3._MAG_Uniform_Specs.pdf
PDF 4 MB Posted
- Attached to
- AIRFIELD & BASE PAVING IDIQ Federal contract opportunity
- Solicitation number
- FA4887-17-R-0002
About this file
Attachment 3 - MAG Uniform Specs
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions_&_Answers_additional.xlsx | XLSX spreadsheet | |
| 2._LAFB_Maintain_Airfield_Base_Pavements_Specifications_rev._1.docx | DOCX document | |
| 6._Luke_Line_Item_Pricing_Matrix_rev._1.xls | XLS spreadsheet | |
| Pre-proposal_Conference_Minutes_-_Paving_IDIQ_5_Jan_17.pdf | ||
| Questions_&_Answers.xlsx | XLSX spreadsheet | |
| Pre-proposal_Paving_IDIQ_Attendees_list_5_Jan_17.pdf | ||
| FA4887-17-R-0002-02_-_Paving_IDIQ.pdf | ||
| 1._LAFB_Statement_of_Work_rev._1.docx | DOCX document | |
| amendment_1.pdf | ||
| 2._LAFB_Specifications.docx | DOCX document | |
| FA4887-17-R-0002.pdf | ||
| 7._Incentive_Option_Plan.docx | DOCX document | |
| 5._Wage_Determination_AZ160008.pdf | ||
| 6._Luke_Line_Item_Pricing_Matrix.xls | XLS spreadsheet | |
| 4._LAFB_AF_Form_66.xls | XLS spreadsheet | |
| 1._LAFB_Statement_of_Work.docx | DOCX document |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Uniform Standard Specifications and Details for Public Works Construction
Sponsored and Distributed by the
January 2016
2016 Revision to the 2015 Edition
New Specifications:
• Section 607: Trenchless Installation of Smooth Wall Jacking Pipe
• Section 742: Precast Manhole
Specifications rewritten, or with major updates:
• Section 101: Abbreviations and Definitions
• Section 321: Placement and Construction of Asphalt Concrete
Pavement
• Section 324: Portland Cement Concrete Pavement
• Section 325: Placement and Construction of Asphalt-Rubber
Asphalt Concrete Pavement
• Section 405: Monuments
• Section 601: Trench Excavation, Backfilling and Compaction
• Section 610: Water Line Construction
• Section 611: Water, Sewer and Storm Drain Testing
(was Disinfecting Water Mains)
• Section 615: Sewer Line Construction
• Section 618: Storm Drain Construction
• Section 625: Manhole Construction and Drop Sewer Connections
• Section 735: Reinforced Concrete Pipe
Specifications with minor updates:
• Section 107: Legal Regulations and Responsibility to Public
• Section 206: Structure Excavation and Backfill
• Section 211: Fill Construction
• Section 310: Placement and Construction of Aggregate Base Course
• Section 336: Pavement Matching and Surfacing Replacement
• Section 340: Concrete Curb, Gutter, Sidewalk, Sidewalk Ramps, Driveway and Alley Entrance
• Section 342: Decorative Pavement, Concrete Paving Stone
• Section 345: Adjusting Frames, Covers, Valve Boxes, Meter
Boxes and Pull Boxes
• Section 355: Utility Potholes-Keyhole Method
• Section 616: Reclaimed Water Line Construction
• Section 710: Asphalt Concrete
• Section 717: Asphalt-Rubber Asphalt Concrete
• Section 726: Concrete Curing Materials
NEW IN THE 2016 REVISION
Uniform Standard Specifications and Details for Public Works Construction—2016 Revision to the 2015 Edition The MAG Standard Specifications and Details Committee, with assistance from five specialized working groups, considered 18 cases during the 2015 session. Of these, 14 were approved and included in this revision.
• Section 739: Steel Reinforced Polyethylene Pipe and Fittings for Storm Drain, Irrigation and Sanitary Sewer
• Section 740: Polypropylene Pipe and Fittings for Storm Drain, Irrigation and Sanitary Sewer
• Section 750: Iron Water Pipe and Fittings
• Section 775: Brick and Concrete Masonry Units (Blocks)
Specifications that have been deleted:
• Section 603: Installation for High Density Polyethylene Pipe
(Incorporated into Section 601.)
New detail drawings:
• Detail 420-1: Concrete Sanitary Sewer Manhole (Replaces existing 420-1: Precast Concrete Sewer Manhole)
• Detail 420-2: Precast Manhole Base
• Detail 420-3: Concrete Manhole Base
(Replaces parts of existing 420-2 and adds details.)
