04_AF_FORM_3052_-_Blank.xlsx
XLSX spreadsheet 24 KB Posted
- Attached to
- Repair Hanger for Paint Stripping, Fac 7420 Federal contract opportunity
- Solicitation number
- FA487719RA012
About this file
This document contains a construction cost estimate breakdown template and details of a related federal contract opportunity for repair work on an Air Force hangar. The template provides line items for general conditions, architectural, civil, structural, mechanical, plumbing, and electrical work required to repair the hangar for paint stripping at Davis-Monthan Air Force Base in Arizona. It includes estimates for items like engineered steel framing, siding repair, HVAC and compressed air systems, piping, conduit, and electrical panels. The related solicitation is identified as FA487719RA012 and seeks bids to perform the repair hangar work outlined in the template. The contracting agency is the Department of the Air Force Air Combat Command. The response is due by an unspecified date.
AF FORM 3052 - Blank
View the file
Other files for this federal contract opportunity
Show all 42
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ktr's Blank
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| CONTRACT FOR(WORK TO BE PERFORMED) | Repair Hangar for Paint Stripping | PROPOSED TOTAL CONTRACT PRICE | ||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | FBNV073765 FY19 | WORK LOCATION | DAVIS-MONTHAN AFB, AZ 85707 | ||||||
| LINE | UNIT OF | MATERIAL COST | LABOR COST | DIRECT | LINE | |||||
| NO. | ITEM | MEASURE | QUANTITY | UNIT | TOTAL | MANHOURS | RATE | TOTAL | COSTS | TOTAL |
| SUMMARY | ||||||||||
| 1 | SUBTOTAL GENERAL CONDITIONS | 0 | 0 | 0 | 0 | |||||
| 2 | SUBTOTAL ARCHITECTURAL | 0 | 0 | 0 | 0 | |||||
| 3 | SUBTOTAL CIVIL | |||||||||
| 4 | SUBTOTAL STRUCTURAL | |||||||||
| 5 | SUBTOTAL MECHANICAL | |||||||||
| 6 | SUBTOTAL PLUMBING | |||||||||
| 7 | SUBTOTAL ELECTRICAL |
| LINE TOTALS |
| OVERHEAD (15%) |
| SUBTOTAL |
| PROFIT (_%) |
| SUBTOTAL |
| TAX (5.6% of 65%) |
| BOND (_%) |
| TOTAL PROJECT PRICE |
| DATE: | FIRM NAME: |
| TITLE: | BY: |
| GENERAL CONDITIONS | |
| 1 | Engineering Design |
| 2 | Shop Drawings/Submittals |
| 3 | Builder's Insurance |
| 4 | Permits |
| 5 | Project Manager |
| 6 | Superintendent |
| 7 | Small Tools |
| 8 | Scheduling |
| 9 | Construction Fence |
| 10 | Project Sign |
| 11 | Dumpsters |
| 12 | Portable Toilets |
| 13 | Safety Items |
| 14 | Cleanup (after job completion) |
| 15 | Cleanup (final floor area) |
| 16 | Site Survey |
| 17 | |
| 18 |
| SUBTOTAL THIS PAGE |
| LABOR BURDEN (_%) |
| SUBTOTAL GENERAL CONDITIONS | |
| ARCHITECTURAL | |
| 1 | Pre-Built 16' x 20' Laser Operator's Booth |
| 2 | Exterior Painting, Clean and Prep. |
| 3 | Exterior Painting, Up to 39' |
| 4 | Fire Protection Room, 10' x 20' |
| 5 | Exterior Painting, Clean and Prep. |
| 6 | Exterior Painting, Up to 39' |
| 7 | |
| 8 | |
| 9 | |
| 10 | |
| 11 | |
| 12 | |
| 13 | |
| SUBTOTAL THIS PAGE | |
| LABOR BURDEN (_%) |
| SUBTOTAL ARCHITECTURAL | |
| CIVIL | |
| 1 | Excavator, 3/8 CUYD, 1' Deep |
| 2 | Hauling Loose Fill, 8CY Truck, 4MI |
| 3 | Fine Grading for Walkway |
| 4 | AB Gravel Fill, 6" Deep, Compacted |
| 5 | Concrete Sidewalk, 4' Wide, 4" Thick |
| 6 | |
| 7 | |
| 8 | |
| 9 | |
| 10 | |
| 11 | |
| 12 | |
| 13 | |
| SUBTOTAL THIS PAGE | |
| LABOR BURDEN (_%) |
| SUBTOTAL CIVIL | |
| STRUCTURAL | |
| 1 | Structural Steel Framing, Front |
| 2 | 22 gage Steel Siding |
| 3 | Steel Siding Repair, Adhesive |
| 4 | Accordian Partition, Steel |
| 5 | Hangar Doors - Sealed |
| 6 | |
| 7 | |
| 8 | |
| 9 | |
| 10 | |
| 11 | |
| 12 | |
| 13 | |
| SUBTOTAL THIS PAGE | |
| LABOR BURDEN (_%) |
| SUBTOTAL STRUCTURAL | |
| MECHANICAL | |
