About this file

This document is a Second Floor Plumbing Plan for Building 60 Repairs at Portsmouth Naval Shipyard in Kittery, Maine, prepared by the Naval Facilities Engineering Systems Command (NAVFAC) Mid-Atlantic. The drawing, dated with a final submission of October 1, 2025 and an amendment dated March 20, 2026, provides detailed mechanical and plumbing specifications for the second floor of the facility at a scale of 1/8" = 1'-0".

The plan depicts plumbing infrastructure across multiple rooms including a shop, open office, network area, electrical room, upholstery shop, multi-purpose room, office, and training spaces. Key specifications include compressed air (CA) piping runs at 84 and 108 inches above finished floor (AFF), with CA outlets at 48" AFF equipped with isolation ball valves, quick-connect fittings, and pressure regulation equipment. The plan requires coordination with the Contracting Officer regarding final shop equipment layout and quick-connect fitting selections. Additional requirements include an auxiliary drain pan for electric water heater EWH-3 with 3/4" drain piping to an air gap fitting, and a 3-inch vent terminal (3" VTR) positioned a minimum of 10 feet from the roof curb-mounted gravity inlet hood (GIV-1). The drawing incorporates references to related plumbing legends, abbreviations, and general notes from sheet P-001, and requires coordination with mechanical systems shown on sheet MH103.

View the file

Other files

File Type Posted
_B60_Continuation Sheet_Amendment 010_03-31-26.pdf PDF
74_SP101_R1_AMENDMENT 010.pdf PDF
96_AE105_R2_AMENDMENT 010.pdf PDF
114_AE401_R1_AMENDMENT 010.pdf PDF
120_AE441_R1_AMENDMENT 010.pdf PDF
178_P-401_R2_AMENDMENT 010.pdf PDF
179_P-402_R1_AMENDMENT 010.pdf PDF
01 91 19_R1_AMENDMENT 009.pdf PDF
116_AE411_R1_AMENDMENT 009.pdf PDF
238_FX400_R1_AMENDMENT 009.pdf PDF
256_EP502_R1_AMENDMENT 009.pdf PDF
260_EP601_R1_AMENDMENT 009.pdf PDF
Att.pdf PDF
Solicitation Amendment N6247026R00120008 SF 30.pdf PDF
Att. S) FFE Final Package-R1_AMENDMENT 008.pdf PDF
_ATTAC1.PDF PDF
02 82 00.00 22_R1_AMENDMENT 008.pdf PDF
31_CS101_R1_AMENDMENT 008.pdf PDF
47_SD102_R1_AMENDMENT 008.pdf PDF
65_SF105_R1_AMENDMENT 008.pdf PDF
68_SF502_R1_AMENDMENT 008.pdf PDF
152_G-004B_R1_AMENDMENT 008.pdf PDF
182_P-601_R1_AMENDMENT 008.pdf PDF
190_MD106_R1_AMENDMENT 008.pdf PDF
192_MD108_R1_AMENDMENT 008.pdf PDF
02 83 00.00 22_R1_AMENDMENT 008.pdf PDF
02 84 16.00 22_R1_AMENDMENT 008.pdf PDF
148_AE804_R1_AMENDMENT 008.pdf PDF
193_MD109_R1_AMENDMENT 008.pdf PDF
210_MP107_R1_AMENDMENT 008.pdf PDF
N6247026R00120007 SF 30.pdf PDF
Solicitation Amendment N6247026R00120006 SF 30.pdf PDF
Solicitation Amendment N6247026R00120004 SF 30.pdf PDF
Att. A) Construction and Design Experience Project Data Sheet.doc.docx DOCX document
Att. E) Small Business Participation Commitment Document (SBPCD) AMD 0004.docx DOCX document
Att. F) Individual Small Business Subcontracting Plan AMD 0004.docx DOCX document
Att. Z) B60 Continuation Sheet AMD 004.pdf PDF
Att. X) DBIDS ACCESS REQUEST FORM.docx DOCX document
Amendment N6247026R00120003.pdf PDF
Att. W) DBIDS 5512 FORM.pdf PDF
Solicitation Amendment N6247026R00120002.pdf PDF
Att. T) Price_schedule AMD 0002.pdf PDF
Solicitation Amendment N6247026R00120001.pdf PDF
Att. G) - PIEE Vendor Access Instructions.pdf PDF
Att. M) Drawings Volume 2a.pdf PDF
Att. S) FFE Package.pdf PDF
Att. U) Submittal Register.xlsx XLSX spreadsheet
Att. I) Specifications Volume 2.pdf PDF
Att. L) Drawings Volume 1b.pdf PDF
Att. P) 01 45 35a Statement_of_Special_Inspections.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AA

