This is an architectural drawing set showing enlarged stair plans for Building 60 repairs at Portsmouth Naval Shipyard in Kittery, Maine. The document, titled "Enlarged Stair Plans 1" (Sheet AE440), was prepared by the Naval Facilities Engineering Systems Command (NAVFAC) Mid-Atlantic and includes detailed floor plans for four separate stairwells: Stair 002 (First Floor and First Floor Mezzanine), Stair 003 (First Floor, First Floor Mezzanine, and Second Floor), and Stair M110 (Mezzanine Floor).

The plans specify construction and repair requirements including guardrail system improvements, handrail installations, self-closing safety gates, aluminum isolation joint covers, and wood window/door repairs, with detailed dimension callouts and cross-references to additional specification sheets (AE444, AE445, AE601, AE622, and AE640). The drawing was finalized on October 1, 2025, with Amendment 010 approved on March 20, 2026. All work is classified as unclassified and falls under NAVFAC oversight, with the Project Number 1740579 and design oversight by ROICC-ME (Resident Officer in Charge of Construction, Mid-Atlantic).

View the file

Other files

File Type Posted
_B60_Continuation Sheet_Amendment 010_03-31-26.pdf PDF
74_SP101_R1_AMENDMENT 010.pdf PDF
96_AE105_R2_AMENDMENT 010.pdf PDF
114_AE401_R1_AMENDMENT 010.pdf PDF
120_AE441_R1_AMENDMENT 010.pdf PDF
178_P-401_R2_AMENDMENT 010.pdf PDF
179_P-402_R1_AMENDMENT 010.pdf PDF
01 91 19_R1_AMENDMENT 009.pdf PDF
116_AE411_R1_AMENDMENT 009.pdf PDF
238_FX400_R1_AMENDMENT 009.pdf PDF
256_EP502_R1_AMENDMENT 009.pdf PDF
260_EP601_R1_AMENDMENT 009.pdf PDF
Att.pdf PDF
Solicitation Amendment N6247026R00120008 SF 30.pdf PDF
Att. S) FFE Final Package-R1_AMENDMENT 008.pdf PDF
_ATTAC1.PDF PDF
02 82 00.00 22_R1_AMENDMENT 008.pdf PDF
31_CS101_R1_AMENDMENT 008.pdf PDF
47_SD102_R1_AMENDMENT 008.pdf PDF
65_SF105_R1_AMENDMENT 008.pdf PDF
68_SF502_R1_AMENDMENT 008.pdf PDF
152_G-004B_R1_AMENDMENT 008.pdf PDF
182_P-601_R1_AMENDMENT 008.pdf PDF
190_MD106_R1_AMENDMENT 008.pdf PDF
192_MD108_R1_AMENDMENT 008.pdf PDF
02 83 00.00 22_R1_AMENDMENT 008.pdf PDF
02 84 16.00 22_R1_AMENDMENT 008.pdf PDF
148_AE804_R1_AMENDMENT 008.pdf PDF
193_MD109_R1_AMENDMENT 008.pdf PDF
210_MP107_R1_AMENDMENT 008.pdf PDF
N6247026R00120007 SF 30.pdf PDF
Solicitation Amendment N6247026R00120006 SF 30.pdf PDF
Solicitation Amendment N6247026R00120004 SF 30.pdf PDF
Att. A) Construction and Design Experience Project Data Sheet.doc.docx DOCX document
Att. E) Small Business Participation Commitment Document (SBPCD) AMD 0004.docx DOCX document
Att. F) Individual Small Business Subcontracting Plan AMD 0004.docx DOCX document
Att. Z) B60 Continuation Sheet AMD 004.pdf PDF
Att. X) DBIDS ACCESS REQUEST FORM.docx DOCX document
Amendment N6247026R00120003.pdf PDF
Att. W) DBIDS 5512 FORM.pdf PDF
Solicitation Amendment N6247026R00120002.pdf PDF
Att. T) Price_schedule AMD 0002.pdf PDF
Solicitation Amendment N6247026R00120001.pdf PDF
Att. G) - PIEE Vendor Access Instructions.pdf PDF
Att. M) Drawings Volume 2a.pdf PDF
Att. S) FFE Package.pdf PDF
Att. U) Submittal Register.xlsx XLSX spreadsheet
Att. I) Specifications Volume 2.pdf PDF
Att. L) Drawings Volume 1b.pdf PDF
Att. P) 01 45 35a Statement_of_Special_Inspections.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DN

DN

UP

UP

DN

np e3 e4 e5 e6

STAIR

003B

CUSTODIAL

M104

60E1K

N

1E

2' -6

9'

-7

(4 T

R E

A D

S A

T

1"

5'-3" ±

(LANDING)

5'-3" ±

(LANDING)

5' -6

/2

(1

R

IS

E R

S

(L A

N D

IN

G

AE501

D1

UP

DN

NB

1E

1D 1E

1E

NB

1J

NF

M104

M106

M105

3B

D3

AE530

19' - 2 3/4"

6' - 0 1/2" 1' - 11 3/4" 5' - 6" 6' - 2 1/2" 11

/2

9'

1/

2" 1'

/4

8'

7"

1'

3" 5'

1/ 4"

6' - 7 1/4" 6' - 11" 6' - 2 3/4" n.9 n.5

NF

1J

1E

NF

UP

12'-0"

11" 12

(M

IN

5'

3/

4"

EXISTING STAIR

A1

AE223

C

B

B kn e1 e2 (10 TREADS AT 11")

