JA-3_AF_Form_66.pdf

PDF 88 KB Posted

Attached to
CHPP Phase A Federal contract opportunity
Solicitation number
FA5004-18-B-C004
Issued by
Department of the Air Force Pacific Air Forces

About this file

JA-3 AF Form 66 - CHPP Phase A - Eielson AFB AK

View the file

Other files for this federal contract opportunity

Other files attached to CHPP Phase A, newest first.
File Type Posted
Phase_A_Bidder_Q&A.pdf PDF
FA500418BC0040001.pdf PDF
JA-5_Drawings.pdf PDF
FA500418BC004.pdf PDF
JA-4_Wage_Determination.pdf PDF
JA-2_Specs.pdf PDF
JA-1_SOW.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. GPO 1987-188-148

PROJECT NUMBER

FTQW 18-0504

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

C

ER

TI

FI

C A

TI

O

N O

F C

O M

PL

IA

N C

E

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M A

N U

FA

C

TU

R

ER

'S

W

A R

R A

N

TY

C A

TA

LO

G D

A

TA

SE

R

VI

C

E / S

IZ

E

U

SE

S

C H

ED

U

LE

O

TH

ER

REQUIRED

SUB-

MISSION

DATE

DATE

RECEIVED

IN CON-

TRACTING

DATE TO

CIVIL

ENGINEER-

ING

RETURN

SUSPENSE

DATE

FOLLOW-UP

DATE

CONTRACTOR

NOTIFIED

CONTRACTOR

RESUBMITTAL FINAL APPROVAL REMARKS

APPROVED DIS-

APPROVED

Work Clearance Request Para. 1.11.A X 7 days prior to work start For information only

Construction Operation and Safety Plan Para 1.4.A.1 X 4 weeks prior to work start

Accident Prevention Plan, Para 1.4.A.2

X 4 weeks prior to work start

4 Ionizing Radiation Use Request. Para 1.4.A.4. X 4 weeks prior to need For informatuion only. Submit only if applicable.

5 Request for use of Lasers. Para.

1.4.A.5 X 4 weeks prior to need For informatuion only. Submit only if applicable.

6 Radioactive Material Use Request.

Para 1.4.A.6. X 4 weeks prior to need For informatuion only. Submit only if applicable.

7 Radio Frequency Radiation Use Request. Para 1.4.A.7. X 4 weeks prior to need For informatuion only. Submit only if applicable.

8 Ultraviolet Radiation Use Request. Para 1.4.A.8. X 4 weeks prior to need For informatuion only. Submit only if applicable.

Environmental Protection Plan; Para 1.4.A.9 X 4 weeks prior to work start

Solid Waste Weight Tickets. Para 1.4.A.10 X 5 days after disposal For information only

Hazardous Materials Inventory. Para 1.4.A.11 X

Each application for payment

Submit only if applicable.

Hazardous Waste Accumulation Log.

Para 1.4.A.12 X

Each application for payment

Submit only if applicable.

Laboratory Test Results. Para 1.4.A.13

X Prior to disposing of waste

Submit only if applicable.

NOI for asbestos abatement Para. 1.4.A.14 X

10 working days prior to work start

Submit only if applicable.

Report and Drawings indicating nature and extent of abatement Para. 1.4.A.15

X 2 weeks prior to request for final payment

Submit only if applicable.

Cutting or Alteration:

Para 1.2 X 2 weeks prior to work Submit only if applicable.

Utility Interruptions Para. 3.2.A X 7 days prior to interruption Submit only if applicable.

Testing laboratory name, address, and telephone number.

Para 1.3.A

X 4 weeks prior to work start

Evidence of testing laboratory’s authorization to operate in the State of Alaska. Para 1.3.B

