This is an electrical power plan document for the first floor of Building 60, specifically the west section. The drawing shows a detailed layout of electrical distribution, power outlets, switches, and associated systems for various rooms and functional areas including offices, shops, corridors, storage, custodial areas, and inspection rooms.
The document specifies electrical requirements for multiple systems and equipment installations, including elevator power and controls (480V, 3-pole fusible shunt trip switch with 120V control circuit), fire alarm and mass notification control panel power, elevator lobby 2-way communications, overhead door power, electric vehicle chargers, compressed air cord reel receptacles, fire pump feeder routing through concrete-encased ductbank, sump pump controls, emergency eyewash systems, forklift charger disconnects, and various receptacle placements. Key coordination requirements include working with the contracting officer on exact installation heights and locations for critical systems, coordinating with architectural trades on overhead door power, and integrating temporary equipment (100A disconnect and 37.5KVA transformer) from an existing trailer into the new building distribution system upon construction completion. The document references multiple related sheets for panelboard schedules, one-line diagrams, equipment wiring schedules, grounding details, and mechanical/plumbing coordination requirements. Specific installation parameters include routing conduit at least 15 feet from heat sealers in Shop 111 and installing electrical cord reel receptacles 3 feet above pit floor.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J
J
J
J
J
J
J
J
F
G
HI
JK
LM
N
O
P
E6
E7
G
G
G
G
PL5
PL6
WP
STS
PL1 PL2
PBB
TPP1
MDP
MSBT
PL3
PL4
T1
PL6-11
MSB-1,3,5
PL5-7,9
PL5-1,3,5
PL5-11
PL5-19,21,23
PL5-25,27
FFF
CFY MWB CFX EQG
PL1-7,9,11 PL1-2,4,6
PL2-13
PL2-1,3,5
PL2-15
PL2-7,9,11
SPD PL3-7,9,11
PL3-15 PL3-1,3,5
---PL4-7,9,11---PL4-1,3,5
PL3-17,19
PL4-31,33,35
PL3-21,23
WOMEN
STAIR
003A
CORRIDOR
OFFICE
SHOP
ELEV
STAIR
002A
VEST
SHOP
ELECTRICAL
MECH
STORAGE
PL5-29
PL4-37
IU
EUH
1-1
MDP-2,4
MDP-6
PRODUCTION LIGHTING
CONTROL PANEL
FA1-4
FA1-2
PL1-1,3,5
TPP1-11
NETWORK
TPP1-9
TPP1-7
TLTLC C
TPP1-23
TPP1-21
PL3-35
PL3-2
PL3-4
PL3-6
PL3-8 PL3-10 PL3-12 PL3-14 PL3-16
PL6-5
PL6-19
PL5-13
INSPECTION
PL6-1
IU
16 6
PL6-21
LCP
PL5-31
PL5-17
FA1-7
NAC
FAMN
UH
1-7
PL6-23
PL1-25
UH
1-9
PL4-17
UH
1-8
P/O
PL4-37
P/O
PL4-39 G
PL4-41
TPP1-5
PL1-15
VFD
VFD
D D
C
MSB-2,4,6
MSB-8,10,12
PL2-19
PL2-21
PL2-23
UH
1-10
MSB-14,16,18 MSB-20,22,24
CR
1A
CR
1B
PL2-25
PL2-2,4,6
LCP
PL3-13
MDP-10
PL6-7
PL5-35
CUH
PL4-25,27,29
SBB
P
1A
P
1B
IU
TF
FA1
PL4-13
WP WP
PL6-3
PL6-15
WP
WP
WP
WP
PL5-10
PL6-9
G
PL1-13
PL6-13
TPA
CUSTODIAL
PL5-15
PL5-6 PL5-8
MH1-2,4,6
PL4-19
TPA
EWH
2PL4-21
PL4-15
TPP1-3
TPP1-1
TPP1-17
C C
TL TL
TPP1-19
TPA
14 14 14 14
TPP1-2,4 EB
PL3-25
SPD
PL2-10
SPD
P/O
PL6-12 SPD
PL1-27
CORRIDOR
MDP-8
SPD
PL6-14
STAIR
004A
44444
P/O
PL4-19
P/O
G
G
SATISFACTORY TO DATE
APPROVED
FOR COMMANDER NAVFAC
SEAL
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SHEET
NAVFAC DRAWING NO.
DESIGNER
DRAWN BY
CHECKED BY
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 14 SEP 2023
DESIGN MANAGER
PROJECT MANAGER
FEAD/PM&E
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
T
IC
P O
R T
S M
O U
T H
N A
V A
L S
H
IP
Y A
R D
K
IT
T
E R
Y M
E
UNCLASSIFIED
UNCLASSIFIED
U N
C L
A S
S
IF
IE
D
ACTIVITY
1740579
T. CARLETON
L. LYONS
S. RUCINSKI
/1
/2
:4
:0
A
M
C U s e rs \b d a ig le \D o c u m e n ts
\2
.2
B
L D
G
E
L E
C -V b d a ig le
Q U
X G
.r v t
EP102
B R
E P
A
IR
S
F
IR
S T
F L O
O R
P O
W E
R P
A R
T P
L A
N
W E
S T
DCL
HRM
BPD
K
IT
T E
R Y
M
E P
O R
T S
M O
U T
H N
A V
A L S
H
IP
Y A
R D
R O
IC
C
-M E
E P
SCALE: 1/8" = 1'-0"
B1
FIRST FLOOR POWER PART PLAN - WEST
PLAN
NORTH
1/8" = 1' - 0" 0 5' 10' 15' 30'
GRAPHIC SCALE(S)
KEY PLANGENERAL NOTES
EXISTING KEYNOTES
1. REFER TO SHEETS EP503 AND EP504 FOR MECHANICAL, PLUMBING,
AND MISCELLANEOUS EQUIPMENT WIRING SCHEDULE.
