This is a First Floor Plumbing Plan document for Building 60, specifically the west section, prepared by NAVFAC (Naval Facilities Engineering Command). The plan is drawn at a scale of 1/8" = 1'-0" and includes detailed mechanical and plumbing system layouts for an industrial facility with multiple functional spaces including offices, shops, storage areas, and utility rooms.

The document specifies several key plumbing and compressed air requirements that require coordination with the contracting officer. These include: installation of 2" pumped waste water piping from an elevator sump pump (SP-1) that runs exposed along the floor with discharge into F-1; provision of 1/2" compressed air service outlets at 80" above finished floor (AFF) with isolation ball valves and quick-connect female hose connections for CNC downdraft table operations; 3/4" compressed air service for additional operations at 60" AFF with isolation ball valves, pressure regulators, pressure gauges, and quick-connect fittings; and 3/4" condensate drain piping from indoor unit IU-1 with PVC jacket on exposed sections running to a nearby floor sink. All installations must maintain mandatory clearance zones around crane rails and bridge crane operational travel paths, and compressed air outlet locations must be coordinated based on final shop equipment layout and downdraft table installation requirements. The plan references P-001 for plumbing legends, abbreviations, and general notes, with additional overhead reel requirements detailed on sheet P-106.

View the file

Other files

File Type Posted
_B60_Continuation Sheet_Amendment 010_03-31-26.pdf PDF
74_SP101_R1_AMENDMENT 010.pdf PDF
96_AE105_R2_AMENDMENT 010.pdf PDF
114_AE401_R1_AMENDMENT 010.pdf PDF
120_AE441_R1_AMENDMENT 010.pdf PDF
178_P-401_R2_AMENDMENT 010.pdf PDF
179_P-402_R1_AMENDMENT 010.pdf PDF
01 91 19_R1_AMENDMENT 009.pdf PDF
116_AE411_R1_AMENDMENT 009.pdf PDF
238_FX400_R1_AMENDMENT 009.pdf PDF
256_EP502_R1_AMENDMENT 009.pdf PDF
260_EP601_R1_AMENDMENT 009.pdf PDF
Att.pdf PDF
Solicitation Amendment N6247026R00120008 SF 30.pdf PDF
Att. S) FFE Final Package-R1_AMENDMENT 008.pdf PDF
_ATTAC1.PDF PDF
02 82 00.00 22_R1_AMENDMENT 008.pdf PDF
31_CS101_R1_AMENDMENT 008.pdf PDF
47_SD102_R1_AMENDMENT 008.pdf PDF
65_SF105_R1_AMENDMENT 008.pdf PDF
68_SF502_R1_AMENDMENT 008.pdf PDF
152_G-004B_R1_AMENDMENT 008.pdf PDF
182_P-601_R1_AMENDMENT 008.pdf PDF
190_MD106_R1_AMENDMENT 008.pdf PDF
192_MD108_R1_AMENDMENT 008.pdf PDF
02 83 00.00 22_R1_AMENDMENT 008.pdf PDF
02 84 16.00 22_R1_AMENDMENT 008.pdf PDF
148_AE804_R1_AMENDMENT 008.pdf PDF
193_MD109_R1_AMENDMENT 008.pdf PDF
210_MP107_R1_AMENDMENT 008.pdf PDF
N6247026R00120007 SF 30.pdf PDF
Solicitation Amendment N6247026R00120006 SF 30.pdf PDF
Solicitation Amendment N6247026R00120004 SF 30.pdf PDF
Att. A) Construction and Design Experience Project Data Sheet.doc.docx DOCX document
Att. E) Small Business Participation Commitment Document (SBPCD) AMD 0004.docx DOCX document
Att. F) Individual Small Business Subcontracting Plan AMD 0004.docx DOCX document
Att. Z) B60 Continuation Sheet AMD 004.pdf PDF
Att. X) DBIDS ACCESS REQUEST FORM.docx DOCX document
Amendment N6247026R00120003.pdf PDF
Att. W) DBIDS 5512 FORM.pdf PDF
Solicitation Amendment N6247026R00120002.pdf PDF
Att. T) Price_schedule AMD 0002.pdf PDF
Solicitation Amendment N6247026R00120001.pdf PDF
Att. G) - PIEE Vendor Access Instructions.pdf PDF
Att. M) Drawings Volume 2a.pdf PDF
Att. S) FFE Package.pdf PDF
Att. U) Submittal Register.xlsx XLSX spreadsheet
Att. I) Specifications Volume 2.pdf PDF
Att. L) Drawings Volume 1b.pdf PDF
Att. P) 01 45 35a Statement_of_Special_Inspections.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OFFICE

