116_AE411_R1_AMENDMENT 009.pdf
PDF 354 KB Posted
- Solicitation number
- N6247026R0012
About this file
This is an architectural drawing set for Building 60 repairs at Portsmouth Naval Shipyard in Kittery, Maine, prepared by Naval Facilities Engineering Systems Command (NAVFAC) Mid-Atlantic. The drawing package, designated as NAVFAC Drawing No. AE411, depicts enlarged elevator plans and sections for the facility's renovation work, with project number 1740579 and final submission dated October 1, 2025, with Amendment 009 dated March 16, 2026.
The drawings provide detailed floor plans for four elevation levels—First Floor (ELEV=10.30'), First Floor Mezzanine (ELEV=20.86'), Second Floor (ELEV=39.64'), and Second Floor Mezzanine (ELEV=48.30')—along with corresponding elevator sections showing construction details and specifications. Key requirements include installation of a 9'-0" wide by 6'-5" deep clear inside passenger elevator cab, elevator pit ladder with non-slip rungs, UFC-required clear entrapment area (1'-8" x 3'-0" minimum), 1-hour rated ceiling system, metal stud wall construction, sump pump installation per structural sheets, and reinstallation of salvage wood strip flooring at steel deck floor systems. The drawings reference coordination with the elevator manufacturer for rough opening dimensions, plumbing fixture locations with required blocking, electrical fixture placement per separate electrical drawings, and compliance with wall, ceiling, door, and room finish schedules contained in related architectural sheets AE001, AE601, and AE640.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1A
A2
AE411
1A
NF
NF
5'-4"
A4
AE411
ELEV
ALIGN
ALIGN
NB 1A
2" 13'-11 1/4"
1A
AE530
A3
AE530
B4
AE530
A3
(SIM)
(MIR)
NA
NA
9' -1
5/
8"
NE
A2
AE411
A1
AE443
1A
NF
5'-4"
8' -4
1' -7
/4
C L
A4
AE411
ELEV
ALIGN
2"
13'-11 1/4"
1A
1A
NF
NB
9' -7
/4
2"
AE531
C3
AE530
A3
(SIM)
3' - 0" ± 5' - 7" ± 4' - 5 1/4" ±CL CL
1A
NB
NE
NE
'-0
4'-3" 2"13
14'-1"
1D
1A 1A
1A
1D
A2
AE411
1A
8' -4
5'-4"
12'-8"
ELEV
1D
ALIGN
ALIGN
1A
A4
AE411
ELEV MACHINE
001A
AE531
C1
NA
NA
NA
NE
NF
8' -4
/8
9'
-1
5/ 8"
FIRST FLOOR
ELEV=10.30'
FIRST FLOOR MEZZANINE
ELEV=20.86'
SECOND FLOOR
ELEV=39.64'
BOTTOM OF TRUSS
ELEV=56.80'
SECOND FLOOR MEZZANINE
ELEV=48.30'
k
5' -0
'-7
'-9
8' -8
8' -6
ELEV
SUMP PUMP SEE
STRUCTURAL SHEETS
A4
AE411
AE412
B1 k.1 k.5
7' -0
7'
-0
7' -0
AE531
C4
(SIM)
AE531
B1
AE531
B4
AE412
B1
(MIR)
FIRST FLOOR
ELEV=10.30'
FIRST FLOOR MEZZANINE
ELEV=20.86'
SECOND FLOOR
ELEV=39.64'
BOTTOM OF TRUSS
ELEV=56.80'
SECOND FLOOR MEZZANINE
ELEV=48.30'
A2
AE411
5' -0
'-7
'-9
8' -8
8' -6
ELEV
4"
AE412
D1
AE412
B2
AE412
B2
AE412
B2
AE412
D2
AE412
B1
2.5
AE720
D1
AE531
C4
AE412
D4
(SIM)
(MIR)
AE412
B1
SATISFACTORY TO DATE
APPROVED
FOR COMMANDER NAVFAC
SEAL
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SHEET
NAVFAC DRAWING NO.
