This is a mechanical plumbing plan drawing for the first floor mezzanine area of Building 60, sheet P-106, scaled at 1/8" = 1'-0". The plan depicts piping systems, equipment locations, and mechanical infrastructure for a shop facility with detailed annotations showing pipe sizes, elevations, and component specifications.

The drawing specifies requirements for compressed air branch service piping outlets, indirect waste drains with trap primer ports, and coordinate piping and equipment installation to maintain mandatory clearance zones around crane rails and bridge crane operational travel paths. Key coordination requirements include: determining final compressed air branch service piping outlet locations with the contracting officer based on final shop equipment layout; providing 1/2" compressed air branch service with isolation valves and hard pipe hose reel connections suspended from structural rail at 24'-0" AFF; running compressed air mains above structural rails using structural steel channels; providing isolation ball valves, pressure regulators, and pressure gauges downstream of regulators; coordinating wall penetrations with a historic sliding door to maintain functionality; ensuring the 3" vent through roof remains a minimum of 10 feet from the DOAS-1 roof curb mounted gravity inlet hood; providing air gap fittings for drains; and offsetting risers to avoid existing crane rails on the first and second floors. The plan includes references to plumbing legends and general notes on sheet P-001 and indicates hose reels are provided as part of equipment package option 2.

View the file

Other files

File Type Posted
Att. Y) PPI responses AMD 0010.pdf PDF
Att. FF) Amendment 0010 Attachment Table of Contents.pdf PDF
01 11 00.00 22_AMENDMENT 010.pdf PDF
14 24 23_AMENDMENT 010.pdf PDF
119_AE440_R1_AMENDMENT 010.pdf PDF
123_AE444_R1_AMENDMENT 010.pdf PDF
138_AE640_R1_AMENDMENT 010.pdf PDF
164_PD102_R1_AMENDMENT 010.pdf PDF
172_P-104_R1_AMENDMENT 010.pdf PDF
176_P-108_R1_AMENDMENT 010.pdf PDF
180_P-403_R1_AMENDMENT 010.pdf PDF
183_P-701_R1_AMENDMENT 010.pdf PDF
222_M-703_R1_AMENDMENT 010.pdf PDF
Att. T) Price Schedule AMD 0009.pdf PDF
Att. EE) Amendment 0009 Attachment Table of Contents.pdf PDF
01 91 00.15 22_R1_AMENDMENT 009.pdf PDF
129_AE530_R1_AMENDMENT 009.pdf PDF
246_ES101_R1_AMENDMENT 009.pdf PDF
249_EP102_R1_AMENDMENT 009.pdf PDF
252_EP105_R1_AMENDMENT 009.pdf PDF
255_EP501_R1_AMENDMENT 009.pdf PDF
257_EP503_R1_AMENDMENT 009.pdf PDF
261_EP602_R1_AMENDMENT 009.pdf PDF
266_EL102_R1_AMENDMENT 009.pdf PDF
273_EL702_R1_AMENDMENT 009.pdf PDF
Att.pdf PDF
02 83 00.00 22_R1_AMENDMENT 008.pdf PDF
02 84 16.00 22_R1_AMENDMENT 008.pdf PDF
148_AE804_R1_AMENDMENT 008.pdf PDF
193_MD109_R1_AMENDMENT 008.pdf PDF
210_MP107_R1_AMENDMENT 008.pdf PDF
Att. CC) Site Visit Log.pdf PDF
Att. F) Individual Small Business Subcontracting Plan AMD 0004.docx DOCX document
Att. Z) B60 Continuation Sheet AMD 004.pdf PDF
Att. R) B60 ISRL AMD 0004.XLSX XLSX spreadsheet
Att. Y) PPI responses AMD 0004.pdf PDF
Att. AA) B60 AMD 004 Drawings 012726.pdf PDF
Att. W) DBIDS 5512 FORM.pdf PDF
AMD 0002 PPI responses.pdf PDF
Att. I) Specifications Volume 2.pdf PDF
Att. L) Drawings Volume 1b.pdf PDF
Att. P) 01 45 35a Statement_of_Special_Inspections.xlsx XLSX spreadsheet
Att. A) - Construction Experience Project Data.docx DOCX document
Att. D) - Historical Small Business Utilization.docx DOCX document
Att. E) - Small Business Participation Commitment Document (SBPCD).docx DOCX document
Att. F) - Individual Small Business Subcontracting Plan.docx DOCX document
Att. H) Specifications Volume 1.pdf PDF
Att. J) Specifications Volume 3.pdf PDF
Att. K) Drawings Volume 1a.pdf PDF
Att. R) B60 - ISRL.XLSX XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AA

