4._LAFB_AF_Form_66.xls
XLS spreadsheet 101 KB Posted
- Attached to
- AIRFIELD & BASE PAVING IDIQ Federal contract opportunity
- Solicitation number
- FA4887-17-R-0002
About this file
Attachment 4 - LAFB AF Form 66
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions_&_Answers_additional.xlsx | XLSX spreadsheet | |
| 2._LAFB_Maintain_Airfield_Base_Pavements_Specifications_rev._1.docx | DOCX document | |
| Pre-proposal_Paving_IDIQ_Attendees_list_5_Jan_17.pdf | ||
| FA4887-17-R-0002-02_-_Paving_IDIQ.pdf | ||
| 1._LAFB_Statement_of_Work_rev._1.docx | DOCX document | |
| 6._Luke_Line_Item_Pricing_Matrix_rev._1.xls | XLS spreadsheet | |
| Pre-proposal_Conference_Minutes_-_Paving_IDIQ_5_Jan_17.pdf | ||
| Questions_&_Answers.xlsx | XLSX spreadsheet | |
| amendment_1.pdf | ||
| 2._LAFB_Specifications.docx | DOCX document | |
| 3._MAG_Uniform_Specs.pdf | ||
| FA4887-17-R-0002.pdf | ||
| 7._Incentive_Option_Plan.docx | DOCX document | |
| 5._Wage_Determination_AZ160008.pdf | ||
| 1._LAFB_Statement_of_Work.docx | DOCX document | |
| 6._Luke_Line_Item_Pricing_Matrix.xls | XLS spreadsheet |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Spec Sort
| ATTACHMENT PAV 4 - LAFB Airfield/Base Paving IDIQ - Submittal AF Form 66 - FA4887-16-R-0007 | PROJECT NUMBER | PROJECT TITLE | SOLICITATION / CONTRACT NO. | |||||||||||||||||||||||
| SCHEDULE OF MATERIAL SUBMITTALS | 16-0050/16/0051 | LUKE AFB Airfield/Base Paving IDIQ | FA4887-16-R-0007 | |||||||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||||||
| NO. OF COPIES REQUIRED | ||||||||||||||||||||||||||
| LINE NO. | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION | OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S | RECOMMENDATIONS | MANUFACTURER'S | WARRANTY | CATALOG DATA | OPERATING | INSTRUCTIONS | SEE PARAGRAPH | REFERENCE | OTHER | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CON-TRACTING | DATE TO CIVIL ENGINEER-ING | RETURN SUSPENSE DATE | FOLLOW-UP | DATE CONTRACTOR NOTIFIED | CONTRAC-TOR RE- SUBMIT-TAL | FINAL APPROVAL | REMARKS | |
| APPROVED | DISAPPROVED | |||||||||||||||||||||||||
| Summary of Work | On completion | |||||||||||||||||||||||||
| 1 | [010110, 1.07, A] | 2 | 2 | of work | ||||||||||||||||||||||
| As-Built Record Drawings | ||||||||||||||||||||||||||
| Cutting and Patching | ||||||||||||||||||||||||||
| 2 | [010450, 1.04, A-C] | 1 | 1 | In advance | ||||||||||||||||||||||
| Safety Requirements | 10 days | |||||||||||||||||||||||||
| 3 | [010700, 1.07, A] | 4 | after | |||||||||||||||||||||||
| Safety Program | NOA | |||||||||||||||||||||||||
| Construction Progress Mgmt Schedule | 10 days | |||||||||||||||||||||||||
| 4 | [013100, 1.02, A-H] 1-3 | 4 | after | |||||||||||||||||||||||
| Submittal | NTP | |||||||||||||||||||||||||
| Construction Progress Mgmt Schedule | 30 Days | |||||||||||||||||||||||||
| 5 | [013100, 1.04, A-F] | 4 | after | |||||||||||||||||||||||
| Complete Network Analysis and Diagrams | NTP | |||||||||||||||||||||||||
| Construction Progress Mgmt Schedule | 30-calendar | |||||||||||||||||||||||||
