174_P-106_R1_AMENDMENT 010.pdf
PDF 337 KB Posted
- Solicitation number
- N6247026R0012
About this file
This is a mechanical plumbing plan drawing for the first floor mezzanine area of Building 60, sheet P-106, scaled at 1/8" = 1'-0". The plan depicts piping systems, equipment locations, and mechanical infrastructure for a shop facility with detailed annotations showing pipe sizes, elevations, and component specifications.
The drawing specifies requirements for compressed air branch service piping outlets, indirect waste drains with trap primer ports, and coordinate piping and equipment installation to maintain mandatory clearance zones around crane rails and bridge crane operational travel paths. Key coordination requirements include: determining final compressed air branch service piping outlet locations with the contracting officer based on final shop equipment layout; providing 1/2" compressed air branch service with isolation valves and hard pipe hose reel connections suspended from structural rail at 24'-0" AFF; running compressed air mains above structural rails using structural steel channels; providing isolation ball valves, pressure regulators, and pressure gauges downstream of regulators; coordinating wall penetrations with a historic sliding door to maintain functionality; ensuring the 3" vent through roof remains a minimum of 10 feet from the DOAS-1 roof curb mounted gravity inlet hood; providing air gap fittings for drains; and offsetting risers to avoid existing crane rails on the first and second floors. The plan includes references to plumbing legends and general notes on sheet P-001 and indicates hose reels are provided as part of equipment package option 2.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AA
BLIND
VENDING
M102
ELEV
BREAK
M101
STAIR
003B
CORRIDOR
M103
LOCKERS
M105
P-402 A3
P-402 A1
C A
CA
C A
2" V UP & DN
6" R DN
(BELOW CA)
6" R UP
1 1/2" CA
1 1/2" CA
6" R DN
6" R UP
2 1/2" CW
1" CW
1" CW DROP
2 2
3/4" CA DN 3/4" CA DN3/4" CA DN3/4" CA DN1 1/2" CA UP
1 1/4"
1/2" CA DN
3/4" CA DN
3/4" CA DN1 1/2" CA DN
1 1/2" CA LOOP
24-0"' AFF
m l i h e7 p e6 n k j g.1 g f.1 f
M3
5.6
4.2 e4 e3
3.5
2.8 n.9 n.5 k.9 k.5
2.5
2.4
2.1 e2 e1 k.1 e d c b a i.1
6" R UP
6" R DN
MECH
M106
CUSTODIAL
M104
3/4" CA DN
2 1/2" CW DN
1" CW DN
1/2" TP UP
OPEN TO BELOW
OPEN TO BELOW
1" CW DROP
1/2" CA DN
CA CA
3/4" CA DN 3/4" CA DN
2" W DN
2" CO
2" FCO
W
2"
1 1 1/2" W UP
3/4" CW UP
1/2" CW UP
1 1/2" CA
24-0"' AFF
1 1/2" CA
24-0"' AFF
3/4" CA DN
3/4" CA DN
DIRT LEG
ELECTRICAL
POWER CORD
REEL (TYP 9)
CA HOSE
REEL (TYP 9)
CA CA CA
1 1/2" CA UP
1 1/2" CA UP
SHOP
MECH MEZZ
M109
CORRIDOR
1 1/2" CA
24-0"' AFF
MECH MEZZ
M110
3/4"
CD
3/4" CD UP
3/4" CD DN
1" CD DN
CD
1"
2"
2 1/2"
1"
FD-2
B4 P-501
TPA
1/2" TP DN1/2" CW
1" CW
1 1/2" V DN 1 1/2" V TO 3" VTR 6
2" V UP
2" V DN
1/2" TP
1 1/2" V UP
2" W UP
2" 2 1/2"
3/4" CA DN
BLOWER
COIL UNIT
1 1/2" IW
SATISFACTORY TO DATE
APPROVED
FOR COMMANDER NAVFAC
SEAL
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SHEET
NAVFAC DRAWING NO.
DESIGNER
DRAWN BY
CHECKED BY
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 14 SEP 2023
DESIGN MANAGER
PROJECT MANAGER
FEAD/PM&E
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
T
IC
P O
R T
S M
O U
T H
N A
V A
L S
H
IP
Y A
R D
K
IT
T
E R
Y M
E
UNCLASSIFIED
UNCLASSIFIED
U N
C L
A S
S
IF
IE
D
ACTIVITY
1740579
T. CARLETON
L. LYONS
S. RUCINSKI
/2
/2
:2
:2
P
M
C U s e rs \s ri c h a rd s \D o c u m e n ts
\2
.2
B
L D
G
M
E C
H A
N
IC
A L
-V s w h it e G
Z D
.r v t
P-106
B
R
E P
A
IR
S
F
IR
S T
F L O
O R
M E
Z Z
A N
IN
E
P L U
M B
IN
G
P L A
N
W E
S T
MSA
RNC
SRW
K
IT
T E
R Y
M
E P
O R
T S
M O
U T
H N
A V
A L S
H
IP
Y A
R D
R O
IC
C
-M E
P -1
SCALE: 1/8" = 1'-0"
B1
FIRST FLOOR MEZZANINE PLUMBING PLAN - WEST
GENERAL NOTES KEYNOTES
1/8" = 1' - 0" 0 5' 10' 15' 30'
GRAPHIC SCALE
KEY PLAN
CHECK GRAPHIC SCALE BEFORE USING
MATCH LINE
PLAN
NORTH
1.
