About this file

This is a fire protection design drawing for Building 60 repairs at Portsmouth Naval Shipyard in Kittery, Maine, prepared by Naval Facilities Engineering Systems Command (NAVFAC) Mid-Atlantic. The drawing, designated FX400, provides an enlarged plan and section view of a fire pump room at a 1/2" = 1'-0" scale and includes detailed fire protection system specifications and keynotes.

The fire pump room design incorporates a new electric fire pump with 1,500 gallons per minute capacity and 50-PSI boost capability, supported by a newly constructed 1-hour fire-rated enclosure. Key system components include an 8" suction isolation valve, 6" discharge isolation valve, 8" backflow preventer, 8" incoming supply from underground, jockey pump control panel, and fire pump control panel. The system connects to first and second floor sprinkler risers through various isolation valves, check valves, waterflow switches, and inspectors' test and drain connections. Additional infrastructure includes a new concrete pad, 6" and 8" diameter piping feeds to test headers and overhead sprinkler systems, flow meter, and exterior drain with splash block. The design notes specify that hangers and pipe supports must comply with NFPA 13, NFPA 20, and project specifications, and references sheets FX001, FX400, and FX501 for additional fire protection notes and details. The drawing was finalized on October 1, 2025, with an amendment dated March 16, 2026.

View the file

Other files

File Type Posted
Att. GG) Amendment 0011 Attachment Table of Contents.pdf PDF
Solicitation Amendment N6247026R00120010 SF 30.pdf PDF
Att. T) Price Schedule AMD 0010.pdf PDF
01 30 10.00 22_AMENDMENT 010.pdf PDF
115_AE402_R1_AMENDMENT 010.pdf PDF
161_Q-601_R2_AMENDMENT 010.pdf PDF
170_P-102_R1_AMENDMENT 010.pdf PDF
171_P-103_R1_AMENDMENT 010.pdf PDF
175_P-107_R1_AMENDMENT 010.pdf PDF
677 attach Attic_AFPR.pdf PDF
Att. Y) PPI responses AMD 0009.pdf PDF
_B60_Continuation Sheet_Amendment 0009.pdf PDF
07 27 10_AMENDMENT 009.pdf PDF
95_AE104_R1_AMENDMENT 009.pdf PDF
216_M505_R1_AMENDMENT 009.pdf PDF
217_M601_R1_AMENDMENT 009.pdf PDF
262_EP603_R1_AMENDMENT 009.pdf PDF
268_EL104_R1_AMENDMENT 009.pdf PDF
Att. Y) PPI responses AMD 0008.pdf PDF
_B60_Continuation Sheet_Amendment 008.pdf PDF
01 11 00.00 22_R1_AMENDMENT 008.pdf PDF
72_SF506_R1_AMENDMENT 008.pdf PDF
220_M-701_R1_AMENDMENT 008.pdf PDF
N6247026R00120007 SF 30.pdf PDF
Solicitation Amendment N6247026R00120006 SF 30.pdf PDF
Att. CC) Site Visit Log.pdf PDF
Att. R) B60 ISRL AMD 0004.XLSX XLSX spreadsheet
Att. Y) PPI responses AMD 0004.pdf PDF
Att. AA) B60 AMD 004 Drawings 012726.pdf PDF
Solicitation Amendment N6247026R00120004 SF 30.pdf PDF
Att. A) Construction and Design Experience Project Data Sheet.doc.docx DOCX document
Att. E) Small Business Participation Commitment Document (SBPCD) AMD 0004.docx DOCX document
Att. X) DBIDS ACCESS REQUEST FORM.docx DOCX document
Amendment N6247026R00120003.pdf PDF
AMD 0002 PPI responses.pdf PDF
Solicitation Amendment N6247026R00120002.pdf PDF
Att. T) Price_schedule AMD 0002.pdf PDF
Att. A) - Construction Experience Project Data.docx DOCX document
Att. D) - Historical Small Business Utilization.docx DOCX document
Att. E) - Small Business Participation Commitment Document (SBPCD).docx DOCX document
Att. F) - Individual Small Business Subcontracting Plan.docx DOCX document
Att. H) Specifications Volume 1.pdf PDF
Att. J) Specifications Volume 3.pdf PDF
Att. K) Drawings Volume 1a.pdf PDF
Att. R) B60 - ISRL.XLSX XLSX spreadsheet
Solicitation Amendment N6247026R00120001.pdf PDF
Att. G) - PIEE Vendor Access Instructions.pdf PDF
Att. M) Drawings Volume 2a.pdf PDF
Att. S) FFE Package.pdf PDF
Att. U) Submittal Register.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. SEE SHEET FX001, FX400, AND FX501 FOR FIRE PROTECTION NOTES AND

DETAILS.

