This document is an Underslab Plumbing Plan for Building 60, Sheet P-102 (West section), prepared at a scale of 1/8" = 1'-0" as of March 20, 2026. The plan depicts mechanical and plumbing infrastructure including sanitary piping, water lines, vent pipes, compressed air piping, and elevator systems throughout the building's subslab area. Key piping elements include 4-inch sanitary lines, 2-inch and 3-inch water and waste lines, 1.5-inch and 2-inch vent pipes, and 6-inch radon vent pipes with open-end elbows into crushed stone fill. The plan coordinates with multiple referenced sheets including P-001 (plumbing legends), CX101 and CS (civil sheets for underground infrastructure), and SB101 (structural infill details).

Critical coordination requirements include maintaining clearance zones around existing crane rails and bridge crane operational paths, offsetting piping through walls around existing structural piers, and integrating with existing compressed air piping from Building 60 to Building 292 (which is to be cut, capped, and abandoned in place). The plan specifies floor saw cut infills, existing floor trenches to be filled and patched, and pitch specifications for certain lines at 1/8-inch per foot. This is a technical construction document prepared in Revit and intended for contractors and construction management teams working on building renovation or modernization activities.

View the file

Other files

File Type Posted
AMENDMENT 0011 Attachments.zip ZIP file
Solicitation Amendment N6247026R00120011 SF 30.pdf PDF
Att. GG) Amendment 0011 Attachment Table of Contents.pdf PDF
222_M-703_R1_AMENDMENT 010.pdf PDF
96_AE105_R2_AMENDMENT 010.pdf PDF
183_P-701_R1_AMENDMENT 010.pdf PDF
123_AE444_R1_AMENDMENT 010.pdf PDF
Att. Y) PPI responses AMD 0010.pdf PDF
Att. FF) Amendment 0010 Attachment Table of Contents.pdf PDF
14 24 23_AMENDMENT 010.pdf PDF
120_AE441_R1_AMENDMENT 010.pdf PDF
179_P-402_R1_AMENDMENT 010.pdf PDF
171_P-103_R1_AMENDMENT 010.pdf PDF
01 11 00.00 22_AMENDMENT 010.pdf PDF
164_PD102_R1_AMENDMENT 010.pdf PDF
132_AE601_R1_AMENDMENT 010.pdf PDF
275_ET102_R1_AMENDMENT 010.pdf PDF
182_P-601_R2_AMENDMENT 010.pdf PDF
126_AE511_R1_AMENDMENT 010.pdf PDF
101_AE121_R1_AMENDMENT 010.pdf PDF
74_SP101_R1_AMENDMENT 010.pdf PDF
176_P-108_R1_AMENDMENT 010.pdf PDF
178_P-401_R2_AMENDMENT 010.pdf PDF
_B60_Continuation Sheet_Amendment 010_03-31-26.pdf PDF
173_P-105_R1_AMENDMENT 010.pdf PDF
119_AE440_R1_AMENDMENT 010.pdf PDF
138_AE640_R1_AMENDMENT 010.pdf PDF
174_P-106_R1_AMENDMENT 010.pdf PDF
180_P-403_R1_AMENDMENT 010.pdf PDF
172_P-104_R1_AMENDMENT 010.pdf PDF
186_MD102_R1_AMENDMENT 010.pdf PDF
169_P-101_R1_AMENDMENT 010.pdf PDF
177_P-109_R1_AMENDMENT 010.pdf PDF
114_AE401_R1_AMENDMENT 010.pdf PDF
677 attach Attic_AFPR.pdf PDF
161_Q-601_R2_AMENDMENT 010.pdf PDF
Solicitation Amendment N6247026R00120010 SF 30.pdf PDF
175_P-107_R1_AMENDMENT 010.pdf PDF
01 30 10.00 22_AMENDMENT 010.pdf PDF
Att. T) Price Schedule AMD 0010.pdf PDF
115_AE402_R1_AMENDMENT 010.pdf PDF
249_EP102_R1_AMENDMENT 009.pdf PDF
252_EP105_R1_AMENDMENT 009.pdf PDF
256_EP502_R1_AMENDMENT 009.pdf PDF
255_EP501_R1_AMENDMENT 009.pdf PDF
Att. EE) Amendment 0009 Attachment Table of Contents.pdf PDF
18_HM101_R1_AMENDMENT 009.pdf PDF
07 22 00_R1_AMENDMENT 009.pdf PDF
238_FX400_R1_AMENDMENT 009.pdf PDF
116_AE411_R1_AMENDMENT 009.pdf PDF
Show 40 more

Latest 50 of 157 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHOP

SHOP

VEST

STAIR

003A

ANNEX

STORAGE

MECH

ELECTRICAL

AA

CORRIDOR

ANNEX

4" UP TO FCO

4" UP

TO FCO

4" UP

TO FCO

MEN

ELEV

STAIR

002A

(E) CO

EXISTING

SANITARY

MANHOLE

6 EXISTING 4" S

(E) 4" S

4" UP

TO FCO

4"

S A

N

SAN SAN

2 5

4" W UP 6" R OE 1

6" R UP

C A

1 1/2"3

3" CW UP

3"

6" R OE 1

6" R UP

6" R OE 1

6" R UP

SAN

3" S UP

2" PW UP

(E) 3/4" CA

CAPPED

2" W UP

(E) CO

4" UP

TO FCO

2" W UP

2" V UP

1 1/2" V UP

4" UP TO FCO

2" V UP (TYP 3)

1 1/2"

V UP

2" W UP

2" W UP

WOMEN

INSPECTION

NETWORK

STAIR

004A

4" S UP (TYP 3)

