This is an architectural drawing sheet for hazardous materials abatement work at Portsmouth Naval Shipyard in Kittery, Maine. The document is a First Floor Hazardous Materials Part Plan - East (Sheet HM101) for Building 60 Repairs, prepared by Naval Facilities Engineering Systems Command (NAVFAC) Mid-Atlantic. The drawing is dated with a final submission of October 1, 2025, and an amendment dated March 16, 2026.

The sheet identifies multiple hazardous materials requiring abatement and removal, including asbestos-containing pipe insulation, asbestos-containing mastics at wood strip flooring removals and penetrations, and heavy metals-containing paint on concrete, brick, and steel surfaces. Specific work tasks include managing disturbances to grey and red floor paint on concrete and white paint on brick; abating and removing loose and flaking heavy metals-containing coatings on steel buttresses; removing asbestos-containing pipe insulation and heavy metals-containing paint debris from floor drains; abating black seam sealant at vertical joints between annex and brick; and abating grey sealant at bolt holes and patches on exterior wall surfaces. The drawing references additional sheets (HM001, HM603-HM604) for general notes, hazardous materials survey, and ACM and sampling schedules. The project number is 1740579, with design management by T. Carleton, drawn by L. Lyons, and checked by S. Rucinski.

View the file

Other files

File Type Posted
AMENDMENT 0011 Attachments.zip ZIP file
Solicitation Amendment N6247026R00120011 SF 30.pdf PDF
Att. GG) Amendment 0011 Attachment Table of Contents.pdf PDF
222_M-703_R1_AMENDMENT 010.pdf PDF
96_AE105_R2_AMENDMENT 010.pdf PDF
183_P-701_R1_AMENDMENT 010.pdf PDF
123_AE444_R1_AMENDMENT 010.pdf PDF
Att. Y) PPI responses AMD 0010.pdf PDF
Att. FF) Amendment 0010 Attachment Table of Contents.pdf PDF
14 24 23_AMENDMENT 010.pdf PDF
120_AE441_R1_AMENDMENT 010.pdf PDF
179_P-402_R1_AMENDMENT 010.pdf PDF
171_P-103_R1_AMENDMENT 010.pdf PDF
01 11 00.00 22_AMENDMENT 010.pdf PDF
164_PD102_R1_AMENDMENT 010.pdf PDF
132_AE601_R1_AMENDMENT 010.pdf PDF
275_ET102_R1_AMENDMENT 010.pdf PDF
182_P-601_R2_AMENDMENT 010.pdf PDF
126_AE511_R1_AMENDMENT 010.pdf PDF
101_AE121_R1_AMENDMENT 010.pdf PDF
74_SP101_R1_AMENDMENT 010.pdf PDF
176_P-108_R1_AMENDMENT 010.pdf PDF
178_P-401_R2_AMENDMENT 010.pdf PDF
_B60_Continuation Sheet_Amendment 010_03-31-26.pdf PDF
173_P-105_R1_AMENDMENT 010.pdf PDF
119_AE440_R1_AMENDMENT 010.pdf PDF
138_AE640_R1_AMENDMENT 010.pdf PDF
174_P-106_R1_AMENDMENT 010.pdf PDF
180_P-403_R1_AMENDMENT 010.pdf PDF
172_P-104_R1_AMENDMENT 010.pdf PDF
186_MD102_R1_AMENDMENT 010.pdf PDF
169_P-101_R1_AMENDMENT 010.pdf PDF
177_P-109_R1_AMENDMENT 010.pdf PDF
114_AE401_R1_AMENDMENT 010.pdf PDF
677 attach Attic_AFPR.pdf PDF
161_Q-601_R2_AMENDMENT 010.pdf PDF
170_P-102_R1_AMENDMENT 010.pdf PDF
Solicitation Amendment N6247026R00120010 SF 30.pdf PDF
175_P-107_R1_AMENDMENT 010.pdf PDF
01 30 10.00 22_AMENDMENT 010.pdf PDF
Att. T) Price Schedule AMD 0010.pdf PDF
115_AE402_R1_AMENDMENT 010.pdf PDF
249_EP102_R1_AMENDMENT 009.pdf PDF
252_EP105_R1_AMENDMENT 009.pdf PDF
256_EP502_R1_AMENDMENT 009.pdf PDF
255_EP501_R1_AMENDMENT 009.pdf PDF
Att. EE) Amendment 0009 Attachment Table of Contents.pdf PDF
07 22 00_R1_AMENDMENT 009.pdf PDF
238_FX400_R1_AMENDMENT 009.pdf PDF
116_AE411_R1_AMENDMENT 009.pdf PDF
Show 40 more

Latest 50 of 157 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C2

HM106

AA

SHOP

SHOP

SHOP

1. SEE HM001 FOR GENERAL SHEET NOTES, HAZARDOUS MATERIALS NOTES,

HAZARDOUS MATERIALS SURVEY, AND HAZARDOUS MATERIALS WORK PLAN.