Details that have been updated:
• Detail 100-1: Index (Page 1 of 2)
• Detail 100-2: Index (Page 2 of 2)
• Detail 120: Survey Marker
• Detail 200-1: Backfill, Pavement and Surface Replacement
• Detail 200-2: Backfill, Pavement and Surface Replacement
• Detail 212: Utility Pothole Repair
• Detail 391-1: Valve Box Installation and Grade Adjustment
• Detail 391-2: Valve Box Installation and Grade Adjustment
• Detail 392: Debris Cap Installation
• Detail 421: Offset Manhole 8” to 30” Pipe
• Detail 422: Manhole Frame and Cover Adjustment
(Deletes Brick Sewer Manhole drawing from existing Detail 422)
• Detail 429: Industrial Waste Control Vault with Manhole
• Detail 522: Storm Drain Manhole Shaft
• Detail 552: Ford Crossing and Cut-off Walls
Details that have been deleted:
• Detail 428: Manhole Steps
Changes made in the 2015 Edition Uniform Standard Specifications and Details for Public Works Construction—2015 Edition The MAG Standard Specifications and Details Committee considered 22 cases during the 2014 session. Of these, 18 were approved and included in this revision.
New Specifications:
• Section 322: Decorative Asphalt
• Section 608: Horizontal Directional Drilling
Specifications rewritten, or with major updates:
• Section 321: Placement and Construction of Asphalt Concrete
Pavement
• Section 336: Pavement Matching and Surfacing Replacement
• Section 342: Interlocking Concrete Paver Installations
• Section 602: Trenchless Installation of Steel Casing
• Section 718: Preservative Seal for Asphalt Concrete
Specifications with minor updates:
• Section 325: Placement and Construction of Asphalt-Rubber Asphalt Concrete Pavement
• Section 334: Preservative Seal for Asphalt Concrete
• Section 345: Adjusting Frames, Covers and Valve Boxes
• Section 601: Trench Excavation, Backfilling and Compaction
• Section 625: Manhole Construction and Drop Sewer Connections
• Section 710: Asphalt Concrete
• Section 717: Asphalt-Rubber Asphalt Concrete
• Section 735: Reinforced Concrete Pipe
• Section 771: Galvanizing
• Section 772: Chain Link Fence
Specifications that have been deleted:
• Section 744: ABS Truss Pipe and Fittings
Details that have been updated:
• Detail 145: Safety Rail
• Detail 200-1: Trench Backfill and Surface Replacement
• Detail 200-2: Trench Backfill and Surface Replacement
• Detail 225: Interlocking Concrete Pavers
• Detail 270: Frame and Cover and Grade Adjustment
New Specifications:
• Section 602: Trenchless Installation of Steel Casing (Replaces
Section 602: Encasement of Water of Sewer Pipe by Jacking or Tunneling Operation)
• Section 739: Steel Reinforced Polyethylene Pipe (SRPE)
• Section 740: Polypropylene Pipe and Fittings for Storm Drain, Irrigation, and Sanitary Sewer
Specifications rewritten, or with major updates:
• Section 309: Lime Stabilization or Modification of Subgrade
• Section 321: Placement and Construction of Asphalt Concrete
Pavement
• Section 337: Crack Sealing
• Section 340: Concrete Curb, Gutter, Sidewalk, Sidewalk Ramps, Driveway and Alley Entrance
• Section 345: Adjusting Frames, Covers, Valve Boxes, and Water
Meter Boxes
• Section 610: Water Line Construction
• Section 711: Paving Asphalt
• Section 729: Expansion Joint Filler
Specifications with minor updates:
• Section 107: Legal Requirements and Responsibility to Public
• Section 108: Commencement, Prosecution and Progress
• Section 301: Subgrade Preparation
• Section 311: Placement and Construction of Cement Treated
Subgrade
• Section 324: Portland Cement Concrete Pavement
Changes made in the 2014 Revision Uniform Standard Specifications and Details for Public Works Construction—2014 Revision to the 2012 Edition The MAG Standard Specifications and Details Committee considered 26 cases during the 2013 session. Of these, 23 were approved and included in 2015 Edition.
• Section 415: Flexible Metal Guardrail
• Section 430: Landscaping and Planting
• Section 505: Concrete Structures
• Section 605: Subdrainage
• Section 725: Portland Cement Concrete
• Section 735: Reinforced Concrete Pipe
• Section 795: Landscape Materials
Specifications that have been deleted:
• Section 737: Asbestos-Cement Pipe and Fittings for Storm Drain and Sanitary Sewer
New detail drawing:
• Detail 120: Survey Marker (Replaces Details 120-1 and 120-2)
Details that have been updated:
• Detail 201: Asphalt Pavement Edge Details
• Detail 221: Curb and Gutter Transition Type A to Type C Integral
Roll Curb, Gutter and Sidewalk
• Detail 230: Sidewalks
• Detail 250-1: Driveway Entrances with Detached Sidewalk
• Detail 270: Frame and Cover
• Detail 391-1: Valve Box Installation and Grade Adjustment
• Detail 501-5: Headwall Drop Inlet
Details that have been deleted:
• Detail 120-2: Survey Marker (for Unincorporated Maricopa
County)
New Specifications:
• None
Specifications rewritten, or with major updates:
• Section 107: Legal Regulations and Responsibility to Public
• Section 310: Placement and Construction of Aggregate Base
• Section 350: Removal of Existing Improvements
• Section 415: Flexible Metal Guardrail
• Section 701: Aggregate
• Section 702: Base Materials
• Section 710: Asphalt Concrete
• Section 711: Paving Asphalt
Specifications with minor updates:
• Section 108: Commencement, Prosecution and Progress
• Section 317: Asphalt Milling
• Section 321: Placement and Construction of Asphalt Concrete
Pavement
• Section 332: Placement and Construction of Asphalt Emulsion
Slurry Seal Coat
• Section 505: Concrete Structures
Changes made in the 2013 Revision Uniform Standard Specifications and Details for Public Works Construction—2013 Revision to the 2012 Edition The MAG Standard Specifications and Details Committee considered 20 cases during the 2012 session. Of these, 17 were approved and included in the 2015 Edition.
