RFIs_19_Jul_17.pdf

PDF 29 KB Posted

Attached to
Repair by Replace HVAC, Satellite Comm Station, B700 Federal contract opportunity
Solicitation number
FA2550-17-R-1021
Issued by
Department of the Air Force Space Command

About this file

RFIs and Responses

View the file

Other files for this federal contract opportunity

Other files attached to Repair by Replace HVAC, Satellite Comm Station, B700, newest first.
File Type Posted
Wage_Determination.pdf PDF
GLEN191001_SOW_-_20_Jul_17.pdf PDF
23_64_10_-_Water_Chillers,_Vapor_Compression_Type.pdf PDF
RFIs_&_Responses_18_Jul_17.pdf PDF
Generator_Fuel_Tank_rules.docx DOCX document
Wage_Determination.pdf PDF
RFIs_and_Responses_GLEN_19-1001_17_Jul_17.pdf PDF
GLEN_19-1001_Site_Visit_Attendance_Sheet_28_Jun_17.pdf PDF
GLEN_19-1001_Site_Visit_Memo_28_Jun_17.pdf PDF
FA2550-17-R-1021_RFP_Repair_HVAC_B700.pdf PDF
SOW_Attch_3_-_AF_Form_66_Submittal_Registry.xls XLS spreadsheet
SOW_Attch_2_-_Specifications.pdf PDF
SOW_Attch_1_-_Project_Drawing_Package.pdf PDF
RFP_Attch_2_-_Wage_Determination.pdf PDF
RFP_Attch_1_-_Statement_of_Work_dated_8_May_17.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Repair by Replace HVAC, B700 GLEN 19-1001 Requests for Information (RFIs)

RFP FA2550-17-R-1021

19 July 2017

1. Should the chillers and the Pumps be connected to Siemens controls?

Government Response: Currently the Building 700 chillers and pumps are connected to HSQ not Siemens. See the SOW Para. 5.2.3.h.

For most units on base we monitor/control the following points:

SAF Status RAF Status OA Damper Position SA Temperature MA Temperature SA pressure FREEZESTAT alarm If it is HEAT Mode or COOL Mode Monitor all ST's associated with the unit

We control/set the following points:

ENABLE/DISABLE unit SA Temperature Set point MA Temperature Set point

For the chiller I would recommend using the points we presently have on the systems that are in use at this time.

2. Should this equipment become part of Siemens controls?

Government Response: The equipment will be part of HSQ controls.

3. Are the RTUs needing new controls to connected to Siemens controls?

Government Response: The RTUs need new controls to connect to HSQ controls. The contractor has to address an issue of the EMP protection for the control wiring on the roof.