About this file

This Task Assignment (TA) represents an indefinite delivery vehicle issued by the State of Florida Department of Environmental Protection (FDEP) under Contract Number HW687. The TA authorizes work for Terracon Consultants, Inc., a contractor specializing in environmental consulting services. The project is designated as TA Number DC003B and is located at Vick's Cleaners facility (ERIC_4650) in Pensacola, Florida at 8645 Pensacola Boulevard. Dean Cox serves as the FDEP Project Manager, and Donna Cline is the contractor's Project Manager responsible for executing the authorized scope of work.

The TA authorizes costs for site groundwater monitoring activities, including replacement monitoring well installation and groundwater sampling at a fixed unit rate of $9,185.53, with a total TA value of $9,185.53. Deliverables include a Groundwater Monitoring Report with well installation log, site activities review, updated tables and figures, field notes and forms, lab analytical report, and next action recommendations, with a completion deadline of January 31, 2024. Invoice payment is contingent upon FDEP approval of the final Groundwater Monitoring Report. The scope encompasses three subtasks: Project Management (ST1), Well Installation and Groundwater Sampling (ST2), and Supplemental Assessment Report preparation (ST3). The task assignment was executed on November 17, 2023, with an April 30, 2024 completion date, representing a negotiated cost reduction of $2,091.84 (19 percent) from the original proposal amount.

View the file

Other files

File Type Posted
CN-370000-HW687-BF01ACO1.pdf PDF
CN-370000-HW687-BF03ACO1.pdf PDF
CN-370000-HW687-BIL01A.pdf PDF
CN-370000-HW687-BIL2ACO1.pdf PDF
CN-370000-HW687-BIL2BCO1.pdf PDF
CN-370000-HW687-BIL2CCO1.pdf PDF
CN-370000-HW687-BIL3ACO2.pdf PDF
CN-370000-HW687-BIO1ACO1.pdf PDF
CN-370000-HW687-DC001A.pdf PDF
CN-370000-HW687-DC003A.pdf PDF
CN-370000-HW687-DC003D.pdf PDF
CN-370000-HW687-DC005D.pdf PDF
CN-370000-HW687-DC006A.pdf PDF
CN-370000-HW687-DC006B.pdf PDF
CN-370000-HW687-DC008C.pdf PDF
CN-370000-HW687-DC010A.pdf PDF
CN-370000-HW687-DC010B.pdf PDF
CN-370000-HW687-DC011F.pdf PDF
CN-370000-HW687-DC011H.pdf PDF
CN-370000-HW687-DC012D.pdf PDF
CN-370000-HW687-DC013C.pdf PDF
CN-370000-HW687-DC015A.pdf PDF
CN-370000-HW687-DC015C.pdf PDF
CN-370000-HW687-DC019A.pdf PDF
CN-370000-HW687-DC01ACO2.pdf PDF
CN-370000-HW687-DC020A.pdf PDF
CN-370000-HW687-DC020B.pdf PDF
CN-370000-HW687-DC020C.pdf PDF
CN-370000-HW687-DC020D.pdf PDF
CN-370000-HW687-DC023C.pdf PDF
CN-370000-HW687-DC025B.pdf PDF
CN-370000-HW687-DC025C.pdf PDF
CN-370000-HW687-DC025F.pdf PDF
CN-370000-HW687-DC027B.pdf PDF
CN-370000-HW687-DC027C.pdf PDF
CN-370000-HW687-DC02BCO1.pdf PDF
CN-370000-HW687-DC02CCO2.pdf PDF
CN-370000-HW687-DC02DCO1.pdf PDF
CN-370000-HW687-DC02HCO1.pdf PDF
CN-370000-HW687-DC032A.pdf PDF
CN-370000-HW687-DC034A.pdf PDF
CN-370000-HW687-DC034C.pdf PDF
CN-370000-HW687-DC034D.pdf PDF
CN-370000-HW687-DC035F.pdf PDF
CN-370000-HW687-DC036A.pdf PDF
CN-370000-HW687-DC03CCO1.pdf PDF
CN-370000-HW687-DC041C.pdf PDF
CN-370000-HW687-DC041D.pdf PDF
CN-370000-HW687-DC048A.pdf PDF
CN-370000-HW687-DC048B.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

☐ Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

HW687

DC003B Completion April 30, 2024

This TA authorizes costs for site groundwater (GW) monitoring, including monitor well sampling and installation of a monitor well. The total cost of this TA is $9,185.53 at fixed unit rate.

Dean Cox 850-245-8969 Contractor Contractor

Contractor Contractor

Contractor Contractor

Contractor

Terracon Consultants, Inc.

Terracon Consultants, Inc.

