Atch 1 - 8 Wage Determinations.pdf

PDF 84 KB Posted

Attached to
Multiple Award Construction Contract (MACC) - MacDill AFB, Florida
Solicitation number
FA4814-08-R-0019
Issued by

About this file

Attachments 1 - 8 Wage Determinations

View the file

Other files

Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation Number: FA4814-08-R-0019 Attachment 1

General Decision Number: FL080084 07/25/2008 FL84

Superseded General Decision Number: FL20070087 State: Florida

Construction Type: Building

County: Highlands County in Florida.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes and apartments up to and including four (4) stories)

Modification Number Publication Date 0 02/08/2008 1 07/25/2008

* SUFL1990-018 01/25/1990

Rates Fringes

Air Conditioning & Heating Mechanic $ 6.55

BRICKLAYER $ 8.50

CARPENTER $ 6.55

CEMENT MASON/CONCRETE FINISHER $ 8.00

ELECTRICIAN $ 6.88

GLAZIER $ 6.55

LABORER: Mason Tender $ 6.55

LABORER $ 6.55

PAINTER $6.55

Plasterer tender $ 6.55

PLASTERER $ 8.76 $ 1.15

PLUMBER/PIPEFITTER $ 7.00

ROOFER, Including Built Up, Composition and Single Ply Roofs $ 6.55

Sheet metal worker $ 7.21

TILE SETTER $ 6.55

TRUCK DRIVER $ 6.55

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)) .

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on

* a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S.

Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

Solicitation No: FA4814-08-R-0019 Attachment 2

General Decision Number: FL080025 07/25/2008 FL25

Superseded General Decision Number: FL20070025

State: Florida

Construction Type: Residential Counties: De Soto, Hardee, Highlands and Polk Counties in Florida

RESIDENTIAL CONSTRUCTION PROJECTS (Consisting of single family homes and apartment up to and including 4 stories)

Modification Number Publication Date

0 02/08/2008 1 07/25/2008

* SUFL1990-011 01/25/1990

Rates Fringes

Air Conditioning Mechanic $ 6.55

BRICKLAYER $ 8.50

CARPENTER $ 6.55

CEMENT MASON/CONCRETE FINISHER $ 6.55

DRYWALL FINISHER/TAPER $ 7.50

DRYWALL HANGER $ 7.50

ELECTRICIAN $ 7.45 .05+18%

IRONWORKER $ 6.55

LABORER $ 6.55

PAINTER $ 6.55

Plumbers and Pipefitters $ 8.88 Power equipment operators:

Bulldozer $ 7.00 Loader $ 6.55 Scaper $ 6.55 ROOFER, Including Built Up, Composition and Single Ply Roofs $ 6.55 Sheet metal worker $ 6.55

TILE SETTER $ 6.78

TRUCK DRIVER $ 6.55

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)) .

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

Solicitation No: FA4814-08-R-0019 Attachment 2

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

∗ an existing published wage determination ∗ a survey underlying a wage determination ∗ a Wage and Hour Division letter setting forth a position on a wage determination matter ∗ a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

Attachment 3

General Decision Number: FL080094 02/08/2008 FL94

Superseded General Decision Number: FL20070097

State: Florida

Construction Types: Heavy

Counties: De Soto, Glades, Hardee, Hendry, Highlands, Monroe and Okeechobee Counties in Florida.

HEAVY CONSTRUCTION PROJECTS (including Sewer & Water Line Construction & Drainage Projects.)

Modification Number Publication Date 0 02/08/2008

SUFL1994-008 10/01/1994

Rates Fringes Carpenter...................... $ 12.00

Electrician.................... $ 14.50

Laborers:

Pipelayers................. $ 9.00 Unskilled................... $ 7.81

Pipefitter..................... $ 10.00

Power equipment operators:

Backhoe..................... $ 12.00 Grader...................... $ 12.00 Loader...................... $ 12.00 Tractor..................... $ 12.00 Trenching Machine........... $ 13.50

Truck Driver................... $ 10.00

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii))

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

Attachment 3

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on

* a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

Solicitation No. FA4814-078-R-0019 Attachment 4

General Decision Number: FL080035 02/08/2008 FL35

Superseded General Decision Number: FL20070035

State: Florida

Construction Types: Highway

Counties: Charlotte, De Soto, Glades, Hardee, Hendry, Highlands, Monroe and Okeechobee Counties in Florida.

