This document contains a construction cost estimate breakdown template and details of a related federal contract opportunity for repair work on an Air Force hangar. The template provides line items for general conditions, architectural, civil, structural, mechanical, plumbing, and electrical work required to repair the hangar for paint stripping at Davis-Monthan Air Force Base in Arizona. It includes estimates for items like engineered steel framing, siding repair, HVAC and compressed air systems, piping, conduit, and electrical panels. The related solicitation is identified as FA487719RA012 and seeks bids to perform the repair hangar work outlined in the template. The contracting agency is the Department of the Air Force Air Combat Command. The response is due by an unspecified date.

AF FORM 3052 - Blank

View the file

Other versions and copies of AF Form 3052

File Revision Posted Attached to
Attachment E - Blank Sample AF Form 3052.xls Revision not stated Robins AFB Paving Multi-Award IDIQ
Attachment 5 - PNQS 24-4829 Airfield Improvements AF Form 3052 - Amendment 0002.xlsx Revision not stated Maxwell AFB - Airfield Repairs - Amendment 0006
31 - AF Form 3052 Cost Estimate Template.xlsx Revision not stated SABER IDIQ
31 - AF Form 3052 Cost Estimate Template.xlsx Revision not stated SABER IDIQ
B6 AF Form 3052 - Construction Cost Estimate.pdf Revision not stated Emergent Requirements Construction IDIQ (Single-Award)
AF Form 3052 (Blank) ReplCath Prot 240026 at Multi Facs -- .xlsx Revision not stated FBNV240026 Replace Cathodic Protection Test Points DMAFB
FBNV240017 - AF Form 3052 Blank.xlsx Revision not stated FA487724R0020 - Upgrade PGS Fire System
Attachment 4 - JUBJ 22 1016 Construct RIC - AF Form 3052.xlsx Revision not stated Construct Research Information Center (Solicitation Amendment 0002)
Attachment 4 - PNQS 24-3992 Replace Localizer Pad - AF Form 3052.xlsx Revision not stated PNQS 24-3992 Replace Localizer Pad (Solicitation Amendment 0001)
05. FBNV230009_AF Form 3052 (Blank).xlsx Revision not stated Solicitation - Repair Command Post Bldg 2300 - DMAFB
B941 Replace AHU AF Form 3052 - Construction Cost Estimate.xlsx Revision not stated Bldg 941 Replace Air Handling Unit 1
AF Form 3052.xlsx Revision not stated BLDG 4868 Additional Electrical Panel for DMAFB
Atch 7 AF Form 3052.xlsx Revision not stated B324 Add Sewer Line, FE Warren AFB, WY
AF Form 3052-Construction Cost Estimate Breakdown (3).xlsx Revision not stated Barnes Center Command Suite Modification Bldg. 832 Gunter Annex (Amendment 0003)
5. AF Form 3052-BLANK.xlsx Revision not stated Replace Swamp Cooler B5045
Copy of Attachment 3 - AF Form 3052-Construction Cost Estimate Breakdown.xlsx Revision not stated Repair Battery Room - Maxwell AFB, AL (Solicitation)
Attachment 4 - PNQS 23-0379 Connect Fire Mains - AF Form 3052.xlsx Revision not stated PNQS 23-0379 Connect Fire Mains Bldgs. 849 & 1143, MAFB & Gunter Annex
17. AF Form 3052 (Blank) - FBNV190002.xlsx Revision not stated Repair and Construct Primary Electric Distribution
Attachment 2.12 - AF Form 3052 Construction Cost Estimate Breakdown Template.xlsx Revision not stated Multiple Award Basic Ordering Agreement for Construction Services at Cannon AFB, NM
Attachment 3 - AF Form 3052-Construction Cost Estimate Breakdown.xlsx Revision not stated Repair Rooms, Building 1410 Gunter
Show all 20

