About this file

This document is a Second Floor Power Plan architectural drawing for Building 60, dated March 16, 2026. The drawing depicts electrical power distribution, receptacle locations, and related systems for the second floor of a facility, presented at a scale of 1/8" = 1'-0".

The plan includes detailed keynotes and general notes specifying electrical installations and coordination requirements across multiple building spaces. Key requirements include: installation of receptacles 4 inches above countertop backsplashes, provision of receptacles for refrigeration equipment with location coordination through the Contracting Officer, disconnects and power connections for an existing bridge crane with field verification of existing wires, combination poke-through devices, junction boxes for systems furniture connections, and twist-lock receptacles for data cabinet installation. Additional specifications address elevator lobby communications systems, trap primer power coordination with plumbing trades, surface-mounted junction boxes within attic spaces, steel slotted strut support for panelboards, simplex receptacles for equipment such as poly bag sealers and roll slitters, and power provisions for emergency eyewash/alarm systems. The drawing references multiple supplementary sheets (EP503, EP504, EP601-EP604, EP501, EP701, EP505, ET502, and ET501) for mechanical, plumbing, panelboard schedules, one-line diagrams, shop equipment schedules, and installation details. Coordination with mechanical, plumbing, and other construction trades is required throughout the installation.

View the file

Other files

File Type Posted
Att. Y) PPI responses AMD 0010.pdf PDF
Att. FF) Amendment 0010 Attachment Table of Contents.pdf PDF
01 11 00.00 22_AMENDMENT 010.pdf PDF
14 24 23_AMENDMENT 010.pdf PDF
119_AE440_R1_AMENDMENT 010.pdf PDF
123_AE444_R1_AMENDMENT 010.pdf PDF
138_AE640_R1_AMENDMENT 010.pdf PDF
164_PD102_R1_AMENDMENT 010.pdf PDF
172_P-104_R1_AMENDMENT 010.pdf PDF
174_P-106_R1_AMENDMENT 010.pdf PDF
176_P-108_R1_AMENDMENT 010.pdf PDF
180_P-403_R1_AMENDMENT 010.pdf PDF
183_P-701_R1_AMENDMENT 010.pdf PDF
222_M-703_R1_AMENDMENT 010.pdf PDF
Att. T) Price Schedule AMD 0009.pdf PDF
Att. EE) Amendment 0009 Attachment Table of Contents.pdf PDF
01 91 00.15 22_R1_AMENDMENT 009.pdf PDF
129_AE530_R1_AMENDMENT 009.pdf PDF
246_ES101_R1_AMENDMENT 009.pdf PDF
249_EP102_R1_AMENDMENT 009.pdf PDF
255_EP501_R1_AMENDMENT 009.pdf PDF
257_EP503_R1_AMENDMENT 009.pdf PDF
261_EP602_R1_AMENDMENT 009.pdf PDF
266_EL102_R1_AMENDMENT 009.pdf PDF
273_EL702_R1_AMENDMENT 009.pdf PDF
Att.pdf PDF
02 83 00.00 22_R1_AMENDMENT 008.pdf PDF
02 84 16.00 22_R1_AMENDMENT 008.pdf PDF
148_AE804_R1_AMENDMENT 008.pdf PDF
193_MD109_R1_AMENDMENT 008.pdf PDF
210_MP107_R1_AMENDMENT 008.pdf PDF
Solicitation Amendment N6247026R00120006 SF 30.pdf PDF
Att. F) Individual Small Business Subcontracting Plan AMD 0004.docx DOCX document
Att. Z) B60 Continuation Sheet AMD 004.pdf PDF
Solicitation Amendment N6247026R00120004 SF 30.pdf PDF
Att. A) Construction and Design Experience Project Data Sheet.doc.docx DOCX document
Att. E) Small Business Participation Commitment Document (SBPCD) AMD 0004.docx DOCX document
Att. W) DBIDS 5512 FORM.pdf PDF
Att. X) DBIDS ACCESS REQUEST FORM.docx DOCX document
Amendment N6247026R00120003.pdf PDF
Solicitation Amendment N6247026R00120002.pdf PDF
Att. T) Price_schedule AMD 0002.pdf PDF
Att. I) Specifications Volume 2.pdf PDF
Att. L) Drawings Volume 1b.pdf PDF
Att. P) 01 45 35a Statement_of_Special_Inspections.xlsx XLSX spreadsheet
Solicitation Amendment N6247026R00120001.pdf PDF
Att. G) - PIEE Vendor Access Instructions.pdf PDF
Att. M) Drawings Volume 2a.pdf PDF
Att. S) FFE Package.pdf PDF
Att. U) Submittal Register.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REF.

