LXEZ_13-2668-4_Section_J_-_Attach_2_-_AF_Form__66_Rev_25_Nov_14.pdf

Air Force Form Rev. 25, Nov 2, 2014 PDF 43 KB Posted

Download PDF, 43 KB

Attached to
LXEZ 13-2668-4 Repair & Maintain Roofs, KAB
Solicitation number
FA5270-15-B-0001
Issued by

About this file

Attachment 2 - AF 66

View the file

Other versions and copies of AF Form 66

File Revision Posted Attached to
Attachment 2 AF Form 66.pdf Revision not stated REPAIR AC PAVING
AF form 66 Blank.pdf Revision not stated Demo Mini mute sites
Attach 9_AF Form 66 Submittal Register.pdf Revision not stated PKAA Dorm Water Damage Repair (Construction)
AF Form 66-EEPZ260842 Renovate Convert Comm to SAPR B730.xlsx Revision not stated B730 Renovate Convert Comm to SAPR
AF Form 66_EEPZ254664-B972 UOQ.xlsx Revision not stated B972 Renovate UOQ Community Commons
AF Form 66 B268.xlsx Revision not stated B268 Replace STUS Backup Generator
AF Form 66 B730.xlsx Revision not stated B730 - Renovate RM106 for Emergency Operations Center
AF Form 66.xlsx Revision not stated B836 Replace Electrical in Airfield Lighting Vault
AF Form 66 OSI Flooring.xlsx Revision not stated OSI B926 Flooring
EEPZ254660 Repair Control Tower HVAC B1806 - AF Form 66.xlsx Revision not stated B1806 Repair Control Tower HVAC
AF Form 66 Template.xlsx Revision not stated Replace AAS BAK-15 Controls, B2001, B2003
AF Form 66 EEPZ216808 Replace Security Forces Elevator B926.xlsx Revision not stated B926 Replace Security Forces Elevator
WT 17518487 AF Form 66.xlsx Revision not stated Repair Structural Fire Trainer B17903, 17904
AF Form 66.xlsx Revision not stated RENOVATE/CONVERT 50th 49th SQ OPS, B230
AF Form 66.xlsx Revision not stated T-6 Flightline Shacks
AF Form 66 Template.xlsx Revision not stated Replace Fire Alarms, Multi Facility
EEPZ248229 -- AF Form 66.xlsx Revision not stated Repair Kiddie Pool
Atch 2 AF Form 66.pdf Revision not stated Removal of Underground Storage Tank at Launch Facility E-10 (Laramie County, WY)
Attachment 4 - AF Form 66 Submittal Register.pdf Revision not stated Bldg 65 - Renovation of Telephone Office Area, FE Warren AFB, WY AMENDMENT 03
Attachment 7 - AF Form 66.xlsx Revision not stated Replace Chapel Windows B912
Show all 20

Who attaches AF Form 66

State Files
Iowa 1
Massachusetts 1

Other files

On GovTribe

Work with this file

  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

25 Nov 14

AF Form, Sep 86 Attachment 2 Page 1 of 3

PROJECT NUMBER: PROJECT TITLE: SOLICITATION / CONTRACT NO.:

LXEZ 13-2668-4 Repair and Maintain Roofs, Multi, KAB

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

APPROVED DIS-

APPROVED

01 01 00, 1.9 As-Built Drawings (for each facility)

7 Days after

Final Inspection

01 01 00, 1.10 Roofing Information Card (for each facility)

7 Days after

Final Inspection

01 01 00, 1.30 DD Form 1354 (for each facility)

7 Days after

Final Inspection

07 50 00.20, 1.05, A., 1.

Polymer Modified Concrete Repair Material

3 45 Days

07 50 00.20, 1.05, A., 2.

Penetrating Water-Based Epoxy Primer

3 45 Days

07 50 00.20, 1.05, A., 3.

Base Coat 3 45 Days

07 50 00.20, 1.05, A., 4.

Heat Reflective Top Coat 3 45 Days

07 50 00.20, 1.05, A., 5.

Reinforcing Fabric and Mesh 3 45 Days

07 50 00.20, 1.05, B., 1.

Polymer Modified Concrete Repair Material

3 45 Days

07 50 00.20, 1.05, B., 2.