2. REFER TO SHEETS EP601 - EP604 FOR PANELBOARD SCHEDULES.
3. REFER TO SHEET EP501 FOR ONE-LINE DIAGRAM AND SCHEDULES.
4. REFER TO SHEET EP701 FOR SHOP EQUIPMENT SCHEDULE.
EXISTING ELECTRIC VEHICLE CHARGERS.
MATCH LINE
KEYNOTES
1 INSTALL 4" ABOVE COUNTERTOP BACKSPLASH.
INSTALL THE TWIST LOCK RECEPTACLE SERVING THE DATA CABINET
WITHIN THE CABINET.
PROVIDE COPPER GROUND BAR. REFER TO DETAIL A4/EP502.
PROVIDE COPPER GROUND BAR, AND GROUND WIRE BACK TO THE
SERVICE GROUND. COORDINATE EXACT INSTALLATION HEIGHT AND
LOCATION IN THE FIELD WITH THE CONTRACTING OFFICER. REFER TO
GROUNDING DETAIL A4/EP502.
PROVIDE FOR ELEVATOR CAB LIGHTING AND RECEPTACLES.
PROVIDE 480V, 3 POLE, FUSIBLE, SHUNT TRIP SWITCH FOR ELEVATOR.
PROVIDE 120V CONTROL CIRCUIT. REFER TO ONE-LINE DIAGRAM ON
SHEET EP501.
PROVIDE POWER TO THE OVERHEAD DOOR. COORDINATE WITH THE
ARCHITECTURAL TRADE.
PROVIDE POWER TO THE FIRE ALARM, MASS NOTIFICATION CONTROL
PANEL AND ASSOCIATED TRANSMITTER. COORDINATE EXACT
LOCATION WITH THE CONTRACTING OFFICER.
FOR ELEVATOR LOBBY 2 WAY COMMUNICATIONS SYSTEM. REFER TO
DETAIL A3/ET501.
ROUTE CONDUIT THAT IS NOT SERVING THE HEAT SEALERS OR ADJACENT
RECEPTACLES A MINIMUM OF 15 FEET AWAY FROM THE HEAT SEALERS IN
SHOP 111.
UTILIZE THE EXISTING TEMPORARY EQUIPMENT (100A DISCONNECT AND
37.5KVA TRANSFORMER) AND CONNECT EXISTING TRAILER 1 TEMPORARY
POWER TO THE NEW BUILDING 60 DISTRIBUTION SYSTEM AT THE
COMPLETION OF CONSTRUCTION. REFER TO SHEET EP501. COORDINATE
WITH THE CONTRACTING OFFICER.
EXTEND 3 EXISTING CONDUITS AND ASSOCIATED CONDUCTORS BETWEEN
EXTERIOR WALL AND SWITCHBOARD. SEAL CONDUIT INTERIORS.
INSTALL 3' ABOVE PIT FLOOR.
PROVIDE RECEPTACLE, MOUNTED TO STEEL SLOTTED STRUT SUPPORT,
FOR ELECTRICAL CORD REEL. INSTALL RECEPTACLE AND CORD REEL
ADJACENT TO COMPRESSED AIR CORD REEL. REFER TO DETAIL C5/SF506
FOR MOUNTING. COORDINATE EXACT LOCATION WITH THE CONTRACTING
OFFICER. ADJUST THE ELECTRICAL CORD REEL STOP SO THE CORD IS 7'
AFF. CONFIRM FINAL STOP HEIGHT WITH THE CONTRACTING OFFICER.
FIRE PUMP FEEDER SECTION OF THE SWITCHBOARD. REFER TO SHEET
EP501. REFER TO SHEET CS101 FOR EXISTING, INCOMING, DUCTBANK.
PROVIDE FIRE PUMP FEEDER THAT EXITS THE BOTTOM OF THE
SWITCHBOARD. ROUTE WITHIN CONCRETE ENCASED DUCTBANK. REFER TO
SHEETS SB101 AND SB102.
INDOOR UNIT IS POWERED FROM THE OUTDOOR UNIT. COORDINATE WITH
THE MECHANICAL TRADE.
FOR ELEVATOR SUMP PUMP, SP-1. MOUNT 5' ABOVE ELEVATOR PIT FLOOR.
PROVIDE LED LIGHT TO VERIFY CIRCUIT IS ENERGIZED. COORDINATE WITH
THE PLUMBING TRADE.
FOR CNC COMPUTER. COORDINATE EXACT LOCATION WITH THE
CONTRACTING OFFICER.
FOR SUMP PUMP CONTROL SYSTEM. COORDINATE WITH THE PLUMBING
TRADE.
PROVIDE POWER TO THE TRAP PRIMER. COORDINATE EXACT LOCATION
WITH THE PLUMBING TRADE.
FORK TRUCK CHARGER DISCONNECT. COORDINATE EXACT LOCATION WITH
THE CONTRACTING OFFICER.
PROVIDE SIMPLEX RECEPTACLE FOR POLYBAG SEALER.
FOR ELEVATOR SHUNT TRIP CONTROL POWER.
PROVIDE POWER TO EMERGENCY EYEWASH ALARM SYSTEM. COORDINATE
WITH THE PLUMBING TRADE.
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
F
IN
A L
S U
B M
IS
S
IO
N
/0
1/
R
S H
A
M E
N D
M E
N T
/1
6/
R
S H
11 11
15 24
11111111
11 11 11
| Sheets |
| EP102 - FIRST FLOOR POWER PART PLAN - WEST |
File details come from the government source that posted it. Updated .