below.

5 EA $_ $_

1O Base Scope Unit Price Providing 1 glove bag Hazardous (ACM) Pipe Fittings Glove Bag Removal and Disposal. Pricing to include all testing (expedited), hazardous plan development, required controls and implementation, performance of the work, hygienist, monitoring, handling and disposal in coordination with PNSY, complete in accordance

10 EA $_ $_

with the drawings and specifications, but excluding work provided in another line item, and in accordance with Notes Item “f” below.

1P Base Scope Unit Price for Providing 10 LF of Hazardous (ACM) Joint Compound Abatement at plaster or drywall finishes to Government Provided Dumpsters. Pricing to include all testing (expedited), hazardous plan development, required controls and implementation, performance of the work including hygienist, monitoring, handling and coordination with PNSY for disposal, complete in accordance with the drawings and specifications, but excluding work provided in another line item, and in accordance with Notes Item “f” below.

5 EA $_ $_

1Q Base Scope Unit Price for Providing 10 LF of Hazardous (ACM) sealant Abatement.

Pricing to include all testing (expedited), hazardous plan development, required controls and implementation, performance of the work including hygienist, monitoring, handling and coordination with PNSY for disposal, complete in accordance with the drawings and specifications, but excluding work provided in another line item, and in accordance with Notes Item “f” below.

5 EA $_ $_

1R Base Scope Unit Price for Providing 10 SF of Hazardous (ACM) Material Abatement for floor tile and mastics removal.

Pricing to include all testing (expedited), hazardous plan development, required controls and implementation, performance of the work, hygienist, monitoring, handling and disposal in coordination with PNSY, complete in accordance with the drawings

5 EA $_ $_

and specifications, but excluding work provided in another line item, and in accordance with Notes Item “f” below.

1S Base Scope Unit Price for Providing 10 LF of Hazardous (ACM) Material Abatement for removal of debris from trenches. Pricing to include all testing (expedited), hazardous plan development, required controls and implementation, performance of the work, hygienist, monitoring, handling and disposal in coordination with PNSY, complete in accordance with the drawings and specifications, but excluding work provided in another line item, and in accordance with Notes Item “f” below.

5 EA $_ $_

1T Base Scope Unit Price for Providing 20 SF of Hazardous Material Abatement for Paint Containing Lead, Cadmium, and/or Chromium dust and debris Removal. Pricing to include all testing (expedited), hazardous plan development, required controls and implementation, performance of the work, hygienist, monitoring, handling and disposal in coordination with PNSY, complete in accordance with the drawings and specifications, but excluding work provided in another line item, and in accordance with Notes Item “f” below.

5 EA $_ $_

1U Base Scope Unit Price for Providing 1 PLM Analysis sampling and testing of suspected asbestos-containing materials using Polarized Light Microscopy (PLM) Analysis, but excluding work provided in another line item, and in accordance with Notes Item “f” below.

10 EA $_ $_

1V Base Scope Unit Price for Providing 1 TEM Analysis sampling and testing of suspected asbestos-containing

10 EA $_ $_

materials using transmission electron microscopy (TEM) Analysis, but excluding work provided in another line item, and in accordance with Notes Item “f” below.

1W Base Scope Unit Price for Providing 1 sampling and testing of suspected lead-, cadmium-, and/or chromium-containing paints using RCRA 8 Analysis, but excluding work provided in another line item, and in accordance with Notes Item “f” below.

15 EA $_ $_

1X Base Scope Unit Price for Providing 1 sampling and testing of suspected lead-, cadmium-, and/or chromium-containing dust using RCRA 8 Analysis, but excluding work provided in another line item, and in accordance with Notes Item “f” below.

10 EA $_ $_

1Y Base Scope Unit Price for Providing 1 sampling and testing of suspected PCB-containing materials, but excluding work provided in another line item, and in accordance with Notes Item “f” below.

10 EA $_ $_

1Z Not applicable. 0

1AA Not applicable. 0

1BB Not applicable. 0

1CC Not applicable. 0

1DD Not applicable. 0

1EE Not applicable. 0

1FF Base Scope Unit Price for Providing 10 LF of Masonry Crack Repairs, but excluding work provided in another line item, and in accordance with Notes Item “f” below.