| 1 | Polyurethane Insulation, Primer |
| 2 | Spray Insulation, Polyurethane |
| 3 | HVAC, Cooling Generating System, water cooled, 100 Tons (est.) - Mechanical Assemblies - D3030 130 1020 |
| 4 | Compressed Air System |
| 5 | Compressed Air Dryer |
| 6 | Compressed Air Cleaner |
| 7 | Air Piping, Schedule 40, 1" |
| 8 | Booster Pump to Fire Riser |
| 9 | |
| 10 | |
| 11 | |
| 12 | |
| 13 | |
| SUBTOTAL THIS PAGE | |
| LABOR BURDEN (_%) |
| SUBTOTAL MECHANICAL | |
| PLUMBING | |
| 1 | Gate Valve (x2) |
| 2 | Check Valve |
| 3 | Foam Control Valve, 3" |
| 4 | Ball Valve, Full Bore, Quarter Turn, 1-1/2" D (est) |
| 5 | Ball Valve, 3/4" D |
| 6 | Check Valve, 1-1/2" D |
| 7 | Flow Meter, Ventury, Inductor Type |
| 8 | Pipe Reducer, 4" to 3" |
| 9 | Backflow Preventer, 4" D, Flanged |
| 10 | Surge Arrestor |
| 11 | Fire Department Connection |
| 12 | 6" Standpipe to 30 feet |
| 13 | Sprinkler Heads, Foam Water System |
| SUBTOTAL THIS PAGE |
| PLUMBING | |
| 1 | Pipe, Steel, Sch 40, 4" D |
| 2 | Pipe, Steel, Black, Sch 40, threaded, couplg and hanger, 10' OC, 3" D |
| 3 | Pipe, Steel, Black, Sch 40, threaded, couplg and hanger, 10' OC, 2-1/2" D |
| 4 | Pipe, Steel, Black, Sch 40, threaded, couplg and hanger 10' OC, 2" D |
| 5 | Pipe, Steel, Black, Sch 40, threaded, couplg and hanger 10' OC, 1-1/2" D |
| 6 | Pipe, Steel, Black, Sch 40, threaded, couplg and hanger 10' OC, 1" D |
| 7 | Pipe, Tee, Maleable Iron, threaded, 4" D |
| 8 | Pipe, Tee, Maleable Iron, threaded, 3" D |
| 9 | Pipe, Tee, Maleable Iron, threaded, 2-1/2" D |
| 10 | Pipe, Tee, Maleable Iron, threaded, 2" D |
| 11 | Pipe, Tee, Maleable Iron, threaded, 1-1/2" D |
| 12 | Pipe, Tee, Maleable Iron, threaded, 1" D |
| 13 | Pipe, 90 deg elbow, Maleable Iron, 1" D |
| SUBTOTAL THIS PAGE |
| PLUMBING | |
| 1 | Pipe, 90 deg elbow, Maleable Iron, 2" D |
| 2 | Pressure Gauge, Liquid Filled |
| 3 | Pipe, Coupling, Sch 40, threaded, 2-1/2" |
| 4 | Pipe, Cap, Sch 40, threaded, 2-1/2" |
| 5 | Reducer, 3/4", Steel to Copper |
| 6 | Pipe, Copper, 3/4", Type M |
| 7 | Steel Storage Tank, 5000 gal Cap. |
| 8 | |
| 9 | |
| 10 | |
| 11 | |
| 12 | |
| 13 | |
| SUBTOTAL THIS PAGE |
SUBTOTAL PREVIOUS PAGE(S)
| SUBTOTAL ALL PAGES |
| LABOR BURDEN (_%) |
| SUBTOTAL PLUMBING | |
| ELECTRICAL | |
| 1 | Demolition |
| 2 | Conduit, steel, 1 inch, Estimate 1000 feet allowance with Height Adjustment to 30 feet (Average) |
| 3 | Conduit, steel, 2 inch, Estimate 800 feet allowance with Height Adjustment to 30 feet (Average) |
| 4 | Wire, THHN, #1 AWG, Three Wire, Grounded - 440 V power (Max, 102 A) |
| 5 | Wire, THHN, #250kcmil, Three Wire, Grounded - 440 V power (Max, 205 A) |
| 6 | Panelboards, 440V/400A(?) |
| 7 | Panelboards, 208V/400A(?) |
| Construction | |
| 8 | Panelboard, 4 wire 480V/600 A |
| 9 | Panelboard, 4 wire 208V/200 A, to 42 circuits |
| 10 | Wire, THHN, #4 AWG (length based on single run x 3 wires) |
| 11 | Wire, THHN, #6 AWG (length based on single run x 3 wires) |
| 12 | 1 in. EMT, Run to North Wall (3 wires total) |
| 13 | 1-1/2 in. EMT, Run to South Wall (12 wires) |
| 14 | 1-1/4 in. EMT, Run to Operator Booth (6 wires) |
| SUBTOTAL THIS PAGE |
| ELECTRICAL | |
| 1 | Fire Alarm Control Panel, up to 200 points |
| 2 | Fire alarm Strobe and Horn (ABA) |
| 3 | Duct Type Smoke Detector (HVAC Ductwork) |
| 4 | Manual Pull Station |
| 5 | |
| 6 | |
| 7 | |
| 8 | |
| 9 | |
| 10 | |
| 11 | |
| 12 | |
| 13 | |
| SUBTOTAL THIS PAGE |
SUBTOTAL PREVIOUS PAGE(S)
| SUBTOTAL ALL PAGES |
| LABOR BURDEN (_%) |
SUBTOTAL ELECTRICAL
| AF Form 3052 (Computer Generated) | &"Univers (WN)"&8 |
| &10*FOR OFFICIAL USE ONLY* | &"Univers (WN)"&8 |
&10PAGE &P OF &N
File details come from the government source that posted it. Updated .