DESIGNER
DRAWN BY
CHECKED BY
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 14 SEP 2023
DESIGN MANAGER
PROJECT MANAGER
FEAD/PM&E
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
T
IC
P O
R T
S M
O U
T H
N A
V A
L S
H
IP
Y A
R D
K
IT
T
E R
Y M
E
UNCLASSIFIED
UNCLASSIFIED
U N
C L
A S
S
IF
IE
D
ACTIVITY
1740579
T. CARLETON
L. LYONS
S. RUCINSKI
/1
/2
:5
:2
A
M
C U s e rs \m d o n o v a n \D o c u m e n ts \2
.2
B L
D G
A
R C
H
IT
E C
T U
R A
L -V m d o n o v a n
V F
X R
.r v t
AE411
B
R
E P
A
IR
S
E N
L A
R G
E D
E L E
V A
T O
R P
L A
N S
A N
D S
E C
T
IO
N S
RSH
JMR
MJD
K
IT
T E
R Y
M
E P
O R
T S
M O
U T
H N
A V
A L S
H
IP
Y A
R D
R O
IC
C
-M E
A E
SCALE: 1/4" = 1'-0" (AE104)
B1
ELEV 001 FIRST FLOOR MEZZANINE PLAN
SCALE: 1/4" = 1'-0" (AE105)
C1
ELEV 001 SECOND FLOOR PLAN
SCALE: 1/4" = 1'-0" (AE102)
A1
ELEV 001 FIRST FLOOR PLAN
SCALE: 1/4" = 1'-0" (AE411)
A2
ELEVATOR SECTION 1
1/4" = 1' - 0" 0 5' 10' 15'1'
GENERAL NOTES
GRAPHIC SCALE(S)
KEYNOTES
1 ELEVATOR PIT LADDER WITH NON-SLIP RUNGS. SEE STRUCTURAL
SHEETS.
PAINT ELEVATOR PIT WALLS.
UFC REQUIRED CLEAR ENTRAPMENT AREA. (1'-8" X 3'-0" MIN)
HOIST BEAM, SEE STRUCTURAL SHEETS.
STEEL COLUMN, SEE STRUCTURAL SHEETS.
MINIMUM CLEAR WIDTH AND HEIGHT DOOR OPENING.
COORDINATE ROUGH OPENING WITH ELEVATOR MANUFACTURER.
EXTEND METAL STUD WALL TO UNDERSIDE OF BEADBOARD
CEILING.
9'-0" (WIDE) X 6'-5" (DEEP) CLEAR INSIDE PASSENGER ELEVATOR
CAB.
1-HR RATED CEILING SYSTEM C-1. PAINT.
PLUMBING FIXTURE, SEE PLUMBING SHEETS. PROVIDE BLOCKING
IN STUD WALL AT WALL MOUNTED FIXTURE LOCATIONS.
METAL LADDER, SEE DETAIL A2/AE443.
LIGHT FIXTURE (TYP). SEE ELECTRICAL DRAWINGS.
REINSTALL SALVAGE WOOD STRIP FLOORING AT STL DECK FLOOR
SYSTEM, SEE STRUCT SHEETS.
SCALE: 1/4" = 1'-0" (AE411)
A4
ELEVATOR SECTION 2
1. SEE SHEET AE001 FOR ALL WALL/CEILING TYPES.
2. SEE SHEET AE601 FOR DOOR SCHEDULE.
3. SEE SHEET AE640 FOR ROOM FINISH SCHEDULE.
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
F
IN
A L
S U
B M
IS
S
IO
N
/0
1/
R
S H
A
M E
N D
M E
N T
/1
6/
R
S H
| Sheets |
| AD104 - SECOND FLOOR REMOVALS PLAN |
| AD105 - SECOND FLOOR MEZZANINE REMOVALS PLAN |
| AE104 - FIRST FLOOR MEZZANINE PART PLAN - WEST |
| AE105 - SECOND FLOOR PLAN |
| AE411 - ENLARGED ELEVATOR PLANS AND SECTIONS |
| AE441 - ENLARGED STAIR PLANS 2 |
| AE444 - STAIR DETAILS |
| AE511 - METAL PANEL DETAILS |
| AE530 - EXPANSION JOINT DETAILS 1 |
| AE531 - EXPANSION JOINT DETAILS 2 |
| AE601 - DOOR SCHEDULE AND DETAILS |
| AE640 - ROOM FINISH SCHEDULE |
| HM101 - FIRST FLOOR HAZARDOUS MATERIALS PART PLAN - EAST |
| SP101 - STRUCTURAL PROTECTION PART PLAN AND DETAILS |
File details come from the government source that posted it. Updated .