Attached to
Repair Hanger for Paint Stripping, Fac 7420
Solicitation number
FA487719RA012
Issued by

About this file

This document is a schedule of material submittals for a federal contract to repair a hangar for paint stripping at Facility 7420. The solicitation number is FA487719RA012 and was issued by the Department of the Air Force Air Combat Command.

The schedule lists 44 required submittals including design documents, permits, test results, samples, warranties, as-built drawings, and shop drawings for items like fire sprinklers, doors, flooring, lighting, and HVAC, plumbing, and electrical systems. Submittal requirements specify the number of copies, required submission dates, and approval processes. The project includes renovation of the hangar to support paint stripping activities and has a construction start date, estimated completion date, and provides for final inspection and closeout.

AF Form 66 Schedule of Material Submittals

View the file

Other versions and copies of AF Form 66

File Revision Posted Attached to
Attachment 2 AF Form 66.pdf Revision not stated REPAIR AC PAVING
AF form 66 Blank.pdf Revision not stated Demo Mini mute sites
Attach 9_AF Form 66 Submittal Register.pdf Revision not stated PKAA Dorm Water Damage Repair (Construction)
AF Form 66-EEPZ260842 Renovate Convert Comm to SAPR B730.xlsx Revision not stated B730 Renovate Convert Comm to SAPR
AF Form 66_EEPZ254664-B972 UOQ.xlsx Revision not stated B972 Renovate UOQ Community Commons
AF Form 66 B268.xlsx Revision not stated B268 Replace STUS Backup Generator
AF Form 66 B730.xlsx Revision not stated B730 - Renovate RM106 for Emergency Operations Center
AF Form 66.xlsx Revision not stated B836 Replace Electrical in Airfield Lighting Vault
AF Form 66 OSI Flooring.xlsx Revision not stated OSI B926 Flooring
EEPZ254660 Repair Control Tower HVAC B1806 - AF Form 66.xlsx Revision not stated B1806 Repair Control Tower HVAC
AF Form 66 Template.xlsx Revision not stated Replace AAS BAK-15 Controls, B2001, B2003
AF Form 66 EEPZ216808 Replace Security Forces Elevator B926.xlsx Revision not stated B926 Replace Security Forces Elevator
WT 17518487 AF Form 66.xlsx Revision not stated Repair Structural Fire Trainer B17903, 17904
AF Form 66.xlsx Revision not stated RENOVATE/CONVERT 50th 49th SQ OPS, B230
AF Form 66.xlsx Revision not stated T-6 Flightline Shacks
AF Form 66 Template.xlsx Revision not stated Replace Fire Alarms, Multi Facility
EEPZ248229 -- AF Form 66.xlsx Revision not stated Repair Kiddie Pool
Atch 2 AF Form 66.pdf Revision not stated Removal of Underground Storage Tank at Launch Facility E-10 (Laramie County, WY)
Attachment 4 - AF Form 66 Submittal Register.pdf Revision not stated Bldg 65 - Renovation of Telephone Office Area, FE Warren AFB, WY AMENDMENT 03
Attachment 7 - AF Form 66.xlsx Revision not stated Replace Chapel Windows B912
Show all 20