J

J

J

JJ

J

J

J

J

F

G

HI

JK

LM

N

O

P

E6

G

PH2

PL10

PL9

T

G

GG

PL8

PL7

PH1

T

TPP2

SBB

F

G

T5

ELEV

STAIR

003C

MEN

WOMEN

SHOP

STAIR

PH2-7,9,11

SPD

PL7-26

PL7-27

2F

F

WPWP

OU

CUH

T4

G

PL7-32

PL7-10

PL7-16

G

TV7

PL7-18

TV

TV

C TL CTL

PL7-19,21,23,25

TPP2-1

TPP2-9

TPP2-5

NETWORK

ELECTRICAL

STAIR

004C

MULTI-PURPOSE

OFFICE

TRAINING

OPEN OFFICE

CORRIDOR

UPHOLSTERY

CORRIDOR

EXPRESSING

PL7-29

PL7-13

PL7-31,33,35,37

PL7-38

PL7-36

PL9-37

PL9-5

PL9-3

G

CUSTODIAL

202 TPP2-7

G

PL10-5

UH

2-1

UH

2-2

PL10-7

PL10-9

P/O

PL10-9

P/O

P/O

PL10-11

PL9-1

PL9-25

PL10-13

PL10-15

PL10-9

UH

2-3

PL10-17

PL10-19

PL10-21

PL9-27

G

PL9-29

C

C PL10-25

PL10-23

TPP1-13,15 MH1-13,15,17

PL6-37,39

WPWPWP

OU

CU

OU

PL9-31 PL9-33 PL9-35

P/O

UH

2-4

PL9-35

P/O

UH

2-5

FA1-7

PL10-27 PL10-29

PL10-31 PL8-5 PL8-7 PL8-9 PL8-11 PL8-13

P/O

PL8-13

P/O

UH

2-7

UH

2-9

PL8-17

PL8-15

PL8-31

PL8-33

PL8-35 PL8-37

P/O

PL8-37

P/O

UH

2-8

UH

2-6

PL7-28 CUH

PL7-2,4,6,8

PL7-30

PL7-34

PL7-17

NAC

TPP2-19TPP2-21

PL7-15

PL7-42

PL7-40

C C C C C

C

CCCC

PL10-33

PL10-35

PL10-37

PL10-39

PL8-39

PL8-41

PL8-2

PL8-4

PL8-6

PL8-8

TPP2-3

L C

P

PL9-20

PL10-41

PL7-43

F

IU

PL10-4

FSR

MVF

PL9-23

TPA

T15

PH2-2,4,6

PL6-33,35

12 12 12 12 12

12121212

TPP2-17

CCTL TL

TPP2-15

PL7-46

PL7-44

PL7-20

TPP2-2,4

EB

SPD

SPD

P/O

PL9-23

P/O

P/O

SATISFACTORY TO DATE

APPROVED

FOR COMMANDER NAVFAC

SEAL

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SHEET

NAVFAC DRAWING NO.

DESIGNER

DRAWN BY

CHECKED BY

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

DRAWFORM REVISION: 14 SEP 2023

DESIGN MANAGER

PROJECT MANAGER

FEAD/PM&E

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

T

IC

P O

R T

S M

O U

T H

N A

V A

L S

H

IP

Y A

R D

K

IT

T

E R

Y M

E

UNCLASSIFIED

UNCLASSIFIED

U N

C L

A S

S

IF

IE

D

ACTIVITY

1740579

T. CARLETON

L. LYONS

S. RUCINSKI

/1

/2

:3

:1

A

M

C U s e rs \b d a ig le \D o c u m e n ts

\2

.2

B

L D

G

E

L E

C -V b d a ig le

Q U

X G

.r v t

EP105

B R

E P

A

IR

S

S E

C O

N D

F L O

O R

P O

W E

R P

L A

N

DCL

HRM

BPD

K

IT

T E

R Y

M

E P

O R

T S

M O

U T

H N

A V

A L S

H

IP

Y A

R D

R O

IC

C

-M E

E P

PLAN

NORTH

1/8" = 1' - 0" 0 5' 10' 15' 30'