2. HANGERS AND PIPE SUPPORTS ARE NOT SHOWN. HANGERS AND PIPE

SUPPORTS MUST BE PROVIDED IN ACCORDANCE WITH NFPA 13, NFPA 20,

AND SPECIFICATION.

e7e8

2 9

B E

A B

O V

E

IN

H E

IG

H

T

U P

P E

R H

A N

D W

H E

E L

M U

S T

N O

T hi e8

B2

FX400

4' - 0" CLEARANCE

ELECTRIC

FIRE PUMP

CONTROLLER

JOCKEY PUMP

CONTROLLER

SATISFACTORY TO DATE

APPROVED

FOR COMMANDER NAVFAC

SEAL

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SHEET

NAVFAC DRAWING NO.

DESIGNER

DRAWN BY

CHECKED BY

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

DRAWFORM REVISION: 14 SEP 2023

DESIGN MANAGER

PROJECT MANAGER

FEAD/PM&E

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

T

IC

P O

R T

S M

O U

T H

N A

V A

L S

H

IP

Y A

R D

K

IT

T

E R

Y M

E

UNCLASSIFIED

UNCLASSIFIED

U N

C

LA

S S

IF

IE

D

ACTIVITY

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

F

IN

A L

S U

B M

IS

S

IO

N

/0

1/

1740579

T. CARLETON

L. LYONS

S. RUCINSKI

R S

H

A M

E N

D M

E N

T

/1 6/

R S

H

/1

/2

:4

:1

A

M

Q G

A -J

O H

N -F

E \A rc h iv e D a ta

\P ro je c ts

C

A D

\2

\2

O P

A

B

D e s ig n

P N

S

\2

.2

B L

D G

F

IR

E

-V

.r v t

FX400

B R

E P

A

IR

S

E N

L A

R G

E D

F

IR

E P

U M

P R

O O

M

J. MCLEAN

J. DEMAINE

C. MANTSCH

MM/DD/YYYY

K

IT

T E

R Y

M

E P

O R

T S

M O

U T

H N

A V

A L S

H

IP

Y A

R D

M

ID

L A

N T

D C

C O

R E

F X

PLAN

NORTH

1/2" = 1' - 0" 0 1' 5'6" 2' 3' 4'

GRAPHIC SCALE(S)

KEY PLAN

MATCH LINE

FIRE PUMP KEYNOTESGENERAL NOTES

SCALE: 1/2" = 1'-0"

B2

FIRE PUMP ROOM SECTION

NEW ELECTRIC FIRE PUMP, 1,500 GPM WITH 50-PSI BOOST

6" FEED TO TEST HEADER (SEE FX501/A4)

8" FIRE PUMP BYPASS

JOCKEY PUMP CONTROL PANEL

FIRE PUMP CONTROL PANEL

8" SUCTION ISOLATION VALVE

6" DISCHARGE ISOLATION VALVE

8" BACKFLOW PREVENTER

8" INCOMING FROM UNDERGROUND SUPPLY

FIRST FLOOR SPRINKLER RISER OS&Y VALVE W/TAMPER SWITCH

17 CEILING HEIGHT

NEW 1-HOUR FIRE PUMP ROOM ENCLOSURE

6" TO FIRST FLOOR OVERHEAD SPRINKLER SYSTEM

SCALE: 1/2" = 1'-0"

B1

ENLARGED FIRE PUMP ROOM

FLOW METER

NEW CONCRETE PAD

FIRST FLOOR SPRINKLER RISER CHECK VALVE

FIRST FLOOR SPRINKLER RISER WATERFLOW SWITCH

FIRST FLOOR SPRINKLER RISER INSPECTORS TEST AND DRAIN

FIRST FLOOR SPRINKLER RISER DRAIN TO EXTERIOR

6" TO SECOND FLOOR SPRINKLER CONTROL VALVE ASSEMBLY (SEE FX501)20

LOCATE CONCRETE SPLASH BLOCK FOR EXTERIOR DRAIN21

TO TEST HEADER22

8" ISOLATION VALVE (NORMALLY CLOSED)23

10/01/2025

Sheets
FX400 - ENLARGED FIRE PUMP ROOM

File details come from the government source that posted it. Updated .