• Section 610: Water Line Construction
• Section 725: Portland Cement Concrete
• Section 728: Controlled Low Strength Materials
• Section 770: Structural and Rivet Steel, Rivets, Bolts, Pins and
Anchor Bolts.
Specifications that have been deleted:
• Section 709: Reclaimed Asphalt Pavement
• Section 719: Recycled Asphalt Concrete Hot Mixed
New detail drawings:
• Detail 260: Alley Entrance (With Vertical Curb and Gutter)
• Detail 360-1: Dry Barrel Fire Hydrant Installation
• Detail 360-2: Wet Barrel Fire Hydrant Installation
• Detail 360-3: Fire Hydrant Installation Details
Details that have been updated:
• Detail 160: 6’ Chain Link Fence and Gate
• Detail 201: Asphalt Pavement Edge Details
• Detail 250-2: Driveway Entrances with Sidewalk Attached to
Curb
For more information and links to agency supplements please visit: http://www.azmag.gov/Committees/Committee.asp?CMSID=1055
UNIFORM STANDARD
SPECIFICATIONS
for
PUBLIC WORKS
CONSTRUCTION
SPONSORED and DISTRIBUTED by the
2016 Revision to the 2015 Edition
ARIZONA
FOREWORD
Publication of these Uniform Standard Specifications and Details for Public Works Construction fulfills the goal of a group of agencies who joined forces in 1966 to produce such a set of documents. Subsequently, in the interest of promoting county-wide acceptance and use of these standards and details, the Maricopa Association of Governments accepted their sponsorship and the responsibility of keeping them current and viable.
These specifications and details, representing the best professional thinking of representatives of several Public Works Departments, reviewed and refined by members of the construction industry, were written to fulfill the need for uniform rules governing public works construction performed for Maricopa County and the various cities and public agencies within Maricopa County who could not afford to promulgate such standards for themselves. Agencies in other regions or climes that desire to use these specifications may need to make adjustments for local conditions.
A uniform set of specifications and details, updated and embracing the most modern materials and construction techniques will reduce conflicts, provide clarity and lower construction costs for the benefit of the public.
Use of these standards for projects outside of the right-of-way should be reviewed by professional engineers and architects and applied with care to insure relevance to the planned work.
Specifications and details should be incorporated into project plans and specifications after careful review by the design engineer or architect of specific project needs. Not all specifications contained herein will apply to all projects. Prepared plans and specifications should clearly call out only those specific uniform specifications and details required for the project.
Uniform specifications and details are not a substitute for good engineering judgment. Unique conditions will arise that are outside the scope of these standards. When this happens, professional engineers and architects are required to use their judgment to amend these standards to best meet site-specific project needs in accordance with the rules set forth by the State of Arizona and policy statements made by the Arizona State Board of Technical Registration.
The Uniform Standard Specifications and Details for Public Works Construction are revised periodically and reprinted to reflect the changing technology of the construction industry. To this end a Specifications and Details Committee has been established as a permanent organization to continually study and recommend changes to the Specifications and Details.
Interested parties may address suggested changes and questions to:
Standard Specifications & Details Committee c/o Maricopa Association of Governments
302 North First Avenue, Suite 300 Phoenix, Arizona, 85003
Suggestions will be reviewed by the committee and appropriate segments of the construction industry and revisions will be published the first of each year. A copy of this publication is available for review on the internet at the website listed below.
Please follow the links to the publications page and look for Uniform Standard Specifications for Public Works Construction and/or Uniform Standard Details for Public Works Construction:
www.azmag.gov
In the interest of regional uniformity, it is hoped that all using agencies will adopt these standards with minimal changes. It is recognized that because of charter requirements and for other reasons, some agencies will find it necessary to modify or supplement certain requirements. In the interest of regional uniformity, it is strongly recommended that using agencies bring desired modifications to the MAG Committee for consideration and inclusion into these standards.
