Appendix 3 AF Form 3052 Cost Estimate.xls
Air Force Form XLS spreadsheet 140 KB Posted
- Solicitation number
- FA4814-08-R-0019
About this file
Attachment 22_Seed Project Price Schedule (AF Form 3052)
View the file
Other versions and copies of AF Form 3052
Show all 20
Who attaches AF Form 3052
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RECAP
| FOR OFFICIAL USE ONLY | ||||||||||
| CONSTRUCTION COST ESTIMATE BREAKDOWN | SHEET NO. | 1 | OF | 6 | ||||||
| CONTRACTOR | ADDRESS | |||||||||
| MacDill AFB, Tampa, Florida | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| REPAIR/INSTALL HANGAR 2 BATHROOMS | $0.00 | |||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION : | ||||||||
| NVZR 09-0021 | HANGAR 2 | |||||||||
| UNIT OF | MATERIAL COST | LABOR COST | $ | $ | ||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | $ | $ | OTHER | LINE | |
| NO | UNIT | TOTAL | MANHOURS | AVERAGE | TOTAL | DIRECT | TOTAL | |||
| RATE | UNIT COSTS | |||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| RECAPITULATION | ||||||||||
| Architectural | $0.00 | 0.0 | $0.00 | $0.00 | $0.00 | |||||
| Civil / Structural | $0.00 | 0.0 | $0.00 | $0.00 | $0.00 | |||||
| Mechanical | $0.00 | 0.0 | $0.00 | $0.00 | $0.00 | |||||
| Electrical | $0.00 | 0.0 | $0.00 | $0.00 | $0.00 | |||||
| TOTAL | $0.00 | 0.0 | $0.00 | $0.00 | $0.00 | |||||
| (AF Form 3052., AUG 93) |
TAB SHEET 2
| FOR OFFICIAL USE ONLY | ||||||||||
| CONSTRUCTION COST ESTIMATE BREAKDOWN | SHEET NO. | 2 | OF | 6 | ||||||
| CONTRACTOR | ADDRESS | |||||||||
| MacDill AFB, Tampa, Florida | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| REPAIR/INSTALL HANGAR 2 BATHROOMS | $0.00 | |||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION : | ||||||||
| NVZR 09-0021 | HANGAR 2 | |||||||||
| UNIT OF | MATERIAL COST | LABOR COST | $ | $ | ||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | $ | $ | OTHER | LINE | |
| NO | UNIT | TOTAL | MANHOURS | AVERAGE | TOTAL | DIRECT | TOTAL | |||
| RATE | UNIT COSTS | |||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| Architectural | ||||||||||
| 1 | DEMOLITION | EACH | $0.00 | |||||||
| 2 | TILE FLOORING | SF | $0.00 | |||||||
| 3 | WALL TILE | SF | $0.00 | |||||||
| 4 | PAINT | JOB | $0.00 | |||||||
| 5 | CEILING SYSTEM | SF | $0.00 | |||||||
| 6 | MILLWORK | LF | $0.00 | |||||||
| 7 | TOILET PARTITIONS | PER RESTROOM | $0.00 | |||||||
| 8 | WALL CONSTRUCTION | JOB | $0.00 | |||||||
| 9 | STORAGE ROOMS | JOB | $0.00 | |||||||
| 10 | TILE FINISH | JOB | $0.00 | |||||||
| 11 | DOOR / FRAME / HARDWARE | EACH | $0.00 | |||||||
| 12 | REFINISH DOOR / FRAME | EACH | $0.00 | |||||||
| 13 | RESTROOM WINDOWS | EACH | $0.00 | |||||||
| 14 | PATCH CONCRETE FLOORS | JOB | $0.00 | |||||||
| 15 | CHASE WALL RE-CONSTRUCTION | EACH | $0.00 | |||||||
| 16 | CONSTRUCT NEW SHOWER IN WOMEN'S RR | JOB | $0.00 | |||||||
| 17 | ACCESS PANELS IN RESTROOMS | EACH | $0.00 | |||||||
| 18 | MIRRORS | SF | $0.00 | |||||||
| 19 | COUNTER-TOPS | LF | $0.00 | |||||||
| 20 | SUSPENDED CEILING SYSTEM | SF | $0.00 | |||||||
| 21 | MOLD ABATEMENT | SF | $0.00 | |||||||
| 22 | ASBESTOS ABATEMENT | SF | $0.00 | |||||||
| (AF Form 3052., AUG 93) | ||||||||||
| FOR OFFICIAL USE ONLY | ||||||||||
| CONSTRUCTION COST ESTIMATE BREAKDOWN | SHEET NO. | 3 | OF | 6 | ||||||
