This is an architectural drawing for the second floor plan of Building 60 at Portsmouth Naval Shipyard in Kittery, Maine. The drawing is part of a renovation and repair project designated as B60 Repairs, with project number 1740579.

The scope of work includes patch and repair of wood flooring, installation of carpet tile, reinstatement of historic borrowed lights, repair and reinstallation of salvaged interior aluminum storm windows, plumbing fixture installation with blocking in stud walls, floor hatch cover installation, guardrail system installation, infill work to match existing wall types, patching of removed wood strip flooring, and patching of existing concrete masonry unit (CMU). The drawing identifies specific rooms on the second floor including custodial (202), women (203), men (204), expressing (205), upholstery (206), shop (207), open office (208), training (209), office (210), multi-purpose (211), corridor (212), electrical (213), and network (214) spaces. The document notes that Building B59 will be occupied during contracting and requires coordination of the work plan and access with the construction officer. An additional 200 square feet of patch and repair wood floor work is included in the lump sum base bid for work not otherwise indicated in the drawings, with locations to be coordinated with the contracting officer. The drawing was last revised on March 20, 2026 (Amendment 010).

View the file

Other files

File Type Posted
AMENDMENT 0011 Attachments.zip ZIP file
Solicitation Amendment N6247026R00120011 SF 30.pdf PDF
Att. GG) Amendment 0011 Attachment Table of Contents.pdf PDF
222_M-703_R1_AMENDMENT 010.pdf PDF
183_P-701_R1_AMENDMENT 010.pdf PDF
123_AE444_R1_AMENDMENT 010.pdf PDF
Att. Y) PPI responses AMD 0010.pdf PDF
Att. FF) Amendment 0010 Attachment Table of Contents.pdf PDF
14 24 23_AMENDMENT 010.pdf PDF
120_AE441_R1_AMENDMENT 010.pdf PDF
179_P-402_R1_AMENDMENT 010.pdf PDF
171_P-103_R1_AMENDMENT 010.pdf PDF
01 11 00.00 22_AMENDMENT 010.pdf PDF
164_PD102_R1_AMENDMENT 010.pdf PDF
132_AE601_R1_AMENDMENT 010.pdf PDF
275_ET102_R1_AMENDMENT 010.pdf PDF
182_P-601_R2_AMENDMENT 010.pdf PDF
126_AE511_R1_AMENDMENT 010.pdf PDF
101_AE121_R1_AMENDMENT 010.pdf PDF
74_SP101_R1_AMENDMENT 010.pdf PDF
176_P-108_R1_AMENDMENT 010.pdf PDF
178_P-401_R2_AMENDMENT 010.pdf PDF
_B60_Continuation Sheet_Amendment 010_03-31-26.pdf PDF
173_P-105_R1_AMENDMENT 010.pdf PDF
119_AE440_R1_AMENDMENT 010.pdf PDF
138_AE640_R1_AMENDMENT 010.pdf PDF
174_P-106_R1_AMENDMENT 010.pdf PDF
180_P-403_R1_AMENDMENT 010.pdf PDF
172_P-104_R1_AMENDMENT 010.pdf PDF
186_MD102_R1_AMENDMENT 010.pdf PDF
169_P-101_R1_AMENDMENT 010.pdf PDF
177_P-109_R1_AMENDMENT 010.pdf PDF
114_AE401_R1_AMENDMENT 010.pdf PDF
677 attach Attic_AFPR.pdf PDF
161_Q-601_R2_AMENDMENT 010.pdf PDF
170_P-102_R1_AMENDMENT 010.pdf PDF
Solicitation Amendment N6247026R00120010 SF 30.pdf PDF
175_P-107_R1_AMENDMENT 010.pdf PDF
01 30 10.00 22_AMENDMENT 010.pdf PDF
Att. T) Price Schedule AMD 0010.pdf PDF
115_AE402_R1_AMENDMENT 010.pdf PDF
249_EP102_R1_AMENDMENT 009.pdf PDF
252_EP105_R1_AMENDMENT 009.pdf PDF
256_EP502_R1_AMENDMENT 009.pdf PDF
255_EP501_R1_AMENDMENT 009.pdf PDF
Att. EE) Amendment 0009 Attachment Table of Contents.pdf PDF
18_HM101_R1_AMENDMENT 009.pdf PDF
07 22 00_R1_AMENDMENT 009.pdf PDF
238_FX400_R1_AMENDMENT 009.pdf PDF
116_AE411_R1_AMENDMENT 009.pdf PDF
Show 40 more

Latest 50 of 157 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C1

AE203

A1

AE204

A1

AE203

A1

AE202

C1

AE202

C1

AE221

A1

AE221

C1

AE222

abcdefgjknp e1 e2 e3 e4 e5 e6 e7

AA

UPHOLSTERY

TRAINING

CUSTODIAL

MEN

WOMEN

SHOP

ROOF BELOW SEE

SHEET AE121

55555

3C

AE741

AE411

C1

AE441

A1

AE402

C1

AE440

A4

(TYP)(TYP)

(TYP)

(TYP)

(TYP)

(TYP)

EXPRESSING

STAIR

003C

C1

AE223

60S2C

60E2A

60PN2A

60E2B60E2C60E2D60E2E60E2F60E2G60E2I 60E2H

60PS2A

60E2J

60N2A

60N2B

60W2B 60W2E 60W2F 60W2G 60W2H 60W2I 60W2J

FE

S1 S1

8 8 8 8 8 8 8

NETWORK

C1

AE204

STAIR

004C

OFFICE

MULTI-PURPOSE

CORRIDOR

ELECTRICAL

STAIR

D5

OPEN OFFICE

CORRIDOR

8B

206B

AE741

D4

S1S1S1

S1

S1 S1 S1 S1 S1 S1 S1

S2

6A

ELEV

209A

9B

3'-3" ±

9NC

'-1

1"