2.
3.
SEE P-001 FOR PLUMBING LEGENDS, ABBREVIATIONS AND GENERAL NOTES.
CORRDINATE WITH CONTRACTING OFFICER THE LOCATIONS FOR COMPRESSED AIR BRANCH SERVICE PIPING OUTLETS, CONSISTENT WITH THE FINAL
SHOP EQUIPMENT LAYOUT.
COORDINATE THE INSTALLATION OF PIPING AND EQUIPMENT TO MAINTAIN MANDATORY CLEARANCE ZONES AROUND CRANE RAILS AND BRIDGE CRANE
OPERATIONAL TRAVEL PATH.
1-1/2" INDIRECT WASTE DRAIN WITH TRAP PRIMER PORT. PROVIDE AIR GAP FITTING FOR 3/4" DRAIN FROM WATER HEATER DRAIN PAN.
PROVIDE OFFSET IN RISER TO AVOID EXISTING CRANE RAILS ON THE FIRST AND SECOND FLOORS.
PROVIDE 1/2" COMPRESSED AIR BRANCH SERVICE WITH ISOLATION VALVE AND HARD PIPE HOSE REEL CONNECTION FITTINGS TO HOSE REEL. THE HOSE REELS ARE PROVIDED AS PART OF EQUIPMENT PACKAGE OPTION 2, AND SUSPENDED FROM STRUCTURAL RAILS LOCATED APPROXIMATELY 24'-0" AFF. RUN COMPRESSED AIR MAIN ABOVE THE STRUCTURAL RAIL ON STRUCTURAL STEEL CHANNEL ACROSS THE RAILS WITH PIPE CONNECTION FITTINGS. THE COMPRESSED AIR HOSE REELS WILL BE PAIRED WITH ELECTRICAL CORD REELS. COORDINATE REEL PAIRING ARRANGEMENTS AND LOCATIONS WITH THE CONTRACTING OFFICER TO ALIGN WITH THE SHOP'S FINAL EQUIPMENT LAYOUT. ALSO, COORDINATE PLACEMENT OF COMPRESSED AIR MAIN WITH ELECTRICAL SERVICE CONDUIT SERVING THE ELECTRIC CORD REELS. REFER TO XX### FOR
STRUCTURAL RAIL DETAILS.
FOR THE CA SERVICE LINE TO THIS CA REEL, PROVIDE ISOLATION BALL VALVE, PRESURE REGULATOR AND PRESURE GAUGE UPSTREAM AND
DOWNSTREAM OF REGULATOR.
COORDINATE WALL PENETRATION WITH HISTORIC SLIDING DOOR. THE DOOR MUST REMAIN FUNCTIONAL.
3" VTR MUST BE A MINIMUM OF 10 FEET AWAY FROM EDGE DOAS-1 ROOF CURB MOUNTED GRAVITY INLET HOOD GIV-1. SEE SHEET MH103 FOR
INLET HOOD LOCATION REFERENCE.
(THIS SHEET ONLY)
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
F
IN
A L
S U
B M
IS
S
IO
N
/0
1/
R
S H
A
M E
N D
M E
N T
/2
0/
R
S H
| Sheets |
| M-703 - MECHANICAL CONTROL DIAGRAMS 3 |
| MD102 - FIRST FLOOR MECHANICAL DUCTWORK REMOVALS PLAN - EAST |
| P-101 - UNDERSLAB PLUMBING PLAN - EAST |
| P-102 - UNDERSLAB PLUMBING PLAN - WEST |
| P-103 - FIRST FLOOR PLUMBING PLAN - EAST |
| P-104 - FIRST FLOOR PLUMBING PLAN - WEST |
| P-105 - FIRST FLOOR MEZZANINE PLUMBING PLAN - EAST |
| P-106 - FIRST FLOOR MEZZANINE PLUMBING PLAN - WEST |
| P-107 - SECOND FLOOR PLUMBING PLAN |
| P-108 - SECOND FLOOR MEZZANINE PLUMBING PLAN |
| P-109 - ATTIC PLUMBING PLAN |
| P-401 - ENLARGED PLUMBING PART PLANS 1 |
| P-402 - ENLARGED PLUMBING PART PLANS 2 |
| P-403 - ENLARGED PLUMBING PART PLANS 3 |
| P-601 - PLUMBING SCHEDULES AND DETAIL |
| P-701 - PLUMBING RISER DIAGRAM |
| PD102 - FIRST FLOOR PLUMBING REMOVALS PLAN - EAST |
File details come from the government source that posted it. Updated .