138_AE640_R1_AMENDMENT 010.pdf
PDF 214 KB Posted
- Solicitation number
- N6247026R0012
About this file
This is a Room Finish Schedule architectural drawing prepared by Naval Facilities Engineering Systems Command (NAVFAC) for Building 60 repairs at Portsmouth Naval Shipyard in Kittery, Maine. The document details finish specifications for multiple rooms across the first floor, first floor mezzanine, and second floor of the facility.
The schedule specifies floor finishes including concrete with hardener, solid vinyl tile (SVT), porcelain floor tile (PFT), porcelain wall tile (PWT), carpet tile (CPTT), and existing wood strip flooring. Wall finishes include various paint colors (Sherwin Williams products in shades P1, P2, P3, and P4), fiber reinforced plastic (FRP), and porcelain wall tile. Base finishes are predominantly rubber wall base (RWB), with specifications for wainscot heights where applicable. Ceiling finishes range from structural paint to acoustical ceiling tile (Armstrong 24"x24" Cirrus High NRC) and gypsum board paint. Manufacturers specified include Patcraft, DalTile, Interface, Johnsonite, Armstrong, Formica, and Crossville. The document includes 16 detailed notes addressing concrete treads with safety nosings, paint specifications for stair components, FRP wainscoting requirements, historic beadboard ceiling salvage and patching procedures, wood flooring refinishing standards, and resinous flooring transitions. The schedule covers approximately 50 distinct rooms and spaces with detailed material specifications and color/finish selections approved by the design manager and project manager. The final submission was dated October 1, 2025, with Amendment 010 dated March 20, 2026.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REF.REF. REF. REF.
M101
M102
002B
003B
M106
M104
1' -6
1'-6"
CENTER SVT 2 ON OPENING
CENTER SVT 2 ON OPENING
RESINOUS FLOORING CONCRETE
1 1/2"
SATISFACTORY TO DATE
APPROVED
FOR COMMANDER NAVFAC
SEAL
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SHEET
NAVFAC DRAWING NO.
DESIGNER
DRAWN BY
CHECKED BY
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 14 SEP 2023
DESIGN MANAGER
PROJECT MANAGER
FEAD/PM&E
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
T
IC
P O
R T
S M
O U
T H
N A
V A
L S
H
IP
Y A
R D
K
IT
T
E R
Y M
E
UNCLASSIFIED
UNCLASSIFIED
U N
C L
A S
S
IF
IE
D
ACTIVITY
1740579
T. CARLETON
L. LYONS
S. RUCINSKI
/2
/2
:1
:5
P
M
C U s e rs \m d o n o v a n \D o c u m e n ts \2
.2
B L
D G
A
R C
H
IT
E C
T U
R A
L -V m d o n o v a n
V F
X R
.r v t
AE640
B
R
E P
A
IR
S
