Appendix 3 AF Form 3052 Cost Estimate.xls

Air Force Form XLS spreadsheet 140 KB Posted

Attached to
Multiple Award Construction Contract (MACC) - MacDill AFB, Florida
Solicitation number
FA4814-08-R-0019
Issued by

About this file

Attachment 22_Seed Project Price Schedule (AF Form 3052)

View the file

Other versions and copies of AF Form 3052

File Revision Posted Attached to
Attachment E - Blank Sample AF Form 3052.xls Revision not stated Robins AFB Paving Multi-Award IDIQ
Attachment 5 - PNQS 24-4829 Airfield Improvements AF Form 3052 - Amendment 0002.xlsx Revision not stated Maxwell AFB - Airfield Repairs - Amendment 0006
31 - AF Form 3052 Cost Estimate Template.xlsx Revision not stated SABER IDIQ
31 - AF Form 3052 Cost Estimate Template.xlsx Revision not stated SABER IDIQ
B6 AF Form 3052 - Construction Cost Estimate.pdf Revision not stated Emergent Requirements Construction IDIQ (Single-Award)
AF Form 3052 (Blank) ReplCath Prot 240026 at Multi Facs -- .xlsx Revision not stated FBNV240026 Replace Cathodic Protection Test Points DMAFB
FBNV240017 - AF Form 3052 Blank.xlsx Revision not stated FA487724R0020 - Upgrade PGS Fire System
Attachment 4 - JUBJ 22 1016 Construct RIC - AF Form 3052.xlsx Revision not stated Construct Research Information Center (Solicitation Amendment 0002)
Attachment 4 - PNQS 24-3992 Replace Localizer Pad - AF Form 3052.xlsx Revision not stated PNQS 24-3992 Replace Localizer Pad (Solicitation Amendment 0001)
05. FBNV230009_AF Form 3052 (Blank).xlsx Revision not stated Solicitation - Repair Command Post Bldg 2300 - DMAFB
B941 Replace AHU AF Form 3052 - Construction Cost Estimate.xlsx Revision not stated Bldg 941 Replace Air Handling Unit 1
AF Form 3052.xlsx Revision not stated BLDG 4868 Additional Electrical Panel for DMAFB
Atch 7 AF Form 3052.xlsx Revision not stated B324 Add Sewer Line, FE Warren AFB, WY
AF Form 3052-Construction Cost Estimate Breakdown (3).xlsx Revision not stated Barnes Center Command Suite Modification Bldg. 832 Gunter Annex (Amendment 0003)
5. AF Form 3052-BLANK.xlsx Revision not stated Replace Swamp Cooler B5045
Copy of Attachment 3 - AF Form 3052-Construction Cost Estimate Breakdown.xlsx Revision not stated Repair Battery Room - Maxwell AFB, AL (Solicitation)
Attachment 4 - PNQS 23-0379 Connect Fire Mains - AF Form 3052.xlsx Revision not stated PNQS 23-0379 Connect Fire Mains Bldgs. 849 & 1143, MAFB & Gunter Annex
17. AF Form 3052 (Blank) - FBNV190002.xlsx Revision not stated Repair and Construct Primary Electric Distribution
Attachment 2.12 - AF Form 3052 Construction Cost Estimate Breakdown Template.xlsx Revision not stated Multiple Award Basic Ordering Agreement for Construction Services at Cannon AFB, NM
Attachment 3 - AF Form 3052-Construction Cost Estimate Breakdown.xlsx Revision not stated Repair Rooms, Building 1410 Gunter
Show all 20

Who attaches AF Form 3052

Other files

Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RECAP

FOR OFFICIAL USE ONLY
CONSTRUCTION COST ESTIMATE BREAKDOWNSHEET NO.1OF6
CONTRACTORADDRESS
MacDill AFB, Tampa, Florida
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
REPAIR/INSTALL HANGAR 2 BATHROOMS$0.00
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION :
NVZR 09-0021HANGAR 2
UNIT OFMATERIAL COSTLABOR COST$$
LINEITEMMEASUREQUANTITY$$$$OTHERLINE
NOUNITTOTALMANHOURSAVERAGETOTALDIRECTTOTAL
RATEUNIT COSTS
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
RECAPITULATION
Architectural$0.000.0$0.00$0.00$0.00
Civil / Structural$0.000.0$0.00$0.00$0.00
Mechanical$0.000.0$0.00$0.00$0.00
Electrical$0.000.0$0.00$0.00$0.00
TOTAL$0.000.0$0.00$0.00$0.00
(AF Form 3052., AUG 93)