BLIND

VENDING

M102

ELEV

BREAK

M101

STAIR

003B

CORRIDOR

M103

LOCKERS

M105

P-402 A3

P-402 A1

C A

CA

C A

2" V UP & DN

6" R DN

(BELOW CA)

6" R UP

1 1/2" CA

1 1/2" CA

6" R DN

6" R UP

2 1/2" CW

1" CW

1" CW DROP

2 2

3/4" CA DN 3/4" CA DN3/4" CA DN3/4" CA DN1 1/2" CA UP

1 1/4"

1/2" CA DN

3/4" CA DN

3/4" CA DN1 1/2" CA DN

1 1/2" CA LOOP

24-0"' AFF

m l i h e7 p e6 n k j g.1 g f.1 f

M3

5.6

4.2 e4 e3

3.5

2.8 n.9 n.5 k.9 k.5

2.5

2.4

2.1 e2 e1 k.1 e d c b a i.1

6" R UP

6" R DN

MECH

M106

CUSTODIAL

M104

3/4" CA DN

2 1/2" CW DN

1" CW DN

1/2" TP UP

OPEN TO BELOW

OPEN TO BELOW

1" CW DROP

1/2" CA DN

CA CA

3/4" CA DN 3/4" CA DN

2" W DN

2" CO

2" FCO

W

2"

1 1 1/2" W UP

3/4" CW UP

1/2" CW UP

1 1/2" CA

24-0"' AFF

1 1/2" CA

24-0"' AFF

3/4" CA DN

3/4" CA DN

DIRT LEG

ELECTRICAL

POWER CORD

REEL (TYP 9)

CA HOSE

REEL (TYP 9)

CA CA CA

1 1/2" CA UP

1 1/2" CA UP

SHOP

MECH MEZZ

M109

CORRIDOR

1 1/2" CA

24-0"' AFF

MECH MEZZ

M110

3/4"

CD

3/4" CD UP

3/4" CD DN

1" CD DN

CD

1"

2"

2 1/2"

1"

FD-2

B4 P-501

TPA

1/2" TP DN1/2" CW

1" CW

1 1/2" V DN 1 1/2" V TO 3" VTR 6

2" V UP

2" V DN

1/2" TP

1 1/2" V UP

2" W UP

2" 2 1/2"

3/4" CA DN

BLOWER

COIL UNIT

1 1/2" IW

SATISFACTORY TO DATE

APPROVED

FOR COMMANDER NAVFAC

SEAL

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SHEET

NAVFAC DRAWING NO.

DESIGNER

DRAWN BY

CHECKED BY

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

DRAWFORM REVISION: 14 SEP 2023

DESIGN MANAGER

PROJECT MANAGER

FEAD/PM&E

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

T

IC

P O

R T

S M

O U

T H

N A

V A

L S

H

IP

Y A

R D

K

IT

T

E R

Y M

E

UNCLASSIFIED

UNCLASSIFIED

U N

C L

A S

S

IF

IE

D

ACTIVITY

1740579

T. CARLETON

L. LYONS

S. RUCINSKI

/2

/2

:2

:2

P

M

C U s e rs \s ri c h a rd s \D o c u m e n ts

\2

.2

B

L D

G

M

E C

H A

N

IC

A L

-V s w h it e G

Z D

.r v t

P-106

B

R

E P

A

IR

S

F

IR

S T

F L O

O R

M E

Z Z

A N

IN

E

P L U

M B

IN

G

P L A

N

W E

S T

MSA

RNC

SRW

K

IT

T E

R Y

M

E P

O R

T S

M O

U T

H N

A V

A L S

H

IP

Y A

R D

R O

IC

C

-M E

P -1

SCALE: 1/8" = 1'-0"

B1

FIRST FLOOR MEZZANINE PLUMBING PLAN - WEST

GENERAL NOTES KEYNOTES

1/8" = 1' - 0" 0 5' 10' 15' 30'

GRAPHIC SCALE

KEY PLAN

CHECK GRAPHIC SCALE BEFORE USING

MATCH LINE

PLAN

NORTH

1.

2.

3.