Who attaches AF Form 3052

Other files

File Type Posted
Solicitation_Amendment_0002_SF_30.pdf PDF
04_AF_FORM_3052_(Blank)_Revision_1.xlsx XLSX spreadsheet
Section_M,_Revision_1_-_Evaluation_Factors_for_Award.pdf PDF
Section_L,_Revision_2_-_Instructions,_Conditions,_and_Notices_to_Offerors.pdf PDF
Solicitation_Amendment_SF_30.pdf PDF
Solicitation_RFI's_-_Answered.pdf PDF
07420-002-004.PDF PDF
07420-008-003.PDF PDF
07420-008.dwg DWG drawing
07420-009-005.PDF PDF
07420-004-001.zip ZIP file
07420-002-001.PDF PDF
07420-002-003.PDF PDF
07420-008-001.PDF PDF
07420-009-006.PDF PDF
07420-009-004.PDF PDF
07420-003-003.PDF PDF
07420-002-006.PDF PDF
07420-003-002.PDF PDF
07420-009-003.PDF PDF
07420-002-005.PDF PDF
07420-004-003.PDF PDF
07420-002-007.PDF PDF
07420-007-001.PDF PDF
07420-004-001.PDF PDF
07420-003-001.zip ZIP file
07420-008-002.PDF PDF
07420-002-002.PDF PDF
07420-009-002.PDF PDF
Section_L,_Revision_1_-_Instructions,_Conditions,_and_Notices_to_Offerors.pdf PDF
Section_M_-_Evaluation_Factors_for_Award.pdf PDF
Solicitation_-_FA487719RA012.pdf PDF
07_DMAFB_Design_Compatibility_Guidelines_pg_1_-_68.pdf PDF
01_SPECIFICATIONS_(30Apr19).pdf PDF
Section_L_-_Instructions,_Conditions,_and_Notices_to_Offerors.pdf PDF
07_DMAFB_Design_Compatibility_Guidelines_pg_69_-137.pdf PDF
07_DMAFB_Design_Compatibility_Guidelines_pg_138_-_274.pdf PDF
06_AF_Form_66_Schedule_of_Material_Submittals.pdf PDF
05_Wage_Determination.pdf PDF
02_Contractor_Environmental_Guide_(15_May_2019).pdf PDF
03_Template_of_Contractor_EAL.xls XLS spreadsheet
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ktr's Blank

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR(WORK TO BE PERFORMED)Repair Hangar for Paint StrippingPROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBERPROJECT NUMBERFBNV073765 FY19WORK LOCATIONDAVIS-MONTHAN AFB, AZ 85707
LINEUNIT OFMATERIAL COSTLABOR COSTDIRECTLINE
NO.ITEMMEASUREQUANTITYUNITTOTALMANHOURSRATETOTALCOSTSTOTAL
SUMMARY
1SUBTOTAL GENERAL CONDITIONS0000
2SUBTOTAL ARCHITECTURAL0000
3SUBTOTAL CIVIL
4SUBTOTAL STRUCTURAL
5SUBTOTAL MECHANICAL
6SUBTOTAL PLUMBING
7SUBTOTAL ELECTRICAL
LINE TOTALS
OVERHEAD (15%)
SUBTOTAL
PROFIT (_%)
SUBTOTAL
TAX (5.6% of 65%)
BOND (_%)
TOTAL PROJECT PRICE
DATE:FIRM NAME:
TITLE:BY:
GENERAL CONDITIONS
1Engineering Design
2Shop Drawings/Submittals
3Builder's Insurance
4Permits
5Project Manager
6Superintendent
7Small Tools
8Scheduling
9Construction Fence
10Project Sign
11Dumpsters
12Portable Toilets
13Safety Items
14Cleanup (after job completion)
15Cleanup (final floor area)
16Site Survey
17
18
SUBTOTAL THIS PAGE
LABOR BURDEN (_%)
SUBTOTAL GENERAL CONDITIONS
ARCHITECTURAL
1Pre-Built 16' x 20' Laser Operator's Booth
2Exterior Painting, Clean and Prep.
3Exterior Painting, Up to 39'
4Fire Protection Room, 10' x 20'
5Exterior Painting, Clean and Prep.
6Exterior Painting, Up to 39'
7
8
9
10
11
12
13
SUBTOTAL THIS PAGE
LABOR BURDEN (_%)
SUBTOTAL ARCHITECTURAL
CIVIL
1Excavator, 3/8 CUYD, 1' Deep
2Hauling Loose Fill, 8CY Truck, 4MI
3Fine Grading for Walkway
4AB Gravel Fill, 6" Deep, Compacted
5Concrete Sidewalk, 4' Wide, 4" Thick
6
7
8
9
10
11
12
13
SUBTOTAL THIS PAGE
LABOR BURDEN (_%)
SUBTOTAL CIVIL
STRUCTURAL
1Structural Steel Framing, Front
222 gage Steel Siding
3Steel Siding Repair, Adhesive
4Accordian Partition, Steel
5Hangar Doors - Sealed
6
7
8
9
10
11
12
13
SUBTOTAL THIS PAGE
LABOR BURDEN (_%)
SUBTOTAL STRUCTURAL
MECHANICAL
1Polyurethane Insulation, Primer
2Spray Insulation, Polyurethane
3HVAC, Cooling Generating System, water cooled, 100 Tons (est.) - Mechanical Assemblies - D3030 130 1020
4Compressed Air System
5Compressed Air Dryer
6Compressed Air Cleaner
7Air Piping, Schedule 40, 1"
8Booster Pump to Fire Riser
9
10
11
12
13
SUBTOTAL THIS PAGE
LABOR BURDEN (_%)
SUBTOTAL MECHANICAL
PLUMBING
1Gate Valve (x2)
2Check Valve
3Foam Control Valve, 3"
4Ball Valve, Full Bore, Quarter Turn, 1-1/2" D (est)
5Ball Valve, 3/4" D
6Check Valve, 1-1/2" D
7Flow Meter, Ventury, Inductor Type
8Pipe Reducer, 4" to 3"
9Backflow Preventer, 4" D, Flanged
10Surge Arrestor
11Fire Department Connection
126" Standpipe to 30 feet
13Sprinkler Heads, Foam Water System
SUBTOTAL THIS PAGE
PLUMBING
1Pipe, Steel, Sch 40, 4" D
2Pipe, Steel, Black, Sch 40, threaded, couplg and hanger, 10' OC, 3" D
3Pipe, Steel, Black, Sch 40, threaded, couplg and hanger, 10' OC, 2-1/2" D
4Pipe, Steel, Black, Sch 40, threaded, couplg and hanger 10' OC, 2" D
5Pipe, Steel, Black, Sch 40, threaded, couplg and hanger 10' OC, 1-1/2" D
6Pipe, Steel, Black, Sch 40, threaded, couplg and hanger 10' OC, 1" D
7Pipe, Tee, Maleable Iron, threaded, 4" D
8Pipe, Tee, Maleable Iron, threaded, 3" D
9Pipe, Tee, Maleable Iron, threaded, 2-1/2" D
10Pipe, Tee, Maleable Iron, threaded, 2" D
11Pipe, Tee, Maleable Iron, threaded, 1-1/2" D
12Pipe, Tee, Maleable Iron, threaded, 1" D
13Pipe, 90 deg elbow, Maleable Iron, 1" D
SUBTOTAL THIS PAGE
PLUMBING
1Pipe, 90 deg elbow, Maleable Iron, 2" D
2Pressure Gauge, Liquid Filled
3Pipe, Coupling, Sch 40, threaded, 2-1/2"
4Pipe, Cap, Sch 40, threaded, 2-1/2"
5Reducer, 3/4", Steel to Copper
6Pipe, Copper, 3/4", Type M
7Steel Storage Tank, 5000 gal Cap.
8
9
10
11
12
13
SUBTOTAL THIS PAGE