SHOP

VEST

SHOP

STORAGE

MECH

ELECTRICAL

STAIR

004A

CORRIDOR

STAIR

003A

P-401 C1

P-401 C3

AA

3" FCO

6" R UP & DN

4" FCO

2" CW RISE

6" R UP & DN

3" W DN

1 1/2" V UP

4" FCO

3/4" CA

FS-1

3/4" CA

2" W UP & DN

3/4" CA UP

3/4" CA UP

1/2" CA UP

3/4" CA UP 3/4" CA UP

3/4" CA UP

3/4" CA UP

1/2" CA

1/2" CA

DROP

1/2" CA

1/2" CA

DROP

ELEV

MACHINE

001A

ELEV

STAIR

003A

MEN

WOMEN

2 2 2 22

2 2

INSPECTION

NETWORK

P-401 A1

P-401 A3 m l i h e7 p e6 n k j g.1 g f.1 f

M3

5.6

4.2 e4 e3

3.5

2.8 n.9 n.5 k.9 k.5

2.5

2.4

2.1 e2 e1 k.1 e d c b a i.1

3" W&T UP TO FD

IN MECH M106

2" V DN

CO

1/2" HW UP

1 1/2" W UP

1/2" CW UP

2" W UP

2"

3/4" CA UP 3/4" CA UP

1" CW

UP/DN

FD-3

STAIR

002A

W

2" PW DN

1/2" HW UP

1 1/2" W UP

1/2" CW UP

1/2"1/2"1/2"

1/2" CA DROP 3

3/4" CA UP

1/2"

1/2" CA

4 4 4

4 4 4 4

2 3/4" CA UP

2 3/4" CA UP

3/4" CD UP

3/4" CD DN

TO FD-33" W

CO 3"

1/2"

TP

3" W&T UP TO FD-2

1/2" TP UP

1/2" TP DN

TPA

2" V UP/DN

1 1/2" V UP

1/2" CW DROP

SPLIT SYSTEM

INDOOR UNIT

SATISFACTORY TO DATE

APPROVED

FOR COMMANDER NAVFAC

SEAL

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SHEET

NAVFAC DRAWING NO.

DESIGNER

DRAWN BY

CHECKED BY

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

DRAWFORM REVISION: 14 SEP 2023

DESIGN MANAGER

PROJECT MANAGER

FEAD/PM&E

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

T

IC

P O

R T

S M

O U

T H

N A

V A

L S

H

IP

Y A

R D

K

IT

T

E R

Y M

E

UNCLASSIFIED

UNCLASSIFIED

U N

C L

A S

S

IF

IE

D

ACTIVITY

1740579

T. CARLETON

L. LYONS

S. RUCINSKI

/2

/2

:2

:2

P

M

C U s e rs \s ri c h a rd s \D o c u m e n ts

\2

.2

B

L D

G

M

E C

H A

N

IC

A L

-V s w h it e G

Z D

.r v t

P-104

B

R

E P

A

IR

S

F

IR

S T

F L O

O R

P L U

M B

IN

G

P L A

N

W E

S T

MSA

RNC

SRW

K

IT

T E

R Y

M

E P

O R

T S

M O

U T

H N

A V

A L S

H

IP

Y A

R D

R O

IC

C

-M E

P -1

SCALE: 1/8" = 1'-0"

B1

FIRST FLOOR PLUMBING PLAN - WEST

GENERAL NOTES KEYNOTES

1/8" = 1' - 0" 0 5' 10' 15' 30'

GRAPHIC SCALE

KEY PLAN

CHECK GRAPHIC SCALE BEFORE USING

MATCH LINE

PLAN

NORTH

1.