1J

1J

'-1

0"

2B

1J

C3

AE442

AE444 C4

2.1 k.9 k.1

2.4 k.5

3'-8" 6'-5"

9'-2"

(7 TREADS AT 11")LANDING

8' -4

(C

LE

A R

3' -8

LANDING

(C

LE

A R

3' -8

5'-6 3/8"

(MIN)

1'-0"

NF

NF

1'

1/

2"

DN

A3

AE442

1' - 0" n e3 e4 e5

3C

ALIGN

1D

60PS2A

ND

1D

1D

ND

NS

5'-8 3/8"

5' -6

/4

ALIGN

DN

AE530

A1

(SIM)

EXISTING

STAIR

A1

AE223

kn e1 e2

W

1B

1J

1J

'-1

0"

1J

2A

C3

AE442

2.1 k.9 k.1

2.4

11"

(C

LE

A R

3' -8

STAIR EDGE

ABOVE

OUTLINE OF STAIR

ABOVE

8" 18'-6" 8"

8'-8"

7" 3'

0"

7" A3

AE442

np e3 e4 e5

60N1E

STAIR

003A

1J ND

1J

1J

NS

1D

003A

18' - 3 1/4"

CLEAR

5' - 4 1/2"

5'

1/

4"

3.5

2.8 n.9 n.5

1D

3/

8"

AE501

D2

EXISTING STAIR

EXISTING STAIR

7' - 9 1/4"

2'

1/

2"1' - 2 1/2"

1' - 2 1/2"

3'

9"

11"

A1

AE223

gj

5.8

5.6 i.1 g.1

18 TREADS AT 11"

16'-6"

C1

AE442

4'

0" 9"

11" 1' - 0"

C

LE

A R

3' -5

SATISFACTORY TO DATE

APPROVED

FOR COMMANDER NAVFAC

SEAL

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SHEET

NAVFAC DRAWING NO.

DESIGNER

DRAWN BY

CHECKED BY

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

DRAWFORM REVISION: 14 SEP 2023

DESIGN MANAGER

PROJECT MANAGER

FEAD/PM&E

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

T

IC

P O

R T

S M

O U

T H

N A

V A

L S

H

IP

Y A

R D

K

IT

T

E R

Y M

E

UNCLASSIFIED

UNCLASSIFIED

U N

C L

A S

S

IF

IE

D

ACTIVITY

1740579

T. CARLETON

L. LYONS

S. RUCINSKI

/2

/2

:1

:3

P

M

C U s e rs \m d o n o v a n \D o c u m e n ts \2

.2

B L

D G

A

R C

H

IT

E C

T U

R A

L -V m d o n o v a n

V F

X R

.r v t

AE440

B

R

E P

A

IR

S

E N

L A

R G

E D

S T

A

IR

P L A

N S

RSH

JMR

MJD

K

IT

T E

R Y

M

E P

O R

T S

M O

U T

H N

A V

A L S

H

IP

Y A

R D

R O

IC

C

-M E

A E

SCALE: 1/4" = 1'-0" (AE104)

A2

STAIR 003 FIRST FLOOR MEZZANINE PLAN

SCALE: 1/4" = 1'-0" (AE104)

C2

STAIR 002 FIRST FLOOR MEZZANINE PLAN

SCALE: 1/4" = 1'-0" (AE105)

A4

STAIR 003 SECOND FLOOR PLAN

SCALE: 1/4" = 1'-0" (AE102)

C1

STAIR 002 FIRST FLOOR PLAN

SCALE: 1/4" = 1'-0" (AE102)

A1

STAIR 003 FIRST FLOOR PLAN

PLAN

NORTH

1/4" = 1' - 0" 0 5' 10' 15'1'

GENERAL NOTES

GRAPHIC SCALE(S)

KEY PLAN

KEYNOTES

MATCH LINE

GUARDRAIL SYSTEM, SEE SIMILAR DETAIL C4/AE444.

HANDRAIL, SEE DETAILS A2/AE444 AND A3/AE444.

GUARDRAIL AND HANDRAIL, SEE DETAIL B3/AE444.

PLUMBING FIXTURE, SEE PLUMBING SHEETS.

EXISTING CRANE RAIL BRACKET.

IMPROVE GUARDRAIL AND PROVIDE HANDRAIL, SEE DETAIL A4/AE445

SELF-CLOSING SAFETY GATE, SEE DETAIL D3/AE445.

CONT ALUM ISOLATION JOINT COVER WITH SPRING CLIP.

HANDRAIL, SEE DETAIL A4/AE444.

REPAIR WOOD WINDOW/DOOR. SEE RESTORATION SCHEDULES.

A1

AAE440

C1

AE440

C2

AE440

A2

AE440

A4

AE440

1. SEE SHEET AE001 FOR WALL TYPES.

2. SEE SHEET AE601 FOR DOOR SCHEDULE.

3. SEE SHEET AE622 FOR DOOR RESTORATION SCHEDULES.

4. SEE SHEET AE640 FOR ROOM FINISH SCHEDULE.

SCALE: 1/4" = 1'-0" (AE104)

C4

STAIR M110 MEZZANINE FLOOR PLAN

(THIS SHEET ONLY)

C4

AE440

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

F

IN

A L

S U

B M

IS

S

IO

N

/0

1/

R

S H

A

M E

N D

M E

N T

/2

0/

R

S H

Sheets
AE440 - ENLARGED STAIR PLANS 1

File details come from the government source that posted it. Updated .