R O
O M
F
IN
IS
H
S C
H E
D U
L E
RSH
JMR
CJE
K
IT
T E
R Y
M
E P
O R
T S
M O
U T
H N
A V
A L S
H
IP
Y A
R D
R O
IC
C
-M E
A E
METAL DOORS/FRAMES - P5 SHERWIN WILLIAMS TIN LIZZIE SW9163
TOILET PARTITIONS SCRANTON HINY HIDERS CONCRETE
PLAM FORMICA WINTER SKY - PLEX FINISH
SS-BREAK ROOMS FORMICA BIANCO MINERAL
SS- TOILET ROOMS CORIAN DOMINO TERRAZZO
MISCELLANEOUS
STRUCT SHERWIN WILLIAMS HIGH REFLECTIVE WHITE SW7757
GYP BD - P4 SHERWIN WILLIAMS HIGH REFLECTIVE WHITE SW7757
ACT ARMSTRONG 24"X24" CIRRUS HIGH NRC
CEILINGS
RWB JOHNSONITE 4" RUBBER BASE THUNDER
BASE
RF 1 STONCLAD GS EPOXY MORTAR SYSTEM - 1/4" MORTAR COAT SLATE
CONC SEE DIVISON 3 HARDENER
SVT 2 PATCRAFT ADMIX 18"X24" SHARK'S TOOTH
SVT 1 PATCRAFT ADMIX 18"X24" SAND DOLLAR
PFT DALTILE CALGARY ARMOR
CPTT INTERFACE JUMBO ROCK NATURAL
FLOORS
FRP MARLITE LIGHT GRAY
PWT CROSSVILLE RETRO ACTIVE 2.0, 3"X12" EMPRESS WHITE
P3 SHERWIN WILLIAMS ARGOS SW7065
P2 SHERWIN WILLIAMS TEMPE STAR SW6229
P1 SHERWIN WILLIAMS PEARLY WHITE SW7009
WALLS
MATERIAL MANUFACTURER MODEL/TYPE COLOR & FINISH
COLOR KEY/MANUFACTURER GUIDEFINISH SCHEDULE
ROOM
FLOOR FINISH BASE FINISH
WALL WAINSCOT CEILING
NotesNO. NAME (ARCH) NORTH FINISH EAST FINISH SOUTH FINISH WEST FINISH FINISH HEIGHT FINISH
FIRST FLOOR
001 ELEV DIA PLATE - - - - - -
001A ELEV MACHINE CONC RWB P3 P3 P3 P3 - - GYP BD/P4
002A STAIR CONC RWB P3 P3 P3 P3 - - STRUCT/P4 1,2
003A STAIR EXIST EXIST P3 P3 P3 P3 - - STRUCT/P4 2,14
004A STAIR EXIST EXIST P3 P3 P3 P3 - - GYP BD/P4 2
101 VEST EX CONC/CONC RWB P3 P3 P3 P3 - - GYP BD/P4 9
102 CORRIDOR EX CONC/CONC RWB - P3 P3 P3 - - GYP BD/P4 9
103 CORRIDOR EX WD/EX
CONC/CONC
RWB P3 P3 P3 P3 - - STRUCT/P4 9,10,16
104 CORRIDOR EX CONC/CONC RWB P3 P3 P3 P3 - - STRUCT/P4 8,9
105 MEN CONC PWT PWT/P1 P1 PWT/P1 PWT/P1 PWT 6'-0" STRUCT/P4 5,9
106 WOMEN CONC PWT PWT/P1 PWT/P1 PWT/P1 PWT/P1 PWT 6'-0" GYP BD/P4 5,9
107 CUSTODIAL CONC FRP FRP/P4 FRP/P4 FRP/P4 FRP/P4 FRP 4'-0" STRUCT/P4 3,9
108 OFFICE CPTT RWB P3 P3 P3 P3 - - STRUCT/P4 9
109 STORAGE CONC RWB P3 P3 P3 P3 - - STRUCT/P4 9
110 SHOP CONC RWB P3 P3 P3 P3 - - STRUCT/P4 9
111 SHOP EX CONC/CONC RWB P3 P3 P3 P3 - - STRUCT/P4 8,9
112 INSPECTION EX CONC RWB P3 P3 P3 P3 STRUCT/P4 9
113 NETWORK EX CONC RWB P3 P3 P3 P3 - - STRUCT/P4 9
114 ELECTRICAL EX CONC RWB P3 P3 P3 P3 - - STRUCT/P4 9
115 MECH EX CONC/CONC RWB P3 P3 P3 P3 - - GYP BD/P4
116 ANNEX EXIST EXIST EXIST EXIST EXIST EXIST - - EXIST
117 ANNEX EXIST EXIST EXIST EXIST EXIST EXIST - - EXIST
118 ANNEX EXIST EXIST EXIST EXIST EXIST EXIST - - EXIST
FIRST FLOOR MEZZANINE