6' -2

(TYP)

(TYP)

'-1

5/ 8"

6' -0

'-2

1' - 1 1/2"

14' - 1 1/4"

5'

1/

4"

3'

1/

4"

1'

1/

4"

1'

6"

12 S1

8A

3.5

2.8

2.5

2.1 n.9 k.9 k.1

2.4 n.5 k.5

60N2C

60S2B

60S2A

60W2A 60W2C 60W2D

4C

NF

NF

10'-6" 3'-0" 10'-10"

AE501

B1

UP

AE501

B1

(MIR)

BL2 2

10' - 0" ±

9'

1/

2"

FE

FE

FIRE PROTECTION

EQUIPMENT, SEE

FIRE PROTECTION

SHEETS

C1

4" ±

2' - 0" ±

A1

AE223

2'

1/

2"

1. SEE SHEET AE101 FOR GENERAL NOTES.

2. B59 WILL BE OCCUPIED DURING CONTRACTING. COORDINATE WORK PLAN

AND ACCESS WITH CONSTRUCTION OFFICER.

3. IN ADDITION TO THE AREAS INDICATED, PROVIDE 200 SF OF PATCH AND

REPAIR WOOD FLOOR WORK FOR WORK NOT OTHERWISE INDICATED IN THE

DRAWINGS. LOCATIONS TO BE COORDINATED WITH THE CONTRACTING

OFFICER, PLANS, SPECIFICATIONS, AND REPORTS. THE QUANTITIES

INDICATED IN PLANS AND SPECIFICATIONS AND NOTED ABOVE ARE TO BE

INCLUDED IN THE LUMP SUM BASE BID LINE ITEM.

SATISFACTORY TO DATE

APPROVED

FOR COMMANDER NAVFAC

SEAL

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SHEET

NAVFAC DRAWING NO.

DESIGNER

DRAWN BY

CHECKED BY

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

DRAWFORM REVISION: 14 SEP 2023

DESIGN MANAGER

PROJECT MANAGER

FEAD/PM&E

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

T

IC

P O

R T

S M

O U

T H

N A

V A

L S

H

IP

Y A

R D

K

IT

T

E R

Y M

E

UNCLASSIFIED

UNCLASSIFIED

U N

C L

A S

S

IF

IE

D

ACTIVITY

1740579

T. CARLETON

L. LYONS

S. RUCINSKI

/2

/2

:3

:5

A

M

C U s e rs \m d o n o v a n \D o c u m e n ts \2

.2

B L

D G

A

R C

H

IT

E C

T U

R A

L -V m d o n o v a n

V F

X R

.r v t

AE105

B

R

E P

A

IR

S

S E

C O

N D

F L O

O R

P L A

N

RSH

JMR

MJD

K

IT

T E

R Y

M

E P

O R

T S

M O

U T

H N

A V

A L S

H

IP

Y A

R D

R O

IC

C

-M E

A E

SCALE: 1/8" = 1'-0"

B1

SECOND FLOOR PLAN

MATCH LINE

PLAN

NORTH

1/8" = 1' - 0" 0 5' 10' 15' 30'

GRAPHIC SCALE(S)

KEY PLANGENERAL NOTES KEYNOTES

INDUSTRIAL EQUIPMENT, SEE Q-SHEETS.

REINSTALL HISTORIC BORROWED LIGHTS.

PLUMBING FIXTURE, SEE PLUMBING SHEETS. PROVIDE BLOCKING IN STUD WALL AT WALL MOUNTED

FIXTURE LOCATIONS.

PATCH AND REPAIR WOOD FLOOR FOR INSTALLATION OF CARPET TILE.

REPAIR AND REINSTALL SALVAGED INTERIOR ALUMINUM STORM WINDOWS.

FLOOR HATCH COVER, SEE STRUCTURAL SHEETS.

PATCH AND REPAIR WOOD FLOOR WHERE PLYWOOD WAS REMOVED, REFINISH WOOD FLOOR.

GUARDRAIL SYSTEM, SEE DETAIL A4/AE626.

INFILL TO MATCH EXISTING WALL TYPE.

PATCH REMOVED AREA OF WOOD STRIP FLOORING AND FINISH TO MATCH EXISTING.

PATCH EXISTING CMU.

REINSTALL RELOCATED ALUMINUM STORM WINDOW. REFER TO SHEET AD104 FOR EXISTING

LOCATION IN OFFICE 217.

PATCH WALL TO MATCH EXISTING ADJACENT

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

F

IN

A L

S U

B M

IS

S

IO

N

/0

1/

R

S H

A

M E

N D

M E

N T

/1

0/

R

S H

A

M E

N D

M E

N T

/2

0/

R

S H

Sheets
AE105 - SECOND FLOOR PLAN
AE401 - ENLARGED FIRST FLOOR TOILET ROOM AND INTERIOR ELEVATION
AE402 - ENLARGED SECOND FLOOR TOILET ROOM PLANS AND ELEVATIONS
AE441 - ENLARGED STAIR PLANS 2
AE444 - STAIR DETAILS
AE511 - METAL PANEL DETAILS
AE601 - DOOR SCHEDULE AND DETAILS
AE640 - ROOM FINISH SCHEDULE
SP101 - STRUCTURAL PROTECTION PART PLAN AND DETAILS

File details come from the government source that posted it. Updated .