Revised 2012 http://www.azmag.gov/
TABLE OF CONTENTS
PART 100 - GENERAL CONDITIONS
Section Last Title Page Revised 101 2015 Abbreviations and Definitions .......................................................................................................... 101-1 102 2008 Bidding Requirements and Conditions ............................................................................................. 102-1 103 1999 Award and Execution of Contract ..................................................................................................... 103-1 104 2012 Scope of Work .................................................................................................................................. 104-1 105 2008 Control of Work ................................................................................................................................ 105-1 106 1998 Control of Materials .......................................................................................................................... 106-1 107 2015 Legal Regulations and Responsibility to Public................................................................................ 107-1 108 2014 Commencement, Prosecution and Progress ...................................................................................... 108-1 109 2011 Measurements and Payments ............................................................................................................ 109-1 110 2000 Notification of Changed Conditions and Dispute Resolution ........................................................... 110-1
PART 200 - EARTHWORK
Section Last Title Page Revised 201 1999 Clearing and Grubbing ...................................................................................................................... 201-1 205 1998 Roadway Excavation ......................................................................................................................... 205-1 206 2015 Structure Excavation and Backfill .................................................................................................... 206-1 210 2009 Borrow Excavation ........................................................................................................................... 210-1 211 2015 Fill Construction ............................................................................................................................... 211-1 215 1998 Earthwork for Open Channels ........................................................................................................... 215-1 220 2012 Riprap Construction .......................................................................................................................... 220-1 230 2010 Dust Palliative Application ............................................................................................................... 230-1
PART 300 - STREETS AND RELATED WORK
Section Last Title Page Revised 301 2014 Subgrade Preparation ........................................................................................................................ 301-1 306 2010 Mechanically Stabilized Subgrade- Geogrid Reinforcement ............................................................ 306-1 309 2014 Lime Slurry Stabilization or Modification of Subgrade .................................................................... 309-1 310 2015 Placement and Construction of Aggregate Base Course ................................................................... 310-1 311 2014 Placement and Construction of Cement Treated Subgrade ............................................................... 311-1 312 2012 Cement Treated Base ........................................................................................................................ 312-1 315 1998 Bituminous Prime Coat ..................................................................................................................... 315-1 317 2013 Asphalt Milling ................................................................................................................................. 317-1 320 1999 Road-Mixed Surfacing ...................................................................................................................... 320-1 321 2016 Placement and Construction of Asphalt Concrete Pavement ............................................................ 321-1 322 2016 Decorative Asphalt .......................................................................................................................... 322-1 324 2015 Portland Cement Concrete Pavement (PCCP) .................................................................................. 324-1 325 2016 Placement and Construction of Asphalt-Rubber Asphalt Concrete .................................................. 325-1 327 2012 Hot In-Place Recycling ..................................................................................................................... 327-1 329 1998 Tack Coat .......................................................................................................................................... 329-1 330 1998 Asphalt Chip Seal.............................................................................................................................. 330-1 331 2009 Microsurfacing Specifications .......................................................................................................... 331-1 332 2013 Placement and Construction of Asphalt Emulsion Slurry Seal Coat ................................................. 332-1 333 2012 Fog Seal Coats .................................................................................................................................. 333-1 334 2016 Preservative Seal for Asphalt Concrete ............................................................................................. 334-1 335 2012 Placement and Construction of Hot Asphalt-Rubber Seal ................................................................ 335-1 336 2016 Pavement Matching and Surfacing Replacement .............................................................................. 336-1 337 2014 Crack Sealing .................................................................................................................................... 337-1 340 2015 Concrete Curb, Gutter, Sidewalk, Curb Ramps, Driveway and Alley Entrance ............................... 340-1 342 2016 Interlocking Concrete Paver Installations ......................................................................................... 342-1 343 1998 Exposed Aggregate Paving ............................................................................................................... 343-1 345 2016 Adjusting Frames, Covers and Valve Boxes ..................................................................................... 345-1 350 2013 Removal of Existing Improvements .................................................................................................. 350-1 355 2015 Utility Potholes-Keyhole Method ..................................................................................................... 355-1 360 1998 Telecommunications Installation ...................................................................................................... 360-1
Revised 2016
PART 400 - RIGHT-OF-WAY AND TRAFFIC CONTROL