HIGHWAY CONSTRUCTION PROJECTS (excluding tunnels; Building structures in rest area projects; railroad construction; bascule, suspension and sprandrel arch bridges designed for commercial navigation; bridges involving marine construction; other major bridges)

Modification Number Publication Date 0 02/08/2008

SUFL1993-002 08/01/1993

Rates Fringes

Bricklayer/Brickmason $ 9.50

Carpenter...................... $ 12.00

Concrete Finisher.............. $ 9.34

Electrician.................... $ 11.85

Fence Erector.................. $ 7.45

Form Setter.................... $ 8.61

Ironworkers:

Reinforcing........ $ 13.83 Structural.................. $ 12.94

Laborers:

Asphalt Raker............ $ 7.80 Unskilled................... $ 6.69

Painter........................ $ 7.92

Power equipment operators:

Asphalt Distributor......... $ 8.01 Asphalt Paving Machine..... $ 9.28 Asphalt Screed.............. $ 8.48 Backhoe..................... $ 8.92 Boom-Auger.................. $ 7.95 Bulldozer................... $ 10.30 Crane, Derrick, Dragline.... $ 12.56 Earthmover.................. $ 7.75 Forklift.................... $ 7.50 Front End Loaders:

1 cu. yard and under...... $ 7.91 over 1 cu. yard $ 7.94 Gradall $ 9.00 Grademan $ 7.16 Guardrail Erector $ 7.08 Guardrail Post Driver $ 7.50 Mechanic $ 10.14 Milling Machine $ 9.00 Milling Machine Grade Checker $ 7.15 Motor Grader $ 10.56 Mulching Machine $ 7.15 Oiler, Greaseman $ 7.73 Pavement Striping Machine $ 8.26 Paving Striping Machine Nozzleman $ 7.00 Pile Driver $ 10.50 Piledriverman $ 10.00 Power Subgrade Mixer $ 7.94 Rollers:

Finish $ 8.41 Rough $ 8.01 Self-Prop. Rubber Tire $ 8.16 Scraper/Pan $ 8.11 Small Tool Operator $ 7.00 Tractor, Light $ 7.52 Trenching Machine $ 8.12 Widening Spreader Machine $ 8.00

Sign Erector $ 7.63

Traffic Controller

TRAFFIC CONTROL SPECIALIST $ 7.50

TRAFFIC SIGNALIZATION

INSTALLER $ 9.79

MECHANIC $ 13.16

Truck drivers:

Lowboy $ 8.11 Multi-Rear Axle $ 8.06 Single-Rear Axle $ 7.80

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii))

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

Attachment 5

General Decision Number: FL080002 02/08/2008 FL2

Superseded General Decision Number: FL20070002

State: Florida

Construction Type: Building

County: Hillsborough County in Florida.

BUILDING CONSTRUCTION PROJECTS (Including Sewer & Water Treatment Plant Construction Projects, but excluding single family homes and apartments up to and including four (4) stories)

Modification Number Publication Date 0 02/08/2008

* ELEV0074-001 01/01/2005

Rates Fringes Elevator Mechanic $ 27.335 12.115

FOOTNOTE FOR ELEVATOR MECHANICS:

A: Employer contributes 8% basic hourly rate for 5 years or more of service or 6% basic hourly rate for 6 months to 5 years of service as vacation pay credit; Paid Holidays: New Year's Day; Memorial Day;

Independence Day; Thanksgiving Day; Friday after Thanksgiving Day, and Christmas Day.

