JA-3_AF_Form_66.pdf

Air Force Form PDF 88 KB Posted

Attached to
CHPP Phase A
Solicitation number
FA5004-18-B-C004
Issued by

About this file

JA-3 AF Form 66 - CHPP Phase A - Eielson AFB AK

View the file

Other versions and copies of AF Form 66

File Revision Posted Attached to
Attachment 2 AF Form 66.pdf Revision not stated REPAIR AC PAVING
AF form 66 Blank.pdf Revision not stated Demo Mini mute sites
Attach 9_AF Form 66 Submittal Register.pdf Revision not stated PKAA Dorm Water Damage Repair (Construction)
AF Form 66-EEPZ260842 Renovate Convert Comm to SAPR B730.xlsx Revision not stated B730 Renovate Convert Comm to SAPR
AF Form 66_EEPZ254664-B972 UOQ.xlsx Revision not stated B972 Renovate UOQ Community Commons
AF Form 66 B268.xlsx Revision not stated B268 Replace STUS Backup Generator
AF Form 66 B730.xlsx Revision not stated B730 - Renovate RM106 for Emergency Operations Center
AF Form 66.xlsx Revision not stated B836 Replace Electrical in Airfield Lighting Vault
AF Form 66 OSI Flooring.xlsx Revision not stated OSI B926 Flooring
EEPZ254660 Repair Control Tower HVAC B1806 - AF Form 66.xlsx Revision not stated B1806 Repair Control Tower HVAC
AF Form 66 Template.xlsx Revision not stated Replace AAS BAK-15 Controls, B2001, B2003
AF Form 66 EEPZ216808 Replace Security Forces Elevator B926.xlsx Revision not stated B926 Replace Security Forces Elevator
WT 17518487 AF Form 66.xlsx Revision not stated Repair Structural Fire Trainer B17903, 17904
AF Form 66.xlsx Revision not stated RENOVATE/CONVERT 50th 49th SQ OPS, B230
AF Form 66.xlsx Revision not stated T-6 Flightline Shacks
AF Form 66 Template.xlsx Revision not stated Replace Fire Alarms, Multi Facility
EEPZ248229 -- AF Form 66.xlsx Revision not stated Repair Kiddie Pool
Atch 2 AF Form 66.pdf Revision not stated Removal of Underground Storage Tank at Launch Facility E-10 (Laramie County, WY)
Attachment 4 - AF Form 66 Submittal Register.pdf Revision not stated Bldg 65 - Renovation of Telephone Office Area, FE Warren AFB, WY AMENDMENT 03
Attachment 7 - AF Form 66.xlsx Revision not stated Replace Chapel Windows B912
Show all 20

Who attaches AF Form 66

State Files
Iowa 1
Massachusetts 1

Other files

File Type Posted
Phase_A_Bidder_Q&A.pdf PDF
FA500418BC0040001.pdf PDF
JA-2_Specs.pdf PDF
JA-1_SOW.pdf PDF
JA-5_Drawings.pdf PDF
FA500418BC004.pdf PDF
JA-4_Wage_Determination.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. GPO 1987-188-148

PROJECT NUMBER

FTQW 18-0504

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

C

ER

TI

FI

C A

TI

O

N O

F C

O M

PL

IA

N C

E

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M A

N U

FA

C

TU

R

ER

'S

W

A R

R A

N

TY

C A

TA

LO

G D

A

TA

SE

R

VI

C

E / S

IZ

E

U

SE

S

C H

ED

U

LE

O

TH

ER

REQUIRED

SUB-

MISSION

DATE

DATE

RECEIVED

IN CON-

TRACTING

DATE TO

CIVIL

ENGINEER-

ING

RETURN

SUSPENSE

DATE

FOLLOW-UP

DATE

CONTRACTOR

NOTIFIED

CONTRACTOR

RESUBMITTAL FINAL APPROVAL REMARKS

APPROVED DIS-

APPROVED

Work Clearance Request Para. 1.11.A X 7 days prior to work start For information only

Construction Operation and Safety Plan Para 1.4.A.1 X 4 weeks prior to work start

Accident Prevention Plan, Para 1.4.A.2

X 4 weeks prior to work start

4 Ionizing Radiation Use Request. Para 1.4.A.4. X 4 weeks prior to need For informatuion only. Submit only if applicable.

