AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to incorpoate the follow ing changes:

Revise Section L Paragraphs 1.3, 1.7, 2.3.1, 2.2.2.1, 2.2.2.3(Deleted), 2.3.6 , 2.4.2, 2.4.3 and 52.236-27 Site Visit

1. CONTRACT ID CODE PAGE OF PAGES

J 1 10

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 19-Mar-2009

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA4814-08-R-0019

X 9B. DATED (SEE ITEM 11)

09-Mar-2009

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

18-Mar-2009

CODE

6TH CONTRACTING SQUADRON

2606 BROWN PELICAN AVE.

MACDILL AFB FL 33621-5000

FA4814 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA4814-08-R-0019

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required performance has changed from A. Project Title: (MACC) Multiple Award Construction Contract - Indefinite Delivery/Indefinite Quantity (IDIQ)B. This acquisition is 100 Percent Total Small Business Set-Aside. Government anticipates award of 4 to 6 contracts to small businesses.C. Project performance period is scheduled for a Base Year plus four (4) one-year Option Periods.D. The Guaranteed minimum amount over the life of this contract is $2,000. The guaranteed minimum will be satisfied by attendance of the awardee's to the MACC Orientation Seminar. E. The total aggregate maximum amount expendable under all MACC contracts awarded shall not exceed $150 Million for base and all option years.F. The "seed project" magnitidue is between $500,000 - $1,000,000. The seed project will be awarded to the "Best Value Offeror". All subsequent task orders will be issued no earlier than 1 Oct 2009.G. A Bid Bond in the amount of 20% will be required for the seed project. See Section H, Special Contract Requirements.H. Reference Section L, "Instruction, Conditions, and Notices to Offerors" for proper proposal preparation and Section M - "Evaluation Factors for Award". J. A Pre-proposal conference/site visit is scheduled for 25 Mar 2009. The conference will include visiting the seed project. to A. Project Title:

(MACC) Multiple Award Construction Contract - Indefinite Delivery/Indefinite Quantity (IDIQ)B. This acquisition is 100 Percent Total Small Business Set-Aside. Government anticipates award of 5 to7 contracts to small businesses.C. Project performance period is scheduled for a Base Year plus four (4) one-year Option Periods.D.

The Guaranteed minimum amount over the life of this contract is $2,000. The guaranteed minimum will be satisfied by attendance of the awardee's to the MACC Orientation Seminar. E. The total aggregate maximum amount expendable under all MACC contracts awarded shall not exceed $150 Million for base and all option years.F. The "seed project" magnitidue is between $500,000 - $1,000,000. The seed project will be awarded to the "Best Value Offeror". All subsequent task orders will be issued no earlier than 1 Oct 2009.G. A Bid Bond in the amount of 20% will be required for the seed project. See Section H, Special Contract Requirements.H. Reference Section L, "Instruction, Conditions, and Notices to Offerors" for proper proposal preparation and Section M - "Evaluation Factors for Award". J. A Pre-proposal conference/site visit is scheduled for 25 Mar 2009. The conference will include visiting the seed project..

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified:

GENERAL PROPOSAL PREPARATIONS

SECTION L

1.0 GENERAL PROPOSAL PREPARATION INSTRUCTIONS

1.1 Offerors are required to meet all solicitation requirements, such as terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors or subfactors. Failure to meet a requirement may result in an offer being ineligible for award.

Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale.

1.2 This is an all-electronic solicitation release. Hard copies are not available. The Government will post amendments to the solicitation to Electronic Posting System (EPS). It is the responsibility of each offeror to review the web page for notice of amendments, updates or changes to current information.

