About this file

This is an electrical power plan document for the first floor of Building 60, specifically the west section. The drawing shows a detailed layout of electrical distribution, power outlets, switches, and associated systems for various rooms and functional areas including offices, shops, corridors, storage, custodial areas, and inspection rooms.

The document specifies electrical requirements for multiple systems and equipment installations, including elevator power and controls (480V, 3-pole fusible shunt trip switch with 120V control circuit), fire alarm and mass notification control panel power, elevator lobby 2-way communications, overhead door power, electric vehicle chargers, compressed air cord reel receptacles, fire pump feeder routing through concrete-encased ductbank, sump pump controls, emergency eyewash systems, forklift charger disconnects, and various receptacle placements. Key coordination requirements include working with the contracting officer on exact installation heights and locations for critical systems, coordinating with architectural trades on overhead door power, and integrating temporary equipment (100A disconnect and 37.5KVA transformer) from an existing trailer into the new building distribution system upon construction completion. The document references multiple related sheets for panelboard schedules, one-line diagrams, equipment wiring schedules, grounding details, and mechanical/plumbing coordination requirements. Specific installation parameters include routing conduit at least 15 feet from heat sealers in Shop 111 and installing electrical cord reel receptacles 3 feet above pit floor.

View the file

Other files

File Type Posted
Att. Y) PPI responses AMD 0010.pdf PDF
Att. FF) Amendment 0010 Attachment Table of Contents.pdf PDF
01 11 00.00 22_AMENDMENT 010.pdf PDF
14 24 23_AMENDMENT 010.pdf PDF
119_AE440_R1_AMENDMENT 010.pdf PDF
123_AE444_R1_AMENDMENT 010.pdf PDF
138_AE640_R1_AMENDMENT 010.pdf PDF
164_PD102_R1_AMENDMENT 010.pdf PDF
172_P-104_R1_AMENDMENT 010.pdf PDF
174_P-106_R1_AMENDMENT 010.pdf PDF
176_P-108_R1_AMENDMENT 010.pdf PDF
180_P-403_R1_AMENDMENT 010.pdf PDF
183_P-701_R1_AMENDMENT 010.pdf PDF
222_M-703_R1_AMENDMENT 010.pdf PDF
Att. T) Price Schedule AMD 0009.pdf PDF
Att. EE) Amendment 0009 Attachment Table of Contents.pdf PDF
01 91 00.15 22_R1_AMENDMENT 009.pdf PDF
129_AE530_R1_AMENDMENT 009.pdf PDF
246_ES101_R1_AMENDMENT 009.pdf PDF
252_EP105_R1_AMENDMENT 009.pdf PDF
255_EP501_R1_AMENDMENT 009.pdf PDF
257_EP503_R1_AMENDMENT 009.pdf PDF
261_EP602_R1_AMENDMENT 009.pdf PDF
266_EL102_R1_AMENDMENT 009.pdf PDF
273_EL702_R1_AMENDMENT 009.pdf PDF
Att.pdf PDF
02 83 00.00 22_R1_AMENDMENT 008.pdf PDF
02 84 16.00 22_R1_AMENDMENT 008.pdf PDF
148_AE804_R1_AMENDMENT 008.pdf PDF
193_MD109_R1_AMENDMENT 008.pdf PDF
210_MP107_R1_AMENDMENT 008.pdf PDF
Att. CC) Site Visit Log.pdf PDF
Att. F) Individual Small Business Subcontracting Plan AMD 0004.docx DOCX document
Att. Z) B60 Continuation Sheet AMD 004.pdf PDF
Att. R) B60 ISRL AMD 0004.XLSX XLSX spreadsheet
Att. Y) PPI responses AMD 0004.pdf PDF
Att. AA) B60 AMD 004 Drawings 012726.pdf PDF
Att. W) DBIDS 5512 FORM.pdf PDF
AMD 0002 PPI responses.pdf PDF
Att. I) Specifications Volume 2.pdf PDF
Att. L) Drawings Volume 1b.pdf PDF
Att. P) 01 45 35a Statement_of_Special_Inspections.xlsx XLSX spreadsheet
Att. A) - Construction Experience Project Data.docx DOCX document
Att. D) - Historical Small Business Utilization.docx DOCX document
Att. E) - Small Business Participation Commitment Document (SBPCD).docx DOCX document
Att. F) - Individual Small Business Subcontracting Plan.docx DOCX document
Att. H) Specifications Volume 1.pdf PDF
Att. J) Specifications Volume 3.pdf PDF
Att. K) Drawings Volume 1a.pdf PDF
Att. R) B60 - ISRL.XLSX XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