Who attaches AF Form 66

State Files
Iowa 1
Massachusetts 1

Other files

File Type Posted
Solicitation_Amendment_0002_SF_30.pdf PDF
04_AF_FORM_3052_(Blank)_Revision_1.xlsx XLSX spreadsheet
Section_M,_Revision_1_-_Evaluation_Factors_for_Award.pdf PDF
Section_L,_Revision_2_-_Instructions,_Conditions,_and_Notices_to_Offerors.pdf PDF
Solicitation_Amendment_SF_30.pdf PDF
Solicitation_RFI's_-_Answered.pdf PDF
07420-002-004.PDF PDF
07420-008-003.PDF PDF
07420-008.dwg DWG drawing
07420-009-005.PDF PDF
07420-004-001.zip ZIP file
07420-002-001.PDF PDF
07420-002-003.PDF PDF
07420-008-001.PDF PDF
07420-009-006.PDF PDF
07420-009-004.PDF PDF
07420-003-003.PDF PDF
07420-002-006.PDF PDF
07420-003-002.PDF PDF
07420-009-003.PDF PDF
07420-002-005.PDF PDF
07420-004-003.PDF PDF
07420-002-007.PDF PDF
07420-007-001.PDF PDF
07420-004-001.PDF PDF
07420-003-001.zip ZIP file
07420-008-002.PDF PDF
07420-002-002.PDF PDF
07420-009-002.PDF PDF
Section_L,_Revision_1_-_Instructions,_Conditions,_and_Notices_to_Offerors.pdf PDF
Section_M_-_Evaluation_Factors_for_Award.pdf PDF
Solicitation_-_FA487719RA012.pdf PDF
07_DMAFB_Design_Compatibility_Guidelines_pg_1_-_68.pdf PDF
01_SPECIFICATIONS_(30Apr19).pdf PDF
Section_L_-_Instructions,_Conditions,_and_Notices_to_Offerors.pdf PDF
07_DMAFB_Design_Compatibility_Guidelines_pg_69_-137.pdf PDF
07_DMAFB_Design_Compatibility_Guidelines_pg_138_-_274.pdf PDF
04_AF_FORM_3052_-_Blank.xlsx XLSX spreadsheet
05_Wage_Determination.pdf PDF
02_Contractor_Environmental_Guide_(15_May_2019).pdf PDF
03_Template_of_Contractor_EAL.xls XLS spreadsheet
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT NUMBER : PROJECT TITLE: SOLICITATION/CONTRACT NO.:

NO. OF COPIES REQUIRED

Awarded:

Pre-Con:

NTP:

Const. Start:

Const. End:

Finalled:

APPROVED DISAPPROVED

AF Form 103 Dig Permit Sec 01010, Para 1.3c 2

Permits Sec 01010, Para 2.4d 2

Notifications Sec 01010, Para 2.4e 2

Manifests Sec 01010, Para 2.4h 2

Chemical Inv./MSDS Sec 01010, Para 2.4h 2

Radioactive Use Sec 01010, Para 2.4i 2

Progress Photographs Sec 01010, Para 2.7 1

Record As-Builts Sec 01010, Para 3.2.2.a 2

Record Disks Sec 01010, Para 3.2.2.b 2

DD Form 1354 Checklist Sec 01010, Para 3.2.2.c.1

11 DD Form 1354 Draft and Final Sec 01010, Para 3.2.2.c.2

Warranty/Guarantee Items Sec 01010, Para 3.2.2.c.3 2

REMARKS

C

ER

TI

FI

C

A

TI

O N

O F

C O

M

PL

IA

N

C E

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M A

N U

FA

C

TU

R

ER

'S

R

EC

O M

M

EN

D A

TI

O

N S

M A

N U

FA

C

TU

R

ER

'S

W A

R R

A N

TY

C A

TA

LO

G D

A

TA

O

PE

R A

TI

N

G

IN

ST

R

U C

TI

O

N S

A S-

B U

IL

TS

O

TH

ER

R

EQ

U

IR

ED

S

U B

M

IS

SI

O

N D

A

TE

FI

N

A L

A

PP

R O

VA

L

DATE CONTRACTOR NOTIFIED

D A

TE

R

EC

EI

VE

D

IN

C

O N

TR

A

C

TI

N G

D A

TE

T

O C

IV

IL

E N

G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D A

TE

SU

B

M

IT

TA

L

N U

M B

ER

S

C O

N

TR

A C

TO

R

R

ES

U B

M

IT

TA

L

LI

N

E N

U M

B

ER

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE

OF SUBMITTAL

SCHEDULE OF MATERIAL SUBMITTALS

(not for use with SABER projects)

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

Rpr (Renovate) Hangar for Pain Stripping, Facility 7420 [ Enter number here ]FBNV073765

AF FORM 66 (Computer Generated) ATCH 2 (PAGE 1 of 5)

Awarded:

Pre-Con:

NTP:

Const. Start:

Const. End:

Finalled:

