About this file

This document is a mechanical plumbing plan for the first floor mezzanine of Building 60. The plan provides enlarged detailed views at a scale of 1/4" = 1'-0" showing two separate systems: sanitary waste and vent piping (left side) and domestic water supply piping (right side). The drawings depict the routing and sizing of pipes throughout the mezzanine level, including connections to mechanical rooms (M106), custodial areas (M104), break rooms (M101), lockers (M105), and common corridors (M103). Pipe sizes range from 1/2" to 4" in diameter, with annotations indicating directional flow (UP, DN) and specific fixture connections. Key components shown include cold water (CW), hot water (HW), domestic hot water return (DHWR), sanitary lines (S), vent lines (V), trap primers (TP), and various shut-off valves and access points.

The plan includes a general notes section referencing plumbing legends, abbreviations, and requirements to maintain mandatory clearances and comply with operational trials. The document is marked as "UNCLASSIFIED" and was generated from Revit architectural software (22103.25_BLDG60_MECHANICAL-V23). The drawing designation is P-402, created for what appears to be a government facility based on the classification marking and technical specifications included. The keynotes section specifies that the water-heater auxiliary drain pan piping must run to FD-1.

View the file

Other files

File Type Posted
Att. Y) PPI responses AMD 0010.pdf PDF
Att. FF) Amendment 0010 Attachment Table of Contents.pdf PDF
01 11 00.00 22_AMENDMENT 010.pdf PDF
14 24 23_AMENDMENT 010.pdf PDF
119_AE440_R1_AMENDMENT 010.pdf PDF
123_AE444_R1_AMENDMENT 010.pdf PDF
138_AE640_R1_AMENDMENT 010.pdf PDF
164_PD102_R1_AMENDMENT 010.pdf PDF
172_P-104_R1_AMENDMENT 010.pdf PDF
174_P-106_R1_AMENDMENT 010.pdf PDF
176_P-108_R1_AMENDMENT 010.pdf PDF
180_P-403_R1_AMENDMENT 010.pdf PDF
183_P-701_R1_AMENDMENT 010.pdf PDF
222_M-703_R1_AMENDMENT 010.pdf PDF
Att. T) Price Schedule AMD 0009.pdf PDF
Att. EE) Amendment 0009 Attachment Table of Contents.pdf PDF
01 91 00.15 22_R1_AMENDMENT 009.pdf PDF
129_AE530_R1_AMENDMENT 009.pdf PDF
246_ES101_R1_AMENDMENT 009.pdf PDF
249_EP102_R1_AMENDMENT 009.pdf PDF
252_EP105_R1_AMENDMENT 009.pdf PDF
255_EP501_R1_AMENDMENT 009.pdf PDF
257_EP503_R1_AMENDMENT 009.pdf PDF
261_EP602_R1_AMENDMENT 009.pdf PDF
266_EL102_R1_AMENDMENT 009.pdf PDF
273_EL702_R1_AMENDMENT 009.pdf PDF
Att.pdf PDF
02 83 00.00 22_R1_AMENDMENT 008.pdf PDF
02 84 16.00 22_R1_AMENDMENT 008.pdf PDF
148_AE804_R1_AMENDMENT 008.pdf PDF
193_MD109_R1_AMENDMENT 008.pdf PDF
210_MP107_R1_AMENDMENT 008.pdf PDF
Att. F) Individual Small Business Subcontracting Plan AMD 0004.docx DOCX document
Att. Z) B60 Continuation Sheet AMD 004.pdf PDF
Att. R) B60 ISRL AMD 0004.XLSX XLSX spreadsheet
Att. Y) PPI responses AMD 0004.pdf PDF
Att. AA) B60 AMD 004 Drawings 012726.pdf PDF
Att. W) DBIDS 5512 FORM.pdf PDF
AMD 0002 PPI responses.pdf PDF
Att. I) Specifications Volume 2.pdf PDF
Att. L) Drawings Volume 1b.pdf PDF
Att. P) 01 45 35a Statement_of_Special_Inspections.xlsx XLSX spreadsheet
Att. A) - Construction Experience Project Data.docx DOCX document
Att. D) - Historical Small Business Utilization.docx DOCX document
Att. E) - Small Business Participation Commitment Document (SBPCD).docx DOCX document
Att. F) - Individual Small Business Subcontracting Plan.docx DOCX document
Att. H) Specifications Volume 1.pdf PDF
Att. J) Specifications Volume 3.pdf PDF
Att. K) Drawings Volume 1a.pdf PDF
Att. R) B60 - ISRL.XLSX XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CORRIDOR

M103

LOCKERS

M105

STAIR

003B

BREAK

M101

CUSTODIAL

M104 p e6 n k e4 e3

3.5

2.8 n.9 n.5 k.9 k.5

2.5 k.1

MECH

M106

ELEV

2" CW UP

3/4" HW UP

1/2" DHWR UP

MR-1

S-3

S-1

S-1

B1 P-501

EWH

1" CW UP

1/2" CW DN

1/2" HW DN

1/2" CW DN

1/2" HW DN

0.5

0.5

2"

3/4"3/4"3/4"

3/4" HW DN

3/4" DHWR DN

3/4"3/4"

3/4"3/4"

2"

COB

1/2"