Federal Business Opportunities: http://fbo.gov/

1.3 Pre-Proposal Conference: A pre-proposal conference will be held on 25 Mar 2009. All prospective offerors are highly encouraged to attend this conference. In order to make the conference as productive as possible, offerors should submit, no later than one week before the conference, any questions they may have in writing to jeremy.starrett@macdill.af.mil. The submission of written questions will not preclude anyone from posing questions during the conference. Failure of a prospective offeror to submit any questions or attend the conference will be construed to mean that the prospective offeror fully understands all requirements of the solicitation. Prospective offerors are advised that the pre-proposal conference will be held solely for the purpose of explaining the concepts involved in the project and the specifications, terms, and conditions of this solicitation. Answers to questions will be posted to Fed Biz Ops within seven (7) workdays following the conference. All prospective offerors are advised that this solicitation will remain unchanged unless it is specifically amended in writing. If an amendment is issued, normal procedures relating to the acknowledgment and receipt of any such amendment as described in contract clause 52.215-1, Instructions to Offerors-Competitive Acquisition, of this RFP shall apply.

Notice to Offerors: Offerors are encouraged to submit all questions and requests for clarifications in writing no later than ten (10) days prior to the RFP closing date. The decision whether to respond to questions and requests for clarification made less than ten (10) days prior to the RFP closing shall be at the sole discretion of the contracting officer.

1.4 Joint Venture Offerors: If the offeror is a joint venture, the offeror shall provide all required solicitation information for all parties including a copy of the signed joint venture agreement with proposal. The agreement shall include information, which identifies the responsibilities for each entity under this contract. The agreement shall demonstrate the relationship between firms and identify contractual relationships and authorities to bind each entity of the joint venture. If the joint venture is comprised of 8(a) firms, the Small Business Administration (SBA), prior to award, must approve the Joint venture agreement.

1.5 Teaming/Partnering Offerors: If the offer is based on a teaming/partnering relationship, the offeror shall provide all required solicitation information for all parties including a copy of the teaming/partnership agreement. The agreement shall include information, which identifies the responsibilities for each entity under this contract. The agreement shall demonstrate the relationship between firms and identify contractual relationships and authorities to bind each entity of the teaming/partnering relationship.

1.6 Subcontracting Information: For information regarding the Small Business Administration’s (SBA) Mentor-Protégé Program see:

http://www.sba.gov./

For information regarding the Department of Defense (DoD) Funded Mentor Protégé Program see:

http://www.acq.osd.mil/sadbu/mentorprotege/info.

1.7 Incurred Expenses: The Government is not responsible and will not reimburse for any costs incurred or associated with preparation and submission of a proposal in response to this solicitation.

1.8 The offeror is required to submit an offer on the “seed project” by providing a price schedule on AF Form 3052, attachment 22 and a separate detailed price breakdown describing the design effort and construction effort on bid schdule, attachment 24. Failure to do so may disqualify the proposal.

1.9 In compliance with FAR Subpart 4.8, the Government will retain one copy of all unsuccessful proposals and will destroy all extra copies. No destruction certificate will be provided.

1.10 All proposals must be complete, self-sufficient, and respond directly to the requirements of this solicitation. Any commitments made in the proposal shall become a part of the resultant contract. In no case shall words like "we will comply with the requirements of the contract," or equivalent statements, be acceptable to meet the requirements of this RFP. Failure to comply with these instructions may result in the Government summarily rejecting the offeror's proposal.

1.11 The technical proposal (Volume 1) shall be prepared in accordance with these instructions and shall be evaluated in accordance with the evaluation criteria and evaluation standards in Section M, Evaluation Factors for Award. Technical proposals shall include necessary information to enable the evaluators to form a definitive conclusion concerning the offeror's ability to perform the required construction and design-build services. Offerors shall submit 1 original, 3 paper copies, and 1 (virus free) electronic copy of Volume I. Reference paragraph 1.12 for address.

1.12 The past performance proposal (Volume II) and price proposal/contract forms (Volume III) shall be prepared in accordance with these instructions. The price proposal must be based on the offeror's own technical proposal for the Seed project and the Government's specifications as set forth herein. The Government will evaluate the price proposal in accordance with Section M. Offerors shall submit 1 original plus 3 paper copies of Volume II plus 1(virus free) electronic copy. Offerors shall submit 1 original plus 3 paper copies of Volume III plus 1 (virus free) electronic copy.

Volume Submission Requirements Copies

(Paper/Electronic) Page Limit

Volume I Mission Capability 4/1 40 Max (excluding drawings/specifications

Volume II Past Performance (P.P. Vol. is due by 9 Apr 2009)

4/1 30 Max

Volume III Price and Contract Forms 4/1 Unlimited

Submit to address shown below.

6th Contracting Squadron ATTN: Jeremy Starrett 2606 Brown Pelican Ave MacDill AFB, FL 33621-5000

1.13 The contracting officer has determined there is a high probability of adequate price competition in this acquisition. Therefore, only a limited amount of pricing information is required in the initial proposals. Upon examination of the initial proposals (offers), the contracting officer will review this determination. If, in the contracting officer's opinion, there is adequate price competition, no additional price information, except for final proposal revisions, will be elicited and certification under FAR 15.406- 2 will not be required. However, if at any time during this competition the contracting officer determines that adequate price competition no longer exists, offerors may be required to prepare, submit, and certify cost or pricing data in accordance with FAR 15.403-4.

1.14 Submitted materials will be fully responsive to and consistent with the following:

• Requirements of the RFP and SOW contained therein;

• Government standards and regulations pertaining to the SOW; and

• Evaluation factors and subfactors for award in Section M of this RFP.

• No material shall be incorporated by reference or reiteration of the RFP. Any such material will not be considered for evaluation. Materials shall be presented in a manner which allows it to stand-alone without need for evaluators to reference other documents.

• Format of the proposal volumes (and any resulting responses to Evaluation Notices (ENs)) shall be as follows:

All typing (including that on charts, graphs, and tables, etc.) shall be no smaller than 12 pitch.

Two columns of text per page are acceptable.

Elaborate format, color representations, and bindings are not desirable. Three ring binders or soft covers with screw type aluminum binding posts are preferred.

• Technical proposals shall be limited to 40 pages excluding the Executive Summary, the Seed project drawings and specifications. The Government will remove pages in excess of 40 and will not evaluate them.

• Past Performance shall be limited to 30 pages.

• The price proposal is not limited as to the number of pages.

• Page limit includes: All appendices, charts, graphs, diagrams, tables, photographs, drawings, etc.

The covers for each volume, tables of contents, indices, title pages, cross reference indices, and section dividers/tales will not be included in the page count if they are inserted solely to provide ease to the reader in locating parts/sections of the proposal. They will be counted if they contain any other information, i.e., diagrams, extraneous data, etc. Pages marked “This page intentionally left blank” will not be counted.

• A page shall be an 8 ½ x11” sheet of paper (minimum of ½” margins). Foldouts will be counted as the appropriate number of pages based on an 8 ½ x 11” sheet of paper. The Offerors shall number each page in order to eliminate any confusion. In the event an offeror creates an ambiguity, the Government may exercise its own discretion in counting pages. Two pages may be printed on one sheet of paper, but will count as 2 pages.

• Offerors are encouraged to number proposal paragraphs consistent with the instructions and measures of merit contained in Section M.

• Additionally, electronic copies of the required proposal information for each volume shall be submitted on CD ROM using Microsoft Word. Electronic copies for the cost information must be submitted on CD ROM using either Microsoft Word and/or Excel. “Read Only” files are acceptable. Electronic copies of drawings shall be submitted in a format readable by PDF. The contractor shall determine the size of hard copy drawings submitted in support of the Statement of Work. All disks shall be virus checked before submission. Replacement CD ROM will be required to update the final proposal resulting from any discussions. Cross-references should be utilized to preclude unnecessary duplication of data between sections.

2.0 SPECIFIC PROPOSAL PREPARATION INSTRUCTIONS:

2.1 Executive Summary Section: Each offeror shall submit an Executive Summary of no more than 3 pages total which summarizes the key points from the offeror’s Mission Capability, Past Performance, and Price areas. The Executive Summary Section is not included in the Volume I page limitation.

Mission Capability Volume I Factor 1 Past Performance Volume II Factor 2 Price and Contract Forms Volume III Factor 3

2.2 FACTOR 1 MISSION CAPABILITY VOLUME I

2.2.1 SUBFACTOR 1 - Organizational Structure and Staffing

2.2.1.1 Key Project Management Staff: Provide an organizational chart clearly identifying management, design, and engineering/construction partnerships as well as key positions in the organization. Show lines of authority depicting communication and interface between and within the design and construction teams and key personnel from design through construction. Include a legend identifying key positions.

2.2.1.2 Describe the hiring criteria for the key positions depicted on the organizational chart. Criteria shall describe the minimum level of education, any professional licenses, technical certification and/or qualifications, minimum experience and/or background, minimum skill levels, and required training necessary to hold the position described. Specifically define the project manager’s responsibility and authority on a project under stand-alone construction and under design-build scenario. Do not provide resumes.

2.2.1.3 Describe overall management approach with regard to organization, coordination, development, monitoring and control of construction and design-build projects. Describe interface with home office, subcontractor operations, and design and construction teams. Describe interface and partnering with government project managers, contracting officials, inspectors, and users. Describe methods and criteria used to screen and select quality subcontractors and design consultants to ensure an appropriate level of experience and expertise for the job.

2.2.2 SUBFACTOR 2 - Technical Capability/Execution and Completeness of the Seed Project

2.2.2.1 Provide the conceptual design proposal for the seed project as defined in the MACC General Provisions, Attachment 10, and Statement of Work for the Seed Project, REPAIR HANGAR 2 BATHROOMS, Project# NVZR 09-0021, Attachment 21. Include all required drawings, written discussions, supporting engineering and planning documents, and project schedule. Describe procedures, processes and methods for tracing the progress of the project and interface with the Government and contractor team from beginning to end.

2.2.2.2 Describe the design/build process that shall be used to carry the design through design and construction phases. The process described should include, but not be limited to, a discussion of the overall performance time for both the design phase and the construction phase, taking into consideration all required design development and review levels. Describe the composition of the design-build team, their involvement throughout the process (including intended major subcontractors) and include a discussion of their commitment to quality, timeliness, and cost control throughout the process. Proposal will include a bar chart project schedule.

2.2.3 SUBFACTOR 3 - Change and Cost Control Management

2.2.3.1 Describe process for reviewing prime or subcontractor change requests or multiple change requests in the work to provide best solution for proceeding with the work. Describe process for ensuring reasonableness of cost for a change or changes prior to submitting the cost proposal to the Government.

Describe actions taken when change solution or prime/subcontractor proposed costs are unreasonable.

Describe process and content for providing supporting cost documentation to the Government with submission of change proposal(s). Describe offeror’s evaluation process for subcontractor overhead and profit rate assignable to changed work. Describe offeror’s determination of its own overhead and profit assignable to changed work.

2.2.4 SUBFACTOR 4 - Quality Control Program

2.2.4.1 Describe the design quality control process, whether accomplished by a separate consulting firm or other entity, or within the prime offeror’s organization, and the construction quality control process applicable to on-site construction including specific methods proposed which shall ensure only high quality materials and workmanship are installed and accepted.

2.2.4.2 Describe the tools/methods the offeror shall use to identify poor performing subcontractors and/or in-house personnel to include surveillance and follow-up procedures the offeror shall use to ensure poor performance is not repeated.

2.2.4.3 Describe processes, or checklists, the offeror will use to ensure designs are reviewed for architectural compatibility, system capability, operability, maintainability and sustainable features before submissions to the government.

2.3 FACTOR 2 PAST PERFORMANCE VOLUME II

(Past Performance Volume is due by 9 Apr 2009)

2.3.1 Contents of Past Performance Volume: The offeror shall submit a Past and Present Performance Volume containing the following:

• Table of Contents

• Summary Page describing the role of the offeror and each major subcontractor , teaming partner, and /or joint venture partner that the offeror is required to provide Past Performance Information Sheets on in accordance with paragraph 2.3.2. below.

• Past Performance Information Sheets in accordance with Attachment 9, in Section J. Past Performance Information and Past/Performance Questionnaire—See paragraph 2.3.6. below.