| 6 | [013100, 1.02, A, 3] | 4 | day | |||||||||||||||||||||||
| Actual Construction Progress Report | intervals | |||||||||||||||||||||||||
| Construction Progress Mgmt Schedule | 30 Days | |||||||||||||||||||||||||
| 7 | [013100, 1.09, 1.10] | 2 | after | |||||||||||||||||||||||
| Network Analysis Software, MS Project | NTP | |||||||||||||||||||||||||
| Quality Control | 30 Days | |||||||||||||||||||||||||
| 8 | [014000, 1.03, A] | 1 | after | |||||||||||||||||||||||
| AF Submittal Form 66 | NTP | |||||||||||||||||||||||||
| Contractor Quality Control | 10 Days | |||||||||||||||||||||||||
| 9 | [014500, 1.03, A, 1] | 1 | after | |||||||||||||||||||||||
| Quality Control Plan | NTP | |||||||||||||||||||||||||
| Contractor Quality Control | 10 Days | |||||||||||||||||||||||||
| 10 | [014500, 1.03, A, 2] | 1 | after | |||||||||||||||||||||||
| Quality Control Manager Qualifications | NTP | |||||||||||||||||||||||||
| Construction Facilities and Temporary Controls | 30 days | |||||||||||||||||||||||||
| 11 | [01500, 1.02, A] | 1 | after | |||||||||||||||||||||||
| Sanitary/Toilet Facilities and Maintenance Plan | NTP | |||||||||||||||||||||||||
| Construction Facilities and Temporary Controls | 30 Days | |||||||||||||||||||||||||
| 12 | [015000, 1.02, B] | 1 | after | |||||||||||||||||||||||
| Plan for Storage Areas | NTP | |||||||||||||||||||||||||
| Construction Facilities and Temporary Controls | 30 Days | |||||||||||||||||||||||||
| 13 | [015000, 1.02, C] | 1 | after | |||||||||||||||||||||||
| Plan for Field Offices | NTP | |||||||||||||||||||||||||
| Construction Facilities and Temporary Controls | 30 Days | |||||||||||||||||||||||||
| 14 | [015000, 1.02, D] | 2 | 1 | after | ||||||||||||||||||||||
| Plan for Barricades | NTP | |||||||||||||||||||||||||
| Project Identification and Signs | 30 Days | |||||||||||||||||||||||||
| 15 | [015800, 1.04, A] | 3 | 3 | after | ||||||||||||||||||||||
| Shop Drawings | NTP | |||||||||||||||||||||||||
| Contract Closeout | See | |||||||||||||||||||||||||
| 16 | [017000, 1.03, A-B] | 1 | Specification | |||||||||||||||||||||||
| Final Inspection | ||||||||||||||||||||||||||
| Contract Closeout | 10 days | |||||||||||||||||||||||||
| 17 | [ 017000, 1.06, A-C] | 2 | Prior to | |||||||||||||||||||||||
| Warranties | Final Completion | |||||||||||||||||||||||||
| Contract Closeout | 10 days | |||||||||||||||||||||||||
| 18 | [ 017000, 1.07, A] | 2 | Prior to | |||||||||||||||||||||||
| Spare Parts and Maintenance Materials | Final Completion | |||||||||||||||||||||||||
| Special Conditions | 5 Calendar | |||||||||||||||||||||||||
| 19 | [018000, 1.02, A] | 1 | Days | |||||||||||||||||||||||
| Work Schedule | in Advance | |||||||||||||||||||||||||
| Special Conditions | 5 Working | |||||||||||||||||||||||||
| 20 | [018000, 1.04, A] | 1 | Days | |||||||||||||||||||||||
| Utility Outages | in Advance | |||||||||||||||||||||||||
| Special Conditions | 5 Working | |||||||||||||||||||||||||
| 21 | [018000, 1.05, A] | 1 | Days | |||||||||||||||||||||||
| Contractor Storage Areas | in Advance | |||||||||||||||||||||||||