| CONTRACTOR | ADDRESS | |||||||||
| MacDill AFB, Tampa, Florida | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| REPAIR/INSTALL HANGAR 2 BATHROOMS | $0.00 | |||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION : | ||||||||
| NVZR 09-0021 | HANGAR 2 | |||||||||
| UNIT OF | MATERIAL COST | LABOR COST | $ | $ | ||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | $ | $ | OTHER | LINE | |
| NO | UNIT | TOTAL | MANHOURS | AVERAGE | TOTAL | DIRECT | TOTAL | |||
| RATE | UNIT COSTS | |||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| Civil / Structural | ||||||||||
| 23 | DEMOLISH SECTION OF EXISTING SANITARY AND CONTROL FLOW | LS | $0.00 | |||||||
| 24 | INSTALL AND REMOVE TEMPORARY CONSTRUCTION FENCE | LF | $0.00 | |||||||
| 25 | INSTALL TWO-WAY SANITARY CLEAN OUT | LS | $0.00 | |||||||
| 26 | SITE RESTORATION | LS | $0.00 | |||||||
| (AF Form 3052., AUG 93) | ||||||||||
| FOR OFFICIAL USE ONLY | ||||||||||
| CONSTRUCTION COST ESTIMATE BREAKDOWN | SHEET NO. | 4 | OF | 6 | ||||||
| CONTRACTOR | ADDRESS | |||||||||
| MacDill AFB, Tampa, Florida | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| REPAIR/INSTALL HANGAR 2 BATHROOMS | $0.00 | |||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION : | ||||||||
| NVZR 09-0021 | HANGAR 2 | |||||||||
| UNIT OF | MATERIAL COST | LABOR COST | $ | $ | ||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | $ | $ | OTHER | LINE | |
| NO | UNIT | TOTAL | MANHOURS | AVERAGE | TOTAL | DIRECT | TOTAL | |||
| RATE | UNIT COSTS | |||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| Mechanical | ||||||||||
| 27 | Plumbing Demo | PER CHASE | $0.00 | |||||||
| 28 | Ceiling Exhaust Fan, incl. Install | EA | $0.00 | |||||||
| 29 | Aluminum Exhaust Duct, 20 GA, Incl. Hangers, Fittings, Dampers, etc. | LBS | $0.00 | |||||||
| 30 | Duct Insulation 2 Inch Blanket c/w vapor barrier and ASJ | SF | $0.00 | |||||||
| 31 | Wall Mount Exhaust Fan, incl. Install | EA | $0.00 | |||||||
| 32 | Exhaust Fan/Light/Heater Combo, incl. Install & Duct Tie-in Fitting | EA | $0.00 | |||||||
| 33 | Exhaust Grilles, incl. Duct Tie-in, Fitting | EA | $0.00 | |||||||
| 34 | Supply Diffusers, incl. Duct Tie-in, Fitting | EA | $0.00 | |||||||
| 35 | PVC Schedule 40 Waste Piping 4 Inch incl Excavation & Backfill | LF | $0.00 | |||||||
| 36 | PVC Schedule 40 Waste Piping 3 Inch incl Excavation & Backfill | LF | $0.00 | |||||||
| 37 | PVC Schedule 40 Waste Piping 2 Inch incl Excavation & Backfill | LF | $0.00 | |||||||
| 38 | PVC Schedule 40 Waste Piping 1 1/2 Inch incl Excavation & Backfill | LF | $0.00 | |||||||
| 39 | PVC Schedule 40 Vent Piping 3 Inch | LF | $0.00 | |||||||
| 40 | PVC Schedule 40 Vent Piping 2 Inch | LF | $0.00 | |||||||
| 41 | PVC Schedule 40 Vent Piping 1 1/2 Inch | LF | $0.00 | |||||||
| 42 | PVC Schedule 40 Vent Piping 1 1/4 Inch | LF | $0.00 | |||||||
| 43 | Pipe Hangers and Supports, Waste and Vent Piping | LF | $0.00 | |||||||
| 44 | Pipe Fittings and Joints, Waste and Vent Piping | LF | $0.00 | |||||||
| 45 | Copper Type L Tubing incl Fittings 1 1/2 Inch | LF | $0.00 | |||||||
| 46 | Copper Type L Tubing incl Fittings 1 Inch | LF | $0.00 | |||||||
| 47 | Copper Type L Tubing incl Fittings 3/4 Inch | LF | $0.00 | |||||||
| 48 | Copper Type L Tubing incl Fittings 1/2 Inch | LF | $0.00 | |||||||