Revised 401 1998 Traffic Control .................................................................................................................................. 401-1 405 2015 Survey Monuments ........................................................................................................................... 405-1 410 1998 Precast Safety Curbs ......................................................................................................................... 410-1 415 2014 Flexible Metal Guardrail ................................................................................................................... 415-1 420 1998 Chain Link Fences ............................................................................................................................ 420-1 424 1998 Parkway Grading .............................................................................................................................. 424-1 425 1998 Topsoils ............................................................................................................................................. 425-1 430 2014 Landscaping and Planting ................................................................................................................. 430-1 440 1999 Sprinkler Irrigation System Installation ............................................................................................ 440-1
PART 500 - STRUCTURES
Section Last Title Page Revised 505 2014 Concrete Structures ........................................................................................................................... 505-1 506 2012 Precast Prestressed Concrete Members ............................................................................................. 506-1 510 1998 Concrete Block Masonry .................................................................................................................. 510-1 511 1998 Brick Masonry .................................................................................................................................. 511-1 515 1998 Steel Structures ................................................................................................................................. 515-1 520 2012 Steel and Aluminum Handrails ......................................................................................................... 520-1 525 1998 Pneumatically Placed Mortar ............................................................................................................ 525-1 530 2000 Painting ............................................................................................................................................. 530-1
PART 600 – WATER, SEWER, STORM DRAIN AND IRRIGATION
Section Last Title Page Revised 601 2016 Trench Excavation, Backfilling and Compaction ............................................................................. 601-1 602 2016 Trenchless Installation of Steel Casing ............................................................................................. 602-1 604 2012 Placement of Controlled Low Strength Material .............................................................................. 604-1 605 2014 Subdrainage....................................................................................................................................... 605-1 607 2015 Trenchless Installation of Smooth Wall Jacking Pipe ....................................................................... 607-1 608 2016 Horizontal Directional Drilling ......................................................................................................... 608-1 610 2015 Water Line Construction ................................................................................................................... 610-1 611 2015 Water, Sewer and Storm Drain Testing ............................................................................................ 611-1 615 2015 Sanitary Sewer Line Construction .................................................................................................... 615-1 616 2015 Reclaimed Water Line Construction ................................................................................................. 616-1 618 2015 Storm Drain Construction ................................................................................................................. 618-1 620 2012 Cast-in-place Concrete Pipe .............................................................................................................. 620-1 621 1998 Corrugated Metal Pipe and Arches ................................................................................................... 621-1 625 2016 Manhole Construction and Drop Sewer Connections ....................................................................... 625-1 630 2012 Tapping Sleeves, Valves and Valve Boxes on Water Lines ............................................................. 630-1 631 2012 Water Taps and Meter Service Connections ..................................................................................... 631-1
PART 700 - MATERIALS
Section Last Title Page Revised 701 2013 Aggregate .......................................................................................................................................... 701-1 702 2013 Base Materials ................................................................................................................................... 702-1 703 2012 Riprap ................................................................................................................................................ 703-1 705 2012 Portland Cement Treated Base .......................................................................................................... 705-1 708 2011 Asphalt Pavement Core Bonding Materials ...................................................................................... 708-1 710 2016 Asphalt Concrete ............................................................................................................................... 710-1 711 2014 Paving Asphalt .................................................................................................................................. 711-1 712 1999 Liquid Asphalt .................................................................................................................................. 712-1 713 2012 Emulsified Asphalts Materials .......................................................................................................... 713-1 714 2012 Microsurfacing Materials .................................................................................................................. 714-1