| Demolition | 5 Working | |||||||||||||||||||||||||
| 22 | 044100, 1.21 | 1 | Days | |||||||||||||||||||||||
| Demolition Plan | in Advance | |||||||||||||||||||||||||
| CAST-IN-PLACE STRUCTURAL CONCRETE | 30 Days | |||||||||||||||||||||||||
| 23 | [03 31 00.00 10, 2.4] | 3 | after | |||||||||||||||||||||||
| Curing Materials | NTP | |||||||||||||||||||||||||
| CAST-IN-PLACE STRUCTURAL CONCRETE | 30 days | |||||||||||||||||||||||||
| 24 | [03 31 00.00 10, 2.10.1] | 3 | after | |||||||||||||||||||||||
| Joint Fillers | NTP | |||||||||||||||||||||||||
| CAST-IN-PLACE STRUCTURAL CONCRETE | 30 Days | |||||||||||||||||||||||||
| 25 | [03 31 00.00 10, 1.3] | 3 | after | |||||||||||||||||||||||
| Portland Cement | NTP | |||||||||||||||||||||||||
| CAST-IN-PLACE STRUCTURAL CONCRETE | 30 days | |||||||||||||||||||||||||
| 26 | [03 31 00.00 10, 2.1] | 3 | after | |||||||||||||||||||||||
| Portland Cement | NTP | |||||||||||||||||||||||||
| CAST-IN-PLACE STRUCTURAL CONCRETE | 30 Days | |||||||||||||||||||||||||
| 27 | [03 31 00.00 10, 3.2] | 3 | after | |||||||||||||||||||||||
| Ready-Mixed Concrete small project | NTP | |||||||||||||||||||||||||
| CAST-IN-PLACE STRUCTURAL CONCRETE | 30 days | |||||||||||||||||||||||||
| 28 | [03 31 00.00 10, 2.7] | 3 | Prior to Use | |||||||||||||||||||||||
| Latex Bonding Agent | of Materials | |||||||||||||||||||||||||
| CAST-IN-PLACE STRUCTURAL CONCRETE | 6 months | |||||||||||||||||||||||||
| 29 | [03 31 00.00 10, 2.3] | 3 | before | |||||||||||||||||||||||
| Chemical Admixtures | NOA | |||||||||||||||||||||||||
| CAST-IN-PLACE STRUCTURAL CONCRETE | 30 days | |||||||||||||||||||||||||
| 30 | [03 31 00.00 10, 2.8] | 3 | after | |||||||||||||||||||||||
| Epoxy-Resin | NTP | |||||||||||||||||||||||||
| CAST-IN-PLACE STRUCTURAL CONCRETE | 14 Days | |||||||||||||||||||||||||
| 31 | [03 31 00.00 10, 1.3.1] | 3 | Prior to Use | |||||||||||||||||||||||
| Mixture Proportions | of Materials | |||||||||||||||||||||||||
| CAST-IN-PLACE STRUCTURAL CONCRETE | 30 days | |||||||||||||||||||||||||
| 32 | [03 31 00.00 10, 3.10] | 3 | after | |||||||||||||||||||||||
| Testing and Inspection for CQC | NTP | |||||||||||||||||||||||||
| Concrete Formwork | 10 Days | |||||||||||||||||||||||||
| 33 | 31000, 1.02 | 3 | after | |||||||||||||||||||||||
| Submittals | NTP | |||||||||||||||||||||||||
| Concrete Reinforcement | 10 Days | |||||||||||||||||||||||||
| 34 | 32000, 1.02 | 3 | after | |||||||||||||||||||||||
| Submittals | NTP | |||||||||||||||||||||||||
| CAST-IN-PLACE STRUCTURAL CONCRETE | 21 days | |||||||||||||||||||||||||
| 33 | [03 31 00.00 10, 1.5] | 2 | 3 | Prior to Use | ||||||||||||||||||||||
| Qualifications | on Project | |||||||||||||||||||||||||
| Lighting and Visual Navigation Aids | 30 Days | |||||||||||||||||||||||||
| 34 | [26 56 20.00 10, 1.3] | 3 | 3 | after | ||||||||||||||||||||||
| SD-02 Shop Drawings | NTP | |||||||||||||||||||||||||
| As-Built Drawings | 30 days | |||||||||||||||||||||||||
| 35 | [26 56 20.00 10, 1.4.5] | 3 | 3 | after | ||||||||||||||||||||||