| 49 | Copper Type L Tubing incl Fittings 3/8 Inch | LF | $0.00 | |||||||
| 50 | 2 Inch Thich Elastomeric Closed Cell Foam Insulation for 1/2 and 3/4 Inch HW Supply Pipe | LF | $0.00 | |||||||
| 51 | PIPE HANGERS AND SUPPORTS, DOMESTIC SUPPLY | LF | $0.00 | |||||||
| 52 | Water Closet (WC) Floor Mnt vit china c/w seat, supply & flush valve | EA | $0.00 | |||||||
| 53 | Water Closet (WC) Floor Mnt vit china c/w seat, supply & Automatic Dual-flushing valve | EA | $0.00 | |||||||
| 54 | Rough In for Floor Mounted WC incl supply, waste, & vent | EA | $0.00 | |||||||
| 55 | Lavatory Sink, Countertop, c/w trap, supply H/CW, stop valves, etc. | EA | $0.00 | |||||||
| 56 | Faucet - Bathroom Lavatory c/w trap,sypply H/C water, stop valves, soap dispenser | EA | $0.00 | |||||||
| 57 | Rough In for Lavatory incl supply, waste, & vent | EA | $0.00 | |||||||
| 58 | Floor Drains 3 Inch Dia pipe with 6 Inch Grate | EA | $0.00 | |||||||
| 59 | Urinal Wall Mnt vit china c/w flush valve, supply & waste | EA | $0.00 | |||||||
| 60 | Urinal Wall Mnt vit china c/w concealed flush valve, supply & waste | EA | $0.00 | |||||||
| 61 | Rough In for Wall Mounted Urinal incl Carrier, supply, waste, & vent | EA | $0.00 | |||||||
| 62 | Wall Cleanout Incl. Chrome plated cover and Install | EA | $0.00 | |||||||
| 63 | Trap Primer, Incl. Install | EA | $0.00 | |||||||
| 64 | foundation slab thickness | CUBIC YARDS | $0.00 | |||||||
| 65 | Behind Wall - Additional Piping, Supports, Carrier Support, etc. | PER CHASE | $0.00 | |||||||
| (AF Form 3052., AUG 93) | ||||||||||
| FOR OFFICIAL USE ONLY | ||||||||||
| CONSTRUCTION COST ESTIMATE BREAKDOWN | SHEET NO. | 5 | OF | 6 | ||||||
| CONTRACTOR | ADDRESS | |||||||||
| MacDill AFB, Tampa, Florida | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| REPAIR/INSTALL HANGAR 2 BATHROOMS | $0.00 | |||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION : | ||||||||
| NVZR 09-0021 | HANGAR 2 | |||||||||
| UNIT OF | MATERIAL COST | LABOR COST | $ | $ | ||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | $ | $ | OTHER | LINE | |
| NO | UNIT | TOTAL | MANHOURS | AVERAGE | TOTAL | DIRECT | TOTAL | |||
| RATE | UNIT COSTS | |||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| Electrical | ||||||||||
| 66 | ELECTRICAL DEMOLITION | LS | $0.00 | |||||||
| 67 | GRID MOUNTED LIGHT FIXTURE, FLUORESCENT, LOUVERED LENS | EA | $0.00 | |||||||
| 68 | RECESSED CAN LIGHT WITH COMPACT FLUORESCENT LAMP, INCLUDING NEW LIGHT SWITCH | EA | $0.00 | |||||||
| 69 | RECESSED CAN LIGHT WITH COMPACT FLUORESCENT LAMP (WET LOCATION) INCLUDING NEW LIGHT SWITCH | EA | $0.00 | |||||||
| 70 | VANITY LIGHT FIXTURE WITH COMP FLUORESCENT LAMPS | EA | $0.00 | |||||||
| 71 | CLOSE-TO-CEILING FIXTURE, DECORATIVE ROUND WITH COMPACT FLOURESCENT LAMPS | EA | $0.00 | |||||||
| 72 | WALL BRACKET FIXTURE, ALUMINUM, FLUORESCENT | EA | $0.00 | |||||||
| 73 | OCCUPANCY SENSOR, CEILING MOUNT, DUAL TECHNOLOGY | EA | $0.00 | |||||||
| 74 | RELAMP AND/OR REBALLAST EXISTING LIGHTS | EA | $0.00 | |||||||
| 75 | NEW 20-AMP GFCI OUTLET, BOX AND CIRCUIT | EA | $0.00 | |||||||
| 76 | REPLACE/INSTALL OUTLETS AND SWITCHES | EA | $0.00 | |||||||
| 77 | CONNECT NEW EXHAUST FANS | EA | $0.00 | |||||||
| 78 | INSTALL LIGHT FIXTURES | EA | $0.00 | |||||||
| 79 | WATER HEATERS | EA | $0.00 | |||||||
