This document is an electrical one-line diagram and associated notes for Building 60 construction work. The diagram illustrates the electrical distribution system including switchboards, panelboards, transformers, and related equipment connections throughout multiple floors (first floor, mezzanine, and second floor) of the facility.

Key electrical components and requirements include: installation of a fire pump feeder with separate switchboard vertical section below the slab within a concrete encased ductbank, extending to the fire pump room; provision of a Shark 270 meter with associated current transformers mounted on existing steel slotted strut support; Category 6 cable in 1-inch RGS conduit between the meter and existing network switch WCO3004 (approximately 20 feet); connection of existing Duraline connection to a relocated exterior receptacle with ground fault protection; temporary power provision to Building 60 construction trailer via existing transformer (assuming 100A, 120/208V, 3-phase); reinstallation of salvaged exterior receptacle serving existing trailer 2; adjustment of current setting to 1,140A (.95X); provision of service entrance available fault current label; and provision of conduit and wire for generator controls, block heater, monitoring, and battery charger. The document references panelboard schedules (EP601-EP604), electrical site plan (ES101), and mechanical and plumbing equipment wiring schedules (EP503-EP504) for additional specifications. Two Contract Line Items (CLIN 004) address exterior receptacle relocation and reconnection tasks, with coordination required with the Contracting Officer on exact locations.

View the file

Other files

File Type Posted
Att. GG) Amendment 0011 Attachment Table of Contents.pdf PDF
Solicitation Amendment N6247026R00120010 SF 30.pdf PDF
Att. T) Price Schedule AMD 0010.pdf PDF
01 30 10.00 22_AMENDMENT 010.pdf PDF
115_AE402_R1_AMENDMENT 010.pdf PDF
161_Q-601_R2_AMENDMENT 010.pdf PDF
170_P-102_R1_AMENDMENT 010.pdf PDF
171_P-103_R1_AMENDMENT 010.pdf PDF
175_P-107_R1_AMENDMENT 010.pdf PDF
677 attach Attic_AFPR.pdf PDF
Att. Y) PPI responses AMD 0009.pdf PDF
_B60_Continuation Sheet_Amendment 0009.pdf PDF
07 27 10_AMENDMENT 009.pdf PDF
95_AE104_R1_AMENDMENT 009.pdf PDF
216_M505_R1_AMENDMENT 009.pdf PDF
217_M601_R1_AMENDMENT 009.pdf PDF
262_EP603_R1_AMENDMENT 009.pdf PDF
268_EL104_R1_AMENDMENT 009.pdf PDF
Att. T) Price Schedule AMD 0009.pdf PDF
Att. EE) Amendment 0009 Attachment Table of Contents.pdf PDF
Att.pdf PDF
Att. Y) PPI responses AMD 0008.pdf PDF
_B60_Continuation Sheet_Amendment 008.pdf PDF
01 11 00.00 22_R1_AMENDMENT 008.pdf PDF
72_SF506_R1_AMENDMENT 008.pdf PDF
220_M-701_R1_AMENDMENT 008.pdf PDF
02 83 00.00 22_R1_AMENDMENT 008.pdf PDF
02 84 16.00 22_R1_AMENDMENT 008.pdf PDF
148_AE804_R1_AMENDMENT 008.pdf PDF
193_MD109_R1_AMENDMENT 008.pdf PDF
210_MP107_R1_AMENDMENT 008.pdf PDF
Att. CC) Site Visit Log.pdf PDF
Att. R) B60 ISRL AMD 0004.XLSX XLSX spreadsheet
Att. Y) PPI responses AMD 0004.pdf PDF
Att. AA) B60 AMD 004 Drawings 012726.pdf PDF
Att. F) Individual Small Business Subcontracting Plan AMD 0004.docx DOCX document
Att. Z) B60 Continuation Sheet AMD 004.pdf PDF
Att. W) DBIDS 5512 FORM.pdf PDF
AMD 0002 PPI responses.pdf PDF
Att. A) - Construction Experience Project Data.docx DOCX document
Att. D) - Historical Small Business Utilization.docx DOCX document
Att. E) - Small Business Participation Commitment Document (SBPCD).docx DOCX document
Att. F) - Individual Small Business Subcontracting Plan.docx DOCX document
Att. H) Specifications Volume 1.pdf PDF
Att. J) Specifications Volume 3.pdf PDF
Att. K) Drawings Volume 1a.pdf PDF
Att. R) B60 - ISRL.XLSX XLSX spreadsheet
Att. I) Specifications Volume 2.pdf PDF
Att. L) Drawings Volume 1b.pdf PDF
Att. P) 01 45 35a Statement_of_Special_Inspections.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T1