| SD-02 Shop Drawings | NTP | |||||||||||||||||||||||||
| Materials and Equipment | 30 Days | |||||||||||||||||||||||||
| 36 | [26 56 20.00 10, 2.1] | 3 | after | |||||||||||||||||||||||
| SD-03 Product Data | NTP | |||||||||||||||||||||||||
| Lighting and Visual Navigation Aids | 30 days | |||||||||||||||||||||||||
| 37 | [26 56 20.00 10, 1.4.3] | 3 | after | |||||||||||||||||||||||
| Protection Plan | NTP | |||||||||||||||||||||||||
| Lighting and Visual Navigation Aids | 30 Days | |||||||||||||||||||||||||
| 38 | [26 56 20.00 10, 3.17] | 3 | after | |||||||||||||||||||||||
| Training Special Tools | NTP | |||||||||||||||||||||||||
| Lighting and Visual Navigation Aids | 30 days | |||||||||||||||||||||||||
| 39 | [26 56 20.00 10, 3.19] | 3 | after | |||||||||||||||||||||||
| Posted Instructions | NTP | |||||||||||||||||||||||||
| Lighting and Visual Navigation Aids | 30 Days | |||||||||||||||||||||||||
| 40 | [26 56 20.00 10, 3.16] | 3 | after | |||||||||||||||||||||||
| Field Quality Control | NTP | |||||||||||||||||||||||||
| Lighting and Visual Navigation Aids | 30 days | |||||||||||||||||||||||||
| 41 | [26 56 20.00 10, 3.16.3] | 3 | after | |||||||||||||||||||||||
| Counterpoise System Test and Inspection | NTP | |||||||||||||||||||||||||
| Lighting and Visual Navigation Aids | After | |||||||||||||||||||||||||
| 42 | [26 56 20.00 10, 1.4.2] | 3 | Completion | |||||||||||||||||||||||
| Qualifications | and Testing | |||||||||||||||||||||||||
| Lighting and Visual Navigation Aids | After Each | |||||||||||||||||||||||||
| 43 | [26 56 20.00 10, 2.1] | 3 | Stage is | |||||||||||||||||||||||
| Materials and Equipment | Completed | |||||||||||||||||||||||||
| EARTHWORK | 30 days | |||||||||||||||||||||||||
| 44 | [31 00 00, 3.7] | 3 | after | |||||||||||||||||||||||
| Utilization of Excavated Materials | NTP | |||||||||||||||||||||||||
| EARTHWORK | 30 Days | |||||||||||||||||||||||||
| 45 | [31 00 00, 3.3] | 6 | after | |||||||||||||||||||||||
| Opening of any Excavation or Borrow Pit | NTP | |||||||||||||||||||||||||
| EARTHWORK | 30 days | |||||||||||||||||||||||||
| 46 | [31 00 00, 3.13] | 3 | after | |||||||||||||||||||||||
| Shoulder Construction | NTP | |||||||||||||||||||||||||
| EARTHWORK | Advance | |||||||||||||||||||||||||
| 47 | [31 00 00, 3.15] | 3 | Notice | |||||||||||||||||||||||
| Structural Excavation | of Excavation | |||||||||||||||||||||||||
| CLEARING AND GRUBBING | Within | |||||||||||||||||||||||||
| 48 | [31 11 00, 2.1] | 4 | 24 Hours | |||||||||||||||||||||||
| Herbicide | of Conclusion | |||||||||||||||||||||||||
| Rubber and Paint Removal from Airfield Pavement | 10 days | |||||||||||||||||||||||||
| 49 | (32 01 11.51, 1.2) | 3 | after | |||||||||||||||||||||||
| Submittals | NTP | |||||||||||||||||||||||||
| SEALING OF CRACKS IN BITUMINOUS PAVEMENTS | 30 days | |||||||||||||||||||||||||
| 50 | [32 01 17.16, 3.3] | 3 | after | |||||||||||||||||||||||
| Installation of Sealant | NTP | |||||||||||||||||||||||||
| SEALING OF CRACKS IN BITUMINOUS PAVEMENTS | 30 days | |||||||||||||||||||||||||