SEE P-001 FOR PLUMBING LEGENDS, ABBREVIATIONS AND GENERAL NOTES.

CORRDINATE WITH CONTRACTING OFFICER THE LOCATIONS FOR COMPRESSED AIR BRANCH SERVICE PIPING OUTLETS, CONSISTENT WITH THE FINAL

SHOP EQUIPMENT LAYOUT.

COORDINATE THE INSTALLATION OF PIPING AND EQUIPMENT TO MAINTAIN MANDATORY CLEARANCE ZONES AROUND CRANE RAILS AND BRIDGE CRANE

OPERATIONAL TRAVEL PATH.

1-1/2" INDIRECT WASTE DRAIN WITH TRAP PRIMER PORT. PROVIDE AIR GAP FITTING FOR 3/4" DRAIN FROM WATER HEATER DRAIN PAN.

PROVIDE OFFSET IN RISER TO AVOID EXISTING CRANE RAILS ON THE FIRST AND SECOND FLOORS.

PROVIDE 1/2" COMPRESSED AIR BRANCH SERVICE WITH ISOLATION VALVE AND HARD PIPE HOSE REEL CONNECTION FITTINGS TO HOSE REEL. THE HOSE REELS ARE PROVIDED AS PART OF EQUIPMENT PACKAGE OPTION 2, AND SUSPENDED FROM STRUCTURAL RAILS LOCATED APPROXIMATELY 24'-0" AFF. RUN COMPRESSED AIR MAIN ABOVE THE STRUCTURAL RAIL ON STRUCTURAL STEEL CHANNEL ACROSS THE RAILS WITH PIPE CONNECTION FITTINGS. THE COMPRESSED AIR HOSE REELS WILL BE PAIRED WITH ELECTRICAL CORD REELS. COORDINATE REEL PAIRING ARRANGEMENTS AND LOCATIONS WITH THE CONTRACTING OFFICER TO ALIGN WITH THE SHOP'S FINAL EQUIPMENT LAYOUT. ALSO, COORDINATE PLACEMENT OF COMPRESSED AIR MAIN WITH ELECTRICAL SERVICE CONDUIT SERVING THE ELECTRIC CORD REELS. REFER TO XX### FOR

STRUCTURAL RAIL DETAILS.

FOR THE CA SERVICE LINE TO THIS CA REEL, PROVIDE ISOLATION BALL VALVE, PRESURE REGULATOR AND PRESURE GAUGE UPSTREAM AND

DOWNSTREAM OF REGULATOR.

COORDINATE WALL PENETRATION WITH HISTORIC SLIDING DOOR. THE DOOR MUST REMAIN FUNCTIONAL.

3" VTR MUST BE A MINIMUM OF 10 FEET AWAY FROM EDGE DOAS-1 ROOF CURB MOUNTED GRAVITY INLET HOOD GIV-1. SEE SHEET MH103 FOR

INLET HOOD LOCATION REFERENCE.

(THIS SHEET ONLY)

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

F

IN

A L

S U

B M

IS

S

IO

N

/0

1/

R

S H

A

M E

N D

M E

N T

/2

0/

R

S H

Sheets
M-703 - MECHANICAL CONTROL DIAGRAMS 3
MD102 - FIRST FLOOR MECHANICAL DUCTWORK REMOVALS PLAN - EAST
P-101 - UNDERSLAB PLUMBING PLAN - EAST
P-102 - UNDERSLAB PLUMBING PLAN - WEST
P-103 - FIRST FLOOR PLUMBING PLAN - EAST
P-104 - FIRST FLOOR PLUMBING PLAN - WEST
P-105 - FIRST FLOOR MEZZANINE PLUMBING PLAN - EAST
P-106 - FIRST FLOOR MEZZANINE PLUMBING PLAN - WEST
P-107 - SECOND FLOOR PLUMBING PLAN
P-108 - SECOND FLOOR MEZZANINE PLUMBING PLAN
P-109 - ATTIC PLUMBING PLAN
P-401 - ENLARGED PLUMBING PART PLANS 1
P-402 - ENLARGED PLUMBING PART PLANS 2
P-403 - ENLARGED PLUMBING PART PLANS 3
P-601 - PLUMBING SCHEDULES AND DETAIL
P-701 - PLUMBING RISER DIAGRAM
PD102 - FIRST FLOOR PLUMBING REMOVALS PLAN - EAST

File details come from the government source that posted it. Updated .