• Organization Structure Change History—See paragraph 2.3.5. below.

2.3.2 Past Performance Information Sheets: Submit information on contracts you consider most relevant in demonstrating your ability to perform the proposed effort. Each relevant contract shall have been performed during the past 3 years from the date of issuance of this solicitation. The offeror shall submit Past Performance Information sheets in accordance with the format contained in Attachment 9, Section J, Past Performance Information. The offeror shall provide experience data for itself and for any proposed division, major subcontractor, consultant, or teaming contractor or partner or key personnel whose effort on this contract will significantly influence performance of the proposed construction and/or design-build effort. The offeror shall submit three (3) to five (5) Past Performance Information sheets identifying active or completed contracts, either Government or commercial, for each prime, teaming partner, and/or joint venture partner (within the same division or cost center). Offerors are cautioned that the Government will use data provided by each offeror in this volume and data obtained from other sources in the evaluation of past and present performance.

2.3.3 Relevant Contracts: Relevant past performance information must demonstrate design/build and build experience with multiple projects, such as new construction, renovation, alteration and repair, with associated architectural and engineering work, with multiple disciplines, such as airfield, pavement, renovation, repair, additions/upgrades, along with specific work in heating, ventilation and air conditioning (HVAC), electrical, mechanical and other major trades. Projects should be similar in size, scope, and complexity as those anticipated under this contract, i.e., having a project value between $500,000 and $5,000,000 and include projects with the Federal Government, state and local government agencies, and commercial customers.

Submit information on contracts that you consider relevant in demonstrating your ability to perform the proposed effort. Provide data for three (3) to five (5) relevant contracts held within the last three years for each entity the offeror wants the Government to consider. Performance Information Sheets for each contract is limited to 3 pages. Include rationale supporting your assertion of relevance. Note that the Government will not consider performance on an effort that concluded more than 3 years prior to the issuance date of this solicitation. Offerors are required to explain what aspects of the contracts are deemed relevant to the proposed effort, and to what aspects of the proposed effort they relate. To clearly link the past performance information to the mission capability subfactors, the offeror should identify which contracts are relevant indicators of performance against a mission capability subfactor.

Categorize the relevance information into the specific evaluation subfactor(s) used to evaluate the proposal:

Subfactor 1 - Organizational Structure Subfactor 2 - Technical Capability/Execution and Completeness of the Seed Project Subfactor 3 - Change and Cost Control Management Subfactor 4 - Quality Control

2.3.4 Specific Content: Offerors may include a discussion of efforts accomplished by the offeror to resolve problems encountered on prior contracts as well as past efforts to identify and manage program risk. Merely having problems does not automatically equate to a Little Confidence or No Confidence rating, since the problems encountered may have been on a more complex program, or an offeror may have subsequently demonstrated the ability to overcome the problems encountered. The offeror is required to clearly demonstrate management actions employed in overcoming problems and the effects of those actions, in terms of improvements achieved or problems rectified. This may allow the offeror to be considered a Substantial Confidence or Satisfactory Confidence candidate. For example, submittal of quality performance indicators or other management indicators that clearly support that an offeror has overcome past problems is required.

2.3.5 Organizational Structure Change History: Many companies have acquired, been acquired by, or otherwise merged with other companies, and/or reorganized their divisions, business groups, subsidiary companies, etc. In many cases, these changes have taken place during the time of performance of relevant present or past efforts or between conclusion of recent past efforts and this source selection. As a result, it is sometimes difficult to determine what past performance is relevant to this acquisition. To facilitate this relevancy determination, include in this proposal volume a "roadmap" describing all such changes in the organization of your company. As part of this explanation, show how these changes impact the relevance of any efforts you identify for past performance evaluation/performance confidence assessment. Since the Government intends to consider present and past performance information provided by other sources as well as that provided by the offeror(s), your "roadmap" should be both specifically applicable to the efforts you identify and general enough to apply to efforts on which the Government receives information from other sources.