| 51 | [32 01 17.16, 1.4] | 3 | after | |||||||||||||||||||||||
| Quality Assurance | NTP | |||||||||||||||||||||||||
| ASPHALT-RUBBER STRESS-ABSORBING MEMBRANE INTERLAYER | 60 days | |||||||||||||||||||||||||
| 52 | [32 01 17.62, 1.6.1] | 1 | 3 | Prior to | ||||||||||||||||||||||
| Asphalt Concrete Mix Design | Use | |||||||||||||||||||||||||
| ASPHALT-RUBBER STRESS-ABSORBING MEMBRANE INTERLAYER | 15 days | |||||||||||||||||||||||||
| 53 | [32 01 17.62, 2.1.1] | 3 | Prior to Use | |||||||||||||||||||||||
| Asphalt-rubber cement | of Materials | |||||||||||||||||||||||||
| ASPHALT-RUBBER STRESS-ABSORBING MEMBRANE INTERLAYER | 30 days | |||||||||||||||||||||||||
| 54 | [32 01 17.62, 2.1.2] | 3 | Prior to Start | |||||||||||||||||||||||
| Emulsified Asphalt | of Work | |||||||||||||||||||||||||
| ASPHALT-RUBBER STRESS-ABSORBING MEMBRANE INTERLAYER | 30 days | |||||||||||||||||||||||||
| 55 | [32 01 17.62, 2.1.4] | 3 | after | |||||||||||||||||||||||
| Sealant | NTP | |||||||||||||||||||||||||
| ASPHALT-RUBBER STRESS-ABSORBING MEMBRANE INTERLAYER | 30 days | |||||||||||||||||||||||||
| 56 | [32 01 17.62, 2.1.5] | 3 | after | |||||||||||||||||||||||
| Reinforcing Fabric Underseal | NTP | |||||||||||||||||||||||||
| FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID PAVEMENTS | 30 days | |||||||||||||||||||||||||
| 57 | [32 01 19, 2.2] | 3 | 3 | after | ||||||||||||||||||||||
| Primers | NTP | |||||||||||||||||||||||||
| FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID PAVEMENTS | 30 days | |||||||||||||||||||||||||
| 58 | [32 01 19, 1.2] | 3 | after | |||||||||||||||||||||||
| System Description | NTP | |||||||||||||||||||||||||
| FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID PAVEMENTS | 30 days | |||||||||||||||||||||||||
| 59 | [32 01 19, 1.4.1] | 3 | Prior to Use | |||||||||||||||||||||||
| Test Requirement | on Project | |||||||||||||||||||||||||
| Plant, Equipment, and Tools | 21 days | |||||||||||||||||||||||||
| 60 | [32 11 23, 1.3] | 3 | Prior to Use | |||||||||||||||||||||||
| SD-03 Product Data | on Project | |||||||||||||||||||||||||
| AGGREGATE BASE COURSE | 21 days | |||||||||||||||||||||||||
| 61 | [32 11 23, 1.5] | 3 | Prior to Start | |||||||||||||||||||||||
| Sampling and Testing | of Work | |||||||||||||||||||||||||
| AGGREGATE BASE COURSE | 30 Days | |||||||||||||||||||||||||
| 62 | [32 11 23, 1.5.2.4] | 3 | after | |||||||||||||||||||||||
| Field Density Tests | NTP | |||||||||||||||||||||||||
| CEMENT TREATMENT OF EXISTING AGGREGATE BASE COURSE AT AIRFIELDS | 30 days | |||||||||||||||||||||||||
| 63 | [32 11 33, 2.2.2.1] | 3 | after | |||||||||||||||||||||||
| Rigid Pavement Base Course | NTP | |||||||||||||||||||||||||
| CEMENT TREATMENT OF EXISTING AGGREGATE BASE COURSE AT AIRFIELDS | 30 days | |||||||||||||||||||||||||
| 64 | [32 11 33, 2.5] | 3 | Prior to Use | |||||||||||||||||||||||
| Mix Design | on Project | |||||||||||||||||||||||||
| CEMENT TREATMENT OF EXISTING AGGREGATE BASE COURSE AT AIRFIELDS | 30 days | |||||||||||||||||||||||||