002B STAIR CONC RWB P3 P3 P3 P3 - - STRUCT/P4 1,2,8
003B STAIR EXIST EXIST P3 P3 P3 P3 - - GYP BD/P4 2,14
004B STAIR EXIST RWB P3 P3 P3 P3 - - GYP BD/P4 2
M101 BREAK SVT 1&2 RWB P3 P3 P2 P3 - - STRUCT/P4 8,9,11
M102 BLIND VENDING SVT 1&2 RWB P3 P3 P2 P3 - - STRUCT/P4 8,9,11
M103 CORRIDOR SVT 1&2 RWB P3 P3 P2 P3 - - GYP BD/P4 11
M104 CUSTODIAL CONC FRP FRP/P4 FRP/P4 FRP/P4 FRP/P4 FRP 4'-0" STRUCT/P4 3,8,9
M105 LOCKERS SVT 1 RWB P3 P3 P3 P3 - - STRUCT/P4 8
M106 MECH CONC RWB P3 P3 P3 P3 - - STRUCT/P4 8,9
M107 FIRE PUMP - - - - - - - - - -
M108 UTILITY CONC RWB P3 P3 P3 P3 - - STRUCT/P4
M109 MECH MEZZ CONC RWB P3 P3 P3 P3 - - STRUCT/P4 8,10
M110 MECH MEZZ CONC RWB P3 P3 P3 P3 - - STRUCT/P4 8
SECOND FLOOR
003C STAIR EXIST/SVT-1 EXIST/RWB P3 P3 P3 P3 - - GYP BD/P4 2, 13,14
004C STAIR EXIST RWB P3 P3 P3 P3 - - EX GYP/P4 2
005 STAIR EXIST EXIST P3 P3 P3 P3 - - EX BEAD BOARD/P4 2,4,7
201 CORRIDOR PFT/SVT-1 RWB P1 P1 P1 P3 EX BEAD BOARD 4,7,12
202 CUSTODIAL PFT FRP FRP/P4 FRP/P4 FRP/P4 FRP/P4 FRP 4'-0" GYP BD/P4 3,12
203 WOMEN PFT PWT PWT/P1 PWT/P1 PWT/P1 PWT/P1 PWT 6'-0" GYP BD/P4 5,12
204 MEN PFT PWT PWT/P1 PWT/P1 PWT/P1 PWT/P1 PWT 6'-0" GYP BD/P4 5,12
205 EXPRESSING PFT RWB P1 P1 P1 P1 - - GYP BD/P4 12
206 UPHOLSTERY EX WD RWB P3 P3 P3 P3 - - EX BEAD BOARD 4,6,7
207 SHOP EX WD RWB P3 P3 P3 P3 - EX BEAD BOARD/P4 4,6,7
208 OPEN OFFICE CPTT RWB P3 P3 P3 P3 - - EX BEAD BOARD/P4 4,7
209 TRAINING EX WD RWB P3 P3 P3 P3 - - ACT 6,15
210 OFFICE CPTT RWB P3 P3 P3 P3 - ACT 15
211 MULTI-PURPOSE EX WD RWB P3 P3 P3 P3 - - ACT 6,15
212 CORRIDOR EX WD RWB P3 P3 P3 P3 - - ACT 6
213 ELECTRICAL EX WD RWB P3 P3 P3 P3 - - EX GYP/P4 6
214 NETWORK EX WD RWB P3 P3 P3 P3 - - EX GYP/P4 6
SECOND FLOOR MEZZANINE
M201 MEZZANINE EXIST EXIST EXIST EXIST EXIST EXIST EXIST
ROOM FINISH SCHEDULE NOTES:
1. PROVIDE CONCRETE TREADS AND LANDINGS WITH ABRASIVE CAST METAL SAFETY NOSINGS.
2. PAINT STAIR COMPONENTS: RISERS, RAILING SYSTEM SKIRTING AND UNDERSIDE.
3. PROVIDE FRP WAINSCOT TO 4'-0" AFF, PAINT ABOVE.
4. IN ADDITION TO AREAS INDICATED ON DRAWINGS, PATCH EXISTING HISTORIC BEADBOARD CEILING
WHERE SPRINKLER HEADS, LIGHT FIXTURES, AND OTHER ELEMENTS HAVE BEEN REMOVED AND
NOT OTHERWISE REUSED/COVERED. REMOVE AND SALVAGE HISTORIC BEADBOARD FROM
AREAS THAT WILL BE CONCEALED BY A CEILING SYSTEM FOR PATCHING. FOR BIDDING ASSUME
200 SQUARE FEET OF REMOVING AND REINSTALLING EXISTING BEADBOARD CEILING.
PATCH THE CEILING AREAS ABOVE THE CEILING SYSTEMS WHERE SALVAGED BEADBOARD IS
REMOVED WITH NEW BEADBOARD TO MATCH EXISTING BEADBOARD. SEE DETAIL D2/AE704 FOR
EXISTING BEADBOARD PROFILE.
