CN-370000-HW687-DC017B.pdf
PDF 1 MB Posted
- Contract number
- HW687
- Issued by
- Florida
About this file
This document is a Task Assignment (TA) issued by the State of Florida Department of Environmental Protection (FDEP) to Terracon Consultants, Inc. for environmental remediation services at the Imperial Cleaners (former) site located at 10055 North Dale Mabry Highway, Tampa, Florida (Hillsborough County). The TA is issued under Contract Number HW687 and represents an indefinite delivery vehicle contract executed January 5, 2022. Dean Cox serves as the Department's Project Manager, while Donna Cline represents Terracon as the contractor's Project Manager. The underlying contract governs the terms and conditions of the work, with the TA incorporating a Scope of Work attachment.
The TA authorizes costs for the completion of a Site Rehabilitation Completion Report (SRCR) for project ERIC_4789, with a completion date of September 30, 2023. The deliverable consists of a comprehensive SRCR with site assessment and remedial background, data review verifying all media meet Florida Administrative Code Rule 62-780.680(1) Risk Management Option I closure requirements, and associated data tables and figures. The total fixed unit rate cost is $2,063.66, representing a negotiated reduction of $654.87 or 24 percent below the original proposal. The invoice is due upon FDEP approval of the Site Rehabilitation Completion Report. The SRCR approval will trigger completion of a Site Rehabilitation Closure Order, subsequent well abandonment, and subsequent site closure entries in the ERIC/DEP databases.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection
(Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection CONTRACTOR Department Name:
Title:
Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW687
DC017B Completion September 30, 2023
This TA authorizes costs for completion of a Site Rehabilitation Completion Report (SRCR). The total cost of this TA is $2,063.66. This entire cost is fixed unit rate.
Dean Cox 850-245-8969 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Terracon Consultants, Inc.
Terracon Consultants, Inc.
Donna Cline 813-321-0340
ERIC_4789
10055 North Dale Mabry Highway, Tampa (Hillsborough County)
Imperial Cleaners (former)
✔ $ 2,063.66
$ 2,063.66
Scope of Work
Kelly Crain
Kelly Crain Digitally signed by Kelly Crain Date: 2023.05.02 09:50:33 -04'00'
N/A
Cline, Donna L Typewriter Donna Cline
Sr. Remediation Engineer
05/02/23
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Site Rehabilitation Completion Report, with site assessment & remedial background, data review verifying all media meet 62-780.680(1) RMO I closure, and associated data tables & figures (Subtask 1 Project Management and Subtask 2 SRCR).
05/31/2023
DEP approval of Site Rehabilitation Completion Report, with site assessment & remedial background, data review verifying all media meet 62-780.680(1) RMO I closure, & associated data tables & figs (Subtask 1 Proj Mgmt and Subtask 2 SRCR).
$ 2,063.66
$ 2,063.66
HW687
DC
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Interim Secretary
Memorandum
TO: HW687 Contract File FROM: Dean Cox, Contract Manager SUBJECT: DC017B Imperial Cleaners (former) SRCR (ERIC_4789)
DATE: 4/27/23
This TA authorizes costs for completion of a Site Rehabilitation Completion Report (SRCR). The total cost of this TA is $2,063.66. This entire cost is fixed unit rate. This TA was negotiated - the total cost is $654.87 or 24% less than originally proposed.
The purpose of this TA is to document site conditions meet RMO I closure requirements. SRCR approval will trigger completion of an SRCO, subsequent well abandonment, and subsequent site closure (entries in ERIC/DEP databases). Site access was confirmed.