J

J

J

J

J

J

J

J

F

G

HI

JK

LM

N

O

P

E6

E7

G

G

G

G

PL5

PL6

WP

STS

PL1 PL2

PBB

TPP1

MDP

MSBT

PL3

PL4

T1

PL6-11

MSB-1,3,5

PL5-7,9

PL5-1,3,5

PL5-11

PL5-19,21,23

PL5-25,27

FFF

CFY MWB CFX EQG

PL1-7,9,11 PL1-2,4,6

PL2-13

PL2-1,3,5

PL2-15

PL2-7,9,11

SPD PL3-7,9,11

PL3-15 PL3-1,3,5

---PL4-7,9,11---PL4-1,3,5

PL3-17,19

PL4-31,33,35

PL3-21,23

WOMEN

STAIR

003A

CORRIDOR

OFFICE

SHOP

ELEV

STAIR

002A

VEST

SHOP

ELECTRICAL

MECH

STORAGE

PL5-29

PL4-37

IU

EUH

1-1

MDP-2,4

MDP-6

PRODUCTION LIGHTING

CONTROL PANEL

FA1-4

FA1-2

PL1-1,3,5

TPP1-11

NETWORK

TPP1-9

TPP1-7

TLTLC C

TPP1-23

TPP1-21

PL3-35

PL3-2

PL3-4

PL3-6

PL3-8 PL3-10 PL3-12 PL3-14 PL3-16

PL6-5

PL6-19

PL5-13

INSPECTION

PL6-1

IU

16 6

PL6-21

LCP

PL5-31

PL5-17

FA1-7

NAC

FAMN

UH

1-7

PL6-23

PL1-25

UH

1-9

PL4-17

UH

1-8

P/O

PL4-37

P/O

PL4-39 G

PL4-41

TPP1-5

PL1-15

VFD

VFD

D D

C

MSB-2,4,6

MSB-8,10,12

PL2-19

PL2-21

PL2-23

UH

1-10

MSB-14,16,18 MSB-20,22,24

CR

1A

CR

1B

PL2-25

PL2-2,4,6

LCP

PL3-13

MDP-10

PL6-7

PL5-35

CUH

PL4-25,27,29

SBB

P

1A

P

1B

IU

TF

FA1

PL4-13

WP WP

PL6-3

PL6-15

WP

WP

WP

WP

PL5-10

PL6-9

G

PL1-13

PL6-13

TPA

CUSTODIAL

PL5-15

PL5-6 PL5-8

MH1-2,4,6

PL4-19

TPA

EWH

2PL4-21

PL4-15

TPP1-3

TPP1-1

TPP1-17

C C

TL TL

TPP1-19

TPA

14 14 14 14

TPP1-2,4 EB

PL3-25

SPD

PL2-10

SPD

P/O

PL6-12 SPD

PL1-27

CORRIDOR

MDP-8

SPD

PL6-14

STAIR

004A

44444

P/O

PL4-19

P/O

G

G

SATISFACTORY TO DATE

APPROVED

FOR COMMANDER NAVFAC

SEAL

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SHEET

NAVFAC DRAWING NO.

DESIGNER

DRAWN BY

CHECKED BY

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

DRAWFORM REVISION: 14 SEP 2023

DESIGN MANAGER

PROJECT MANAGER

FEAD/PM&E

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

T

IC

P O

R T

S M

O U

T H

N A

V A

L S

H

IP

Y A

R D

K

IT

T

E R

Y M

E

UNCLASSIFIED

UNCLASSIFIED

U N

C L

A S

S

IF

IE

D

ACTIVITY

1740579

T. CARLETON

L. LYONS

S. RUCINSKI

/1

/2

:4

:0

A

M

C U s e rs \b d a ig le \D o c u m e n ts

\2

.2

B

L D

G

E

L E

C -V b d a ig le

Q U

X G

.r v t

EP102

B R

E P

A

IR

S

F

IR

S T

F L O

O R

P O

W E

R P

A R

T P

L A

N

W E

S T

DCL

HRM

BPD

K

IT

T E

R Y

M

E P

O R

T S

M O

U T

H N

A V

A L S

H

IP

Y A

R D

R O

IC

C

-M E

E P

SCALE: 1/8" = 1'-0"

B1

FIRST FLOOR POWER PART PLAN - WEST

PLAN

NORTH

1/8" = 1' - 0" 0 5' 10' 15' 30'

GRAPHIC SCALE(S)

KEY PLANGENERAL NOTES

EXISTING KEYNOTES

1. REFER TO SHEETS EP503 AND EP504 FOR MECHANICAL, PLUMBING,

AND MISCELLANEOUS EQUIPMENT WIRING SCHEDULE.

2. REFER TO SHEETS EP601 - EP604 FOR PANELBOARD SCHEDULES.

3. REFER TO SHEET EP501 FOR ONE-LINE DIAGRAM AND SCHEDULES.

4. REFER TO SHEET EP701 FOR SHOP EQUIPMENT SCHEDULE.

EXISTING ELECTRIC VEHICLE CHARGERS.

MATCH LINE

KEYNOTES

1 INSTALL 4" ABOVE COUNTERTOP BACKSPLASH.

INSTALL THE TWIST LOCK RECEPTACLE SERVING THE DATA CABINET

WITHIN THE CABINET.