| 65 | [32 11 33, 3.7.2.1] | 3 | Prior to Start | |||||||||||||||||||||||
| Aggregate Testing | of Work | |||||||||||||||||||||||||
| CEMENT TREATMENT OF EXISTING AGGREGATE BASE COURSE AT AIRFIELDS | 30 Days | |||||||||||||||||||||||||
| 66 | [32 11 33, 2.2.2] | 3 | after | |||||||||||||||||||||||
| Base Course Aggregate | NTP | |||||||||||||||||||||||||
| CEMENT TREATMENT OF EXISTING AGGREGATE BASE COURSE AT AIRFIELDS | 30 days | |||||||||||||||||||||||||
| 67 | [32 11 33, 2.4.1] | 3 | after | |||||||||||||||||||||||
| Compressive Strength | NTP | |||||||||||||||||||||||||
| CEMENT TREATMENT OF EXISTING AGGREGATE BASE COURSE AT AIRFIELDS | 30 days | |||||||||||||||||||||||||
| 68 | [32 11 33, 3.7.2.1] | 3 | after | |||||||||||||||||||||||
| Aggregate Testing | NTP | |||||||||||||||||||||||||
| CEMENT TREATMENT OF EXISTING AGGREGATE BASE COURSE AT AIRFIELDS | 30 days | |||||||||||||||||||||||||
| 69 | [32 11 33, 3.7.2.6] | 3 | after | |||||||||||||||||||||||
| Laboratory Test | NTP | |||||||||||||||||||||||||
| CEMENT TREATMENT OF EXISTING AGGREGATE BASE COURSE AT AIRFIELDS | 30 Days | |||||||||||||||||||||||||
| 70 | [32 11 33, 2.1] | 3 | after | |||||||||||||||||||||||
| Cement | NTP | |||||||||||||||||||||||||
| CEMENT TREATMENT OF EXISTING AGGREGATE BASE COURSE AT AIRFIELDS | 30 days | |||||||||||||||||||||||||
| 71 | [32 11 33, 1.5.1] | 3 | after | |||||||||||||||||||||||
| Required Data | NTP | |||||||||||||||||||||||||
| BITUMINOUS TACK AND PRIME COATS | 30 Days | |||||||||||||||||||||||||
| 72 | [32 12 10, 1.4] | 3 | after | |||||||||||||||||||||||
| QUALITY ASSURANCE | NTP | |||||||||||||||||||||||||
| BITUMINOUS TACK AND PRIME COATS | 30 days | |||||||||||||||||||||||||
| 73 | [32 12 10, 3.7] | 3 | after | |||||||||||||||||||||||
| Sampling and Testing | NTP | |||||||||||||||||||||||||
| BITUMINOUS SURFACE TREATMENT | 30 Days | |||||||||||||||||||||||||
| 74 | 32 12 11, 1.1 | 3 | after | |||||||||||||||||||||||
| paybills and Delivery Tickets | NTP | |||||||||||||||||||||||||
| BITUMINOUS SURFACE TREATMENT | Within | |||||||||||||||||||||||||
| 75 | 32 12 11, 2.1.2.1 | 3 | 24 hours | |||||||||||||||||||||||
| Emulsified Asphalt | of Completion | |||||||||||||||||||||||||
| BITUMINOUS SURFACE TREATMENT | Within | |||||||||||||||||||||||||
| 76 | 32 12 11, 2.1.2.2 | 3 | 24 hours | |||||||||||||||||||||||
| Asphalt-Rubber Cement | of Completion | |||||||||||||||||||||||||
| BITUMINOUS SURFACE TREATMENT | 30 Days | |||||||||||||||||||||||||
| 77 | 32 12 11, 2.1.3 | 3 | after | |||||||||||||||||||||||
| Sealant | NTP | |||||||||||||||||||||||||
| BITUMINOUS SURFACE TREATMENT | 30 Days | |||||||||||||||||||||||||
| 78 | 32 12 11, 1.5.2 | 3 | after | |||||||||||||||||||||||
| Tests | NTP | |||||||||||||||||||||||||
| BITUMINOUS SURFACE TREATMENT | 30 Days | |||||||||||||||||||||||||
| 79 | [32 11 33, 3.7.2.6] | 3 | after | |||||||||||||||||||||||
| Optimum Moisture Content and Maximum Density | NTP | |||||||||||||||||||||||||
| BITUMINOUS SURFACE TREATMENT | 30 Days | |||||||||||||||||||||||||
| 80 | [32 11 33, 2.1] | 3 | after | |||||||||||||||||||||||