X 4 weeks prior to work start

M A

N U

FA

C

TU

R

E' S

R

EC

O M

M

EN

D A

TI

O

N S

Repair CH&PP Panels/Circuits, Phase A, Eielson AFB

NO. OF COPIES REQUIRED

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

SOLICITATION/CONTRACT NO.PROJECT TITLE

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT ENGINEER

O

PE

R A

TI

N

G

IN

ST

R

U C

TI

O

N S

SECTION 01010 - DESCRIPTION OF WORK

AND COORDINATION

SECTION 01030 – SAFETY, ENVIRONMENTAL

PROTECTION, REGULATIONS, AND CODES

SECTION 01080 - EXISTING UTILITIES

SECTION 01400 - QUALITY CONTROL

SECTION 01045 - CUTTING AND PATCHING

Page 1 of 4 October 2017

N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

C

ER

TI

FI

C A

TI

O

N O

F C

O M

PL

IA

N C

E

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M A

N U

FA

C

TU

R

R

R A

N

TY

C A

TA

LO

G D

A

TA

SE

R

VI

C

E / S

IZ

E

U

SE

S

C H

ED

U

LE

O

TH

ER

REQUIRED

SUB-

MISSION

DATE

DATE

RECEIVED

IN CON-

TRACTING

DATE TO

CIVIL

ENGINEER-

ING

RETURN

SUSPENSE

DATE

FOLLOW-UP

DATE

CONTRACTOR

NOTIFIED

CONTRACTOR

RESUBMITTAL FINAL APPROVAL REMARKS

APPROVED DIS-

APPROVED

M A

N U

FA

C

TU

R

E' S

R

EC

O M

M

EN

D A

TI

O

N S

Repair CH&PP Panels/Circuits, Phase A, Eielson AFB

NO. OF COPIES REQUIRED

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

SOLICITATION/CONTRACT NO.PROJECT TITLE

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT ENGINEER

O

PE

R A

TI

N

G

IN

ST

R

U C

TI

O

N S

Name, registration, address, and telephone number of registered engineer employed by testing agency to review services provided by testing agency.

Para 1.3.C

X 4 weeks prior to work start

The qualifications and test certifications of the proposed Independent Testing Agen-cies and Laboratories. Para 1.3.D

X 4 weeks prior to work start

Certification of individual workmen when certified or qualified personnel are specified.

Para 1.3.E

X 4 weeks prior to work start

Construction Photographs Para. 1.7 X

Each application for payment

24 Notifications. Para 1.9 X 3 days prior to test

Project Test Log.

Para 1.4.D X Prior to final inspection

Preliminary Record Documents reflecting As-Built conditions.

Para 1.4.H

X Prior to final inspection

Final Record Documents reflecting As- Built conditions.

Para 1.4.I

X Prior to closeout

O & M Manuals.

Para 1.5 X 7 days prior to final inspection

Warranties.

Para 1.6 X 7 days prior to final inspection

Demo Work Plan (DWP).

Para 1.5.A

4 weeks prior to work start

Site Safety and Health Plan (SSHP).

Para 1.5.B & 01030-1.9.

4 weeks prior to work start

Insulated Conductors.

Para 2.3.A X 4 wks prior to procurement

Bare Copper Conductors.

Para 2.3.B X 4 wks prior to procurement

Connectors.

Para 2.4.A X 4 wks prior to procurement

Product Data.

Para 1.2.A X 4 wks prior to procurement

SECTION 02055 – SELECTIVE DEMOLITION

SECTION 01700 - RECORD DOCUMENTS,

INSPECTIONS, & CLOSEOUT

SECTION 16073 - HANGERS AND SUPPORTS

FOR ELECTRICAL

SECTION 16060 - GROUNDING AND BONDING

Page 2 of 4 October 2017

N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

C

ER

TI

FI

C A

TI

O

N O

F C

O M

PL

IA

N C

E

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M A

N U

FA

C

TU

R

R

R A

N

TY

C A

TA

LO

G D

A

TA

SE

R

VI

C

E / S

IZ

E

U

SE

S

C H

ED

U

LE

O

TH

ER

REQUIRED

SUB-

MISSION

DATE

DATE

RECEIVED

IN CON-

TRACTING

DATE TO

CIVIL

ENGINEER-

ING

RETURN

SUSPENSE

DATE

FOLLOW-UP

DATE

CONTRACTOR

NOTIFIED

CONTRACTOR

RESUBMITTAL FINAL APPROVAL REMARKS

APPROVED DIS-

APPROVED

M A

N U

FA

C

TU

R

E' S

R

EC

O M

M

EN

D A

TI

O

N S

Repair CH&PP Panels/Circuits, Phase A, Eielson AFB

NO. OF COPIES REQUIRED

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

SOLICITATION/CONTRACT NO.PROJECT TITLE

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT ENGINEER

O

PE

R A

TI

N

G

IN

ST

R

U C

TI

O

N S

Product Data.

Para 1.3.A X 4 wks prior to procurement

Delegated-Design Submittal.

Para 1.3.B X 4 wks prior to procurement

Seismic Certification.

Para 1.3.C X 4 wks prior to procurement

Product Data.

Para 1.2.A X 4 wks prior to procurement

Product Data.

Para 1.2.A X 4 wks prior to procurement

Field quality-control reports.

Para 1.3.A X 2 wks prior to final inspection

Product Data.

