Construction Cost Estimate (Blank).pdf

PDF 121 KB Posted

Attached to
Sustain Overhead Electrical DMAFB
Solicitation number
FA487724R0021
Issued by

About this file

This document is a Construction Cost Estimate template for a federal contract opportunity titled "Sustain Overhead Electrical DMAFB". The contract requires the replacement of overhead power lines and poles, including cross arms and air break switches, along several roads at Davis-Monthan Air Force Base, Arizona. A site visit is scheduled for September 4, 2024, and proposals are due by August 14, 2024. The contract is being issued by the Department of the Air Force Air Combat Command. The cost estimate template includes various construction divisions and allows for the contractor to input overhead, profit, bonds, and taxes. No further details about the specific products, services, or performance requirements are provided in this document.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Construction Cost Estimate

COMPANY

PROJECT

FBNV240027 Sustainment for Over-Head Electrical - PH-1

LOCATION PROJECT NO.

DAVIS MONTHAN AIR FORCE BASE, ARIZONA

DIVISION 01 GENERAL REQUIREMENTS

DIVISION 02 EXISTING CONDITIONS

DIVISION 03 CONCRETE WORK

DIVISION 04 MASONRY -

DIVISION 05 METALS -

DIVISION 06 WOOD, PLASTICS AND COMPOSITES - GC Overhead

DIVISION 07 THERMAL AND MOISTURE PROTECTION - GC Profit

DIVISION 08 OPENINGS - Sub Overhead

DIVISION 09 FINISHES - Sub Profit

DIVISION 10 SPECIALTIES - AZ Tax

DIVISION 11 EQUIPMENT - Risk/Bonding

DIVISION 12 FURNISHINGS -

DIVISION 13 SPECIAL CONSTRUCTION -

DIVISION 14 CONVEYING EQUIPMENT -

DIVISION 21 FIRE SUPRESSION -

DIVISION 22 PLUMBING -

DIVISION 23 HEATING, VENTILATING AND A/C -

DIVISION 25 INTEGRATED AUTOMATION -

DIVISION 26 ELECTRICAL

DIVISION 27 COMMUNICATIONS

DIVISION 28 ELECTRONIC SAFETY AND SECURITY -

DIVISION 31 EARTHWORK -

DIVISION 32 EXTERIOR IMPROVEMENTS -

DIVISION 33 UTILITIES -

DIVISION 34 TRANSPORTATION -

DIVISION 35 WATERWAYS AND MARINE CONSTRUCTION -

DIVISION 40 PROCESS INTEGRATION -

DIVISION 41 MATERIAL PROCESING AND HANDLING EQUIPMENT -

DIVISION 42 PROCESS HEATING, COOLING AND DRYING EQUIPMENT -

DIVISION 43

PROCESS GAS & LIQUID HANDLING, PURIFICATION AND

STORAGE EQUIPMENT -

DIVISION 44 POLLUTION CONTROL EQUIPMENT -

DIVISION 45 INDUSTRY-SPECIFIC MANUFACTURING EQUIPMENT -

DIVISION 48 ELECTRICAL POWER GENERATION -

SUBTOTAL

SUBTOTAL

FBNV 240027

Division Total % by

DivisionDESCRIPTIONDIVISION

BUILDER'S RISK / PERFORMANCE BONDS (Fill in%)

CONTRACT TOTAL

FILL IN AS REQUIRED

(this will link to the entire document)

This spreadsheet contains many formulas... please save a copy prior to editting in case you make a mistake. All shaded areas are either linked or contain formulas

CONSTRUCTION COST ESTIMATE

Date:

HARD COST TOTAL

PRIME GENERAL CONTRACT OFFICE OVERHEAD (Fill in%)

PRIME GENERAL CONTRACTOR'S PROFIT(Fill in%)

Summary

File details come from the government source that posted it. Updated .