| Cement | NTP | |||||||||||||||||||||||||
| BITUMINOUS SURFACE TREATMENT | 30 days | |||||||||||||||||||||||||
| 81 | [32 11 33, 1.5.1] | 3 | after | |||||||||||||||||||||||
| Location of Aggregate Source | NTP | |||||||||||||||||||||||||
| BITUMINOUS TACK AND PRIME COATS | 30 Days | |||||||||||||||||||||||||
| 82 | [32 12 10, 1.4] | 3 | after | |||||||||||||||||||||||
| Quality Assurance | NTP | |||||||||||||||||||||||||
| BITUMINOUS TACK AND PRIME COATS | 30 days | |||||||||||||||||||||||||
| 83 | [32 12 10, 3.7] | 3 | after | |||||||||||||||||||||||
| Sampling and Testing | NTP | |||||||||||||||||||||||||
| HOT-MIX ASPHALT (HMA) FOR AIRFIELDS | 30 Days | |||||||||||||||||||||||||
| 84 | [32 12 15, 1.4] | 3 | after | |||||||||||||||||||||||
| System Description | NTP | |||||||||||||||||||||||||
| HOT-MIX ASPHALT (HMA) FOR AIRFIELDS | Within | |||||||||||||||||||||||||
| 85 | [32 12 15, 2.3] | 3 | 24 hours | |||||||||||||||||||||||
| Mix Design | of Completion | |||||||||||||||||||||||||
| HOT-MIX ASPHALT (HMA) FOR AIRFIELDS | 30 Days | |||||||||||||||||||||||||
| 86 | [32 12 15, 3.1] | 3 | after | |||||||||||||||||||||||
| Contractor Quality Control | NTP | |||||||||||||||||||||||||
| HOT-MIX ASPHALT (HMA) FOR AIRFIELDS | 30 days | |||||||||||||||||||||||||
| 87 | [32 12 15, 2.2] | 3 | after | |||||||||||||||||||||||
| Asphalt Cement Binder | NTP | |||||||||||||||||||||||||
| HOT-MIX ASPHALT (HMA) FOR AIRFIELDS | 30 Days | |||||||||||||||||||||||||
| 88 | [32 12 15, 2.1] | 3 | after | |||||||||||||||||||||||
| Aggregates | NTP | |||||||||||||||||||||||||
| HOT-MIX ASPHALT (HMA) FOR AIRFIELDS | 30 Days | |||||||||||||||||||||||||
| 89 | [32 12 15, 3.1.3.10] | 3 | after | |||||||||||||||||||||||
| QC Monitoring | NTP | |||||||||||||||||||||||||
| HOT-MIX ASPHALT (HMA) FOR AIRFIELDS | 30 days | |||||||||||||||||||||||||
| 90 | [32 12 15, 2.2] | 3 | after | |||||||||||||||||||||||
| Asphalt Cement Binder | NTP | |||||||||||||||||||||||||
| HOT-MIX ASPHALT (HMA) FOR AIRFIELDS | 30 Days | |||||||||||||||||||||||||
| 91 | [32 12 15, 3.7] | 3 | after | |||||||||||||||||||||||
| Testing Laboratory | NTP | |||||||||||||||||||||||||
| CONCRETE PAVEMENT FOR AIRFIELDS AND OTHER HEAVY-DUTY PAVEMENTS MORE THAN 1,000 CUBIC YARDS | 30 days | |||||||||||||||||||||||||
| 92 | [32 13 11, 2.10] | 3 | after | |||||||||||||||||||||||
| Equipment | NTP | |||||||||||||||||||||||||
| CONCRETE PAVEMENT FOR AIRFIELDS AND OTHER HEAVY-DUTY PAVEMENTS MORE THAN 1,000 CUBIC YARDS | 30 Days | |||||||||||||||||||||||||
| 93 | [32 13 11, 3.1.2] | 3 | after | |||||||||||||||||||||||
| Proposed Techniques | NTP | |||||||||||||||||||||||||
| CONCRETE PAVEMENT FOR AIRFIELDS AND OTHER HEAVY-DUTY PAVEMENTS MORE THAN 1,000 CUBIC YARDS | 30 days | |||||||||||||||||||||||||
| 94 | [32 13 11, 2.12.2] | 3 | after | |||||||||||||||||||||||
| Proportioning Studies | NTP | |||||||||||||||||||||||||
| CONCRETE PAVEMENT FOR AIRFIELDS AND OTHER HEAVY-DUTY PAVEMENTS MORE THAN 1,000 CUBIC YARDS | 30 Days | |||||||||||||||||||||||||