1/2" TP DN

1/2" CW DN & UP

1/2" DHWR

3/4" HW

3/4" HW UP

TPA

B4 P-5010.5

LOCKERS

M105

CORRIDOR

M103

STAIR

003B

BREAK

M101 p e6 n k e4 e3

3.5

2.8 n.9 n.5 k.9 k.5

2.5 k.1

ELEV

4" S DROP & 2" V UP

WITHIN TRUSS SPACE (TYP 2)

4" S UP (TYP 2)

3" W DROP & 1 1/2" V UP

WITHIN TRUSS SPACE

3" W&T UP

TO FD-1

S A

N

4" S DN,

4" V UP

2" W UP

3" W&T

UP TO MR-1

1 1/2" V UP

3"

3" UP TO FCO

3"

4"

4" S UP

4" S TO 2" V UP

2" W UP

S-3

CUSTODIAL

M104

MECH

M106

2" W DN

MR-1

1 1/2" V DN

1 1/2" V DN

3" W DN

FD-1

1 1/2" W DN,

1 1/2" V RISE

1 1/2" V UP

(ABOVE

WINDOW)

S-1

S-1

1 1/2" W UP

2" W UP

2" UP TO FCO

2" W DN

2" W DROP,

1 1/2" V RISE

2" V UP

2" V DN

EWH

B1 P-501

W

2"

W

W

1 1/2" W DN,

1 1/2" V RISE

1 1/2"

1 1/2" V RISE TO

ABOVE WINDOW

4" S UP

TO FCO

4" S UP TO FCOW 3"

4" S WITHIN SOFFIT

BELOW TRUSS SPACE

2" UP TO FCO

SATISFACTORY TO DATE

APPROVED

FOR COMMANDER NAVFAC

SEAL

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SHEET

NAVFAC DRAWING NO.

DESIGNER

DRAWN BY

CHECKED BY

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

DRAWFORM REVISION: 14 SEP 2023

DESIGN MANAGER

PROJECT MANAGER

FEAD/PM&E

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

T

IC

P O

R T

S M

O U

T H

N A

V A

L S

H

IP

Y A

R D

K

IT

T

E R

Y M

E

UNCLASSIFIED

UNCLASSIFIED

U N

C L

A S

S

IF

IE

D

ACTIVITY

1740579

T. CARLETON

L. LYONS

S. RUCINSKI

/2

/2

:2

:3

P

M

C U s e rs \s ri c h a rd s \D o c u m e n ts

\2

.2

B

L D

G

M

E C

H A

N

IC

A L

-V s w h it e G

Z D

.r v t

P-402

B

R

E P

A

IR

S

E N

L A

R G

E D

P L U

M B

IN

G

P A

R T

P L A

N S

MSA

RNC

SRW

K

IT

T E

R Y

M

E P

O R

T S

M O

U T

H N

A V

A L S

H

IP

Y A

R D

R O

IC

C

-M E

P -4

1/4" = 1' - 0" 0 5' 10' 15'1'

GENERAL NOTES

GRAPHIC SCALE

KEY PLAN

KEYNOTES

1.

2.

SEE P-001 FOR PLUMBING LEGENDS, ABBREVIATIONS AND GENERAL

NOTES.

COORDINATE THE INSTALLATION OF PIPING AND EQUIPMENT TO

MAINTAIN MANDATORY CLEARANCE ZONES AROUND CRANE RAILS AND

BRIDGE CRANE OPERATIONAL TRAVEL PATH.

MATCH LINE

CHECK GRAPHIC SCALE BEFORE USING

PLAN

NORTH

1 RUN THE WATER HEATER AUXILIARY DRAIN PAN PIPING TO FD-1.

SCALE: 1/4" = 1'-0" (P-106)

A3

ENLARGED FIRST FLOOR MEZZANINE DOMESTIC WATER SUPPLY PART PLAN

SCALE: 1/4" = 1'-0" (P-106)

A1

ENLARGED FIRST FLOOR MEZZANINE SANITARY WASTE AND VENT PART PLAN

A1 P-402

A3 P-402

(THIS SHEET ONLY)

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

F

IN

A L

S U

B M

IS

S

IO

N

/0

1/

R

S H

A

M E

N D

M E

N T

/2

0/

R

S H

Sheets
M-703 - MECHANICAL CONTROL DIAGRAMS 3
MD102 - FIRST FLOOR MECHANICAL DUCTWORK REMOVALS PLAN - EAST
P-101 - UNDERSLAB PLUMBING PLAN - EAST
P-102 - UNDERSLAB PLUMBING PLAN - WEST
P-103 - FIRST FLOOR PLUMBING PLAN - EAST
P-104 - FIRST FLOOR PLUMBING PLAN - WEST
P-105 - FIRST FLOOR MEZZANINE PLUMBING PLAN - EAST
P-106 - FIRST FLOOR MEZZANINE PLUMBING PLAN - WEST
P-107 - SECOND FLOOR PLUMBING PLAN
P-108 - SECOND FLOOR MEZZANINE PLUMBING PLAN
P-109 - ATTIC PLUMBING PLAN
P-401 - ENLARGED PLUMBING PART PLANS 1
P-402 - ENLARGED PLUMBING PART PLANS 2
P-403 - ENLARGED PLUMBING PART PLANS 3
P-601 - PLUMBING SCHEDULES AND DETAIL
P-701 - PLUMBING RISER DIAGRAM
PD102 - FIRST FLOOR PLUMBING REMOVALS PLAN - EAST

File details come from the government source that posted it. Updated .