SOW_Attch_3_-_AF_Form_66_Submittal_Registry.xls

Air Force Form XLS spreadsheet 129 KB Posted

Attached to
Repair by Replace HVAC, Satellite Comm Station, B700
Solicitation number
FA2550-17-R-1021
Issued by

About this file

SOW Attch 3 - AF Form 66 Submittal Registry

View the file

Other versions and copies of AF Form 66

File Revision Posted Attached to
Attachment 2 AF Form 66.pdf Revision not stated REPAIR AC PAVING
AF form 66 Blank.pdf Revision not stated Demo Mini mute sites
Attach 9_AF Form 66 Submittal Register.pdf Revision not stated PKAA Dorm Water Damage Repair (Construction)
AF Form 66-EEPZ260842 Renovate Convert Comm to SAPR B730.xlsx Revision not stated B730 Renovate Convert Comm to SAPR
AF Form 66_EEPZ254664-B972 UOQ.xlsx Revision not stated B972 Renovate UOQ Community Commons
AF Form 66 B268.xlsx Revision not stated B268 Replace STUS Backup Generator
AF Form 66 B730.xlsx Revision not stated B730 - Renovate RM106 for Emergency Operations Center
AF Form 66.xlsx Revision not stated B836 Replace Electrical in Airfield Lighting Vault
AF Form 66 OSI Flooring.xlsx Revision not stated OSI B926 Flooring
EEPZ254660 Repair Control Tower HVAC B1806 - AF Form 66.xlsx Revision not stated B1806 Repair Control Tower HVAC
AF Form 66 Template.xlsx Revision not stated Replace AAS BAK-15 Controls, B2001, B2003
AF Form 66 EEPZ216808 Replace Security Forces Elevator B926.xlsx Revision not stated B926 Replace Security Forces Elevator
WT 17518487 AF Form 66.xlsx Revision not stated Repair Structural Fire Trainer B17903, 17904
AF Form 66.xlsx Revision not stated RENOVATE/CONVERT 50th 49th SQ OPS, B230
AF Form 66.xlsx Revision not stated T-6 Flightline Shacks
AF Form 66 Template.xlsx Revision not stated Replace Fire Alarms, Multi Facility
EEPZ248229 -- AF Form 66.xlsx Revision not stated Repair Kiddie Pool
Atch 2 AF Form 66.pdf Revision not stated Removal of Underground Storage Tank at Launch Facility E-10 (Laramie County, WY)
Attachment 4 - AF Form 66 Submittal Register.pdf Revision not stated Bldg 65 - Renovation of Telephone Office Area, FE Warren AFB, WY AMENDMENT 03
Attachment 7 - AF Form 66.xlsx Revision not stated Replace Chapel Windows B912
Show all 20

Who attaches AF Form 66

State Files
Iowa 1
Massachusetts 1

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Submittal 1

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBERPROJECT NAMESOLICITATION /CONTRACT NUMBER
GLEN 19-1001Repair by Replacement HVAC, Satellite Comm Station, B700FA2550-17-R-1021
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
LINE NUMBERNote: 3 copies required per submittal. Government will retain all submittals.CERTIFICATE OF COMPLIANCESHOP DRAWINGSCOLOR SELECTIONMANUFATURUR'S RECOMMENDATIONCATALOG DATAO&M RECOMMENDATIONSCALCULATIONSWARRANTYDRAWINGSREPORTTEST RESULTSREQUIRED SUBMISSION DATEDATE TO CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSAPPROVEDDISAPPROVEDCONTRACTOR SUBMITTALFINAL APPROVALREMARKS
GENERAL
1Specification Section 01 00 00 para. 1.5.10.1.b: AF Form 3064, Contract Progress ScheduleXNTP+10 Days
2Specification Section 01 00 00 para. 1.5.10.1.b: AF Form 3065, Contract Progress ReportXPer Contract
3Specification Section 01 00 04 para. 1.2.1: AF Form 103, Work Clearance RequestXPrior to Project Start
4Specification Section 01 35 29 para. 1.2.1.1.a and b: Accident Prevention Plan and Activity Hazard AnalysisXPrior to Project Start
5Specification Section 01 57 20.00 10, Appendix A, Contractor Hazardous Material Approval FormXPrior to Project Start
6Specification Section 01 57 20.00 10, Appendix B: Green Products Determination FormXPrior to Project Start
7Specification Section 01 57 20.00 10, Appendix C:Recovered Materials Estimate and Certification FormXPrior to Project Start
CONCRETE
8Specification Section 03 30 00 para. 2.3: ConcreteXXNTP+15 Days
MECHANICAL
9Specification Section 23 07 00 para. 2.2: Pipe InsulationXNTP+15 Days
10Specificaiton Section 23 09 23: ControlsXNTP+15 Days
11Specificaiton Section 23 23 00 para. 2.3: Refrigerant pipingXNTP+15 Days
12Specification Section 23 64 10 para. 2.5: Chillers and Condensing UnitsXNTP+15 Days
ELECTRICAL
13Specification Section 26 05 19.00 10 para. 2.1: Wiring and conduitXNTP+15 Days
14Specification Section 26 05 73.00 40: Overcurrent protective devicesXNTP+15 Days
CLOSEOUT
15Specification Section 01 78 00 para 2: As-Built DrawingsXPrior to Closeout
16Specification Section 01 78 00 para 2.4: O&M ManualsXPrior to Closeout

&F