5. PAINT ABOVE PWT.
6. EXIST WD FLOORING TO BE REFINISHED, SEE SPEC SECTION 09 01 90.60 FOR THE
PREPARATION OF WOOD STRIP FLOOR FOR REFINISHING.
7. REFINISH EXISTING BEAD BOARD CEILING [OPTION 8].
8. PAINT EXISTING CEILING/STRUCTURE [OPTION 8].
9. PROVIDE RESINOUS FLOORING UNDER. SEE A1/AE640 FOR RESINOUS FLOORING TRANSISTIONS [OPTION 10].
10. WHERE EXIST WOOD CEILINGS ARE EXPOSED, DO NOT PAINT.
11. SEE A5/AE640 FOR FLOOR FINISH PATTERN.
12. INSTALL PFT IN RUNNING BOND PATTERN ENSURING OVERLAP OF THE JOINTS DOES
NOT EXCEED 1/3 OF THE TILE TO AVOID LIPPAGE.
13. SEE A1/AE402 FOR FLOORING TRANSITION DETAIL.
14. NEW WOOD HANDRAIL TO MATCH EXIST WOOD HANDRAIL ON GUARDRAIL.
15. PATCH EXISTING WALL FINISHES AT REMOVED UTILITIES/DEVICES TO MATCH ADJACENT
16. REFINISH EXISTING WOOD STRIP FLOORING [OPTION 8].
ROOM FINISH LEGEND
WALL FINISH
PWT = PORCELAIN WALL TILE
FRP = FIBER REINFORCED PLASTIC
P- = PAINT
FLOOR FINISH
CONC = CONCRETE - HARDENED AND SEALED
CPTT = CAREPET TILE
EX CONC = EXISTING CONCRETE
EX WD = EXISTING WOOD STRIP FLOORING
PFT = PORCELAIN FLOOR TILE
SVT = SOLID VINYL TILE
BASE FINISH
RWB = RUBBER WALL BASE
CEILING FINISH
ACT = ACOUSTICAL CEILING TILE
P- = PAINT
STRUCT = CEILING STRUCTURE TO ALSO
INCLUDE MECHANICAL,
ELECTRICAL, PLUMBING AND
SPRINKLER EQUIPMENT, PAINT
MISCELLANEOUS FINISH
PLAM = PLASTIC LAMINATE
SS = SOLID SURFACE
ROOM FINISH GENERAL NOTES:
A. MANUFACTURER'S NAMES, MODEL NUMBERS, AND COLOR
IDENTIFCATIONS LISTED ARE USED FOR THE PURPOSE
OF AESTHETICS COORDINATION ONLY. PRODUCTS FROM OTHER
MANUFACTURERS ARE ACCEPTABLE IF THE PRODUCT APPROIMATES
THE PRODUCT INDICATED, CONFORMS TO THE SPECIFICATIONS, AND
IS APPROVED BY THE CONTRACTING OFFICER.
B. SEE SHEETS AE701-704 FOR REFLECTED CEILING PLANS.
C. SEE SHEETS AE741 FOR INTERIOR ELEVATIONS.
D. PROVIDE TRANSITION STRIP AT INTERSECTIONS OF DISSIMILAR
FLOOR MATERIALS.
E. CHANGE IN FLOOR MATERIALS SHALL OCCUR UNDER DOORS
UNLESS OTHERWISE NOTED.
SCALE: 1/8" = 1'-0" (AE104)
A5
BREAK ROOM M102 FLOOR PATTERN
SCALE: 12" = 1'-0"
A1
RESINOUS FLOORING TRANSITION
12" = 1' - 0" 0 2" 3"1"0.5"
1/8" = 1' - 0" 0 5' 10' 15' 30'
GRAPHIC SCALE(S)
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
F
IN
A L
S U
B M
IS
S
IO
N
/0
1/
R
S H
A
M E
N D
M E
N T
/2
0/
R
S H
| Sheets |
| AE640 - ROOM FINISH SCHEDULE |
File details come from the government source that posted it. Updated .