5 Request for use of Lasers. Para.

1.4.A.5 X 4 weeks prior to need For informatuion only. Submit only if applicable.

6 Radioactive Material Use Request.

Para 1.4.A.6. X 4 weeks prior to need For informatuion only. Submit only if applicable.

7 Radio Frequency Radiation Use Request. Para 1.4.A.7. X 4 weeks prior to need For informatuion only. Submit only if applicable.

8 Ultraviolet Radiation Use Request. Para 1.4.A.8. X 4 weeks prior to need For informatuion only. Submit only if applicable.

Environmental Protection Plan; Para 1.4.A.9 X 4 weeks prior to work start

Solid Waste Weight Tickets. Para 1.4.A.10 X 5 days after disposal For information only

Hazardous Materials Inventory. Para 1.4.A.11 X

Each application for payment

Submit only if applicable.

Hazardous Waste Accumulation Log.

Para 1.4.A.12 X

Each application for payment

Submit only if applicable.

Laboratory Test Results. Para 1.4.A.13

X Prior to disposing of waste

Submit only if applicable.

NOI for asbestos abatement Para. 1.4.A.14 X

10 working days prior to work start

Submit only if applicable.

Report and Drawings indicating nature and extent of abatement Para. 1.4.A.15

X 2 weeks prior to request for final payment

Submit only if applicable.

Cutting or Alteration:

Para 1.2 X 2 weeks prior to work Submit only if applicable.

Utility Interruptions Para. 3.2.A X 7 days prior to interruption Submit only if applicable.

Testing laboratory name, address, and telephone number.

Para 1.3.A

X 4 weeks prior to work start

Evidence of testing laboratory’s authorization to operate in the State of Alaska. Para 1.3.B

X 4 weeks prior to work start

M A

N U

FA

C

TU

R

E' S

R

EC

O M

M

EN

D A

TI

O

N S

Repair CH&PP Panels/Circuits, Phase A, Eielson AFB

NO. OF COPIES REQUIRED

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

SOLICITATION/CONTRACT NO.PROJECT TITLE

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT ENGINEER

O

PE

R A

TI

N

G

IN

ST

R

U C

TI

O

N S

SECTION 01010 - DESCRIPTION OF WORK

AND COORDINATION

SECTION 01030 – SAFETY, ENVIRONMENTAL

PROTECTION, REGULATIONS, AND CODES

SECTION 01080 - EXISTING UTILITIES

SECTION 01400 - QUALITY CONTROL

SECTION 01045 - CUTTING AND PATCHING

Page 1 of 4 October 2017

N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

C

ER

TI

FI

C A

TI

O

N O

F C

O M

PL

IA

N C

E

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M A

N U

FA

C

TU

R

R

R A

N

TY

C A

TA

LO

G D

A

TA

SE

R

VI

C

E / S

IZ

E

U

SE

S

C H

ED

U

LE

O

TH

ER

REQUIRED

SUB-

MISSION

DATE

DATE

RECEIVED

IN CON-

TRACTING

DATE TO

CIVIL

ENGINEER-

ING

RETURN

SUSPENSE

DATE

FOLLOW-UP

DATE

CONTRACTOR

NOTIFIED

CONTRACTOR

RESUBMITTAL FINAL APPROVAL REMARKS

APPROVED DIS-

APPROVED

M A

N U

FA

C

TU

R

E' S

R

EC

O M

M

EN

D A

TI

O

N S

Repair CH&PP Panels/Circuits, Phase A, Eielson AFB

NO. OF COPIES REQUIRED

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

SOLICITATION/CONTRACT NO.PROJECT TITLE

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT ENGINEER

O

PE

R A

TI

N

G

IN

ST

R

U C

TI

O

N S

Name, registration, address, and telephone number of registered engineer employed by testing agency to review services provided by testing agency.