FIRST FLOOR

250/3 250/3 70/3

MDP, 1200A, 120/208V, 3PH, 4W SWITCHBOARD 42K AIC

PANEL

ML2

INTERIOREXTERIOR

MEZZANINE

600/3 30/3

MSB, 1200A, 480V, 3PH, 3W, 100K AIC, SWITCHBOARDGRADE

1140AT

EXISTING LOAD CENTER 4

M

EXISTING LC4 VAULT AND

MANHOLE AC 801

SECOND FLOOR

PANEL

PH2

PANEL

PL9

T5

FIRE PUMP RM

GRADE

FIRE PUMP

CONTROLLER WITH

INTEGRAL ATS

FIRE PUMP

EXISTING TRAILER 2

EXIST 45KVA, 480V: 120/208V,

TRANSFORMER, PRIMARY AND

SECONDARY DISCONNECTS, AND

SECONDARY CONDUCTORS

SERVING EXISTING TRAILER 2

125KW, 480V, DIESEL

GENERATOR WITH SOUND

ATTENUATING, WEATHERPROOF

ENCLOSURE AND SUB BASE

FUEL TANK

PANEL

AH1

T3

PANEL

AL1

PANEL

PH1

T4

PANEL

PL7

PANEL

TPP2

1200AF

SPD

600/3

1140AT

1200AF

SPD

SPD

PANEL

PL10

PANEL

ML1

T2

PANEL

MH1

PANEL

PL1

PANEL

PL2

400/3

PANEL

PL3

250/3 250/3 125/3

PANEL

PL5

PANEL

PL4

PANEL

PL6

125/3 125/3 60/3

S P

A R

E

S P

A R

E

20/1 20/1

S P

A R

E

S P

A R

E

STS

200A

ELEVATOR

ANNEX

PANEL

FA2

PANEL

PL8

PANEL

FA1

PANEL

TPP1

S P

A R

E

S P

A R

E

S P

A R

E

60/3

CU-4

WP

100/3

EXIST TRAILER 1

T

100/3 225/3 125/3150/3150/3175/3

CR-1(B)

WP

CR-1(A)

WP

P-1BP-1A

30/3 50/3

WP

AHU-1

30/3 15/3 15/3

100/3 100/3100/3

225/3

24 [CLIN 004] 23 [CLIN 004]

100A

1 PHASE

37.5KVA

15 14 17 16 15 18

1000AT

1200AF

10 11

21 S P

A R

E

25 19

JJ

[CLIN 004]

MEZZANINE

SPD

J

RATED CHASE

SPD

SPD

SPD

SPD

SPD

SPD

(TYP)

480 - 208Y/120300

VOLTS

TRANSFORMER SCHEDULE

TAG

T1

KVA

T2

T3

T4

480 - 208Y/120

480 - 208Y/120

480 - 208Y/120

T5 480 - 208Y/120

EXISTING 3 #500, + GROUND3

CABLE

WIRING SCHEDULE

# CONDUIT

EXISTING1

3 #10, 1 #10G1 3/4"2

4 #12, 2 #10N, 2 #12G

2#8, 1#10G

3#4, 1#8G

1"

3/4"

1"C

16 4#1, 1#6G 1-1/2"C

17 3#1/0, 1#6G

18 4#1/0, 1#6G

19 4#6, 1#10G

110 4#1, 1#4G

111 4#4, 1#8G

112 4#250, 1#2G

113 3#1, 1#6G

1-1/2"C

1-1/2"C

1-1/4"C

1"C

1-1/2"C

2-1/2"C

1-1/2"C

114 4#250 1#4G 2-1/2"C

115 4#350, 1#2G

116 4#300, 1#3G

117 4#500, 1#3G 3"C

118 4#3/0, 1#2G 2"C

119 3#4/0, 1#4G 2"C

120 3#3/0, 1#6G 2"C

221 3#350, 1#1G 2-1/2"C

322 4#400, 1#3/0G 3"C

123 3#2, 1#8G 1-1/4"C

124 3#2/0, 1#4G 1-1/2"C

125 3#2/0, 1#1G 2"C

2-1/2"C

2-1/2"C

SATISFACTORY TO DATE

APPROVED

FOR COMMANDER NAVFAC

SEAL

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SHEET

NAVFAC DRAWING NO.

