252_EP105_R1_AMENDMENT 009.pdf
PDF 714 KB Posted
- Solicitation number
- N6247026R0012
About this file
This document is a Second Floor Power Plan architectural drawing for Building 60, dated March 16, 2026. The drawing depicts electrical power distribution, receptacle locations, and related systems for the second floor of a facility, presented at a scale of 1/8" = 1'-0".
The plan includes detailed keynotes and general notes specifying electrical installations and coordination requirements across multiple building spaces. Key requirements include: installation of receptacles 4 inches above countertop backsplashes, provision of receptacles for refrigeration equipment with location coordination through the Contracting Officer, disconnects and power connections for an existing bridge crane with field verification of existing wires, combination poke-through devices, junction boxes for systems furniture connections, and twist-lock receptacles for data cabinet installation. Additional specifications address elevator lobby communications systems, trap primer power coordination with plumbing trades, surface-mounted junction boxes within attic spaces, steel slotted strut support for panelboards, simplex receptacles for equipment such as poly bag sealers and roll slitters, and power provisions for emergency eyewash/alarm systems. The drawing references multiple supplementary sheets (EP503, EP504, EP601-EP604, EP501, EP701, EP505, ET502, and ET501) for mechanical, plumbing, panelboard schedules, one-line diagrams, shop equipment schedules, and installation details. Coordination with mechanical, plumbing, and other construction trades is required throughout the installation.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REF.
J
J
J
JJ
J
J
J
J
F
G
HI
JK
LM
N
O
P
E6
G
PH2
PL10
PL9
T
G
GG
PL8
PL7
PH1
T
TPP2
SBB
F
G
T5
ELEV
STAIR
003C
MEN
WOMEN
SHOP
STAIR
PH2-7,9,11
SPD
PL7-26
PL7-27
2F
F
WPWP
OU
CUH
T4
G
PL7-32
PL7-10
PL7-16
G
TV7
PL7-18
TV
TV
C TL CTL
PL7-19,21,23,25
TPP2-1
TPP2-9
TPP2-5
NETWORK
ELECTRICAL
STAIR
004C
MULTI-PURPOSE
OFFICE
TRAINING
OPEN OFFICE
CORRIDOR
UPHOLSTERY
CORRIDOR
EXPRESSING
PL7-29
PL7-13
PL7-31,33,35,37
PL7-38
PL7-36
PL9-37
PL9-5
PL9-3
G
CUSTODIAL
202 TPP2-7
G
PL10-5
UH
2-1
UH
2-2
PL10-7
PL10-9
P/O
PL10-9
P/O
P/O
PL10-11
PL9-1
PL9-25
PL10-13
PL10-15
PL10-9
UH
2-3
PL10-17
PL10-19
PL10-21
PL9-27
G
PL9-29
C
C PL10-25
PL10-23
TPP1-13,15 MH1-13,15,17
PL6-37,39
WPWPWP
OU
CU
OU
PL9-31 PL9-33 PL9-35
P/O
UH
2-4
PL9-35
P/O
UH
2-5
FA1-7
PL10-27 PL10-29
PL10-31 PL8-5 PL8-7 PL8-9 PL8-11 PL8-13
P/O
PL8-13
P/O
UH
2-7
UH
2-9
PL8-17
PL8-15
PL8-31
PL8-33
PL8-35 PL8-37
P/O
PL8-37
P/O
UH
2-8
UH
2-6
PL7-28 CUH
PL7-2,4,6,8
PL7-30
PL7-34
PL7-17
NAC
TPP2-19TPP2-21
PL7-15
PL7-42
PL7-40
C C C C C
C
CCCC
PL10-33
PL10-35
PL10-37
PL10-39
PL8-39
PL8-41
PL8-2
PL8-4
PL8-6
PL8-8
TPP2-3
L C
P
PL9-20
PL10-41
PL7-43
F
IU
PL10-4
FSR
MVF
PL9-23
TPA
T15
PH2-2,4,6
PL6-33,35
12 12 12 12 12
12121212
TPP2-17
CCTL TL
TPP2-15
PL7-46
PL7-44
PL7-20
TPP2-2,4
EB
SPD
SPD
P/O
PL9-23
P/O
P/O
SATISFACTORY TO DATE
APPROVED
FOR COMMANDER NAVFAC
SEAL
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SHEET
NAVFAC DRAWING NO.