Para 1.3.C

X 4 weeks prior to work start

The qualifications and test certifications of the proposed Independent Testing Agen-cies and Laboratories. Para 1.3.D

X 4 weeks prior to work start

Certification of individual workmen when certified or qualified personnel are specified.

Para 1.3.E

X 4 weeks prior to work start

Construction Photographs Para. 1.7 X

Each application for payment

24 Notifications. Para 1.9 X 3 days prior to test

Project Test Log.

Para 1.4.D X Prior to final inspection

Preliminary Record Documents reflecting As-Built conditions.

Para 1.4.H

X Prior to final inspection

Final Record Documents reflecting As- Built conditions.

Para 1.4.I

X Prior to closeout

O & M Manuals.

Para 1.5 X 7 days prior to final inspection

Warranties.

Para 1.6 X 7 days prior to final inspection

Demo Work Plan (DWP).

Para 1.5.A

4 weeks prior to work start

Site Safety and Health Plan (SSHP).

Para 1.5.B & 01030-1.9.

4 weeks prior to work start

Insulated Conductors.

Para 2.3.A X 4 wks prior to procurement

Bare Copper Conductors.

Para 2.3.B X 4 wks prior to procurement

Connectors.

Para 2.4.A X 4 wks prior to procurement

Product Data.

Para 1.2.A X 4 wks prior to procurement

SECTION 02055 – SELECTIVE DEMOLITION

SECTION 01700 - RECORD DOCUMENTS,

INSPECTIONS, & CLOSEOUT

SECTION 16073 - HANGERS AND SUPPORTS

FOR ELECTRICAL

SECTION 16060 - GROUNDING AND BONDING

Page 2 of 4 October 2017

N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

C

ER

TI

FI

C A

TI

O

N O

F C

O M

PL

IA

N C

E

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M A

N U

FA

C

TU

R

R

R A

N

TY

C A

TA

LO

G D

A

TA

SE

R

VI

C

E / S

IZ

E

U

SE

S

C H

ED

U

LE

O

TH

ER

REQUIRED

SUB-

MISSION

DATE

DATE

RECEIVED

IN CON-

TRACTING

DATE TO

CIVIL

ENGINEER-

ING

RETURN

SUSPENSE

DATE

FOLLOW-UP

DATE

CONTRACTOR

NOTIFIED

CONTRACTOR

RESUBMITTAL FINAL APPROVAL REMARKS

APPROVED DIS-

APPROVED

M A

N U

FA

C

TU

R

E' S

R

EC

O M

M

EN

D A

TI

O

N S

Repair CH&PP Panels/Circuits, Phase A, Eielson AFB

NO. OF COPIES REQUIRED

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

SOLICITATION/CONTRACT NO.PROJECT TITLE

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT ENGINEER

O

PE

R A

TI

N

G

IN

ST

R

U C

TI

O

N S

Product Data.

Para 1.3.A X 4 wks prior to procurement

Delegated-Design Submittal.

Para 1.3.B X 4 wks prior to procurement

Seismic Certification.

Para 1.3.C X 4 wks prior to procurement

Product Data.

Para 1.2.A X 4 wks prior to procurement

Product Data.

Para 1.2.A X 4 wks prior to procurement

Field quality-control reports.

Para 1.3.A X 2 wks prior to final inspection

Product Data.

Para 1.2.A X 4 wks prior to procurement

Seismic Qualification Certificates. Para 1.3.A X 4 wks prior to procurement

Product Data.

Para 1.3.A X 4 wks prior to procurement

Shop Drawings.

Para 1.3.B X 4 wks prior to procurement

Seismic Qualification Certificates. Para 1.4.A X 4 wks prior to procurement

Sample Warranty.

Para 1.4.B X 4 wks prior to procurement

Operation and Maintenance Data. Para 1.5.A X X X X 2 wks prior to demonstration

Maintenance Material Submittals. Para

1.6 X By final

inspection

Test and Inspection Reports.