APPROVED DISAPPROVED

REMARKS

C

ER

TI

FI

C

A

TI

O N

O F

C O

M

PL

IA

N

C E

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M A

N U

FA

C

TU

R

ER

'S

R

EC

O M

M

EN

D A

TI

O

N S

M A

N U

FA

C

TU

R

ER

'S

W A

R R

A N

TY

C A

TA

LO

G D

A

TA

O

PE

R A

TI

N

G

IN

ST

R

U C

TI

O

N S

A S-

B U

IL

TS

O

TH

ER

R

EQ

U

IR

ED

S

U B

M

IS

SI

O

N D

A

TE

FI

N

A L

A

PP

R O

VA

L

DATE CONTRACTOR NOTIFIED

D A

TE

R

EC

EI

VE

D

IN

C

O N

TR

A

C

TI

N G

D A

TE

T

O C

IV

IL

E N

G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D A

TE

SU

B

M

IT

TA

L

N U

M B

ER

S

C O

N

TR

A C

TO

R

R

ES

U B

M

IT

TA

L

LI

N

E N

U M

B

ER

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE

OF SUBMITTAL

SCHEDULE OF MATERIAL SUBMITTALS

(not for use with SABER projects)

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

Rpr (Renovate) Hangar for Pain Stripping, Facility 7420 [ Enter number here ]FBNV073765

DD Form 250 Sec 01010, Para 3.2.2.c.4 2

O&M Manual Sec 01010, Para 3.2.2.d 1

AF Form 3064 Sec 01011, Para 1.5.2 2

35% Design Submittal Sec 01011, Para 2.11.3 1

65% Design Submittal Sec 01011, Para 2.11.4 1

95% Design Submittal Sec 01011, Para 2.11.5 1

100% Design Submittal Sec 01011, Para 2.11.6 1

Hazardous Material Survey Abatement/Remediation Plan Sec 01010, Para 2.4c

Soil Compaction Test Results for Utilities and Facilities Sec 01011, Para 3.3

Sprinkler Heads; Fire Riser- Piping; Calculations Sec 01011, 1.8.1

2 2

AF FORM 66 (Computer Generated) ATCH 2 (PAGE 2 of 5)

Awarded:

Pre-Con:

NTP:

Const. Start:

Const. End:

Finalled:

APPROVED DISAPPROVED

REMARKS

C

ER

TI

FI

C

A

TI

O N

O F

C O

M

PL

IA

N

C E

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M A

N U

FA

C

TU

R

ER

'S

R

EC

O M

M

EN

D A

TI

O

N S

M A

N U

FA

C

TU

R

ER

'S

W A

R R

A N

TY

C A

TA

LO

G D

A

TA

O

PE

R A

TI

N

G

IN

ST

R

U C

TI

O

N S

A S-

B U

IL

TS

O

TH

ER

R

EQ

U

IR

ED

S

U B

M

IS

SI

O

N D

A

TE

FI

N

A L

A

PP

R O

VA

L

DATE CONTRACTOR NOTIFIED

D A

TE

R

EC

EI

VE

D

IN

C

O N

TR

A

C

TI

N G

D A

TE

T

O C

IV

IL

E N

G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D A

TE

SU

B

M

IT

TA

L

N U

M B

ER

S

C O

N

TR

A C

TO

R

R

ES

U B

M

IT

TA

L

LI

N

E N

U M

B

ER

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE

OF SUBMITTAL

SCHEDULE OF MATERIAL SUBMITTALS

(not for use with SABER projects)

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

Rpr (Renovate) Hangar for Pain Stripping, Facility 7420 [ Enter number here ]FBNV073765

Fire Alarm/Mass Notification System Control Panel(s) Transceiver; Devices- (Strobes/Speakers/Pull Stations/Heat Detectors/etc.)

Local Operating Console (LOC); Cables and Conduit

24 Door Hardware- Davis- Monthan (DCG); Appendix A

Gypsum Board-Type X and Type X Mold Resistant 2 2

Flooring-Tile/Grout; Epoxy- Urethane with Texture and Pattern; Chemical Resistant Urethane (CRU); Sealed Concrete; Rubber Base

1 2

27 Ceiling Grid and Tiles 1 2

28 Interior Paint 1 2 2

29 Exterior Paint 1 2 2

Interior Wood Doors/Exterior Metal Doors

1 2

Cabinetry/Millwork 2 1

Toilet Partitions 1 2

AF FORM 66 (Computer Generated) ATCH 2 (PAGE 3 of 5)