Revised 715 2012 Slurry Seal Materials ......................................................................................................................... 715-1 716 2012 Cover Material .................................................................................................................................. 716-1 717 2016 Asphalt-Rubber Asphalt Concrete .................................................................................................... 717-1 718 2016 Preservative Seal for Asphalt Concrete ............................................................................................. 718-1 725 2014 Portland Cement Concrete ................................................................................................................ 725-1 726 2015 Concrete Curing Materials ................................................................................................................ 726-1 727 2008 Steel Reinforcement .......................................................................................................................... 727-1 728 2013 Controlled Low Strength Material .................................................................................................... 728-1 729 2014 Expansion Joint Filler ....................................................................................................................... 729-1 735 2016 Reinforced Concrete Pipe ................................................................................................................. 735-1 736 2012 Non-Reinforced Concrete Pipe ......................................................................................................... 736-1 738 2012 High Density Polyethylene Pipe And Fittings for Storm Drain And Sanitary Sewer ....................... 738-1 739 2015 Steel Reinforced Polyethylene Pipe And Fittings for Storm Drain, Irrigation And Sanitary Sewer . 739-1 740 2014 Polypropylene Pipe And Fittings for Storm Drain, Irrigation And Sanitary Sewer .......................... 740-1 741 2011 Lining for Reinforced Concrete Sanitary Sewer Pipe ....................................................................... 741-1 742 2015 Precast Manhole ................................................................................................................................ 742-1 743 1998 Vitrified Clay Pipe ............................................................................................................................ 743-1 745 1998 PVC Sewer Pipe and Fittings ............................................................................................................ 745-1 750 2015 Iron Water Pipe and Fittings ............................................................................................................. 750-1 752 1998 Asbestos-Cement Water Pipe and Fittings ........................................................................................ 752-1 753 2000 Galvanized Pipe and Fittings ............................................................................................................ 753-1 754 2012 Copper Pipe, Tubing and Fittings ..................................................................................................... 754-1 755 2012 Polyethylene Pipe for Water Distribution ......................................................................................... 755-1 756 2008 Dry Barrel Fire Hydrants .................................................................................................................. 756-1 757 1998 Sprinkler Irrigation System ............................................................................................................... 757-1 758 2005 Concrete Pressure Pipe - Steel Cylinder Type .................................................................................. 758-1 759 2002 Steel Pipe .......................................................................................................................................... 759-1 760 1998 Coating Corrugated Metal Pipe and Arches ...................................................................................... 760-1 761 1998 Structural Plate Pipe, Arches, and Pipe Arches ................................................................................. 761-1 770 2013 Structural and Rivet Steel, Rivets, Bolts, Pins, and Anchor Bolts .................................................... 770-1 771 2016 Galvanizing ....................................................................................................................................... 771-1 772 2016 Chain Link Fence .............................................................................................................................. 772-2 775 2015 Brick and Concrete Masonry Units (Blocks) .................................................................................... 775-1 776 2012 Masonry Mortar and Grout ............................................................................................................... 776-1 778 1998 Lumber .............................................................................................................................................. 778-1 779 1998 Wood Preservatives........................................................................................................................... 779-1 787 1999 Gray Iron Castings ............................................................................................................................ 787-1 790 1999 Paint .................................................................................................................................................. 790-1 792 2010 Dust Palliative ................................................................................................................................... 792-1 795 2014 Landscape Material ........................................................................................................................... 795-1 796 2010 Geosynthetics .................................................................................................................................... 796-1
2016 Index .............................................................................................................................................. Index-1
This Page Reserved for Future Use
PART 100
GENERAL CONDITIONS
Revised
101 2015 Abbreviations and Definitions ............................................................................................................ 101-1
102 2008 Bidding Requirements and Conditions................................................................................................ 102-1
103 1999 Award and Execution of Contract ....................................................................................................... 103-1
104 2012 Scope of Work .................................................................................................................................... 104-1
105 2008 Control of Work .................................................................................................................................. 105-1
106 1998 Control of Materials ............................................................................................................................ 106-1
107 2015 Legal Regulations and Responsibility to Public .................................................................................. 107-1
108 2014 Commencement, Prosecution and Progress ........................................................................................ 108-1
109 2011 Measurements and Payments .............................................................................................................. 109-1
110 2000 Notification of Changed Conditions and Dispute Resolution ............................................................. 110-1
Revised 2015
This Page Reserved for Future Use
SECTION 101
ABBREVIATIONS AND DEFINITIONS
101.1 ABBREVIATIONS:
Wherever the following abbreviations are used in these specifications, standard details or on the plans, they are to be constructed the same as the respective expressions represented.
AASHTO American Association of State Highway and
Transportation Officials AAN American Association of Nurserymen AB Aggregate base Aban Abandon ABC Aggregate base course AC Asphalt cement or concrete ACB Asphalt concrete base ACI American Concrete Institute ACP Asbestos cement pipe ACPA American Concrete Pipe Association ACWS Asphalt concrete wearing surface AFRB Arizona Fire Rating Bureau AGC Associated General Contractors of America, Inc.