FDEP COST ESTIMATE
Contractor: Terracon
Date: 4/26/2023 Task #: HW687 SubTask 1 SRCR SubTask 6
Site: Imperial Cleaners (Former) ERIC_4789 SubTask 2 SubTask 7 Activity/Phase: SRCR SubTask 3 SubTask 8
Project Manager: Dean Cox SubTask 4 SubTask 9 SubTask 5 SubTask 10
Totals 1 2 3 4 5 Labor Rate Category
$64.50 Project Manager Donna Cline 1.23 1.23 $0.00 Administrative 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 Brownfield Consultant 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0
$22.25 CADD Specialist 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 Data Analyst & Visualization Specialist 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 Environmental Technician 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 Field Geologist 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 Field Scientist 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 GIS Technician 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 Principal Consultant 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 Project Geologist 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 Project Industrial Hygienist 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 Project Scientist 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0
$64.50 Senior Engineer Donna Cline 2.00 2.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 Senior Geologist 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 Senior GIS Analyst Chelse Fugate 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 Senior Industrial Hygienist 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 Senior Scientist 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0
$48.08 Senior Geologist Shawn Ouellette 10.00 10.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 Staff Scientist 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 $0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0
Total Hours 13.23 1.23 12.00 0.00 0.00 0.00 0 0 0 0 0
Direct Labor $689.07 $79.27 $609.80 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 116.00% $799.32 $91.95 $707.37 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 56.26% $387.67 $44.60 $343.07 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $1,876.06 $215.82 $1,660.24 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF TERRACON Page 1
FDEP COST ESTIMATEContractor: Terracon Date: 4/26/2023
Task #: HW687 SubTask 1 SRCR SubTask 6 Site: Imperial Cleaners (Former) ERIC_4789 SubTask 2 SubTask 7
Activity/Phase: SRCR SubTask 3 SubTask 8 Project Manager: Dean Cox SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 Travel
Vehicle Rental $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Initiation Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $1,876.06 $215.82 $1,660.24 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $187.60 $21.58 $166.02 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $2,063.66 $237.40 $1,826.26 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF TERRACON Page 2
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Imperial Cleaners (Former) ERIC_4789
SUBTASK 2: SRCR
PROPOSAL NO. PH4237157
DATE: 4/26/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Field Task Planning/Initial Site Visit/Month 1 O&M
Senior Geologist SO 6.00 Senior Geologist SO 2.00 Senior Geologist SO Gather TetraTech exhibits 2.00 Senior Engineer DC Prepare Conclusions and Recommendations for SRCR 2.00
CADD CF Prepare base maps 0.00 CADD CF Prepare soil, groundwater assessment exhibits 0.00
Personnel: SO DC CF Hours: 10.00 2.00 0.00 TOTAL LABOR 12.00
Gather summary tables Prepare SRCR Report
5463 West Waters Avenue, Suite 830
Tampa, FL 33584
P (813) 221-0050
F (813) 221-0051
Terracon.com
April 25, 2023
Florida Department of Environmental Protection
Waste Cleanup Program
Waste Management Division
2600 Blair Stone Road
Tallahassee, Florida 32399-2400
Attn: Mr. Dean Cox, Environmental Consultant
E: Dean.Cox@FloridaDep.gov
W: 850-245-8969
M: 727-686-6502
Re: Proposal for Preparation of a Site Rehabilitation Completion Order (SRCO)
Imperial Cleaners (Former)
10055 North Dale Mabry Highway
Tampa, Florida 33618
ERIC_4789
Task Assignment HW687 DC014B
Terracon Proposal No PH4237157
Dear Mr. Cox:
Terracon Consultants, Inc. (Terracon) appreciates the opportunity to submit this proposal to the
Florida Department of Environmental Program (FDEP) Waste Cleanup Program to prepare a Site
Rehabilitation Completion Report (SRCR).
Scope of Services
◼ Prepare an SRCR Report that documents the soil, groundwater, and vapor, assessment activities and confirms that the site meets the No Further Action requirements, without institutional or engineering controls, as defined as a Risk Management Option 1 per Rule 62-780.680 (1), Florida Administrative Code;
◼ Recommend FDEP issue a SRCR for the site;
◼ Submit a SRCR Report, to include site assessment summary tables, exhibits, conclusions, and recommendations.
◼ The SRCR will reference Tetra Tech’s summary tables and drawings. Terracon has no intention of recreating the tables or drawings.
See attached LOE for details
Schedule The SRCR will be submitted within 20 business days of receipt of analytical results.
Compensation See attached CEF for details.
Proposal for SRCR
Imperial Cleaners (Former), ERIC_4789 ■ Tampa, FL
April 25, 2023 ■ Terracon Proposal No. PH4237157
CLOSING REMARKS
Terracon services will be conducted in accordance with the terms and conditions, contained within DEP
Waste Cleanup Program (WCP) Contract No. HW687, executed January 5, 2022. It is understood that a Task Assignment will be issued to authorize us to perform this work.
We appreciate the opportunity to provide this proposal and look forward to working with you on this project. If you should have any questions or comments, please contact either of the undersigned at
813-221-0050.
Sincerely, Terracon Consultants, Inc.
Donna Cline, P.E. Shawn Ouellette, P.G.
Senior Remediation Engineer Senior Geologist
Attachments: Cost Spreadsheet
Level of Effort
Cline, Donna L Stamp
| DC017B.pdf |
| DC017B memo.pdf |
| HW687 Terracon Imperial Cleaners ERIC_4789 SRCR signed.pdf |
| CEF LOE Imperial SRCR Rev 1.0 |
File details come from the government source that posted it. Updated .