SUFL1995-003 02/09/1995

Rates Fringes Bricklayer/Blocklayer $ 12.00 Carpenter (Including Drywall Hanging and Batt Installation, and Acoustical Tile Installation $ 11.00 Cement Mason/Concrete Finisher. $ 10.07 Drywall Finisher $ 11.00 Electrician $ 10.10 .87 Garage door installer $ 8.00 Glazier $ 11.30 HVAC Mechanic (Duct & Pipe Work) $ 10.08 1.50 Insulators - Heat and Frost $ 10.09 1.36 Ironworkers:

Ornamental $ 8.94 Reinforcing $ 11.50 Structural $ 10.80 Laborers:

Concrete $ 7.87 Mason Tenders $ 7.00 Pipelayers $ 8.75 1.03 Plasterers Tenders $ 7.50 Unskilled $ 6.74 Lather $ 11.00 Pipefitter (Excluding HVAC Work) $ 12.44 Plasterer $ 11.76 Plumber (Excluding HVAC Work) $ 10.58 1.94

Power equipment operators:

Backhoe $ 9.13 Concrete Pump $ 9.75 1.00 Crane $ 13.17 2.09 Loader $ 8.67 1.57 Roofer (including Built Up, Composition and Single Ply) $ 9.60 Sheetmetal Worker $ 10.71 Duct & Pipe Work Sprinkler Fitter $ 10.71 Tile Setter $ 11.96 Truck Driver $ 7.93 1.11 Waterproofer $ 9.36

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)) .

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S.

Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

Attachment 6

General Decision Number: FL080024 07/25/2008 FL24

Superseded General Decision Number: FL20070024

State: Florida

Construction Type: Residential

Counties: Citrus, Hernando, Hillsborough, Pasco, Pinellas and Sumter Counties in Florida.

RESIDENTIAL CONSTRUCTION PROJECTS (Consisting of single family homes and apartments up to and including 4 stories)

Modification Number Publication Date

0 02/08/2008 1 07/25/2008

* SUFL1982-001 05/01/1982

Rates Fringes

Air Conditioning Mechanic $ 6.55

BRICKLAYER $ 9.00

CARPENTER $ 6.55

CEMENT MASON/CONCRETE FINISHER $ 7.50

DRYWALL FINISHER/TAPER $ 8.96

DRYWALL HANGER $ 8.00

ELECTRICIAN $ 6.75

FLOOR LAYER: CARPET (SOFT)

FLOOR $ 7.52

GLAZIER $ 6.84

Insulation Installer $ 6.55

IRONWORKER $ 6.55

Laborers:

Mason Tenders $ 6.55 Mortar Mixers $ 6.55 Pipelayers $ 6.55 Plasterer Tenders $ 6.55

Unskilled $ 6.55

LATHER $ 6.55

PAINTER $ 6.55

PLASTERER $ 7.50

PLUMBER/PIPEFITTER $ 7.02

Power equipment operators:

Backhoe $ 6.55 Bulldozer $ 6.55 Compactor $ 6.55 Dragline and Crane $ 10.00 Grader $ 6.65 Loader $ 6.55 Pan $ 6.55 Tractor $ 6.55

ROOFER, Including Built Up, Composition and Single Ply Roofs $ 6.55

Sheet metal worker $ 6.55

TILE SETTER $ 8.00

TRUCK DRIVER $ 6.55

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)) .

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

Attachment 7

General Decision Number: FL080030 07/25/2008 FL30

Superseded General Decision Number: FL20070030

State: Florida

Construction Type: Heavy

Counties: Brevard, Hernando, Hillsborough, Manatee, Orange, Osceola, Pasco, Pinellas, Polk, Sarasota and Seminole Counties in Florida.

HEAVY CONSTRUCTION PROJECTS (Does not include Sewer and Water Line Construction Projects)

Modification Number Publication Date 0 02/08/2008 1 07/25/2008

* SUFL1990-036 01/26/1990

Rates Fringes

CARPENTER $ 10.08

CEMENT MASON/CONCRETE FINISHER $ 11.00 1.42

ELECTRICIAN $ 16.40 2.40+4%

Ironworkers:

Reinforcing $ 11.20 3.11

LABORER

Landscape $ 6.55 1.58 Pipelayers $ 7.97 Unskilled $ 6.55

MILLWRIGHT $ 10.43 1.14

PIPEFITTER $ 9.73

PLUMBER $ 8.97

Power equipment operators:

Backhoes $ 10.35 2.00 Bulldozers $ 9.61 2.00 Crane $ 10.94 2.00 Graders $ 10.35 2.00 Loaders $ 10.35 2.00 Mechanic $ 10.71 2.00 Roller $ 10.35 2.00 Scraper $ 10.35 2.00

TRUCK DRIVER $ 7.52

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5

(a) (1) (ii)) .