Awarded:

Pre-Con:

NTP:

Const. Start:

Const. End:

Finalled:

APPROVED DISAPPROVED

REMARKS

C

ER

TI

FI

C

A

TI

O N

O F

C O

M

PL

IA

N

C E

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M A

N U

FA

C

TU

R

ER

'S

R

EC

O M

M

EN

D A

TI

O

N S

M A

N U

FA

C

TU

R

ER

'S

W A

R R

A N

TY

C A

TA

LO

G D

A

TA

O

PE

R A

TI

N

G

IN

ST

R

U C

TI

O

N S

A S-

B U

IL

TS

O

TH

ER

R

EQ

U

IR

ED

S

U B

M

IS

SI

O

N D

A

TE

FI

N

A L

A

PP

R O

VA

L

DATE CONTRACTOR NOTIFIED

D A

TE

R

EC

EI

VE

D

IN

C

O N

TR

A

C

TI

N G

D A

TE

T

O C

IV

IL

E N

G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D A

TE

SU

B

M

IT

TA

L

N U

M B

ER

S

C O

N

TR

A C

TO

R

R

ES

U B

M

IT

TA

L

LI

N

E N

U M

B

ER

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE

OF SUBMITTAL

SCHEDULE OF MATERIAL SUBMITTALS

(not for use with SABER projects)

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

Rpr (Renovate) Hangar for Pain Stripping, Facility 7420 [ Enter number here ]FBNV073765

Themal Insulation-Roof and Walls 1 2

34 HVAC Systems- Air Handlers;

Compressors; Piping; Wires

2 1 2 2

35 Chiller; Piping; Controls- Ethermeter

1 2 2

36 Mini-Split System HVAC Units 2 2

Exhaust Fans 2 2

Plumbing Fixtures-Davis- Monthan Design Compatibility Guidelines (DCG); Section 6, Engineering Standards, Para 6.3.3

2 2

Plumbing: Backflow Preventers; Water Meter;

Piping

1 1 1 2 1

Lighting Fixtures (Interior and Exterior) 1 1 2 2

41 Receptacles and Switches 1 1 2 1 2

Roll up Window/Door in Support Section 2 2

Electrical- Primary Transformer; Feeders;

Conduit

1 1 2 1 2

44 Interior/exterior Signage 1 1

AF FORM 66 (Computer Generated) ATCH 2 (PAGE 4 of 5)

Awarded:

Pre-Con:

NTP:

Const. Start:

Const. End:

Finalled:

APPROVED DISAPPROVED

REMARKS

C

ER

TI

FI

C

A

TI

O N

O F

C O

M

PL

IA

N

C E

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M A

N U

FA

C

TU

R

ER

'S

R

EC

O M

M

EN

D A

TI

O

N S

M A

N U

FA

C

TU

R

ER

'S

W A

R R

A N

TY

C A

TA

LO

G D

A

TA

O

PE

R A

TI

N

G

IN

ST

R

U C

TI

O

N S

A S-

B U

IL

TS

O

TH

ER

R

EQ

U

IR

ED

S

U B

M

IS

SI

O

N D

A

TE

FI

N

A L

A

PP

R O

VA

L

DATE CONTRACTOR NOTIFIED

D A

TE

R

EC

EI

VE

D

IN

C

O N

TR

A

C

TI

N G

D A

TE

T

O C

IV

IL

E N

G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D A

TE

SU

B

M

IT

TA

L

N U

M B

ER

S

C O

N

TR

A C

TO

R

R

ES

U B

M

IT

TA

L

LI

N

E N

U M

B

ER

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE

OF SUBMITTAL

SCHEDULE OF MATERIAL SUBMITTALS

(not for use with SABER projects)

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

Rpr (Renovate) Hangar for Pain Stripping, Facility 7420 [ Enter number here ]FBNV073765

Electrical- Primary Switch Gear (SES); Panels; Sub-panels; Breakers; Wire;

Conduit

1 2 1 2

46 Contractor to add Submittals as required or requested.

AF FORM 66 (Computer Generated) ATCH 2 (PAGE 5 of 5)