Para 3.5.E X 2 wks prior to final inspection

Product Data. Para 1.4.A X 4 wks prior to procurement

Shop Drawings. Para 1.4.B X 4 wks prior to procurement

Seismic Qualification Certificates. Para 1.5.A X 4 wks prior to procurement

SECTION 16074 - VIBRATION AND SEISMIC

CONTROLS FOR ELECTRICAL SYSTEMS

SECTION 16075 - ELECTRICAL

IDENTIFICATION

SECTION 16120 - CONDUCTORS AND CABLES

SECTION 16130 - RACEWAYS AND BOXES

SECTION 16265 - CENTRAL BATTERY

EQUIPMENT FOR EMERGENCY LIGHTING

SECTION 16410 - ENCLOSED SWITCHES AND

CIRCUIT BREAKERS

Page 3 of 4 October 2017

N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

C

ER

TI

FI

C A

TI

O

N O

F C

O M

PL

IA

N C

E

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M A

N U

FA

C

TU

R

R

R A

N

TY

C A

TA

LO

G D

A

TA

SE

R

VI

C

E / S

IZ

E

U

SE

S

C H

ED

U

LE

O

TH

ER

REQUIRED

SUB-

MISSION

DATE

DATE

RECEIVED

IN CON-

TRACTING

DATE TO

CIVIL

ENGINEER-

ING

RETURN

SUSPENSE

DATE

FOLLOW-UP

DATE

CONTRACTOR

NOTIFIED

CONTRACTOR

RESUBMITTAL FINAL APPROVAL REMARKS

APPROVED DIS-

APPROVED

M A

N U

FA

C

TU

R

E' S

R

EC

O M

M

EN

D A

TI

O

N S

Repair CH&PP Panels/Circuits, Phase A, Eielson AFB

NO. OF COPIES REQUIRED

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

SOLICITATION/CONTRACT NO.PROJECT TITLE

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT ENGINEER

O

PE

R A

TI

N

G

IN

ST

R

U C

TI

O

N S

Field quality-control reports.

Para 1.5.B X 2 wks prior to final inspection

Operation and maintenance data. Para 1.6.A X 2 wks prior to final inspection

Product Data.

Para 1.2.A X 4 wks prior to procurement

Shop Drawings.

Para 1.2.B X 4 wks prior to procurement

Seismic Qualification Certificates. Para 1.3.A X 4 wks prior to procurement

Field quality-control reports.

Para 1.3.B X 2 wks prior to final inspection

Operation and maintenance data. Para 1.4.A X X X 2 wks prior to demonstration

Product Data.

Para 1.2.A X 4 wks prior to procurement

Shop Drawings.

Para 1.2.B X 4 wks prior to procurement

Seismic Qualification Certificates. Para 1.3.A X 4 wks prior to procurement

Field quality-control reports.

Para 1.3.B X 2 wks prior to final inspection

Panelboard schedules for installation in panelboards.

Para 1.3.C

X 2 wks prior to final inspection

Operation and maintenance data. Para 1.4.A X X X 2 wks prior to final inspection

Product Data.

Para 1.2.A X 4 wks prior to procurement

Shop Drawings.

Para 1.2.B X 4 wks prior to procurement

Manufacturer Seismic Qualification Certification. Para 1.3.A X 4 wks prior to procurement

Field quality-control test reports. Para 1.3.B X 2 wks prior to final inspection

Operation and maintenance data. Para 1.4.A X X X 2 wks prior to final inspection

Product Data.

Para 1.3.A X 4 wks prior to procurement

Field quality-control reports.

Para 1.4.A X 2 wks prior to final inspection

Seismic Certifications.

Para 1.4.B X 2 wks prior to final inspection

SECTION 16442 - PANELBOARDS

SECTION 16461 - LOW-VOLTAGE

TRANSFORMERS

SECTION 16511 - LIGHTING

SECTION 16415 - TRANSFER SWITCHES

Page 4 of 4 October 2017

File details come from the government source that posted it.