This is a mechanical plumbing plan for Building 60, specifically the First Floor Mezzanine Plumbing Plan - East section. The drawing is scaled at 1/8" = 1'-0" and was generated on 3/20/2026 from a Revit file (22103.25_BLDG60_MECHANICAL-V23). The plan is classified as UNCLASSIFIED and is prepared by OAK POINT ASSOCIATES.
The plan details the plumbing infrastructure for the east portion of the first floor mezzanine, including a fire pump (M107) positioned at the top of the drawing with connections marked as "OPEN TO BELOW." The system features various piping configurations with risers and drops, including 1/2" through-penetration (TP) connections, 3/4" cold water (CW) lines, and 2" vertical risers to 3" valves. The plan identifies multiple annexes (116, 117, 118) and specifies equipment designations such as FD-3 and P-501. General notes reference plumbing legends, abbreviations, and require maintaining 2'-0" clearance for equipment servicing. The key plan provides orientation, and a graphic scale is included for reference. This document appears to be a construction or renovation plan requiring coordination of mechanical and plumbing systems within the building structure.
View the file
Other files
Show 40 more
Latest 50 of 157 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FIRE PUMP
M107
OPEN TO BELOW
AA
ANNEX
ANNEX
1/2" TP DN
1/2" CW DROP
TPA
B4 P-501
3/4" CW
2" V RISE TO 3" VTR
2" V DN
& RISE
FD-3
e12 e11 o m l i h e10 e9
J.2 J.1
8.3
8.1
7.8
7.1 e8 e7 e6
ANNEX
SATISFACTORY TO DATE
APPROVED
FOR COMMANDER NAVFAC
SEAL
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SHEET
NAVFAC DRAWING NO.
DESIGNER
DRAWN BY
CHECKED BY
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 14 SEP 2023
DESIGN MANAGER
PROJECT MANAGER
FEAD/PM&E
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
T
IC
P O
R T
S M
O U
T H
N A
V A
L S
H
IP
Y A
R D
K
IT
T
E R
Y M
E
UNCLASSIFIED
UNCLASSIFIED
U N
C L
A S
S
IF
IE
D
ACTIVITY
1740579
T. CARLETON
L. LYONS
S. RUCINSKI
/2
/2
:2
:2
P
M
C U s e rs \s ri c h a rd s \D o c u m e n ts
\2
.2
B
L D
G
M
E C
H A
N
IC
A L
-V s w h it e G
Z D
.r v t
P-105
B
R
E P
A
IR
S
F
IR
S T
F L O
O R
M E
Z Z
A N
IN
E
P L U
M B
IN
G
P L A
N
E A
S T
MSA
RNC
SRW
K
IT
T E
R Y
M
E P
O R
T S
M O
U T
H N
A V
A L S
H
IP
Y A
R D
R O
IC
C
-M E
P -1
SCALE: 1/8" = 1'-0"
A1
FIRST FLOOR MEZZANINE PLUMBING PLAN - EAST
1/8" = 1' - 0" 0 5' 10' 15' 30'
GENERAL NOTES
GRAPHIC SCALE
KEY PLAN
KEYNOTES
1.
2.
SEE P-001 FOR PLUMBING LEGENDS, ABBREVIATIONS AND GENERAL
NOTES.
COORDINATE THE INSTALLATION OF PIPING AND EQUIPMENT TO
MAINTAIN MANDATORY CLEARANCE ZONES AROUND CRANE RAILS AND
BRIDGE CRANE OPERATIONAL TRAVEL PATH.
MATCH LINE
CHECK GRAPHIC SCALE BEFORE USING
PLAN
NORTH
1 PROVIDE 2" V UP WITH 3" VTR. VTR MUST BE A MINIMUM OF 10'-0" FROM
EDGE OF THE WALL.
(THIS SHEET ONLY)
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
F
IN
A L
S U
B M
IS
S
IO
N
/0
1/
R
S H
A
M E
N D
M E
N T
/2
0/
R
S H
| Sheets |
| M-703 - MECHANICAL CONTROL DIAGRAMS 3 |
| MD102 - FIRST FLOOR MECHANICAL DUCTWORK REMOVALS PLAN - EAST |
| P-101 - UNDERSLAB PLUMBING PLAN - EAST |
| P-102 - UNDERSLAB PLUMBING PLAN - WEST |
| P-103 - FIRST FLOOR PLUMBING PLAN - EAST |
| P-104 - FIRST FLOOR PLUMBING PLAN - WEST |
| P-105 - FIRST FLOOR MEZZANINE PLUMBING PLAN - EAST |
| P-106 - FIRST FLOOR MEZZANINE PLUMBING PLAN - WEST |
| P-107 - SECOND FLOOR PLUMBING PLAN |
| P-108 - SECOND FLOOR MEZZANINE PLUMBING PLAN |
| P-109 - ATTIC PLUMBING PLAN |
| P-401 - ENLARGED PLUMBING PART PLANS 1 |
| P-402 - ENLARGED PLUMBING PART PLANS 2 |
| P-403 - ENLARGED PLUMBING PART PLANS 3 |
| P-601 - PLUMBING SCHEDULES AND DETAIL |
| P-701 - PLUMBING RISER DIAGRAM |
| PD102 - FIRST FLOOR PLUMBING REMOVALS PLAN - EAST |