GRAPHIC SCALE(S)

KEY PLANKEYNOTES

11. REFER TO SHEES EP503 AND EP504 FOR MECHANICAL, PLUMBING,

AND MISCELLANEOUS EQUIPMENT WIRING SCHEDULE.

2. REFER TO SHEETS EP601 - EP604 FOR PANELBOARD SCHEDULES.

3. REFER TO SHEET EP501 FOR ONE-LINE DIAGRAM AND SCHEDULES.

4. REFER TO SHEET EP701 FOR SHOP EQUIPMENT SCHEDULE.

INSTALL 4" ABOVE COUNTERTOP BACKSPLASH.

PROVIDE RECEPTACLE FOR REFRIGERATOR. COORDINATE EXACT

LOCATION WITH THE CONTRACTING OFFICER.

PROVIDE DISCONNECT AND POWER TO EXISTING BRIDGE CRANE.

SPLICE AND EXTEND EXISTING WIRES SERVING THE BRIDGE CRANE TO

THE DISCONNECT. FIELD VERIFY. EXISTING CRANE CONTROLS TO

REMAIN.

PROVIDE COMBINATION POKE THROUGH DEVICE. REFER TO POKE

THROUGH DETAIL A1/EP505.

COORDINATE EXACT RECEPTACLE LOCATION WITH THE PLUMBING

TRADE AND WATER HEATER, EWH-3.

PROVIDE JUNCTION BOX AND 8-WIRE SYSTEMS FURNITURE

CONNECTION. REFER TO DETAIL C3/EP504.

REFER TO DETAIL C1/ET502 FOR TV MONITOR AND AV INSTALLATION

DETAIL.

MATCH LINE

SCALE: 1/8" = 1'-0"

B1

SECOND FLOOR POWER PLAN

8 INSTALL THE TWIST LOCK RECEPTACLE SERVING THE DATA CABINET

WITHIN THE CABINET.

FOR ELEVATOR LOBBY 2 WAY COMMUNICATIONS SYSTEM. REFER TO

DETAIL A3/ET501.

INDOOR UNIT IS POWERED FROM THE OUTDOOR UNIT. COORDINATE

WITH THE MECHANICAL TRADE.

FOR TRAP PRIMER. COORDINATE WITH THE PLUMBING TRADE.

PROVIDE SURFACE MOUNTED BOX WITH ASSOCIATED CONDUIT

CONCEALED WITHIN THE ATTIC SPACE ABOVE. PAINT THE JUNCTION

BOX TO MATCH THE ADJACENT SURFACE.

PROVIDE STEEL SLOTTED STRUT SUPPORT FOR MOUNTING

PANELBOARDS. COORDINATE WITH THE MECHANICAL TRADE TO AVOID

PIPING THAT IS ROUTED VERTICALLY ALONG THE WALL.

PROVIDE SIMPLEX RECEPTACLE FOR POLY BAG SEALER.

GENERAL NOTES

15 INSTALL ROLL SLITTER TRANSFORMER. REFER TO SHEET EP701.

COORDINATE EXACT LOCATION IN THE FIELD.

PROVIDE POWER TO THE TRAP PRIMER. COORDINATE EXACT

LOCATION WITH THE PLUMBING TRADE.

PROVIDE POWER TO EMERGENCY EYEWASH ALARM SYSTEM.

COORDINATE WITH THE PLUMBING TRADE.

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

F

IN

A L

S U

B M

IS

S

IO

N

/0

1/

R

S H

A

M E

N D

M E

N T

/1

6/

R

S H

Sheets
EP105 - SECOND FLOOR POWER PLAN

File details come from the government source that posted it. Updated .