Agg Aggregate ADOT Arizona Department of Transportation ADA Americans With Disabilities Act of 1990 ADEQ Arizona Department of Environmental
Quality Ahd Ahead AIA American Institute of Architects AIEE American Institute of Electrical Engineers AISC American Institute of Steel Construction ANSI American National Standards Institute APA American Plywood Association Approx Approximate APWA American Public Works Association AR Aged residue ARAC Asphalt-Rubber Asphalt Concrete ARIZ Arizona Department of Transportation Test
Method ARS Arizona Revised Statutes ASCE American Society of Civil Engineers ASME American Society of Mechanical Engineers ASTM American Society for Testing Materials Ave Avenue AWPA American Wood Preservers Association AWSC American Welding Society Code AWWA American Water Works Association Bbl Barrel BC Beginning of curve BCR Beginning of curb return Beg Beginning Bk Book or Back Blvd Boulevard BM Bench Mark or Board Measure
Brg Bearing BST Bituminous Surface Treatment BTB Bituminous Treated Base BTU British Thermal Units BVC Beginning of vertical curve C Centigrade or Curb CB Catch Basin CBF&C Catch basin frame & cover CC or C/C Center to Center CE City or County Engineer Cem Cement CF Curb face cfs Cubic Feet per second CIP Cast Iron pipe CIPP Cast-in-place concrete pipe CL or C Centerline CLR Clear Cm Centimeter CMP Corrugated metal pipe CO Clean out Col Column Conc Concrete Const Construct CP Concrete pipe (non-reinforced) CTB Cement Treated Base Cu Cubic Deg Degree DF Douglas Fir DG Decomposed granite Dia Diameter Dim Dimension DIP Ductile Iron Pipe Div Division Dr Drive Drwg Drawing Dwy Driveway Ea Each Ease Easement E East EC End of curve ECR End of curb return El or Elv Elevation Equa or Eq Equation EVC End of vertical curve Ex or Exist Existing F Fahrenheit FB Field book F & C Frame & cover FH Fire hydrant FL or F Floor line or flow line Fl El Floor Elevation Fnd Found fps Feet per second FS Finished surface
101-1
FSS Federal Specifications and Standards Ft Foot or feet G Gutter Ga Gage Galv Galvanized GL Ground line Gpm Gallons per minute Gr Grade H High or height HC House connection HH Hand Hole Hdwl Headwall Horiz Horizontal Hwy Highway ICA Industrial Commission of Arizona ID Improvement District or inside diameter IE Invert Elevation IEEE Institute of Electrical and Electronic
Engineers In Inch Inv Invert IP Iron Pipe IPS Iron Pipe Size Irrig Irrigation Jt Joint JC Junction Chamber Jct Junction JS Junction Structure L Length Lb Pound L&T Lead and Tack LD Local Depression LF Linear Feet LH Lamp Hole Lin Linear Long Longitudinal Lt Left M Map or Maps MAG Maricopa Association of Governments Max Maximum MCR Maricopa County Records Meas Measured MH Manhole MHF&C Manhole Frame and Cover Min Minutes or Minimum Misc Miscellaneous ML or M Monument Line mm Millimeter Mon Monolithic or monument MTD Multiple Tile Duct N North NBS National Bureau of Standards NCPI National Clay Pipe Institute NE Northeast NEC National Electric Code NEMA National Electrical Manufacturer's
Association
NFPA National Fire Protection Association NP Non-Plastic NPI Non pay item NSC National Safety Council NSF National Sanitation Foundation NTS Not to Scale NW Northwest No Number OC On Center OD Outside Diameter Oz Ounces PC Point of Curvature PCC Point of Compound Curve or Portland Cement Concrete PI Point of Intersection or Plastic Index PL Property Line POC Point of Curve POS Point of Spiral PP Power Pole ppm Parts per million PRC Point of Reverse Curve Prod Produced Prop Proposed or Property psi Pounds per square inch psf Pounds per square foot PT or POT Point of Tangent P&TP Power and Telephone Pole Pvmt Pavement Q Rate of flow R Radius RC Reinforced Concrete RCP Reinforced Concrete Pipe Rd Road Rdwy Roadway Reinf Reinforced, Reinforcing Ret Wall Retaining Wall RGRCP Rubber Gasket Reinforced Concrete Pipe rpm Revolutions Per Minute Rt Right R/W Right-of-way S South or Slope SAE Society of Automotive Engineers San Sanitary SC Spiral to Curve SCCP Steel Cylinder Concrete Pipe SD Storm Drain or Sewer District Sdl Saddle Sec Seconds Sect Section SE Southeast Sht Sheet Spec Specifications SPR Simplified Practice Recommendation Sp MH Special Manhole Sq Ft Yd Square Foot, Yard SS Sanitary Sewer
101-2
St Street Sta Station Std Standard Str gr Structural grade Struct Structure or structural SW Southwest SWPPP Stormwater Pollution Prevention Plan T Tangent Distance Tel Telephone Temp Temporary TH Test Hole TP Telephone pole Tr Tract Trans Transition TS Traffic signal or Tangent to spiral TSC Traffic signal conduit Typ Typical UL Underwriters' Laboratories Inc.
USC & GS United States Coast and Geodetic Survey USGS United States Geological Survey V Velocity of flow VC Vertical curve VCP Vitrified clay pipe Vert Vertical W West or width WI Wrought iron WS Wearing surface Wt Weight Yd Yard ‘ feet or minutes “ inches or seconds ̊ degrees % percent # number or pound @ at / per = equals
Revised 2015 101-3
101.2 DEFINITIONS AND TERMS:
Whenever in these specifications or in other contract documents the following terms or pronouns in place of them are used, the intent and meaning shall be interpreted as follows:
Addendum: A supplement to any of the Contract Documents issued, in writing, after advertisement of but prior to the opening of bids for a contract.
Advertisement: The public announcement, as required by law, inviting bids for work to be performed or materials to be furnished.
Agency: The governmental agency for which the construction is being done, either by permit or contract.
Architect: The individual or firm who has accomplished the architectural services for the project, including his representatives.
Arizona Test Method: Arizona Department of Transportation Materials Testing Manual test method.
Award: The formal action of the governing body is accepting a proposal.
Backfill: Material placed in an excavated space to fill such space. For trenches, see definitions for Initial Backfill and Final Backfill.
Base Course: The upper course of the granular base of a pavement or the lower course of an asphalt concrete pavement structure.
Bedding: A material layer placed on top of the trench foundation to the bottom of the pipe, typically 4-6 inches in height. The bedding establishes the line and grade for a conduit and provides support that is firm, but not hard.
Bidder: Any qualified individual, firm, partnership, corporation or combination thereof, acting directly or through a duly authorized representative who legally submits a proposal for the advertised work.
Board of Supervisors: The Maricopa County Board of Supervisors acting under the authority of the laws of the State of Arizona.
Bond Issue Project: A project financed from bonds issued by the City or County pledging credit or a revenue resource.
Bridge: A structure, including supports, erected over a depression or an obstruction, as water, highway, or railway, and having a track or passageway for carrying traffic or other moving loads and having a length measured along the center of roadway of more than 20 feet between undercopings of abutments or extreme ends of openings for multiple boxes.
(Length) The length of a bridge structure is the over-all length measured along the line of survey stationing back to back of backwalls of abutments, if present, otherwise end to end of the bridge floor; but in no case less than the total clear opening of the structure.
(Roadway Width) The clear width measured at right angles to the longitudinal centerline of the bridge between the bottom or curbs or guard timbers or in the case of multiple heights of curbs, between the bottoms of the lower risers.