PROVIDE COPPER GROUND BAR. REFER TO DETAIL A4/EP502.

PROVIDE COPPER GROUND BAR, AND GROUND WIRE BACK TO THE

SERVICE GROUND. COORDINATE EXACT INSTALLATION HEIGHT AND

LOCATION IN THE FIELD WITH THE CONTRACTING OFFICER. REFER TO

GROUNDING DETAIL A4/EP502.

PROVIDE FOR ELEVATOR CAB LIGHTING AND RECEPTACLES.

PROVIDE 480V, 3 POLE, FUSIBLE, SHUNT TRIP SWITCH FOR ELEVATOR.

PROVIDE 120V CONTROL CIRCUIT. REFER TO ONE-LINE DIAGRAM ON

SHEET EP501.

PROVIDE POWER TO THE OVERHEAD DOOR. COORDINATE WITH THE

ARCHITECTURAL TRADE.

PROVIDE POWER TO THE FIRE ALARM, MASS NOTIFICATION CONTROL

PANEL AND ASSOCIATED TRANSMITTER. COORDINATE EXACT

LOCATION WITH THE CONTRACTING OFFICER.

FOR ELEVATOR LOBBY 2 WAY COMMUNICATIONS SYSTEM. REFER TO

DETAIL A3/ET501.

ROUTE CONDUIT THAT IS NOT SERVING THE HEAT SEALERS OR ADJACENT

RECEPTACLES A MINIMUM OF 15 FEET AWAY FROM THE HEAT SEALERS IN

SHOP 111.

UTILIZE THE EXISTING TEMPORARY EQUIPMENT (100A DISCONNECT AND

37.5KVA TRANSFORMER) AND CONNECT EXISTING TRAILER 1 TEMPORARY

POWER TO THE NEW BUILDING 60 DISTRIBUTION SYSTEM AT THE

COMPLETION OF CONSTRUCTION. REFER TO SHEET EP501. COORDINATE

WITH THE CONTRACTING OFFICER.

EXTEND 3 EXISTING CONDUITS AND ASSOCIATED CONDUCTORS BETWEEN

EXTERIOR WALL AND SWITCHBOARD. SEAL CONDUIT INTERIORS.

INSTALL 3' ABOVE PIT FLOOR.

PROVIDE RECEPTACLE, MOUNTED TO STEEL SLOTTED STRUT SUPPORT,

FOR ELECTRICAL CORD REEL. INSTALL RECEPTACLE AND CORD REEL

ADJACENT TO COMPRESSED AIR CORD REEL. REFER TO DETAIL C5/SF506

FOR MOUNTING. COORDINATE EXACT LOCATION WITH THE CONTRACTING

OFFICER. ADJUST THE ELECTRICAL CORD REEL STOP SO THE CORD IS 7'

AFF. CONFIRM FINAL STOP HEIGHT WITH THE CONTRACTING OFFICER.

FIRE PUMP FEEDER SECTION OF THE SWITCHBOARD. REFER TO SHEET

EP501. REFER TO SHEET CS101 FOR EXISTING, INCOMING, DUCTBANK.

PROVIDE FIRE PUMP FEEDER THAT EXITS THE BOTTOM OF THE

SWITCHBOARD. ROUTE WITHIN CONCRETE ENCASED DUCTBANK. REFER TO

SHEETS SB101 AND SB102.

INDOOR UNIT IS POWERED FROM THE OUTDOOR UNIT. COORDINATE WITH

THE MECHANICAL TRADE.

FOR ELEVATOR SUMP PUMP, SP-1. MOUNT 5' ABOVE ELEVATOR PIT FLOOR.

PROVIDE LED LIGHT TO VERIFY CIRCUIT IS ENERGIZED. COORDINATE WITH

THE PLUMBING TRADE.

FOR CNC COMPUTER. COORDINATE EXACT LOCATION WITH THE

CONTRACTING OFFICER.

FOR SUMP PUMP CONTROL SYSTEM. COORDINATE WITH THE PLUMBING

TRADE.

PROVIDE POWER TO THE TRAP PRIMER. COORDINATE EXACT LOCATION

WITH THE PLUMBING TRADE.

FORK TRUCK CHARGER DISCONNECT. COORDINATE EXACT LOCATION WITH

THE CONTRACTING OFFICER.

PROVIDE SIMPLEX RECEPTACLE FOR POLYBAG SEALER.

FOR ELEVATOR SHUNT TRIP CONTROL POWER.

PROVIDE POWER TO EMERGENCY EYEWASH ALARM SYSTEM. COORDINATE

WITH THE PLUMBING TRADE.

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

F

IN

A L

S U

B M

IS

S

IO

N

/0

1/

R

S H

A

M E

N D

M E

N T

/1

6/

R

S H

11 11

15 24

11111111

11 11 11

Sheets
EP102 - FIRST FLOOR POWER PART PLAN - WEST

File details come from the government source that posted it. Updated .