96_AE105_R2_AMENDMENT 010.pdf
PDF 430 KB Posted
- Solicitation number
- N6247026R0012
About this file
This is an architectural drawing for the second floor plan of Building 60 at Portsmouth Naval Shipyard in Kittery, Maine. The drawing is part of a renovation and repair project designated as B60 Repairs, with project number 1740579.
The scope of work includes patch and repair of wood flooring, installation of carpet tile, reinstatement of historic borrowed lights, repair and reinstallation of salvaged interior aluminum storm windows, plumbing fixture installation with blocking in stud walls, floor hatch cover installation, guardrail system installation, infill work to match existing wall types, patching of removed wood strip flooring, and patching of existing concrete masonry unit (CMU). The drawing identifies specific rooms on the second floor including custodial (202), women (203), men (204), expressing (205), upholstery (206), shop (207), open office (208), training (209), office (210), multi-purpose (211), corridor (212), electrical (213), and network (214) spaces. The document notes that Building B59 will be occupied during contracting and requires coordination of the work plan and access with the construction officer. An additional 200 square feet of patch and repair wood floor work is included in the lump sum base bid for work not otherwise indicated in the drawings, with locations to be coordinated with the contracting officer. The drawing was last revised on March 20, 2026 (Amendment 010).
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C1
AE203
A1
AE204
A1
AE203
A1
AE202
C1
AE202
C1
AE221
A1
AE221
C1
AE222
abcdefgjknp e1 e2 e3 e4 e5 e6 e7
AA
UPHOLSTERY
TRAINING
CUSTODIAL
MEN
WOMEN
SHOP
ROOF BELOW SEE
SHEET AE121
55555
3C
AE741
AE411
C1
AE441
A1
AE402
C1
AE440
A4
(TYP)(TYP)
(TYP)
(TYP)
(TYP)
(TYP)
EXPRESSING
STAIR
003C
C1
AE223
60S2C
60E2A
60PN2A
60E2B60E2C60E2D60E2E60E2F60E2G60E2I 60E2H
60PS2A
60E2J
60N2A
60N2B
60W2B 60W2E 60W2F 60W2G 60W2H 60W2I 60W2J
FE
S1 S1
8 8 8 8 8 8 8
NETWORK
C1
AE204
STAIR
004C
OFFICE
MULTI-PURPOSE
CORRIDOR
ELECTRICAL
STAIR
D5
OPEN OFFICE
CORRIDOR
8B
206B
AE741
D4
S1S1S1
S1
S1 S1 S1 S1 S1 S1 S1
S2
6A
ELEV
209A
9B
3'-3" ±
9NC
'-1
1"
6' -2
(TYP)
(TYP)
'-1
5/ 8"
6' -0
'-2
1' - 1 1/2"
14' - 1 1/4"
5'
1/
4"
3'
1/
4"
1'
1/
4"
1'
6"
12 S1
8A
3.5
2.8
2.5
2.1 n.9 k.9 k.1
2.4 n.5 k.5
60N2C
60S2B
60S2A
60W2A 60W2C 60W2D
4C
NF
NF
10'-6" 3'-0" 10'-10"
AE501
B1
UP
AE501
B1
(MIR)
BL2 2
10' - 0" ±
9'
1/
2"
FE
FE
FIRE PROTECTION
EQUIPMENT, SEE
FIRE PROTECTION
SHEETS
C1
4" ±
2' - 0" ±
A1
AE223
2'
1/
2"
1. SEE SHEET AE101 FOR GENERAL NOTES.
2. B59 WILL BE OCCUPIED DURING CONTRACTING. COORDINATE WORK PLAN
AND ACCESS WITH CONSTRUCTION OFFICER.
3. IN ADDITION TO THE AREAS INDICATED, PROVIDE 200 SF OF PATCH AND
REPAIR WOOD FLOOR WORK FOR WORK NOT OTHERWISE INDICATED IN THE
DRAWINGS. LOCATIONS TO BE COORDINATED WITH THE CONTRACTING
OFFICER, PLANS, SPECIFICATIONS, AND REPORTS. THE QUANTITIES
INDICATED IN PLANS AND SPECIFICATIONS AND NOTED ABOVE ARE TO BE
INCLUDED IN THE LUMP SUM BASE BID LINE ITEM.