Budget Project: A project financed by funds from General Tax levies and shared revenue funds set aside in the annual budget adopted by the Council or Board of Supervisors.
Building: Any structure built for the support, shelter, or enclosure of persons, animals, chattel or movable property.
Building Code: A regulation adopted by the governing body establishing minimum standards of construction for the protection of the public health, safety, and welfare in terms of measured performance rather than in terms of rigid specification of materials and methods.
Calendar Day: Every day shown on the calendar.
101-4
Call for Bids: The standard forms inviting proposals or bids.
“Careful and prudent manner”: means conducting excavation in such a way that when it approaches within twenty-four inches of the underground facility located and marked by the owner or operator, by stakes, paint or in some customary manner, the exact location is manually determined, and the uncovered facility is supported and protected.
Change Order: A written order issued by the Engineer to the Contractor to make changes in the work or to perform extra work, and setting forth conditions for payment and/or adjustment in time of completion.
City: A municipal corporation, organized and existing under and by virtue of the laws of the State of Arizona.
City/County Clerk: The duly authorized person who performs the duties of clerk for the Contracting Agency.
Completion Time: The number of calendar days for completion of an act, including authorized time extensions. In case a calendar date of completion is shown in the proposal in lieu of the number of calendar days, the contract shall be completed by that date. The time within which an act is to be done shall be computed by excluding the first and including the last day; and if the last day be Sunday or a legal holiday, that shall be excluded.
Conflicting Utility: An existing utility, shown or not shown on the plans is conflicting when any part of the utility falls within the dimensions of the new installation, such that it would be in physical contact with the new installation.
Construction Project: The erection, installation, remodeling, alteration, of durable facilities upon, under, or over the ground.
This shall include, but is not limited to buildings, roadways and utility pipes, lines, poles or other structures.
Contingent Bid Item: This is a minor bid item which is likely, but not certain, to occur during the course of work. If the Engineer determines that this work is required, the Contractor will accomplish the work and payment will be made based on the contingent unit bid price included in the proposal. Since the quantity listed in the proposal is primarily for bid comparison, the amount of work required by the Engineer may vary materially from this.
Contract: The written instrument executed by the Contractor and the Contracting Agency by which the Contractor is bound to furnish all labor, equipment, and materials and to perform the work specified, and by which the Contracting Agency is obligated to compensate the Contractor therefore at the prices set forth therein. The Contract Documents are herewith by reference made a part of the contract as if fully set forth therein.
Contract Documents: All the integral documents of the contract, including but not limited to, Call for Bids, Plans, Standard Specifications and Details, Special Provisions, Proposal, Addenda, Performance Bond, Payment Bond, Certificates of Insurance, Ordinance, Contract, and Change Orders.
Contracting Agency: The legal entity that has contracted for the performance of the work or for whom the work is being performed.
Contractor: The individual, firm, partnership, corporation or combination thereof entering into a contract with the Contracting Agency to perform the advertised work.
Council: The City Council which by law constitutes the Legislative Department of the City.
County: Maricopa County, organized and existing under and by virtue of the laws of the State of Arizona.
Culvert: Any structure not classified as a bridge, which provides an opening under or adjacent to the roadway.
Days: Unless otherwise designated, days will be understood to mean calendar days.
Emergency: Unforeseen occurrences and combinations of circumstances involving the public welfare or the protection of work already done under the Contract Documents, or which endanger life or property and call for immediate action or remedy.
Engineer: The person, appointed as City or County Engineer by the Council or the Board of Supervisors, acting directly or through his duly authorized representative.
101-5
Equipment: (Construction) — All machinery and equipment, together with the necessary supplies for upkeep and maintenance, and also tools and apparatus necessary for the proper construction and acceptable completion of work. (Installed)
— All material or articles used in equipping a facility as furnishings or apparatus to fulfill a functional design.
Extra Work: An item of work not provided for in the contract as awarded but found essential to the satisfactory completion of the contract within its intended scope.
Final Backfill: The material placed in a trench above the initial backfill to the top of the trench or to the bottom of the road base material.
Flooding: Flooding will consist of the inundation of the entire lift with water, puddle with poles or bars to insure saturation of the entire lift.
Force Account Work: Work done by personnel of the Contracting Agency as in-house work.
Foundation: For buildings or structures, this will be the substructure. For a trench, the foundation is the bottom of the required trench excavation. The foundation surface is either native material, or replacement material when unsuitable material occurs, and is removed and replaced at the bottom of the required trench excavation.
Full Depth Pavement: An asphalt concrete pavement structure in which the granular base and subbase are replaced by proportionate thicknesses of asphalt concrete.
Haunching: The area of a pipe trench between the bottom of the pipe and the springline of the pipe.
Improvement District Project: A project financed by assessments against the property included in a special assessment district authorized under, or implemented by an act of the legislature of the State and/or a procedural ordinance of the City or County.
Initial Backfill: The material placed in a trench between the springline…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .