About this file

This is a mechanical plumbing plan drawing for the first floor mezzanine area of Building 60, sheet P-106, scaled at 1/8" = 1'-0". The plan depicts piping systems, equipment locations, and mechanical infrastructure for a shop facility with detailed annotations showing pipe sizes, elevations, and component specifications.

The drawing specifies requirements for compressed air branch service piping outlets, indirect waste drains with trap primer ports, and coordinate piping and equipment installation to maintain mandatory clearance zones around crane rails and bridge crane operational travel paths. Key coordination requirements include: determining final compressed air branch service piping outlet locations with the contracting officer based on final shop equipment layout; providing 1/2" compressed air branch service with isolation valves and hard pipe hose reel connections suspended from structural rail at 24'-0" AFF; running compressed air mains above structural rails using structural steel channels; providing isolation ball valves, pressure regulators, and pressure gauges downstream of regulators; coordinating wall penetrations with a historic sliding door to maintain functionality; ensuring the 3" vent through roof remains a minimum of 10 feet from the DOAS-1 roof curb mounted gravity inlet hood; providing air gap fittings for drains; and offsetting risers to avoid existing crane rails on the first and second floors. The plan includes references to plumbing legends and general notes on sheet P-001 and indicates hose reels are provided as part of equipment package option 2.

View the file

Other files

File Type Posted
AMENDMENT 0011 Attachments.zip ZIP file
Solicitation Amendment N6247026R00120011 SF 30.pdf PDF
Att. GG) Amendment 0011 Attachment Table of Contents.pdf PDF
222_M-703_R1_AMENDMENT 010.pdf PDF
96_AE105_R2_AMENDMENT 010.pdf PDF
183_P-701_R1_AMENDMENT 010.pdf PDF
123_AE444_R1_AMENDMENT 010.pdf PDF
Att. Y) PPI responses AMD 0010.pdf PDF
Att. FF) Amendment 0010 Attachment Table of Contents.pdf PDF
14 24 23_AMENDMENT 010.pdf PDF
120_AE441_R1_AMENDMENT 010.pdf PDF
179_P-402_R1_AMENDMENT 010.pdf PDF
171_P-103_R1_AMENDMENT 010.pdf PDF
01 11 00.00 22_AMENDMENT 010.pdf PDF
164_PD102_R1_AMENDMENT 010.pdf PDF
132_AE601_R1_AMENDMENT 010.pdf PDF
275_ET102_R1_AMENDMENT 010.pdf PDF
182_P-601_R2_AMENDMENT 010.pdf PDF
126_AE511_R1_AMENDMENT 010.pdf PDF
101_AE121_R1_AMENDMENT 010.pdf PDF
74_SP101_R1_AMENDMENT 010.pdf PDF
176_P-108_R1_AMENDMENT 010.pdf PDF
178_P-401_R2_AMENDMENT 010.pdf PDF
_B60_Continuation Sheet_Amendment 010_03-31-26.pdf PDF
173_P-105_R1_AMENDMENT 010.pdf PDF
119_AE440_R1_AMENDMENT 010.pdf PDF
138_AE640_R1_AMENDMENT 010.pdf PDF
180_P-403_R1_AMENDMENT 010.pdf PDF
172_P-104_R1_AMENDMENT 010.pdf PDF
186_MD102_R1_AMENDMENT 010.pdf PDF
169_P-101_R1_AMENDMENT 010.pdf PDF
177_P-109_R1_AMENDMENT 010.pdf PDF
114_AE401_R1_AMENDMENT 010.pdf PDF
677 attach Attic_AFPR.pdf PDF
161_Q-601_R2_AMENDMENT 010.pdf PDF
170_P-102_R1_AMENDMENT 010.pdf PDF
Solicitation Amendment N6247026R00120010 SF 30.pdf PDF
175_P-107_R1_AMENDMENT 010.pdf PDF
01 30 10.00 22_AMENDMENT 010.pdf PDF
Att. T) Price Schedule AMD 0010.pdf PDF
115_AE402_R1_AMENDMENT 010.pdf PDF
249_EP102_R1_AMENDMENT 009.pdf PDF
252_EP105_R1_AMENDMENT 009.pdf PDF
256_EP502_R1_AMENDMENT 009.pdf PDF
255_EP501_R1_AMENDMENT 009.pdf PDF
Att. EE) Amendment 0009 Attachment Table of Contents.pdf PDF
18_HM101_R1_AMENDMENT 009.pdf PDF
07 22 00_R1_AMENDMENT 009.pdf PDF
238_FX400_R1_AMENDMENT 009.pdf PDF
116_AE411_R1_AMENDMENT 009.pdf PDF
Show 40 more

Latest 50 of 157 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AA

BLIND

VENDING

M102

ELEV

BREAK

M101

STAIR

003B

CORRIDOR

M103

LOCKERS

M105

P-402 A3

P-402 A1

C A

CA

C A

2" V UP & DN

6" R DN

(BELOW CA)

6" R UP

1 1/2" CA

1 1/2" CA

6" R DN

6" R UP

2 1/2" CW

1" CW

1" CW DROP

2 2

3/4" CA DN 3/4" CA DN3/4" CA DN3/4" CA DN1 1/2" CA UP

1 1/4"

1/2" CA DN

3/4" CA DN

3/4" CA DN1 1/2" CA DN

1 1/2" CA LOOP

24-0"' AFF

m l i h e7 p e6 n k j g.1 g f.1 f

M3

5.6

4.2 e4 e3

3.5

2.8 n.9 n.5 k.9 k.5

2.5

2.4

2.1 e2 e1 k.1 e d c b a i.1

6" R UP

6" R DN

MECH

M106

CUSTODIAL

M104

3/4" CA DN

2 1/2" CW DN

1" CW DN

1/2" TP UP

OPEN TO BELOW

OPEN TO BELOW

1" CW DROP

1/2" CA DN

CA CA

3/4" CA DN 3/4" CA DN

2" W DN

2" CO

2" FCO

W

2"

1 1 1/2" W UP

3/4" CW UP

1/2" CW UP

1 1/2" CA

24-0"' AFF

1 1/2" CA

24-0"' AFF

3/4" CA DN

3/4" CA DN

DIRT LEG

ELECTRICAL

POWER CORD

REEL (TYP 9)

CA HOSE

REEL (TYP 9)

CA CA CA

1 1/2" CA UP

1 1/2" CA UP

SHOP

MECH MEZZ

M109

CORRIDOR

1 1/2" CA

24-0"' AFF

MECH MEZZ

M110

3/4"

CD

3/4" CD UP

3/4" CD DN

1" CD DN

CD

1"

2"

2 1/2"

1"

FD-2

B4 P-501

TPA

1/2" TP DN1/2" CW

1" CW

1 1/2" V DN 1 1/2" V TO 3" VTR 6

2" V UP

2" V DN

1/2" TP

1 1/2" V UP

2" W UP

2" 2 1/2"

3/4" CA DN

BLOWER

COIL UNIT

1 1/2" IW

SATISFACTORY TO DATE

APPROVED

FOR COMMANDER NAVFAC

SEAL

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SHEET

NAVFAC DRAWING NO.

DESIGNER

DRAWN BY

CHECKED BY

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

DRAWFORM REVISION: 14 SEP 2023

DESIGN MANAGER

PROJECT MANAGER

FEAD/PM&E

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

T

IC

P O

R T

S M

O U

T H

N A

V A

L S

H

IP

Y A

R D

K

IT

T

E R

Y M

E

UNCLASSIFIED

UNCLASSIFIED

U N

C L

A S

S

IF

IE

D

ACTIVITY

1740579

T. CARLETON

L. LYONS

S. RUCINSKI

/2

/2

:2

:2

P

M

C U s e rs \s ri c h a rd s \D o c u m e n ts

\2

.2

B

L D

G

M

E C

H A

N

IC

A L

-V s w h it e G

Z D

.r v t

P-106

B

R

E P

A

IR

S

F

IR

S T

F L O

O R

M E

Z Z

A N

IN

E

P L U

M B

IN

G

P L A

N

W E

S T

MSA

RNC

SRW

K

IT

T E

R Y

M

E P

O R

T S

M O

U T

H N

A V

A L S

H

IP

Y A

R D

R O

IC

C

-M E

P -1

SCALE: 1/8" = 1'-0"

B1

FIRST FLOOR MEZZANINE PLUMBING PLAN - WEST

GENERAL NOTES KEYNOTES

1/8" = 1' - 0" 0 5' 10' 15' 30'

GRAPHIC SCALE

KEY PLAN

CHECK GRAPHIC SCALE BEFORE USING

MATCH LINE

PLAN

NORTH

1.

2.

3.

SEE P-001 FOR PLUMBING LEGENDS, ABBREVIATIONS AND GENERAL NOTES.

CORRDINATE WITH CONTRACTING OFFICER THE LOCATIONS FOR COMPRESSED AIR BRANCH SERVICE PIPING OUTLETS, CONSISTENT WITH THE FINAL

SHOP EQUIPMENT LAYOUT.

COORDINATE THE INSTALLATION OF PIPING AND EQUIPMENT TO MAINTAIN MANDATORY CLEARANCE ZONES AROUND CRANE RAILS AND BRIDGE CRANE

OPERATIONAL TRAVEL PATH.

1-1/2" INDIRECT WASTE DRAIN WITH TRAP PRIMER PORT. PROVIDE AIR GAP FITTING FOR 3/4" DRAIN FROM WATER HEATER DRAIN PAN.

PROVIDE OFFSET IN RISER TO AVOID EXISTING CRANE RAILS ON THE FIRST AND SECOND FLOORS.

PROVIDE 1/2" COMPRESSED AIR BRANCH SERVICE WITH ISOLATION VALVE AND HARD PIPE HOSE REEL CONNECTION FITTINGS TO HOSE REEL. THE HOSE REELS ARE PROVIDED AS PART OF EQUIPMENT PACKAGE OPTION 2, AND SUSPENDED FROM STRUCTURAL RAILS LOCATED APPROXIMATELY 24'-0" AFF. RUN COMPRESSED AIR MAIN ABOVE THE STRUCTURAL RAIL ON STRUCTURAL STEEL CHANNEL ACROSS THE RAILS WITH PIPE CONNECTION FITTINGS. THE COMPRESSED AIR HOSE REELS WILL BE PAIRED WITH ELECTRICAL CORD REELS. COORDINATE REEL PAIRING ARRANGEMENTS AND LOCATIONS WITH THE CONTRACTING OFFICER TO ALIGN WITH THE SHOP'S FINAL EQUIPMENT LAYOUT. ALSO, COORDINATE PLACEMENT OF COMPRESSED AIR MAIN WITH ELECTRICAL SERVICE CONDUIT SERVING THE ELECTRIC CORD REELS. REFER TO XX### FOR

STRUCTURAL RAIL DETAILS.

FOR THE CA SERVICE LINE TO THIS CA REEL, PROVIDE ISOLATION BALL VALVE, PRESURE REGULATOR AND PRESURE GAUGE UPSTREAM AND

DOWNSTREAM OF REGULATOR.

COORDINATE WALL PENETRATION WITH HISTORIC SLIDING DOOR. THE DOOR MUST REMAIN FUNCTIONAL.

3" VTR MUST BE A MINIMUM OF 10 FEET AWAY FROM EDGE DOAS-1 ROOF CURB MOUNTED GRAVITY INLET HOOD GIV-1. SEE SHEET MH103 FOR

INLET HOOD LOCATION REFERENCE.

(THIS SHEET ONLY)

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

F

IN

A L

S U

B M

IS

S

IO

N

/0

1/

R

S H

A

M E

N D

M E

N T

/2

0/

R

S H

Sheets
M-703 - MECHANICAL CONTROL DIAGRAMS 3
MD102 - FIRST FLOOR MECHANICAL DUCTWORK REMOVALS PLAN - EAST
P-101 - UNDERSLAB PLUMBING PLAN - EAST
P-102 - UNDERSLAB PLUMBING PLAN - WEST
P-103 - FIRST FLOOR PLUMBING PLAN - EAST
P-104 - FIRST FLOOR PLUMBING PLAN - WEST
P-105 - FIRST FLOOR MEZZANINE PLUMBING PLAN - EAST
P-106 - FIRST FLOOR MEZZANINE PLUMBING PLAN - WEST
P-107 - SECOND FLOOR PLUMBING PLAN
P-108 - SECOND FLOOR MEZZANINE PLUMBING PLAN
P-109 - ATTIC PLUMBING PLAN
P-401 - ENLARGED PLUMBING PART PLANS 1
P-402 - ENLARGED PLUMBING PART PLANS 2
P-403 - ENLARGED PLUMBING PART PLANS 3
P-601 - PLUMBING SCHEDULES AND DETAIL
P-701 - PLUMBING RISER DIAGRAM
PD102 - FIRST FLOOR PLUMBING REMOVALS PLAN - EAST

File details come from the government source that posted it. Updated .