LXEZ_13-2668-4_Section_J_-_Attach_2_-_AF_Form__66_Rev_25_Nov_14.pdf
Air Force Form Rev. 25, Nov 2, 2014 PDF 43 KB Posted
- Attached to
- LXEZ 13-2668-4 Repair & Maintain Roofs, KAB
- Solicitation number
- FA5270-15-B-0001
About this file
Attachment 2 - AF 66
View the file
Other versions and copies of AF Form 66
Show all 20
Who attaches AF Form 66
| State | Files |
|---|---|
| Iowa | 1 |
| Massachusetts | 1 |
Other files
On GovTribe
Work with this file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
25 Nov 14
AF Form, Sep 86 Attachment 2 Page 1 of 3
PROJECT NUMBER: PROJECT TITLE: SOLICITATION / CONTRACT NO.:
LXEZ 13-2668-4 Repair and Maintain Roofs, Multi, KAB
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
APPROVED DIS-
APPROVED
01 01 00, 1.9 As-Built Drawings (for each facility)
7 Days after
Final Inspection
01 01 00, 1.10 Roofing Information Card (for each facility)
7 Days after
Final Inspection
01 01 00, 1.30 DD Form 1354 (for each facility)
7 Days after
Final Inspection
07 50 00.20, 1.05, A., 1.
Polymer Modified Concrete Repair Material
3 45 Days
07 50 00.20, 1.05, A., 2.
Penetrating Water-Based Epoxy Primer
3 45 Days
07 50 00.20, 1.05, A., 3.
Base Coat 3 45 Days
07 50 00.20, 1.05, A., 4.
Heat Reflective Top Coat 3 45 Days
07 50 00.20, 1.05, A., 5.
Reinforcing Fabric and Mesh 3 45 Days
07 50 00.20, 1.05, B., 1.
Polymer Modified Concrete Repair Material
3 45 Days
07 50 00.20, 1.05, B., 2.
Primer Coat 3 45 Days
SCHEDULE OF MATERIAL SUBMITTALS
O
PE
R A
TI
N
G
IN
ST
R
U C
TI
O
N S
St at em en ts
Se e
R eq ui re m en t
REQUIRED
SUB-
MISSION
DATE
After NTP or as
IndicatedM A
N U
F' R
R
EC
O M
M
EN
D A
TI
O
N
M A
N U
F' R
'S
IN
ST
R
U C
TI
O
N S
L I N E
N U M B E R
SH
O
P D
R A
W
IN
G S
C A
TA
LO
G D
A
TA
REMARKS
DATE
RECEIVED
IN CON-
TRACTING
DATE TO
CIVIL
ENGINEER-
ING
RETURN
SUS-
PENSE
DATE
FOLLOW-UP
DATE
CONTRACTOR
NOTIFIED CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
C
ER
TI
FI
C A
TE
O
F C
O M
PL
IA
N C
E
AF Form, Sep 86 Attachment 2 Page 2 of 3
PROJECT NUMBER: PROJECT TITLE: SOLICITATION / CONTRACT NO.:
LXEZ 13-2668-4 Repair and Maintain Roofs, Multi, KAB
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
APPROVED DIS-
APPROVED
SCHEDULE OF MATERIAL SUBMITTALS
O
PE
R A
TI
N
G
IN
ST
R
U C
TI
O
N S
St at em en ts
Se e
R eq ui re m en t
REQUIRED
SUB-
MISSION
DATE
After NTP or as
IndicatedM A
N U
F' R
R
EC
O M
M
EN
D A
TI
O
N
M A
N U
F' R
'S
IN
ST
R
U C
TI
O
N S
L I N E
N U M B E R
SH
O
P D
R A
W
IN
G S
C A
TA
LO
G D
A
TA
REMARKS
DATE
RECEIVED
IN CON-
TRACTING
DATE TO
CIVIL
ENGINEER-
ING
RETURN
SUS-
PENSE
DATE
FOLLOW-UP
DATE
CONTRACTOR
NOTIFIED CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
C
ER
TI
FI
C A
TE
O
F C
O M
PL
IA
N C
E
07 50 00.20, 1.05, B., 3.
Coatings (Base and Top Coat) 3 45 Days
07 50 00.20, 1.05, C., 1.
Polymer Modified Concrete Repair Material
3 45 Days
07 50 00.20, 1.05, C., 2.
Penetrating Water-Based Epoxy Primer
4 45 Days
07 50 00.20, 1.05, C., 3.
Base Coat 4 45 Days
07 50 00.20, 1.05, C., 4.
Heat Reflective Top Coat 4 45 Days
07 50 00.20, 1.05, C., 5.
Reinforcing Fabric and Mesh 4 45 Days
07 50 00.20, 1.05, D.
Applicator Qualification 4 45 Days
13 28 0A, 1.03 Asbestos Haz Control
(RESERVED)
AF Form, Sep 86 Attachment 2 Page 3 of 3
PROJECT NUMBER: PROJECT TITLE: SOLICITATION / CONTRACT NO.:
LXEZ 13-2668-4 Repair and Maintain Roofs, Multi, KAB
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
APPROVED DIS-
APPROVED
SCHEDULE OF MATERIAL SUBMITTALS
O
PE
R A
TI
N
G
IN
ST
R
U C
TI
O
N S
St at em en ts
Se e
R eq ui re m en t
REQUIRED
SUB-
MISSION
DATE
After NTP or as
IndicatedM A
N U
F' R
R
EC
O M
M
EN
D A
TI
O
N
M A
N U
F' R
'S
IN
ST
R
U C
TI
O
N S
L I N E
N U M B E R
SH
O
P D
R A
W
IN
G S
C A
TA
LO
G D
A
TA
REMARKS
DATE
RECEIVED
IN CON-
TRACTING
DATE TO
CIVIL
ENGINEER-
ING
RETURN
SUS-
PENSE
DATE
FOLLOW-UP
DATE
CONTRACTOR
NOTIFIED CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
C
ER
TI
FI
C A
TE
O
F C
O M
PL
IA
N C
E
Sheet1
File details come from the government source that posted it. Updated .