SHOP

OPEN

OFFICE

STAIR

P-403 B3

P-403

B1 ELEV

STAIR

003C

6" R UP

& DN

6" R UP & DN

1 1/2" CA DN W/ BVIV

1 1/2" CA

NETWORK

ELECTRICAL

UPHOLSTERY

MULTI-PURPOSE

OFFICE

TRAINING

m l i h e7 p e6 n k j g.1 g f.1 f

M3

5.6

4.2 e4 e3

3.5

2.8 n.9 n.5 k.9 k.5

2.5

2.4

2.1 e2 e1 k.1 e d c b a i.1

111111

1 1/2" CA 2

1 1/2" CA

1 1/2" CA

1 1/2" CA

1 1/2" CA

1/2" CW UP

1 1/2" CA DN W/ BVIV

ROOF BELOW

1/2" TP

UP & DN

1/2" CW DN

2" V UP

2" W&T

TO IW

2" W DN

TP

1/2" TP UP

TP

1 1/2"

2" W DN,

1 1/2" V RISE

3/4" CW DN

1 1/2" CA

DN W/ BVIV

1 1/2" CAP

1" CA DROP

1 1/2" CAP

1"

CAP

2"

3/4" CD DN

2" V UP & DN

2" V UP & DN

SPLIT SYSTEM

INDOOR UNIT

3" VTR6

EWH

DRAIN PAN W/ 3/4"

DRAIN DN TO IW

1/2" CW

(IN CABINET)

2" FCO

1 1/2" V DN

SATISFACTORY TO DATE

APPROVED

FOR COMMANDER NAVFAC

SEAL

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SHEET

NAVFAC DRAWING NO.

DESIGNER

DRAWN BY

CHECKED BY

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

DRAWFORM REVISION: 14 SEP 2023

DESIGN MANAGER

PROJECT MANAGER

FEAD/PM&E

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

T

IC

P O

R T

S M

O U

T H

N A

V A

L S

H

IP

Y A

R D

K

IT

T

E R

Y M

E

UNCLASSIFIED

UNCLASSIFIED

U N

C L

A S

S

IF

IE

D

ACTIVITY

1740579

T. CARLETON

L. LYONS

S. RUCINSKI

/2

/2

:3

:2

P

M

C U s e rs \s ri c h a rd s \D o c u m e n ts

\2

.2

B

L D

G

M

E C

H A

N

IC

A L

-V s w h it e G

Z D

.r v t

P-107

B

R

E P

A

IR

S

S E

C O

N D

F L O

O R

P L U

M B

IN

G

P L A

N

MSA

RNC

SRW

K

IT

T E

R Y

M

E P

O R

T S

M O

U T

H N

A V

A L S

H

IP

Y A

R D

R O

IC

C

-M E

P -1

SCALE: 1/8" = 1'-0"

B1

SECOND FLOOR PLUMBING PLAN - WEST

GENERAL NOTES KEYNOTES

1/8" = 1' - 0" 0 5' 10' 15' 30'

GRAPHIC SCALE

KEY PLAN

CHECK GRAPHIC SCALE BEFORE USING

MATCH LINE

PLAN

NORTH

1.

2.

SEE P-001 FOR PLUMBING LEGENDS, ABBREVIATIONS AND GENERAL NOTES.

CORRDINATE WITH CONTRACTING OFFICER THE LOCATIONS FOR COMPRESSED AIR BRANCH SERVICE PIPING OUTLETS, CONSISTENT WITH THE FINAL

SHOP EQUIPMENT LAYOUT.

PROVIDE CA OUTLET WITH DIRT LEG AND 1/2" PIPED OUTLET WITH ISOLATION BALL VALVE AND QUICK CONNECT FEMALE FITTING TO RECEIVE A 3/8" CA HOSE W/ CONNECTING MALE COMPONENT OF QUICK CONNECT FITTING. COORDINATE WITH CONTRACTING OFFICER TO ESTABLISH QUICK CONNECT FITTING

SELECTIONS. PLACE OUTLETS 48" AFF.

RUN HORIZONTAL CA PIPE AT 84" AFF.

RUN HORIZONTAL CA PIPE AT 108" AFF.

PROVIDE CA OUTLET 48" AFF WITH ISOLATION BALL VALVE, CA PRESSURE REGULATOR, PRESSURE GAUGES UPSTREAM AND DOWNSTREAM OF REGULATOR AND QUICK CONNECT HOSE FITTING. COORDINATE QUICK CONNECT FITTING SELECTION AND OUTLET LOCATIONS WITH CONTRACTING OFFICER TO ALIGN WITH

FINAL SHOP EQUIPMENT LAYOUT.

PROVIDE AUXILIARY DRAIN PAN FOR EWH-3. PIPE 3/4" DRAIN TO AIR GAP FITTING BELOW (SEE SHEET P-106).

3" VTR MUST BE A MINIMUM OF 10 FEET AWAY FROM EDGE DOAS-1 ROOF CURB MOUNTED GRAVITY INLET HOOD GIV-1. SEE SHEET MH103 FOR INLET HOOD

LOCATION REFERENCE.

(THIS SHEET ONLY)

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

F

IN

A L

S U

B M

IS

S

IO

N

/0

1/

R

S H

A

M E

N D

M E

N T

/2

0/

R

S H

Sheets
P-107 - SECOND FLOOR PLUMBING PLAN

File details come from the government source that posted it. Updated .