5 EA $_ $_

1GG Not applicable. 0

2 Option Item No. 1: Furniture, Furnishings, and Equipment (FF&E). Price for providing work in connection with labor, Government Estimated Price:

HAR

Percent

(NTE

HAR

Subtotal

Total

FF&E

Estimated Price material, equipment, transportation, and supervision required for the FF&E, complete in accordance with the drawings and specifications (identified as Option Item 1), but excluding work provided in another line item.

[$233,601]

5%)

3 Option Item No. 2: Total Price for the entire work for Option Item 2, in accordance with the drawings and specifications, complete, but excluding work provided in another Priced line Item.

1 EA $_

3A Subtotal of Option Item 2 for the work associated with procurement and installation of NEW equipment (identified as Option Item 2), but excluding work provided in another line item.

Government Estimated Price:

[$1,698,248

HAR

Percent

(NTE

5%)

HAR

Subtotal

Total

FF&E

Estimated Price

3B Subtotal of Option Item 2 for the entire work associated with industrial equipment, including installation of government procured and provided equipment and associated utilities (identified as Option Item 2), but excluding work provided in another line item.

1 EA $_

4 Option Item No. 3: Price for providing radon fans and associated wiring/controls at third floor radon vents (identified as Option Item 3), but excluding work provided in another line item.

1 EA $_

5 Option Item No. 4: Price for providing Electronic Security Systems (ESS) complete, including Access Control System (ACS) (identified as Option Item 4), but excluding work provided in another line item.

Note that provision of supporting permanent infrastructure is included in item 1A. (“Supporting permanent infrastructure”

TOTAL PRICE FOR Line Items 1 - 12 $_

GENERAL BID NOTES

a. Award will be made on the total sum of Line Item 1.

b. The Government reserves the unilateral right to award Line Items 6 through 9 and 11 through 12 to the Contractor at the proposed price within 365 calendar days after the contract award. The Government reserves the unilateral right to award Line Item 10 to the Contractor at the proposed price within 90 calendar days after the contract award.

A firm fixed proposed price is required for Line Items 2 through 12. No provision is made for economic price includes electronic door strikes, door-hardware, cable pathways, junction boxes, pullstrings, power connections, exterior duct banks, manholes, and utility connections.).

6 Option Item No. 5: Price for providing work associated with additional existing wood window repairs (identified as Option Item 5), but excluding work provided in another line item.

1 EA $_

7 Option Item No. 6: Not applicable.

8 Option Item No. 7: Price for providing work associated with Additional Annex Repairs (identified as Option Item 7), but excluding work provided in another line item.

1 EA $_

9 Option Item No. 8: Price for providing work associated with Additional Finishes (identified as Option Item 8), but excluding work provided in another line item.

1 EA $_

10 Option Item No. 9: Price for providing work associated with Electrical Service Infrastructure (identified as Option Item 9), but excluding work provided in another line item.

1 EA $_

11 Option Item No. 10: Price for Resinous Flooring (identified as Option Item 10), but excluding work provided in another line item.

1 EA $_

12 Option Item No. 11: Price for Communication Service Routing (identified as Option Item 11), but excluding work provided in another line item.

adjustment. If Line Items 6 through 12 are exercised, the contract completion date remains 622 calendar days after the award of the contract. If Option 3 is exercised, 40 days will be added to the contract completion date.

c. Evaluation of Options (JUL 1990). Except when it is determined in accordance with FAR 17.206(b) Evaluation not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the price for the Option(s) to the total price for Line Item 0001. In accordance with FAR 52.217-5 Evaluation of Options, evaluation of options will not obligate the Government to exercise the Option(s).

d. The Government may reject an offer as non-responsive if it is materially unbalanced as to prices for the basic requirement and the option quantities. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.

e. If any of Line Items 2 through 12 are exercised, additional bonding and consent of surety is required.

Consequently, the Performance Bond must reflect 100 percent of the aggregate amount of all Items.

f. All Line Items which provide quantities are estimated quantities for the described scope of work by the respective Cost Line Items. These quantities are for scope not otherwise indicated in the plans, specifications or reports provided with the solicitation. The bidder is to utilize these quantities to establish unit prices and include this subtotal and quantity in the total bid price for the Base Scope. Contractor’s Quality Control Manager is to track actual quantities and locations, coordinated with and verified by the Contracting Officer’s Representative prior to execution of the work, for each line item as the work progresses and invoice for actual quantities when completed.

All quantities described in this Price Schedule shall be based upon in-place measurements.