Attachment 7

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

∗ an existing published wage determination ∗ a survey underlying a wage determination ∗ a Wage and Hour Division letter setting forth a position on a wage determination matter ∗ a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.)

should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

Attachment 8

General Decision Number: FL080039 02/08/2008 FL39

Superseded General Decision Number: FL20070039

State: Florida

Construction Type: Highway

Counties: Brevard, Collier, Hernando, Hillsborough, Lee, Manatee, Martin, Orange, Osceola, Pasco, Pinellas, Polk, Sarasota, Seminole and St Lucie Counties in Florida.

EXCLUDING CAPE CANAVERAL AIR FORCE STATION, PATRICK AIR FORCE BASE, KENNEDY

SPLACE FLIGHT CENTER AND MELABAR RADAR SITE HIGHWAY CONSTRUCTION PROJECTS

(excluding tunnels, building structures in rest area projects, & railroad construction; bascule, suspension & spandrel arch bridges; bridges designed for commerc ia l naviga t ion ; br idges involv ing mar ine construction; & other major bridges.

Modification Number Publication Date 0 02/08/2008

* SUFL1993-012 08/01/1993

Rates Fringes

BRICKLAYER (Manhole) $ 9.02

CARPENTER $ 9.71

Concrete Finisher $ 8.91

ELECTRICIAN $ 13.42

FENCE ERECTOR $ 7.75

Form Setter $ 7.76

Guardrail erector $ 7.95

Ironworkers:

Reinforcing $ 12.37 Structural $ 6.60

Laborers:

Asphalt Raker $ 7.23 Pipelayer $ 8.01 Unskilled $ 6.60

N/A $ 7.34

Painters:

Blaster $ 10.72

Power equipment operators:

Asphalt Distributor $ 7.39 Asphalt Paving Machine $ 8.23 Asphalt Plant Operator $ 6.83

Asphalt Screed $ 7.68 Backhoe $ 9.00 Boom-Auger $ 9.40 Bulldozer $ 8.42 Concrete Curb Machine $ 8.50 Concrete Groover/Grinder $ 9.00 Concrete Joint Saw $ 9.97 Concrete Mixer Operator $ 6.63 Concrete Paving Finish Machine $ 8.50 Concrete Pump Op $ 13.00 Crane, Derrick, or Dragline $ 11.53 Earthmover $ 7.78 Fork Lift $ 7.63 Front End Loader $ 8.00 Gradall $ 8.76 Grade Checker $ 6.60 Guardrail Post Driver $ 10.78 Mechanic $ 9.52 Milling Machine Grade Checker $ 7.03 Milling Machine $ 8.76 Motor Grade $ 9.54 Mulching Machine $ 6.70 Oiler, Greaseman $ 7.21 Pavement Striping Machine $ 11.04 Paving Striping Machine Nozzleman $ 7.50 Piledriver Leadsman $ 9.75 Piledriver Operator $ 10.82 Power Subgrade Mixer $ 7.63 Rollers:

Finish $ 7.24 Rough $ 6.70 Self-Prop., Rubber Tire $ 7.01 Scraper $ 7.33 Sign Erector $ 13.27 Small tool $ 7.33 Tractors:

80 HP or less $ 6.60 Light $ 6.76 Over 80 HP $ 10.62 Trenching Machine $ 8.00 Widening Spreader Machine $ 7.52

Traffic Controller

TRAFFIC CONTROL SPECIALIST $ 7.15

TRAFFIC SIGNALIZATION:

Installer $ 9.70 Mechanic $ 13.25

Truck drivers:

Lowboy $ 8.02 Multi-Rear Axle $ 6.97 Single Rear Axle $ 6.70

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)) .

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

∗ an existing published wage determination ∗ a survey underlying a wage determination ∗ a Wage and Hour Division letter setting forth a position on a wage determination matter ∗ a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

File details come from the government source that posted it. Updated .