About this opportunity
This solicitation is for a fixed-price construction contract to sustain the overhead electrical system at Davis-Monthan Air Force Base (DMAFB) in Arizona. The Department of the Air Force's Air Combat Command is seeking a contractor to follow the design, plans, and specifications to replace overhead power lines, utility poles, cross-arms, and air break switches along specific roads on the base. Key requirements include replacing 14 utility poles with 45-ft Western Red Cedar poles, 7 switch poles with 55-ft Western Red Cedar poles, and installing new electrical components.
The contractor must comply with the base's Design Compatibility Guidelines, environmental regulations, and security requirements. Proposals are due by August 14, 2024, and a site visit is scheduled for September 4, 2024. The total performance period is 287 calendar days. This contract opportunity is not set aside for any specific business size or type. The value of the contract is not specified, but the work involves replacing overhead electrical infrastructure along multiple roads on the base.
Notice text
2 versions
Update #2 · Latest ·
This RFP requires the contractor to follow the design, plans, specifications, and repair by replacement overhead (OH) power lines and poles along Wilmot, Yuma, Herky and Zapper on Davis-Monthan AFB, AZ. The contractor shall replace Utility Poles to include cross arms. There will be (5) Air break switches replaced on the poles. They will evaluate if existing poles need to be repaired or replaced and will replace all components to include all electrical accessories.
Site Visit Scheduled for 4 September 2024 at 9:15 AM Arizona Local Time. Submit EAL by: 14 August 2024 at 1:00 pm Arizona Local Time
Please see attachments for additional information and the Statement of Work for this project.
10 September 2024 - RFIs have been submitted and attached. Please see amended SF30 as well as additional attachments
Update #1 ·
This RFP requires the contractor to follow the design, plans, specifications, and repair by replacement overhead (OH) power lines and poles along Wilmot, Yuma, Herky and Zapper on Davis-Monthan AFB, AZ. The contractor shall replace Utility Poles to include cross arms. There will be (5) Air break switches replaced on the poles. They will evaluate if existing poles need to be repaired or replaced and will replace all components to include all electrical accessories.
Site Visit Scheduled for 4 September 2024 at 9:15 AM Arizona Local Time. Submit EAL by: 14 August 2024 at 1:00 pm Arizona Local Time
Please see attachments for additional information and the Statement of Work for this project.
Files
Show all 13
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| Sustain Overhead Electrical DMAFB | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| 56 CS FOC to Flightline and Wx Equipment, Luke AFB | Air Education and Training Command | Woman-Owned Small Business | |
| Repair Electrical Systems | AFLCMC Wright Patterson AFB | No set-aside | |
| WWYK260004 - repair structural integrity, B1134, post 34 & north wall | Air Force Sustainment Center | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity