Text version

98904

Courtesy

Florida Department of

~nvironmental Protectir ,tn 1"...:rs Office Bldg. .Tallahassee, Florida .;..:399-- .'\10

NOTICE OF ASBESTOS REMOVAL PROJECT

Type of Notice: IX I Original II Revised II Cancelled II Demolition

I Facility Name Mac_~il~ AF6 00#5013 Address ~~~aer #2 Reoair Comm Rm #105

City MacOil1 AFB State FL County Hillsborouah Site Blda 378 Surveyed by -- Building Size 2500 (Square Feet) # of Floors 1 Age in Years 50 Prior Use~

II Fee Receipt Will Be Sent to Address in Block Below: (Print or Type)

III. Facility Owner MacDil1 AFB Phone (813) 828-3815 X358

Address. 6~.~o.n~~ctinQ SQuadron 2606 Brown Pelican Ave City MacDil1 AFB State FL Zip 33621

Fold Line IV.

V. Demolition II Removal/xl Demolition with no ACM II Emeraency II Annual!!

VI. Removal/Demolition Procedures to be Used

*Must Obtain Prior DEP Approval Before Using a Dry Method!

VII. Waste Disposal Site Name Central Florida DisDosal Class III

Address 3400 Hvw 17/98 City Ft. Meade State FL

VIII.

Fee Calculation & Type of RACM in Renovations or ACM in Demolitions

RACM?

(circle Yes or No)

Square Feet Surfacing Material Yes No Linear Feet Pipe Yes No Square Feet Cementitious Material Yes No ~ Square Feet Resilient Flooring Yes No.xx Square Feet Asphalt Roofing Yes No -0- Total RACM (square + linear feet)

S -0- Enclosed (§ee Fee Schedule) II Check if Demo Only

DEP USE ONLY

Fee Received $ APIS # Date Received

D:\DA T A\98900\98904\WP60\Notification. wpd ~--IR' ~\ ,..,.t~_., ~... I ~'" '" , v " , , , ,,/ , ( {1 \. j L J I " I, ~) U' =:./ U

",C'co."c."

I A w

2008/11/18

Fli ht Li

E i ti B th 1

Flight Line

1st Floor Hangar 2

Existing Bathroom 1

1 Floor Hangar 2 North

New Bathroom 2

Flight Line

New Bathroom 3

2nd Floor Hangar 2

N hNorth Existing Bathroom 4

Hangar 2 Bathroom 1 Male New Typical C fi iConfiguration

New Sink New Water ClosetNew Urinal

Not to Scale

Hangar 2 Bathroom 2 Female New Typical

New SinkNew Sink

New Water Closet New Storage Room with Mop Sink

New door

Existing Walls

Mop Sink

Existing Door Hallway

Hangar 2 Bathroom 3 Female New Typical

HallwayExisting Door

New Sink

Existing Walls

New Sink

New Water Closet New Storage Room with Mop Sink

New door Mop Sink

Hangar 2 Bathroom 4 Men’s New Typical

New Sink New Urinal New Water Closet

Storage i h

Not to Scale Room with Mop Sink

AF FORM 66, SEP 89 PREVIOUS EDITION WILL BE USED (22 Mar 04)

SCHEDULE OF MATERIAL SUBMITTALS PROJECT NUMBER PROJECT TITLE

MACC Contract and Task Order

SOLICITATION/CONTRACT NO.

NVZR 09-0021 Repair/Install Hangar 2 Bathrooms F8481408R0019

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

L I N E

N U M B E R

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

REQUIRED

SUBMISSION

DATE

RECEIVED

IN CON-

TRACTING

DATE TO

CIVIL

ENGI-

NEERING

RETURN

SUSPENSE

SUBMITTAL NUMBERS

CONTRACTOR

NOTIFIED

DIS-

APPROVED APPROVED

CONTRACTOR

RESUBMITTAL

FINAL

APPROVAL

REMARKS

1 Section 1.0 Para 1A

Concept Design

65% design submittal, drawings, cost estimate, schedule for Phase 1 and Phase II, specifications (8 Copies of each with CD ROM)

2 Section 2.0 Para 2A3)

Urinal andToilet

2 2 2 Interior/Exterior finishes

Section 2.0 Para 2A3)

Interior and exterior finishes

2 2 2 2

4 Section 2.0 Para 2A5)

Diffusers and exhaust fans

2 2

5 Section 2.0 Para 2A6)

Light Fixtures and Ocupancy Sensors

2 2

6 MACC Project Specs Section 01300

Table 1 Design Submittals and

As-builts

8 Design submittal and as-built information schedule (8 Copies of each with CD ROM)

7 MACC Project Specs Section

Antiterrorism Level 1 Training

Annual certification of Anti-terrorism traning

SCHEDULE OF MATERIAL SUBMITTALS PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NO.

Appendix 2 bathroom stalls Pics.pdf
Page 1
Page 2
Page 3
Page 4
Page 5
Page 6
Page 7
Page 8
Page 9
Page 10
Page 11
Page 12
Page 13
Page 14

File details come from the government source that posted it. Updated .