2. SEE HM603-HM604 FOR SUMMARY OF ACM AND SAMPLING SCHEDULES.

3. ABATE AND REMOVE ASBESTOS CONTAINING MASTICS AT WOOD STRIP

FLOORING REMOVALS/PENETRATIONS.

SATISFACTORY TO DATE

APPROVED

FOR COMMANDER NAVFAC

SEAL

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SHEET

NAVFAC DRAWING NO.

DESIGNER

DRAWN BY

CHECKED BY

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

DRAWFORM REVISION: 14 SEP 2023

DESIGN MANAGER

PROJECT MANAGER

FEAD/PM&E

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

T

IC

P O

R T

S M

O U

T H

N A

V A

L S

H

IP

Y A

R D

K

IT

T

E R

Y M

E

UNCLASSIFIED

UNCLASSIFIED

U N

C L

A S

S

IF

IE

D

ACTIVITY

1740579

T. CARLETON

L. LYONS

S. RUCINSKI

/1

/2

:5

:3

A

M

C U s e rs \m d o n o v a n \D o c u m e n ts \2

.2

B L

D G

A

R C

H

IT

E C

T U

R A

L -V m d o n o v a n

V F

X R

.r v t

HM101

B

R

E P

A

IR

S

F

IR

S T

F L O

O R

H A

Z A

R D

O U

S M

A T

E R

IA

L S

P A

R T

P L A

N

E A

S T

RSH

JMR

MJD

K

IT

T E

R Y

M

E P

O R

T S

M O

U T

H N

A V

A L S

H

IP

Y A

R D

R O

IC

C

-M E

H M

GENERAL NOTES

GRAPHIC SCALE(S)

HAZARDOUS MATERIALS

KEYNOTES

SCALE: 1/8" = 1'-0"

A1

FIRST FLOOR HAZARDOUS MATERIALS PART PLAN - EAST

PLAN

NORTH

1/8" = 1' - 0" 0 5' 10' 15' 30'

KEY PLAN

ABATE AND REMOVE ASBESTOS CONTAINING PIPE INSULATION

MANAGE DISTURBANCES TO HEAVY METALS CONTAINING GREY/RED

FLOOR PAINT ON CONCRETE AND WHITE PAINT ON BRICK.

OPTION 7: ABATE AND REMOVE (BRUSH/SCRAPE) LOOSE AND FLANKING

HEAVY METALS/ASBESTOS CONTAINING SILVER COATING ON STEEL

BUTREESSES.

ABATE AND REMOVE ASBESTOS CONTAINING PIPE INSULATION AND HEAVY

METALS CONTAINING PAINT DEBRIS SETTLED WITHIN FLOOR DRAIN TO BE

REMOVED. COORDINATE WITH PLUMBING SHEETS.

ABATE AND REMOVE (BRUSH/SCRAPE) LOOSE AND FLAKING HEAVY METALS

CONTAINING GREY COATING ON STEEL BUTTRESSES AS REQUIRED AT

INSTALLATION OF EXTERIOR METAL PANEL WALL SYSTEM (MINIMUM OF 1'

FROM EXISTING FACE OF METAL SIDING). COORDINATE WITH

ARCHITECTURAL SHEETS.

ABATE AND REMOVE BLACK SEAM SEALANT AT VERTICAL JOINT BETWEEN

ANNEX AND BRICK.

ABATE AND REMOVE GREY SEALANT AT BOLT HOLES AND PATCHES ON

EXTERIOR WALL SURFACES.

(THIS SHEET ONLY)

MATCH LINE

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

F

IN

A L

S U

B M

IS

S

IO

N

/0

1/

R

S H

A

M E

N D

M E

N T

/1

6/

R

S H

Sheets
AD104 - SECOND FLOOR REMOVALS PLAN
AD105 - SECOND FLOOR MEZZANINE REMOVALS PLAN
AE104 - FIRST FLOOR MEZZANINE PART PLAN - WEST
AE105 - SECOND FLOOR PLAN
AE411 - ENLARGED ELEVATOR PLANS AND SECTIONS
AE441 - ENLARGED STAIR PLANS 2
AE444 - STAIR DETAILS
AE511 - METAL PANEL DETAILS
AE530 - EXPANSION JOINT DETAILS 1
AE531 - EXPANSION JOINT DETAILS 2
AE601 - DOOR SCHEDULE AND DETAILS
AE640 - ROOM FINISH SCHEDULE
HM101 - FIRST FLOOR HAZARDOUS MATERIALS PART PLAN - EAST
SP101 - STRUCTURAL PROTECTION PART PLAN AND DETAILS