DESIGNER

DRAWN BY

CHECKED BY

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

DRAWFORM REVISION: 14 SEP 2023

DESIGN MANAGER

PROJECT MANAGER

FEAD/PM&E

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

T

IC

P O

R T

S M

O U

T H

N A

V A

L S

H

IP

Y A

R D

K

IT

T

E R

Y M

E

UNCLASSIFIED

UNCLASSIFIED

U N

C L

A S

S

IF

IE

D

ACTIVITY

1740579

T. CARLETON

L. LYONS

S. RUCINSKI

/1

/2

:4

:4

A

M

C U s e rs \b d a ig le \D o c u m e n ts

\2

.2

B

L D

G

E

L E

C -V b d a ig le

Q U

X G

.r v t

EP501

B R

E P

A

IR

S

O N

E -L

IN

E

D

IA

G R

A M

A N

D S

C H

E D

U L E

S

DCL

HRM

BPD

K

IT

T E

R Y

M

E P

O R

T S

M O

U T

H N

A V

A L S

H

IP

Y A

R D

R O

IC

C

-M E

E P

SCALE: NOT TO SCALE

B2

ONE-LINE DIAGRAM

1 INSTALL BELOW SLAB WITHIN CONCRETE ENCASED DUCTBANK. EXTEND FROM

BELOW SLAB TRENCH TO THE FIRE PUMP ROOM IN A RATED CHASE. REFER TO

SHEETS AE101, SB101, AND SB102.

PROVIDE SEPARATE SWITCHBOARD VERTICAL SECTION FOR THE FIRE PUMP FEEDER.

PROVIDE RED LABEL WITH WHITE CENTER CORE INDICATING, "FIRE PUMP FEEDER".

PROVIDE SHARK 270 METER AND ASSOCIATED CURRENT TRANSFORMERS. MOUNT ON

EXISTING STEEL SLOTTED STRUT SUPPORT WITHIN THE LOAD CENTER 4 ENCLOSURE.

COORDINATE EXACT LOCATION WITH THE CONTRACTING OFFICER. PROVIDE

CATEGORY 6 CABLE, IN 1" RGS CONDUIT, BETWEEN METER AND EXISTING NETWORK

SWITCH WCO3004. FOR BIDDING PURPOSES ASSUME 20' OF CONDUIT WITH WIRE.

[CLIN 004]: CONNECT EXISTING DURALINE CONNECTION TO RELOCATED EXTERIOR

RECEPTACLE.

PROVIDE GROUND FAULT PROTECTION.

SPLICE TO EXISTING CONDUCTORS. SEAL INTERIOR PORTION OF EXISTING

CONDUITS.

REFER TO TRANSFORMER GROUNDING DETAIL, C4/EP502.

PROVIDE BREAKER SIZED PER SPD MANUFACTURER'S RECOMMENDATION.

1. REFER TO SHEETS EP601-EP604 FOR PANELBOARD SCHEDULES.

2. REFER TO SHEET ES101 FOR ELECTRICAL SITE PLAN.

3. REFER TO SHEETS EP503 AND EP504 FOR MECHANICAL,

PLUMBING, AND MISCELLANEOUS EQUIPMENT WIRING

SCHEDULE.

EXISTING GE POWER BREAK THC1616SSH LOAD CENTER BREAKER

WITH RMS-9 MICROVERSA TRIP UNIT. CIRCUIT LC4-13. FRAME RATING

IS 1600A, SENSOR RATING IS 1200A.

EXISTING FEEDER BETWEEN LOAD CENTER 4 AND BUILDING 60.

GENERAL NOTES KEYNOTES

COORDINATE WITH THE FIRE ALARM TRADE FOR MONITORING OF THE

GENERATOR.

[CLIN 004]: REINSTALL SALVAGED EXTERIOR RECEPTACLE SERVING EXISTING

TRAILER 2. COORDINATE EXACT LOCATION WITH THE CONTRACTING OFFICER.

PROVIDE TEMPORARY POWER TO BUILDING 60 CONSTRUCTION TRAILER VIA

EXISTING TRANSFORMER. COORDINATE WITH THE CONTRACTING OFFICER. FOR

BIDDING PURPOSES ASSUME 100A, 120/208V, 3 PHASE.

[CLIN 004]: UTILIZE EXISTING TEMPORARY EQUIPMENT SERVING EXISTING

TRAILER 1. REFER TO SHEETS ED102, ES101, EP102, AND G-007 THRU G-009.

ADJUST CURRENT SETTING TO 1,140A (.95X).

PROVIDE SERVICE ENTRANCE AVAILABLE FAULT CURRENT LABEL. REFER TO

SHEET EP601 FOR ADDITIONAL INFORMATION.

PROVIDE JUNCTION BOX IN ACCORDANCE WITH NEC 695.6(H) AND (I).

PROVIDE CONDUIT AND WIRE FOR GENERATOR CONTROLS, BLOCK HEATER,

MONITORING, AND BATTERY CHARGER.

EXISTING KEYNOTES

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

F

IN

A L

S U

B M

IS

S

IO

N

/0

1/

R

S H

A

M E

N D

M E

N T

/1

6/

R

S H

Sheets
EP501 - ONE-LINE DIAGRAM AND SCHEDULES

File details come from the government source that posted it. Updated .