2.3.6 Past Performance Evaluation Questionnaires: The offeror shall send out Past Performance Evaluation Questionnaires to each of the Points of Contact (POCs) identified in the Past Performance Volume. In turn, the evaluating agencies shall submit the completed questionnaire to Mr. Jeremy Starrett at 6th Contracting Squadron, 2606 Brown Pelican Ave, MacDill AFB FL 33621-5000, Fax (813) 828- 1091, Email: jeremy.starrett@macdill.af.mil. Evaluators shall send questionnaires directly to the Government no later than 7 calendar days after receipt of the questionnaire. No questionnaire submittals will be accepted received directly from the offeror being evaluated. Once the evaluator completes the questionnaires, the information shall be considered sensitive and shall not be released to the offeror. A cover letter for transmitting the questionnaire to each point of contact is provided in Attachment 9. Due date for Past Performance Volume II is 9 Apr 2009 Close of Business 4:30pm Eastern Standard Time

2.3.7 Subcontractor Consent: Past performance information pertaining to a subcontractor cannot be disclosed to the prime offeror without the subcontractor’s consent. Provide a Subcontractor/Teaming Partner Consent Form, Attachment 9, from all subcontractors/teaming partners that will perform major or critical aspects of the requirement, consenting to release of their past performance information to the prime contractor.

2.4 FACTOR 3 PRICE AND CONTRACT FORMS VOLUME III

2.4.1 Price: Offerors have been provided a Seed Project price schedule (Attachment 22) and Seed Project, bid schedule (Attachment 24) on which to submit a price proposal for evaluation. The Government will evaluate the Seed project to determine whether price is realistic for the work described, reflects a clear understanding of the requirement, and is consistent with the various subfactors of the offeror’s mission capability proposal.

2.4.2 Bonds: Offeror shall provide proposal guarantee (bid bond) in the amount of 20% for the seed project as stated in Section H.

2.4.3 Financial Resources: Offerors shall address a fiscal plan for covering phase-in, unexpected and/or emergency situations, and initial performance costs prior to recoupment in the form of progress payments. Offerors shall submit a financial capability letter from their financial institution and a letter from the bonding company confirming bonding capability. Offerors shall submit income statement and balance sheet for the previous 5 fiscal years. The letter from the bonding company must indicate the offeror’s bonding capacity. This letter will be used in the Contracting Officer’s determination of responsibility.

2.4.4 Contract Forms: Include the following data in this volume in the format indicated. Designate on the volume cover, which proposal package contains the original, executed copy of the proposal (RFP).

• Section 1: Proposal forwarding letter, if any.

• Section 2: A complete copy of this RFP (through Section M, less attachments) with the original signature of an official authorized to contractually bind the offeror in block 20B of the SF 1442.

The offeror must complete the following sections within the RFP:

• Part I, Section A (SF 1442, Blocks 19-20C).

• Part I, Section G – Persons Authorized to Negotiate or Conduct Discussions

• Part IV, Section K, Representations, Certifications, and other Statements of Offeror. In addition to the on line representation and certifications the provisions at 52.204-8, 52.222-22, 52.219-19 & 252.247-7022, and Competitiveness Demonstration Program certification will need to be completed and submitted. (See directions for Online Representations and Certifications Application (ORCA) in section K)

• Section 3: Any exceptions to or deviations from, any of the clauses or special contract requirements along with justification therefore.

• Section 4: Any information, excluding price, which does not properly belong within the other proposal volumes.

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for 25 MAR 2009 at 9:00am

Participants will meet at the parking lot behind the Base Theater at, 2420 Florida Keys Avenue. Then will proceed as a group to Hanger 2, Bldg. 7703, Hanger Loop Dr., MacDill AFB, FL 33621

Site visits may be arranged during normal duty hours by contacting:

Name: Jeremy Starrett Email: jeremy.starrett@macdill.af.mil Telephone: 813-828-2837

(c) The following information is required to access the base for the site visit:

Name of attendee(s) Your company’s name Date of Birth Social Security # Drivers License number and issuing State

This information must reach the Contracting Officer no later than 5 working days prior to the site visit.

(End of provision)

(End of Summary of Changes)