2.

3.

4.

SEE P-001 FOR PLUMBING LEGENDS, ABBREVIATIONS AND GENERAL NOTES.

COORDINATE WITH CONTRACTING OFFICER THE LOCATIONS FOR COMPRESSED AIR BRANCH SERVICE PIPING OUTLETS, CONSISTENT WITH THE FINAL

SHOP EQUIPMENT LAYOUT.

COORDINATE THE INSTALLATION OF PIPING AND EQUIPMENT TO MAINTAIN MANDATORY CLEARANCE ZONES AROUND CRANE RAILS AND BRIDGE CRANE

OPERATIONAL TRAVEL PATH.

INDUSTRIAL EQUIPMENT SHOWN FOR REFERENCE.

2" PUMPED WASTE WATER FROM ELEVATOR SUMP PUMP (SP-1). PIPE WILL RUN EXPOSED ALONG FLOOR AND DISCHARGE INTO FS-1.

PROVIDE 1/2" CA WITH ISOLATION BALL VALVE AND QUICK CONNECT FEMALE HOSE CONNECTION FITTING 80" AFF. COORDINATE QUICK CONNECT

FITTING SELECTION WITH CONTRACTING OFFICER.

COMPRESSED AIR SERVICE FOR CNC DOWNDRAFT TABLE OPERATIONS. COORDINATE CA OUTLET LOCATION WITH CONTRACT OFFICER TO ALIGN

WITH DOWNDRAFT TABLE INSTALLATION REQUIREMENTS.

3/8" COMPRESSED AIR HOSE AND ELECTRICAL POWER EXTENSION CHORD FROM RETRACTABLE REELS OVERHEAD. SET AIR HOSE AND ELECTRICAL CHORD STOPS TO POSITION THEIR ENDS 7'-0" AFF(ADJUSTABLE). SEE SHEET P-106 FOR OVERHEAD REEL INSTALLATION

REQUIREMENTS.

PROVIDE CA OUTLET 60" AFF WITH ISOLATION BALL VALVE, CA PRESSURE REGULATOR, PRESSURE GAUGES UPSTREAM AND DOWNSTREAM OF REGULATOR AND QUICK CONNECT HOSE FITTING. COORDINATE QUICK CONNECT FITTING SELECTION WITH CONTRACTING OFFICER.

RUN 3/4" IU-1 CONDENSATE DRAIN EXPOSED ON WALL TO NEARBY FLOOR SINK. PROVIDE PVC JACKET ON EXPOSED PIPE INSULATION.

(THIS SHEET ONLY)

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

F

IN

A L

S U

B M

IS

S

IO

N

/0

1/

R

S H

A

M E

N D

M E

N T

/2

0/

R

S H

Sheets
M-703 - MECHANICAL CONTROL DIAGRAMS 3
MD102 - FIRST FLOOR MECHANICAL DUCTWORK REMOVALS PLAN - EAST
P-101 - UNDERSLAB PLUMBING PLAN - EAST
P-102 - UNDERSLAB PLUMBING PLAN - WEST
P-103 - FIRST FLOOR PLUMBING PLAN - EAST
P-104 - FIRST FLOOR PLUMBING PLAN - WEST
P-105 - FIRST FLOOR MEZZANINE PLUMBING PLAN - EAST
P-106 - FIRST FLOOR MEZZANINE PLUMBING PLAN - WEST
P-107 - SECOND FLOOR PLUMBING PLAN
P-108 - SECOND FLOOR MEZZANINE PLUMBING PLAN
P-109 - ATTIC PLUMBING PLAN
P-401 - ENLARGED PLUMBING PART PLANS 1
P-402 - ENLARGED PLUMBING PART PLANS 2
P-403 - ENLARGED PLUMBING PART PLANS 3
P-601 - PLUMBING SCHEDULES AND DETAIL
P-701 - PLUMBING RISER DIAGRAM
PD102 - FIRST FLOOR PLUMBING REMOVALS PLAN - EAST

File details come from the government source that posted it. Updated .