| (AF Form 3052., AUG 93) |
SUMMARY
| INSTRUCTIONS FOR COMPLETING AF FORM 3052 | ||||||
| Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to | ||||||
| permit itemizing of all direct costs. | ||||||
| Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples : square yards - SY, cubic yards - CY, square | ||||||
| feet - SF, linear feet - LF, board feet - BF, each - EA, pound -LB). | ||||||
| Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2). Items and units of measure will be | ||||||
| funished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will | ||||||
| be issued. Otherwise, the contractor is responsible for determining quantity estimates. | ||||||
| Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1. | ||||||
| Col 6, 7 and 8 Labor Costs. Enter in Col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. | ||||||
| Enter in Col 7 the average rate per manhour (manday) and in Col 8 the total labor cost. | ||||||
| Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract | ||||||
| and of significant dollar value. | ||||||
| Col 10 Line Total. Self-explanatory. | ||||||
| NOTE: In addition to the other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last | ||||||
| page as follows. | ||||||
| FOR OFFICIAL USE ONLY | ||||||
| TOTAL MATERIAL COSTS | $ | 0.00 | ||||
| TOTAL LABOR COSTS | $ | 0.00 | ||||
| TOTAL OTHER DIRECT COSTS | $ | 0.00 | ||||
| TOTAL DIRECT COSTS | $ | 0.00 | ||||
| OVERHEAD | 10.00 | % | $ | 0.00 | ||
| PROFIT | 10.00 | % | $ | 0.00 | ||
| SALES TAX 7.5% ON MATERIALS | $ | 0.00 | ||||
| TOTAL PRICE | $ | 0.00 | ||||
| DATE : | FIRM NAME : | |||||
| TITLE : | BY : | |||||
| (Signature) | ||||||
| INSTRUCTIONS TO OFFERORS | ||||||
| 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and | ||||||
| estimated costs (and attached supporting information) suitable for detaied review and analysis. Prior to the award of a contract resulting from | ||||||
| this proposal the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data | ||||||
| (see ASPR 3-807.3(e) and 3-807.4) | ||||||
| 2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with this | ||||||
| form any additional data, supporting schedules, or substantiation which are reasonably required for the conduct of an appropriate review and | ||||||
| analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clear understanding of | ||||||
| a. The existing, verifiable data. | ||||||
| b. The judgmental factors applied in projecting from known data to the estimate, and | ||||||
| c. The contingencies used by the offeror in his proposed price. | ||||||
| In short, the offeror's estimating process itself needs to be disclosed. | ||||||
| 3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate), | ||||||
| and made available to the contracting officer or his authorized representative upon request. | ||||||
| 4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the | ||||||
| purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate | ||||||
| evaluation of such cost or pricing data, along with the computations and projections used herein. This right may be exercised in connection | ||||||
| with any negotiations prior to contract award. | ||||||
| (Reverse of AF Form 3052., AUG 93) |
File details come from the government source that posted it. Updated .