DESIGNER
DRAWN BY
CHECKED BY
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 14 SEP 2023
DESIGN MANAGER
PROJECT MANAGER
FEAD/PM&E
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
T
IC
P O
R T
S M
O U
T H
N A
V A
L S
H
IP
Y A
R D
K
IT
T
E R
Y M
E
UNCLASSIFIED
UNCLASSIFIED
U N
C L
A S
S
IF
IE
D
ACTIVITY
1740579
T. CARLETON
L. LYONS
S. RUCINSKI
/1
/2
:3
:1
A
M
C U s e rs \b d a ig le \D o c u m e n ts
\2
.2
B
L D
G
E
L E
C -V b d a ig le
Q U
X G
.r v t
EP105
B R
E P
A
IR
S
S E
C O
N D
F L O
O R
P O
W E
R P
L A
N
DCL
HRM
BPD
K
IT
T E
R Y
M
E P
O R
T S
M O
U T
H N
A V
A L S
H
IP
Y A
R D
R O
IC
C
-M E
E P
PLAN
NORTH
1/8" = 1' - 0" 0 5' 10' 15' 30'
GRAPHIC SCALE(S)
KEY PLANKEYNOTES
11. REFER TO SHEES EP503 AND EP504 FOR MECHANICAL, PLUMBING,
AND MISCELLANEOUS EQUIPMENT WIRING SCHEDULE.
2. REFER TO SHEETS EP601 - EP604 FOR PANELBOARD SCHEDULES.
3. REFER TO SHEET EP501 FOR ONE-LINE DIAGRAM AND SCHEDULES.
4. REFER TO SHEET EP701 FOR SHOP EQUIPMENT SCHEDULE.
INSTALL 4" ABOVE COUNTERTOP BACKSPLASH.
PROVIDE RECEPTACLE FOR REFRIGERATOR. COORDINATE EXACT
LOCATION WITH THE CONTRACTING OFFICER.
PROVIDE DISCONNECT AND POWER TO EXISTING BRIDGE CRANE.
SPLICE AND EXTEND EXISTING WIRES SERVING THE BRIDGE CRANE TO
THE DISCONNECT. FIELD VERIFY. EXISTING CRANE CONTROLS TO
REMAIN.
PROVIDE COMBINATION POKE THROUGH DEVICE. REFER TO POKE
THROUGH DETAIL A1/EP505.
COORDINATE EXACT RECEPTACLE LOCATION WITH THE PLUMBING
TRADE AND WATER HEATER, EWH-3.
PROVIDE JUNCTION BOX AND 8-WIRE SYSTEMS FURNITURE
CONNECTION. REFER TO DETAIL C3/EP504.
REFER TO DETAIL C1/ET502 FOR TV MONITOR AND AV INSTALLATION
DETAIL.
MATCH LINE
SCALE: 1/8" = 1'-0"
B1
SECOND FLOOR POWER PLAN
8 INSTALL THE TWIST LOCK RECEPTACLE SERVING THE DATA CABINET
WITHIN THE CABINET.
FOR ELEVATOR LOBBY 2 WAY COMMUNICATIONS SYSTEM. REFER TO
DETAIL A3/ET501.
INDOOR UNIT IS POWERED FROM THE OUTDOOR UNIT. COORDINATE
WITH THE MECHANICAL TRADE.
FOR TRAP PRIMER. COORDINATE WITH THE PLUMBING TRADE.
PROVIDE SURFACE MOUNTED BOX WITH ASSOCIATED CONDUIT
CONCEALED WITHIN THE ATTIC SPACE ABOVE. PAINT THE JUNCTION
BOX TO MATCH THE ADJACENT SURFACE.
PROVIDE STEEL SLOTTED STRUT SUPPORT FOR MOUNTING
PANELBOARDS. COORDINATE WITH THE MECHANICAL TRADE TO AVOID
PIPING THAT IS ROUTED VERTICALLY ALONG THE WALL.
PROVIDE SIMPLEX RECEPTACLE FOR POLY BAG SEALER.
GENERAL NOTES
15 INSTALL ROLL SLITTER TRANSFORMER. REFER TO SHEET EP701.
COORDINATE EXACT LOCATION IN THE FIELD.
PROVIDE POWER TO THE TRAP PRIMER. COORDINATE EXACT
LOCATION WITH THE PLUMBING TRADE.
PROVIDE POWER TO EMERGENCY EYEWASH ALARM SYSTEM.
COORDINATE WITH THE PLUMBING TRADE.
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
F
IN
A L
S U
B M
IS
S
IO
N
/0
1/
R
S H
A
M E
N D
M E
N T
/1
6/
R
S H
| Sheets |
| EP105 - SECOND FLOOR POWER PLAN |
File details come from the government source that posted it. Updated .