Construction AF Form 66.xlsx

XLSX spreadsheet 24 KB Posted

Attached to
Sustain Overhead Electrical DMAFB
Solicitation number
FA487724R0021
Issued by

About this file

This document appears to be an AF Form 66 - Schedule of Material Submittals for a construction project related to the Sustainment of Over-Head Electrical at Davis-Monthan AFB, Phase 1. The key details include:

The project solicitation number is FA487724R0021, and the contract requires the contractor to follow the design, plans, specifications, and repair/replace overhead power lines and poles along several roads on the base. The contractor shall replace utility poles, cross arms, and air break switches as needed. The project includes a site visit scheduled for September 4, 2024, and proposals are due by August 14, 2024. The contracting agency is the Department of the Air Force's Air Combat Command. The AF Form 66 lists the various submittal requirements for the project, including items such as the traffic control plan, disposal manifests, progress photographs, record as-builts, DD Form 1354, warranties, and design submittals.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AF Form 66

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBER :PROJECT TITLE:SOLICITATION/CONTRACT NO.:
FBNV 240027Sustainment for Over-Head Electrical - PH-1
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALNO. OF COPIES REQUIREDREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVAL
CERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSAS-BUILTSOTHERAwarded:
Pre-Con:
NTP:
Const. Start:
Const. End:
Finalled:
DATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
APPROVEDDISAPPROVED
1Traffic Control Plan Sec 01010, Para 2.2.b.1
2Permits Sec 01010, Para 2.2.6.c.1
3Disposal Manifests Sec 01010, Para 2.7 e.1
4Chemical Inv./MSDS Sec 01010, Para 2.7g1
5Radioactive Use Sec 01010, Para 2.71
6Progress Photographs Sec 01010, Para 2.6 important note: (Do not post any Photographs of the work in any multimedia system or social networks).1
7Record As-Builts Sec 01010, Para 2.5j1
8Quality control Record Sec 01010 2.51
9DD 1354 , Transfer Sec 010101
10DD Form 1354, Checklist Sec 010101
11Warranty Items, Sec 010101
12AF Form 66 Schedule of Material Submittals with edit notes Sec 01011, Para 4.2a1
13AF Form 3064, Sec 01011, Para 2.41
1412.12. Design Submittal Package Requirements. 65% Design Submittal, Sec 010112
1512.12. Design Submittal Package Requirements. 95% Design Submittal, Sec 010112
1612.12. Design Submittal Package Requirements. 100% Design Submittal (Design Suitable for constrution), Sec 010112
17Contractor to add Submittals as required or requested.