| 95 | [32 13 11, 1.3.4] | 3 | after | |||||||||||||||||||||||
| Flexural Strength | NTP | |||||||||||||||||||||||||
| CONCRETE PAVEMENT FOR AIRFIELDS AND OTHER HEAVY-DUTY PAVEMENTS MORE THAN 1,000 CUBIC YARDS | 30 days | |||||||||||||||||||||||||
| 96 | [32 13 11, 1.5.1] | 3 | Prior to Use | |||||||||||||||||||||||
| Contractor Quality Control Staff | of Materials | |||||||||||||||||||||||||
| CONCRETE PAVEMENT FOR AIRFIELDS AND OTHER HEAVY-DUTY PAVEMENTS MORE THAN 1,000 CUBIC YARDS | 6 months | |||||||||||||||||||||||||
| 97 | [32 13 11, 1.5.3] | 3 | before | |||||||||||||||||||||||
| Laboratory Accreditation | NOA | |||||||||||||||||||||||||
| COMPRESSION JOINT SEALS FOR CONCRETE PAVEMENTS | 30 Days | |||||||||||||||||||||||||
| 98 | [32 13 73, 1.2] | 3 | after | |||||||||||||||||||||||
| System Description | NTP | |||||||||||||||||||||||||
| COMPRESSION JOINT SEALS FOR CONCRETE PAVEMENTS | 30 days | |||||||||||||||||||||||||
| 99 | [32 13 73, 3.1.1] | 3 | after | |||||||||||||||||||||||
| Manufacturer's Instructions | NTP | |||||||||||||||||||||||||
| COMPRESSION JOINT SEALS FOR CONCRETE PAVEMENTS | 21 days | |||||||||||||||||||||||||
| 100 | [32 13 73, 2.1] | 3 | Prior to Use | |||||||||||||||||||||||
| Compression Seals | on Project | |||||||||||||||||||||||||
| COMPRESSION JOINT SEALS FOR CONCRETE PAVEMENTS | 21 days | |||||||||||||||||||||||||
| 101 | [32 13 73, 1.2.3] | 3 | 3 | Prior to Use | ||||||||||||||||||||||
| Test Requirements | on Project | |||||||||||||||||||||||||
| PAVEMENT MARKINGS | 60 days | |||||||||||||||||||||||||
| 102 | [32 17 24.00 10, 1.2] | 3 | Prior to Use | |||||||||||||||||||||||
| System Description | on Project | |||||||||||||||||||||||||
| PAVEMENT MARKINGS | 21 days | |||||||||||||||||||||||||
| 103 | [32 17 24.00 10, 2.1] | 3 | Prior to Use | |||||||||||||||||||||||
| Composition | on Project | |||||||||||||||||||||||||
| PAVEMENT MARKINGS | 30 Days | |||||||||||||||||||||||||
| 104 | [32 17 24.00 10, 1.4.1] | 3 | after | |||||||||||||||||||||||
| Qualifications | NTP | |||||||||||||||||||||||||
| PAVEMENT MARKINGS | 30 days | |||||||||||||||||||||||||
| 105 | [32 17 24.00 10, 2.3] | 3 | after | |||||||||||||||||||||||
| Sampling and Testing | NTP | |||||||||||||||||||||||||
| PAVEMENT MARKINGS | 30 Days | |||||||||||||||||||||||||
| 106 | [32 17 24.00 10, 2.1] | 3 | after | |||||||||||||||||||||||
| Paint | NTP | |||||||||||||||||||||||||
| 107 | ||||||||||||||||||||||||||
| 108 | ||||||||||||||||||||||||||
| 109 | ||||||||||||||||||||||||||
| 110 | ||||||||||||||||||||||||||
| 111 | ||||||||||||||||||||||||||
| 112 | ||||||||||||||||||||||||||
| 113 | ||||||||||||||||||||||||||
| 114 | ||||||||||||||||||||||||||
| 115 | ||||||||||||||||||||||||||
| 116 | ||||||||||||||||||||||||||
| 117 | ||||||||||||||||||||||||||
| 118 | ||||||||||||||||||||||||||
| 119 | ||||||||||||||||||||||||||
| 120 | ||||||||||||||||||||||||||
| 121 | ||||||||||||||||||||||||||
| 122 | ||||||||||||||||||||||||||
| 123 | ||||||||||||||||||||||||||
| 124 |
&L&"Arial,Bold"AF Form 66, Computer Generated&CPage &P of &N&R&D