JA-5_Drawings.pdf
PDF 5 MB Posted
- Attached to
- CHPP Phase A Federal contract opportunity
- Solicitation number
- FA5004-18-B-C004
About this file
JA-5 Drawings - CHPP Phase A - Eielson AFB AK
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Phase_A_Bidder_Q&A.pdf | ||
| FA500418BC0040001.pdf | ||
| FA500418BC004.pdf | ||
| JA-3_AF_Form_66.pdf | ||
| JA-2_Specs.pdf | ||
| JA-1_SOW.pdf | ||
| JA-4_Wage_Determination.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
THIS PROJECT
EIELSON AIR FORCE BASE VICINITY MAP
PACIFIC AIR FORCES
354th CE Squadron
Eielson Air Force Base
FTQW 18-0504
REPAIR CENTRAL HEATING & POWER PLANT (CH & PP)
ELECTRICAL PANELS & CIRCUITS, PHASE A
SHEET INDEX
SHEET NUMBER SHEET TITLE
E0
TITLE SHEET, INDEX, AND VICINITY MAP
E1 LEGEND AND SCHEDULES
E2 LIGHTING NEW WORK ONE-LINE DIAGRAM
E3 BASEMENT LIGHTING PLAN
E4 FIRST FLOOR LIGHTING PLAN
E5 BASEMENT FLOOR LIGHTING DEMOLITION PLAN
E6 FIRST FLOOR LIGHTING DEMOLITION PLAN
E7 PANEL SCHEDULES
H1 ACM AND DUST SAMPLE LOCATIONS AND RESULTS
H2 LBP SAMPLE LOCATIONS AND RESULTS
F500
AREA CLASSIFICATION PLANS (ISSUED FOR REFERENCE)
ER1
EXISTING ELECTRICAL ONE-LINE DIAGRAM
(ISSUED FOR REFERENCE)
David Harr
EE-10223
01/26/2018
REG IST ER E D P R O F E S S IO NA L ENGINEER
David Harr
EE-10223
A-#
A-#
SD-#
LEGEND
FIRST FLOOR FOURTH FLOOR
ASH HOUSE
A-3
A-4
A-5
A-6
A-7
A-8
A-9
A-10
A-1
SD-6
SD-1
SD-2
SD-5
A-2
SD-3
SD-4
ASBESTOS SAMPLE LOCATIONS NEGATIVE (<1%
ASBESTOS)
ASBESTOS SAMPLE LOCATIONS POSITIVE (>1%
ASBESTOS)
SETTLED DUST SAMPLE LOCATIONS
NOTES:
1. All settled dust sample locations contain detectable concentrations of RCRA 8-metal and silica.
See discussion in the hazardous material investigation report.
2. EPA HUD lead in dust standards:
Floors: 40(ug/ft²)
Interior windowsills: 250(ug/ft²)
Window troughs: 400(ug/ft²)
5TH FLOOR
4TH FLOOR
3RD FLOOR
2ND FLOOR
1ST FLOOR
BASEMENT
SHOP PANEL
BASEMENT
PANEL LP-1A
BASEMENT
PANEL LP-1
BASEMENT
PANEL A
BASEMENT
PANEL CH
1ST FLR
PANEL C
1ST FLR
GATE
HOUSE
PANEL
1ST FLR
COAL
HANDLING
PANEL
1ST FLR
PANEL H
1ST FLR
PANEL G
1ST FLR
PANEL B1
PUMP RM
PANEL B
PUMP RM
PANEL K
TURBINE RM
MAIN LP
TURBINE RM
ATS
TURBINE RM
SWGR 2
TURBINE RM
SWGR 1
TURBINE RM
PANEL P-1A
ELEC. SHOP
PANEL P-1
ELEC. SHOP
PANEL D
2ND FLR
PANEL N
3RD FLR
PANEL LP-4
3RD FLR
PANEL E
4TH FLR
PANEL J
4TH FLR
PANEL F
5TH FLR
ROOF PANEL
5TH FLR
PANEL PH
POND HOUSE
PANEL N.
SILO TOWER
PANEL N.
SILO TOWER
PANEL S.
SILO TOWER
PANEL S.
SILO TOWER
ASH HOUSE BUILDING
POND HOUSE BUILDING
LEGEND
SEE LEAD BASED PAINT TABULATION
RESULTS FOR CONCENTRATION AND
DESCRIPTION
LEAD BASED PAINT SAMPLE NEGATIVE (<1
mg cm
², EPA HUD STANDARD FOR LOW INCOME HOUSING.)