Primer Coat 3 45 Days

SCHEDULE OF MATERIAL SUBMITTALS

O

PE

R A

TI

N

G

IN

ST

R

U C

TI

O

N S

St at em en ts

Se e

R eq ui re m en t

REQUIRED

SUB-

MISSION

DATE

After NTP or as

IndicatedM A

N U

F' R

R

EC

O M

M

EN

D A

TI

O

N

M A

N U

F' R

'S

IN

ST

R

U C

TI

O

N S

L I N E

N U M B E R

SH

O

P D

R A

W

IN

G S

C A

TA

LO

G D

A

TA

REMARKS

DATE

RECEIVED

IN CON-

TRACTING

DATE TO

CIVIL

ENGINEER-

ING

RETURN

SUS-

PENSE

DATE

FOLLOW-UP

DATE

CONTRACTOR

NOTIFIED CONTRACTOR

RESUBMITTAL

FINAL

APPROVAL

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

C

ER

TI

FI

C A

TE

O

F C

O M

PL

IA

N C

E

AF Form, Sep 86 Attachment 2 Page 2 of 3

PROJECT NUMBER: PROJECT TITLE: SOLICITATION / CONTRACT NO.:

LXEZ 13-2668-4 Repair and Maintain Roofs, Multi, KAB

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

APPROVED DIS-

APPROVED

SCHEDULE OF MATERIAL SUBMITTALS

O

PE

R A

TI

N

G

IN

ST

R

U C

TI

O

N S

St at em en ts

Se e

R eq ui re m en t

REQUIRED

SUB-

MISSION

DATE

After NTP or as

IndicatedM A

N U

F' R

R

EC

O M

M

EN

D A

TI

O

N

M A

N U

F' R

'S

IN

ST

R

U C

TI

O

N S

L I N E

N U M B E R

SH

O

P D

R A

W

IN

G S

C A

TA

LO

G D

A

TA

REMARKS

DATE

RECEIVED

IN CON-

TRACTING

DATE TO

CIVIL

ENGINEER-

ING

RETURN

SUS-

PENSE

DATE

FOLLOW-UP

DATE

CONTRACTOR

NOTIFIED CONTRACTOR

RESUBMITTAL

FINAL

APPROVAL

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

C

ER

TI

FI

C A

TE

O

F C

O M

PL

IA

N C

E

07 50 00.20, 1.05, B., 3.

Coatings (Base and Top Coat) 3 45 Days

07 50 00.20, 1.05, C., 1.

Polymer Modified Concrete Repair Material

3 45 Days

07 50 00.20, 1.05, C., 2.

Penetrating Water-Based Epoxy Primer

4 45 Days

07 50 00.20, 1.05, C., 3.

Base Coat 4 45 Days

07 50 00.20, 1.05, C., 4.

Heat Reflective Top Coat 4 45 Days

07 50 00.20, 1.05, C., 5.

Reinforcing Fabric and Mesh 4 45 Days

07 50 00.20, 1.05, D.

Applicator Qualification 4 45 Days

13 28 0A, 1.03 Asbestos Haz Control

(RESERVED)

AF Form, Sep 86 Attachment 2 Page 3 of 3

PROJECT NUMBER: PROJECT TITLE: SOLICITATION / CONTRACT NO.:

LXEZ 13-2668-4 Repair and Maintain Roofs, Multi, KAB

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

APPROVED DIS-

APPROVED

SCHEDULE OF MATERIAL SUBMITTALS

O

PE

R A

TI

N

G

IN

ST

R

U C

TI

O

N S

St at em en ts

Se e

R eq ui re m en t

REQUIRED

SUB-

MISSION

DATE

After NTP or as

IndicatedM A

N U

F' R

R

EC

O M

M

EN

D A

TI

O

N

M A

N U

F' R

'S

IN

ST

R

U C

TI

O

N S

L I N E

N U M B E R

SH

O

P D

R A

W

IN

G S

C A

TA

LO

G D

A

TA

REMARKS

DATE

RECEIVED

IN CON-

TRACTING

DATE TO

CIVIL

ENGINEER-

ING

RETURN

SUS-

PENSE

DATE

FOLLOW-UP

DATE

CONTRACTOR

NOTIFIED CONTRACTOR

RESUBMITTAL

FINAL

APPROVAL

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

C

ER

TI

FI

C A

TE

O

F C

O M

PL

IA

N C

E

Sheet1

File details come from the government source that posted it. Updated .