AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The Purpose of this amendment is to incorporate the follow ing changes:
1. Replace Attachment 24 Seed Project Bid Schedule w ith the attached updated Attachment 24 Bid Schedule.
2. Add Section L Paragraph 2.2.2.3 and revise Section L Paragraph 2.2.2.1
3. Clarify the phrase, “Conceptual Design" as it relates to the Seed Project.
4. Clarify the use of Construction Specification Institute (CSI) divisions.
5. Add Section L Paragraph 1.1.1 Submission of Proposal
6. Revise Seed Project Appendix 1, Asbestos Survey Report
7. Revise Seed Project Appendix 2, Hangar 2 Bathroom Pictures
8. Extend the due date for the Past Performance Volume II from 9 Apr 09 to 16 Apr 09.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 07-Apr-2009
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA4814-08-R-0019
X 9B. DATED (SEE ITEM 11)
09-Mar-2009
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
07-Apr-2009
CODE
6TH CONTRACTING SQUADRON
2606 BROWN PELICAN AVE.
MACDILL AFB FL 33621-5000
FA4814 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA4814-08-R-0019
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The following changes are hereby incorporated:
1. Replace Attachment 24 Seed Project Bid Schedule with the attached, updated Attachment 24 Seed Project Bid Schedule, to correct typos.
2. Add Paragraph 2.2.2.3 in Section L. This paragraph was deleted with Amendment 0002, however it has been reinserted to give the Contracting Officer the ability to evaluate Mission Capability Subfactor 2, Completeness of the Seed Project. The contractor's ability to complete the documents required in this paragraph will be evaluated per Section M paragraph 5.2.7. Revise Section L Paragraph
2.2.2.1 to include price schedule and price breakdown by Construction Specification Institute (CSI) divisions.
3. Change the phrase, “Conceptual Design or Concept Design” to, “Intermediate Design” in Section L paragraph 2.2.2.1, Section M paragraph 5.2.1 and Attachment 21, Seed Project, Statement of Work (SOW) sections: 1.0 A- page 2, 1.0 E 1-page 2, Section 2.0 J 2, and J3- Page 6.
4. Revise MACC general provisions Paragraph 9.3- page 01300-3 and Seed Project Statement of Work Section 1.0 B- page 2, to read (CSI) forty-eight divisions.
5. Section L Paragraph 1.1.1 Submission of Proposal is hereby incorporated.
6. Revised Seed Project Appendix 1, Asbestos Survey Report is hereby incorporated.
7. Revised Seed Project Appendix 2, Hangar 2 bathroom pictures is hereby incorporated.
8. Extend the due date for Past Performance Volume II from 9 Apr 09 to 16 Apr 09 at 4:30pm Eastern Standard Time.
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
The following have been modified:
GENERAL PROPOSAL PREPARATIONS
SECTION L
1.1.1 SUBMISSION OF PROPOSAL: Faxed proposals will NOT be accepted. Proposals will be accepted by mail or hand carried delivery to: 6th Contracting Squadron/LGCM, Attention Jeremy Starrett, 2606 Brown Pelican Ave., MacDill AFB, FL 33621-5000. The sealed envelope or package used to submit your proposal must show the time and date specified for receipt, Solicitation Number and name address of the offorer. Offerors are cautioned that MacDill AFB, FL has visitor control procedures requiring individuals not affiliated with the installation to obtain a visitor pass prior to entrance. SOME DELAY SHOULD BE ANTICIPATED WHEN HAND CARRYING PROPOSALS. Offerors should
FA4814-08-R-0019
allow sufficient time to obtain a visitor pass and to deliver the proposal PRIOR to the time specified for receipt. To obtain a visitor pass, the offeror shall contact the office in block 7 of Standard Form 1442, PRIOR to the date and time specified for receipt.
2.2.2 SUBFACTOR 2 - Technical Capability/Execution and Completeness of the Seed Project
2.2.2.1 Provide the intermediate design proposal for the seed project as defined in the MACC General Provisions, Attachment 10, and Statement of Work for the Seed Project, REPAIR HANGAR 2 BATHROOMS, Project# NVZR 09-0021, Attachment 21. Include all required drawings, written discussions, supporting engineering and planning documents, project schedule, price schedule and price breakdown by Construction Specification Institute (CSI) divisions. Describe procedures, processes and methods for tracing the progress of the project and interface with the Government and contractor team from beginning to end.
2.2.2.3 Completeness of Seed Project NVZR 09-0021: Provide a price schedule on AF Form 3052, attachment 22 and provide a separate detailed price breakdown describing the design effort and construction effort by completing bid schedule, attachment 24. For construction on the AF Form 3052, show material, labor and equipment quantities subtotaled by the 48 division specification format as developed by the Construction Specification Institute (CSI).
The following have been modified:
EVALUATION FACTORS FOR AWARD
SECTION M
5.2.1 Provided intermediate design proposal for the seed project as defined in the MACC General Provisions, Attachment 10 and Statement of Work for the Seed Project, REPAIR HANGAR 2 BATHROOMS, Project# NVZR 09-0021, Attachment 21.
(End of Summary of Changes)