LEAD BASED PAINT SAMPLE POSITIVE (>1
mg cm
²)
Note:
Any level of lead in paint may still pose an OSHA health hazard if mishandled.
REFERENCED GRIDLINES
BAGHOUSE
BAGHOUSE
CHEMICAL STORAGE AREA TO
BE INCLUDED IN WP AREA
CLASSIFICATION HOWEVER
DETECTORS INSTALLED SHALL
BE THE SAME TYPE INSTALLED
IN THE CLASS II DIV 1 AREAS
OPEN TO BELOW
ROOF
BAGHOUSE
BAGHOUSE
OPEN TO BELOW
OPEN TO BELOW
BAGHOUSE BAGHOUSE
ROOF
ROOF
ROOF
F500 NO SCALE
F500 NO SCALE
F500 NO SCALE
F500 NO SCALE
F500 NO SCALE
F500 NO SCALE
F500 NO SCALE
F500 NO SCALE
CLASS II DIV 1 GROUP F AREA
UNCLASSIFIED AREA, BUT EQUIPMENT TO BE INSTALLED AS WEATHERPROOF TO
INCLUDE RACEWAYS, BACK BOXES, CONNECTIONS AND SHALL ALSO INCLUDE
SECONDARY ENCLOSURES FOR ANY PACKAGED EQUIPMENT WHICH IS PROVIDED IN
NEMA 1 TYPE ENCLOSURES TO PROVIDE ADDITIONAL PROTECTION FROM DUST
INFILTRATION INTO THESE COMPONENTS, DEVICES AND/OR ANCILLARY SYSTEMS
CLASS I DIV 2 GROUP D AREA
UNCLASSIFIED AREA
EAST
FILTRATION
BUILDING
COAL
THAWING
ROOM
ELEV. 575'-6"
ELEV. 581'-2"
ELEV. 600'-0"
ELEV. 616'-0"
WEST
FILTRATION
BUILDING
ELEV. 578'-3"
ELEV. 543'-9"
ELEV. 636'-0"
B
TRIPPER
ROOM
CRANE
ELEV. 543'-9" ELEV. 543'-9"
ELEV. 556'-2"
ELEV. 581'-2"
ELEV. 600'-0"
ELEV. 616'-0"
TRIPPER
ROOM
EAST
FILTRATION
BUILDING
COAL
THAWING
ROOM
ELEV. 575'-6"
ELEV. 556'-2"
ELEV. 545'-6"
ELEV. 531'-0"
ELEV. 581'-2"
ELEV. 600'-0"
ELEV. 616'-0"
WEST
FILTRATION
BUILDING
ELEV. 571'-3"
ELEV. 575'-6" ELEV. 578'-3"ELEV. 578'-3"
TURBINE
GENERATOR
ROOM
AREA CLASSIFICATION: AREA CLASSIFICATION:
AREA CLASSIFICATION: AREA CLASSIFICATION: AREA CLASSIFICATION:
AREA CLASSIFICATION: AREA CLASSIFICATION:
GENERAL SHEET F500 NOTES
1. COAL HANDLING AREAS ARE AT VARIOUS ELEVATIONS WITH EXTERNAL CONVEYORS ARE NOT LEVEL.
2. AREA CLASSIFICATIONS BASED ON TYPES OF MATERIALS NORMALLY PRESENT AT THE LOCATIONS, i.e. PREDOMINANTLY COAL DUSTS. OTHER NON EXPLOSIVE BASED DUSTS AND DIRT ARE ALSO PRESENT WITHIN THE PLANT AREAS WHERE DEVICES ARE NOTED TO HAVE WEATHERPROOF ENCLOSURES TO PREVENT THIS DUST INFILTRATION INTO THESE SYSTEMS.
3. AREA CLASSIFICATIONS FOR THE SORBENT FACILITIES HAS NOT BEEN VERIFIED AS THESE LOCATIONS ARE STILL NOT COMPLETED AND TURNED OVER TO THE GOVERNMENT AND AS SUCH AS-BUILT INFORMATION IS NOT AVAILABLE. SHEET 11 OF 12
WASHDOWN AREA
FOR REFERENCE ONLY
EE-10223
| Electric Panels Ph A Dwg Sched |
| CH&PP Electric Ph A Drawings |
| Binder4 |
| H1-H2 Issued for Const. |
File details come from the government source that posted it.