TAB SHEET 2

FOR OFFICIAL USE ONLY
CONSTRUCTION COST ESTIMATE BREAKDOWNSHEET NO.2OF6
CONTRACTORADDRESS
MacDill AFB, Tampa, Florida
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
REPAIR/INSTALL HANGAR 2 BATHROOMS$0.00
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION :
NVZR 09-0021HANGAR 2
UNIT OFMATERIAL COSTLABOR COST$$
LINEITEMMEASUREQUANTITY$$$$OTHERLINE
NOUNITTOTALMANHOURSAVERAGETOTALDIRECTTOTAL
RATEUNIT COSTS
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
Architectural
1DEMOLITIONEACH$0.00
2TILE FLOORINGSF$0.00
3WALL TILESF$0.00
4PAINTJOB$0.00
5CEILING SYSTEMSF$0.00
6MILLWORKLF$0.00
7TOILET PARTITIONSPER RESTROOM$0.00
8WALL CONSTRUCTIONJOB$0.00
9STORAGE ROOMSJOB$0.00
10TILE FINISHJOB$0.00
11DOOR / FRAME / HARDWAREEACH$0.00
12REFINISH DOOR / FRAMEEACH$0.00
13RESTROOM WINDOWSEACH$0.00
14PATCH CONCRETE FLOORSJOB$0.00
15CHASE WALL RE-CONSTRUCTIONEACH$0.00
16CONSTRUCT NEW SHOWER IN WOMEN'S RRJOB$0.00
17ACCESS PANELS IN RESTROOMSEACH$0.00
18MIRRORSSF$0.00
19COUNTER-TOPSLF$0.00
20SUSPENDED CEILING SYSTEMSF$0.00
21MOLD ABATEMENTSF$0.00
22ASBESTOS ABATEMENTSF$0.00
(AF Form 3052., AUG 93)
FOR OFFICIAL USE ONLY
CONSTRUCTION COST ESTIMATE BREAKDOWNSHEET NO.3OF6
CONTRACTORADDRESS
MacDill AFB, Tampa, Florida
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
REPAIR/INSTALL HANGAR 2 BATHROOMS$0.00
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION :
NVZR 09-0021HANGAR 2
UNIT OFMATERIAL COSTLABOR COST$$
LINEITEMMEASUREQUANTITY$$$$OTHERLINE
NOUNITTOTALMANHOURSAVERAGETOTALDIRECTTOTAL
RATEUNIT COSTS
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
Civil / Structural
23DEMOLISH SECTION OF EXISTING SANITARY AND CONTROL FLOWLS$0.00
24INSTALL AND REMOVE TEMPORARY CONSTRUCTION FENCELF$0.00
25INSTALL TWO-WAY SANITARY CLEAN OUTLS$0.00
26SITE RESTORATIONLS$0.00
(AF Form 3052., AUG 93)
FOR OFFICIAL USE ONLY
CONSTRUCTION COST ESTIMATE BREAKDOWNSHEET NO.4OF6
CONTRACTORADDRESS
MacDill AFB, Tampa, Florida
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
REPAIR/INSTALL HANGAR 2 BATHROOMS$0.00
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION :
NVZR 09-0021HANGAR 2
UNIT OFMATERIAL COSTLABOR COST$$
LINEITEMMEASUREQUANTITY$$$$OTHERLINE
NOUNITTOTALMANHOURSAVERAGETOTALDIRECTTOTAL
RATEUNIT COSTS
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
Mechanical
27Plumbing DemoPER CHASE$0.00
28Ceiling Exhaust Fan, incl. InstallEA$0.00
29Aluminum Exhaust Duct, 20 GA, Incl. Hangers, Fittings, Dampers, etc.LBS$0.00
30Duct Insulation 2 Inch Blanket c/w vapor barrier and ASJSF$0.00
31Wall Mount Exhaust Fan, incl. InstallEA$0.00
32Exhaust Fan/Light/Heater Combo, incl. Install & Duct Tie-in FittingEA$0.00
33Exhaust Grilles, incl. Duct Tie-in, FittingEA$0.00
34Supply Diffusers, incl. Duct Tie-in, FittingEA$0.00
35PVC Schedule 40 Waste Piping 4 Inch incl Excavation & BackfillLF$0.00
36PVC Schedule 40 Waste Piping 3 Inch incl Excavation & BackfillLF$0.00
37PVC Schedule 40 Waste Piping 2 Inch incl Excavation & BackfillLF$0.00
38PVC Schedule 40 Waste Piping 1 1/2 Inch incl Excavation & BackfillLF$0.00
39PVC Schedule 40 Vent Piping 3 InchLF$0.00
40PVC Schedule 40 Vent Piping 2 InchLF$0.00
41PVC Schedule 40 Vent Piping 1 1/2 InchLF$0.00
42PVC Schedule 40 Vent Piping 1 1/4 InchLF$0.00
43Pipe Hangers and Supports, Waste and Vent PipingLF$0.00
44Pipe Fittings and Joints, Waste and Vent PipingLF$0.00
45Copper Type L Tubing incl Fittings 1 1/2 InchLF$0.00
46Copper Type L Tubing incl Fittings 1 InchLF$0.00
47Copper Type L Tubing incl Fittings 3/4 InchLF$0.00
48Copper Type L Tubing incl Fittings 1/2 InchLF$0.00
49Copper Type L Tubing incl Fittings 3/8 InchLF$0.00
502 Inch Thich Elastomeric Closed Cell Foam Insulation for 1/2 and 3/4 Inch HW Supply PipeLF$0.00
51PIPE HANGERS AND SUPPORTS, DOMESTIC SUPPLYLF$0.00
52Water Closet (WC) Floor Mnt vit china c/w seat, supply & flush valveEA$0.00
53Water Closet (WC) Floor Mnt vit china c/w seat, supply & Automatic Dual-flushing valveEA$0.00
54Rough In for Floor Mounted WC incl supply, waste, & ventEA$0.00
55Lavatory Sink, Countertop, c/w trap, supply H/CW, stop valves, etc.EA$0.00
56Faucet - Bathroom Lavatory c/w trap,sypply H/C water, stop valves, soap dispenserEA$0.00
57Rough In for Lavatory incl supply, waste, & ventEA$0.00
58Floor Drains 3 Inch Dia pipe with 6 Inch GrateEA$0.00
59Urinal Wall Mnt vit china c/w flush valve, supply & wasteEA$0.00
60Urinal Wall Mnt vit china c/w concealed flush valve, supply & wasteEA$0.00
61Rough In for Wall Mounted Urinal incl Carrier, supply, waste, & ventEA$0.00
62Wall Cleanout Incl. Chrome plated cover and InstallEA$0.00
63Trap Primer, Incl. InstallEA$0.00
64foundation slab thicknessCUBIC YARDS$0.00
65Behind Wall - Additional Piping, Supports, Carrier Support, etc.PER CHASE$0.00
(AF Form 3052., AUG 93)
FOR OFFICIAL USE ONLY
CONSTRUCTION COST ESTIMATE BREAKDOWNSHEET NO.5OF6
CONTRACTORADDRESS
MacDill AFB, Tampa, Florida
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
REPAIR/INSTALL HANGAR 2 BATHROOMS$0.00
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION :
NVZR 09-0021HANGAR 2
UNIT OFMATERIAL COSTLABOR COST$$
LINEITEMMEASUREQUANTITY$$$$OTHERLINE
NOUNITTOTALMANHOURSAVERAGETOTALDIRECTTOTAL
RATEUNIT COSTS
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
Electrical
66ELECTRICAL DEMOLITIONLS$0.00
67GRID MOUNTED LIGHT FIXTURE, FLUORESCENT, LOUVERED LENSEA$0.00
68RECESSED CAN LIGHT WITH COMPACT FLUORESCENT LAMP, INCLUDING NEW LIGHT SWITCHEA$0.00
69RECESSED CAN LIGHT WITH COMPACT FLUORESCENT LAMP (WET LOCATION) INCLUDING NEW LIGHT SWITCHEA$0.00
70VANITY LIGHT FIXTURE WITH COMP FLUORESCENT LAMPSEA$0.00
71CLOSE-TO-CEILING FIXTURE, DECORATIVE ROUND WITH COMPACT FLOURESCENT LAMPSEA$0.00
72WALL BRACKET FIXTURE, ALUMINUM, FLUORESCENTEA$0.00
73OCCUPANCY SENSOR, CEILING MOUNT, DUAL TECHNOLOGYEA$0.00
74RELAMP AND/OR REBALLAST EXISTING LIGHTSEA$0.00
75NEW 20-AMP GFCI OUTLET, BOX AND CIRCUITEA$0.00
76REPLACE/INSTALL OUTLETS AND SWITCHESEA$0.00
77CONNECT NEW EXHAUST FANSEA$0.00
78INSTALL LIGHT FIXTURESEA$0.00
79WATER HEATERSEA$0.00
(AF Form 3052., AUG 93)