SUBTOTAL PREVIOUS PAGE(S)

SUBTOTAL ALL PAGES
LABOR BURDEN (_%)
SUBTOTAL PLUMBING
ELECTRICAL
1Demolition
2Conduit, steel, 1 inch, Estimate 1000 feet allowance with Height Adjustment to 30 feet (Average)
3Conduit, steel, 2 inch, Estimate 800 feet allowance with Height Adjustment to 30 feet (Average)
4Wire, THHN, #1 AWG, Three Wire, Grounded - 440 V power (Max, 102 A)
5Wire, THHN, #250kcmil, Three Wire, Grounded - 440 V power (Max, 205 A)
6Panelboards, 440V/400A(?)
7Panelboards, 208V/400A(?)
Construction
8Panelboard, 4 wire 480V/600 A
9Panelboard, 4 wire 208V/200 A, to 42 circuits
10Wire, THHN, #4 AWG (length based on single run x 3 wires)
11Wire, THHN, #6 AWG (length based on single run x 3 wires)
121 in. EMT, Run to North Wall (3 wires total)
131-1/2 in. EMT, Run to South Wall (12 wires)
141-1/4 in. EMT, Run to Operator Booth (6 wires)
SUBTOTAL THIS PAGE
ELECTRICAL
1Fire Alarm Control Panel, up to 200 points
2Fire alarm Strobe and Horn (ABA)
3Duct Type Smoke Detector (HVAC Ductwork)
4Manual Pull Station
5
6
7
8
9
10
11
12
13
SUBTOTAL THIS PAGE

SUBTOTAL PREVIOUS PAGE(S)

SUBTOTAL ALL PAGES
LABOR BURDEN (_%)

SUBTOTAL ELECTRICAL

AF Form 3052 (Computer Generated)&"Univers (WN)"&8
&10*FOR OFFICIAL USE ONLY*&"Univers (WN)"&8

&10PAGE &P OF &N

File details come from the government source that posted it. Updated .