Para 1.2.A X 4 wks prior to procurement

Seismic Qualification Certificates. Para 1.3.A X 4 wks prior to procurement

Product Data.

Para 1.3.A X 4 wks prior to procurement

Shop Drawings.

Para 1.3.B X 4 wks prior to procurement

Seismic Qualification Certificates. Para 1.4.A X 4 wks prior to procurement

Sample Warranty.

Para 1.4.B X 4 wks prior to procurement

Operation and Maintenance Data. Para 1.5.A X X X X 2 wks prior to demonstration

Maintenance Material Submittals. Para

1.6 X By final

inspection

Test and Inspection Reports.

Para 3.5.E X 2 wks prior to final inspection

Product Data. Para 1.4.A X 4 wks prior to procurement

Shop Drawings. Para 1.4.B X 4 wks prior to procurement

Seismic Qualification Certificates. Para 1.5.A X 4 wks prior to procurement

SECTION 16074 - VIBRATION AND SEISMIC

CONTROLS FOR ELECTRICAL SYSTEMS

SECTION 16075 - ELECTRICAL

IDENTIFICATION

SECTION 16120 - CONDUCTORS AND CABLES

SECTION 16130 - RACEWAYS AND BOXES

SECTION 16265 - CENTRAL BATTERY

EQUIPMENT FOR EMERGENCY LIGHTING

SECTION 16410 - ENCLOSED SWITCHES AND

CIRCUIT BREAKERS

Page 3 of 4 October 2017

N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

C

ER

TI

FI

C A

TI

O

N O

F C

O M

PL

IA

N C

E

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M A

N U

FA

C

TU

R

R

R A

N

TY

C A

TA

LO

G D

A

TA

SE

R

VI

C

E / S

IZ

E

U

SE

S

C H

ED

U

LE

O

TH

ER

REQUIRED

SUB-

MISSION

DATE

DATE

RECEIVED

IN CON-

TRACTING

DATE TO

CIVIL

ENGINEER-

ING

RETURN

SUSPENSE

DATE

FOLLOW-UP

DATE

CONTRACTOR

NOTIFIED

CONTRACTOR

RESUBMITTAL FINAL APPROVAL REMARKS

APPROVED DIS-

APPROVED

M A

N U

FA

C

TU

R

E' S

R

EC

O M

M

EN

D A

TI

O

N S

Repair CH&PP Panels/Circuits, Phase A, Eielson AFB

NO. OF COPIES REQUIRED

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

SOLICITATION/CONTRACT NO.PROJECT TITLE

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT ENGINEER

O

PE

R A

TI

N

G

IN

ST

R

U C

TI

O

N S

Field quality-control reports.

Para 1.5.B X 2 wks prior to final inspection

Operation and maintenance data. Para 1.6.A X 2 wks prior to final inspection

Product Data.

Para 1.2.A X 4 wks prior to procurement

Shop Drawings.

Para 1.2.B X 4 wks prior to procurement

Seismic Qualification Certificates. Para 1.3.A X 4 wks prior to procurement

Field quality-control reports.

Para 1.3.B X 2 wks prior to final inspection

Operation and maintenance data. Para 1.4.A X X X 2 wks prior to demonstration

Product Data.

Para 1.2.A X 4 wks prior to procurement

Shop Drawings.

Para 1.2.B X 4 wks prior to procurement

Seismic Qualification Certificates. Para 1.3.A X 4 wks prior to procurement

Field quality-control reports.

Para 1.3.B X 2 wks prior to final inspection

Panelboard schedules for installation in panelboards.

Para 1.3.C

X 2 wks prior to final inspection

Operation and maintenance data. Para 1.4.A X X X 2 wks prior to final inspection

Product Data.

Para 1.2.A X 4 wks prior to procurement

Shop Drawings.

Para 1.2.B X 4 wks prior to procurement

Manufacturer Seismic Qualification Certification. Para 1.3.A X 4 wks prior to procurement

Field quality-control test reports. Para 1.3.B X 2 wks prior to final inspection

Operation and maintenance data. Para 1.4.A X X X 2 wks prior to final inspection

Product Data.

Para 1.3.A X 4 wks prior to procurement

Field quality-control reports.

Para 1.4.A X 2 wks prior to final inspection

Seismic Certifications.

Para 1.4.B X 2 wks prior to final inspection

SECTION 16442 - PANELBOARDS

SECTION 16461 - LOW-VOLTAGE

TRANSFORMERS

SECTION 16511 - LIGHTING

SECTION 16415 - TRANSFER SWITCHES

Page 4 of 4 October 2017

File details come from the government source that posted it.