SUMMARY

INSTRUCTIONS FOR COMPLETING AF FORM 3052
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to
permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples : square yards - SY, cubic yards - CY, square
feet - SF, linear feet - LF, board feet - BF, each - EA, pound -LB).
Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2). Items and units of measure will be
funished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will
be issued. Otherwise, the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in Col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1.
Enter in Col 7 the average rate per manhour (manday) and in Col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract
and of significant dollar value.
Col 10 Line Total. Self-explanatory.
NOTE: In addition to the other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last
page as follows.
FOR OFFICIAL USE ONLY
TOTAL MATERIAL COSTS$0.00
TOTAL LABOR COSTS$0.00
TOTAL OTHER DIRECT COSTS$0.00
TOTAL DIRECT COSTS$0.00
OVERHEAD10.00%$0.00
PROFIT10.00%$0.00
SALES TAX 7.5% ON MATERIALS$0.00
TOTAL PRICE$0.00
DATE :FIRM NAME :
TITLE :BY :
(Signature)
INSTRUCTIONS TO OFFERORS
1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and
estimated costs (and attached supporting information) suitable for detaied review and analysis. Prior to the award of a contract resulting from
this proposal the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data
(see ASPR 3-807.3(e) and 3-807.4)
2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with this
form any additional data, supporting schedules, or substantiation which are reasonably required for the conduct of an appropriate review and
analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clear understanding of
a. The existing, verifiable data.
b. The judgmental factors applied in projecting from known data to the estimate, and
c. The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate),
and made available to the contracting officer or his authorized representative upon request.
4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the
purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate
evaluation of such cost or pricing data, along with the computations and projections used herein. This right may be exercised in connection
with any negotiations prior to contract award.
(Reverse of AF Form 3052., AUG 93)

File details come from the government source that posted it. Updated .