4" UP TO FCO

3" W&T

1 1/2" V UP

4" W UP

2" S UP

4" S UP

4" UP

TO FCO

3" W&T

4" ABANDONED

VENT CAPPED

2" W UP

CORRIDOR

CORRIDOR

SHOP

4" m l i h e7 p e6 n k j g.1 g f.1 f

M3

5.6

4.2 e4 e3

3.5

2.8 n.9 n.5 k.9 k.5

2.5

2.4

2.1 e2 e1 k.1 e d c b a i.1

ELEV

MACHINE

001A4" W&T UP

TO FS-1

2" V UP

1/2" TP

UP (TYP 3)

3" W UP

SP

4"

SAN

S A

N

2 4" 24"

4"

S A

N

1 1/2" CA UP

24" T

P

1/2"

3" W&T

1/2"

TP

T P

1/2"

4" W&T

4" 1/2" TP UP

S A

N

4"

INV EL: 6.55'

2" W

4" UP

TO FCO

1/2"

T

P 2" V UP

SATISFACTORY TO DATE

APPROVED

FOR COMMANDER NAVFAC

SEAL

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SHEET

NAVFAC DRAWING NO.

DESIGNER

DRAWN BY

CHECKED BY

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

DRAWFORM REVISION: 14 SEP 2023

DESIGN MANAGER

PROJECT MANAGER

FEAD/PM&E

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

T

IC

P O

R T

S M

O U

T H

N A

V A

L S

H

IP

Y A

R D

K

IT

T

E R

Y M

E

UNCLASSIFIED

UNCLASSIFIED

U N

C L

A S

S

IF

IE

D

ACTIVITY

1740579

T. CARLETON

L. LYONS

S. RUCINSKI

/2

/2

:2

:1

P

M

C U s e rs \s ri c h a rd s \D o c u m e n ts

\2

.2

B

L D

G

M

E C

H A

N

IC

A L

-V s w h it e G

Z D

.r v t

P-102

B

R

E P

A

IR

S

U N

D E

R S

L A

B P

L U

M B

IN

G

P L A

N

W E

S T

MSA

RNC

SRW

K

IT

T E

R Y

M

E P

O R

T S

M O

U T

H N

A V

A L S

H

IP

Y A

R D

R O

IC

C

-M E

P -1

SCALE: 1/8" = 1'-0"

B1

UNDERSLAB PLUMBING PLAN - WEST

GENERAL NOTES KEYNOTES

1/8" = 1' - 0" 0 5' 10' 15' 30'

GRAPHIC SCALE

KEY PLAN

CHECK GRAPHIC SCALE BEFORE USING

MATCH LINE

PLAN

NORTH

1.

2.

SEE P-001 FOR PLUMBING LEGENDS, ABBREVIATIONS AND GENERAL NOTES.

COORDINATE THE INSTALLATION OF PIPING AND EQUIPMENT TO MAINTAIN MANDATORY CLEARANCE ZONES AROUND CRANE RAILS AND BRIDGE CRANE

OPERATIONAL TRAVEL PATH.

(THIS SHEET ONLY)

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

F

IN

A L

S U

B M

IS

S

IO

N

/0

1/

R

S H

A

M E

N D

M E

N T

/2

0/

R

S H

PROVIDE 6" RADON VENT PIPE WITH OPEN END (OE) PIPE ELBOW INTO CRUSHED STONE LAYER OF FILLED FLOOR TRENCH.

PITCH PIPE AT 1/8" PER FOOT.

SEE CIVIL SHEET CX101 FOR CONTINUATION OF EXISTING UNDER GROUND COMPRESSED AIR PIPING AND SHEET CS101 FOR REPLACEMENT UNDERGROUND

DOMESTIC WATER PIPING.

EXISTING 3/4" COMPRESSED AIR FROM BUILDING 60 TO BUILDING 292, CUT, CAPPED, AND ABANDONED IN PLACE.

EXISTING FLOOR TRENCH TO BE FILLED AND SLAB PATCHED. SEE SB101 FOR INFILL DETAILS.

SEE CIVIL SHEET CX101 FOR CONTINUATION OF EXISTING SANITARY PIPING.

SEE SHEET P-101 FOR CNTINUATION.

COORDINATE PIPING THROUGH WALL WITH EXISTING STRUCTURAL PIERS. PROVIDE OFFSET AND FITTINGS AS REQUIRED.

FLOOR SAW CUT INFILL. SEE STRUCTURAL SHEET SB101 FOR INFILL DETAILS.

Sheets
M-703 - MECHANICAL CONTROL DIAGRAMS 3
MD102 - FIRST FLOOR MECHANICAL DUCTWORK REMOVALS PLAN - EAST
P-101 - UNDERSLAB PLUMBING PLAN - EAST
P-102 - UNDERSLAB PLUMBING PLAN - WEST
P-103 - FIRST FLOOR PLUMBING PLAN - EAST
P-104 - FIRST FLOOR PLUMBING PLAN - WEST
P-105 - FIRST FLOOR MEZZANINE PLUMBING PLAN - EAST
P-106 - FIRST FLOOR MEZZANINE PLUMBING PLAN - WEST
P-107 - SECOND FLOOR PLUMBING PLAN
P-108 - SECOND FLOOR MEZZANINE PLUMBING PLAN
P-109 - ATTIC PLUMBING PLAN
P-401 - ENLARGED PLUMBING PART PLANS 1
P-402 - ENLARGED PLUMBING PART PLANS 2
P-403 - ENLARGED PLUMBING PART PLANS 3
P-601 - PLUMBING SCHEDULES AND DETAIL
P-701 - PLUMBING RISER DIAGRAM
PD102 - FIRST FLOOR PLUMBING REMOVALS PLAN - EAST

File details come from the government source that posted it. Updated .