SATISFACTORY TO DATE
APPROVED
FOR COMMANDER NAVFAC
SEAL
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SHEET
NAVFAC DRAWING NO.
DESIGNER
DRAWN BY
CHECKED BY
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 14 SEP 2023
DESIGN MANAGER
PROJECT MANAGER
FEAD/PM&E
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
T
IC
P O
R T
S M
O U
T H
N A
V A
L S
H
IP
Y A
R D
K
IT
T
E R
Y M
E
UNCLASSIFIED
UNCLASSIFIED
U N
C L
A S
S
IF
IE
D
ACTIVITY
1740579
T. CARLETON
L. LYONS
S. RUCINSKI
/2
/2
:3
:5
A
M
C U s e rs \m d o n o v a n \D o c u m e n ts \2
.2
B L
D G
A
R C
H
IT
E C
T U
R A
L -V m d o n o v a n
V F
X R
.r v t
AE105
B
R
E P
A
IR
S
S E
C O
N D
F L O
O R
P L A
N
RSH
JMR
MJD
K
IT
T E
R Y
M
E P
O R
T S
M O
U T
H N
A V
A L S
H
IP
Y A
R D
R O
IC
C
-M E
A E
SCALE: 1/8" = 1'-0"
B1
SECOND FLOOR PLAN
MATCH LINE
PLAN
NORTH
1/8" = 1' - 0" 0 5' 10' 15' 30'
GRAPHIC SCALE(S)
KEY PLANGENERAL NOTES KEYNOTES
INDUSTRIAL EQUIPMENT, SEE Q-SHEETS.
REINSTALL HISTORIC BORROWED LIGHTS.
PLUMBING FIXTURE, SEE PLUMBING SHEETS. PROVIDE BLOCKING IN STUD WALL AT WALL MOUNTED
FIXTURE LOCATIONS.
PATCH AND REPAIR WOOD FLOOR FOR INSTALLATION OF CARPET TILE.
REPAIR AND REINSTALL SALVAGED INTERIOR ALUMINUM STORM WINDOWS.
FLOOR HATCH COVER, SEE STRUCTURAL SHEETS.
PATCH AND REPAIR WOOD FLOOR WHERE PLYWOOD WAS REMOVED, REFINISH WOOD FLOOR.
GUARDRAIL SYSTEM, SEE DETAIL A4/AE626.
INFILL TO MATCH EXISTING WALL TYPE.
PATCH REMOVED AREA OF WOOD STRIP FLOORING AND FINISH TO MATCH EXISTING.
PATCH EXISTING CMU.
REINSTALL RELOCATED ALUMINUM STORM WINDOW. REFER TO SHEET AD104 FOR EXISTING
LOCATION IN OFFICE 217.
PATCH WALL TO MATCH EXISTING ADJACENT
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
F
IN
A L
S U
B M
IS
S
IO
N
/0
1/
R
S H
A
M E
N D
M E
N T
/1
0/
R
S H
A
M E
N D
M E
N T
/2
0/
R
S H
| Sheets |
| AE105 - SECOND FLOOR PLAN |
| AE401 - ENLARGED FIRST FLOOR TOILET ROOM AND INTERIOR ELEVATION |
| AE402 - ENLARGED SECOND FLOOR TOILET ROOM PLANS AND ELEVATIONS |
| AE441 - ENLARGED STAIR PLANS 2 |
| AE444 - STAIR DETAILS |
| AE511 - METAL PANEL DETAILS |
| AE601 - DOOR SCHEDULE AND DETAILS |
| AE640 - ROOM FINISH SCHEDULE |
| SP101 - STRUCTURAL PROTECTION PART PLAN AND DETAILS |
File details come from the government source that posted it. Updated .