Donna Cline 813-321-0340

ERIC_4650

8645 Pensacola Blvd., Pensacola

Vick's Cleaners

✔ $ 9,185.53

$ 9,185.53

Scope of Work

Kelly Crain

Kelly Crain Digitally signed by Kelly Crain Date: 2023.11.17 09:37:58 -05'00'

N/A

Cline, Donna L Typewriter Donna Cline

Senior Associate

11/17/23

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Groundwater Monitoring Report with well installation log, site activities review, updated tables and figures, field notes & forms, lab analytical report, and next action recommendations (ST1 Proj. Mgt. + ST2 Well Install & GW Sampling + ST3 Report)

01/31/2024

DEP approval of Groundwater Monitoring Report with well installation log, site activities review, updated tables and figures, field notes & forms, lab report, and next action recommendations (Subtask 1 Project Management + Subtask 2 + Subtask 3)

$ 9,185.53

$ 9,185.53

HW687

DC003B

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Shawn Hamilton Interim Secretary

Negotiation Summary

TO: HW687 Contract File FROM: Dean Cox, Contract Manager SUBJECT: DC003B Vick’s Cleaners Groundwater Monitoring and Well Installation

DATE: 11/13/2023

This TA authorizes costs for site groundwater (GW) monitoring, including monitor well sampling and installation of a monitor well. The total cost of this TA is $9,185.53 at fixed unit rate. This TA was negotiated - the total cost is $2,091.84 or 19% less than originally proposed. Site access was confirmed.

The WSCS PG approved the scope of this TA after meeting with the PM. A soil excavation ISR was completed in 2001, two chem-ox injection events were completed in 2005 and 2006, and SVE was run from 2010-2015. Onsite monitor well data was all below GCTLs in 2022. But an offsite well in the ROW across the street had been destroyed and PCE had been slightly above the GCTL in 2018, so this well is being reinstalled and will be sampled as part of this groundwater monitoring event. The biennial groundwater monitoring schedule has been truncated considering the groundwater may be below GCTLs.

FDEP COST ESTIMATE

Contractor: Terracon

Date: 6/22/2023 Task #: SubTask 1 Project Management SubTask 6

Site: Vicks Cleaners, ERIC_4650 SubTask 2 Well Installation and Groundwater Sampling SubTask 7 Activity/Phase: Replacement Well and Sampling SubTask 3 Supplemental Assessment Report SubTask 8

Project Manager: Dean Cox SubTask 4 SubTask 9 SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$75.48 Project Manager Tom Lewis 2.94 2.94 $0.00 Administrative 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Brownfield Consultant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$32.50 CADD Specialist Chelsea Fugate 4.00 0.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Data Analyst & Visualization Specialist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Environmental Technician 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Field Geologist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Field Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 GIS Technician 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Principal Consultant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Project Geologist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Project Industrial Hygienist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$33.17 Project Scientist Kyle Parson 29.00 20.00 9.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Engineer 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$75.48 Senior Geologist Tom Lewis 5.00 0.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior GIS Analyst 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Industrial Hygienist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$47.60 Senior Scientist Sid O'Neal 5.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Staff Engineer 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Staff Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total Hours 45.94 2.94 25.00 18.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Direct Labor $1,929.28 $221.95 $901.40 $805.93 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 116.00% $2,237.96 $257.46 $1,045.62 $934.88 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 56.26% $1,085.42 $124.87 $507.13 $453.42 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $5,252.66 $604.28 $2,454.15 $2,194.23 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF TERRACON Page 1

FDEP COST ESTIMATEContractor: Terracon Date: 6/22/2023

Task #: SubTask 1 Project Management SubTask 6 Site: Vicks Cleaners, ERIC_4650 SubTask 2 Well Installation and Groundwater Sampling SubTask 7

Activity/Phase: Replacement Well and Sampling SubTask 3 Supplemental Assessment Report SubTask 8 Project Manager: Dean Cox SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Travel

Vehicle Rental $360.00 $360.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $360.00 $360.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $1,771.00 $1,771.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $110.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $1,881.00 $1,881.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $188.10 $188.10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $2,069.10 $2,069.10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $252.00 $252.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $52.00 $52.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping Ice $6.50 $6.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $310.50 $310.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $80.00 $80.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $182.00 $182.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $356.00 $356.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $50.00 $50.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $668.00 $668.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $8,660.26 $604.28 $5,861.75 $2,194.23 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $525.27 $60.43 $245.42 $219.42 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $9,185.53 $664.71 $6,107.17 $2,413.65 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF TERRACON Page 2

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Vicks Cleaners, ERIC_4650 SUBTASK 2: Well Installation and Groundwater Sampling

PROPOSAL NO. PHF227090

DATE: 6/22/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Task Planning and Replacement Monitoring Well Installation Senior Scientist SO 0.50 Senior Scientist SO 1.00 Senior Scientist SO 3.00 Project Scientist KP Load/unload 1.00 Project Scientist KP Mobilization/Demobilization (from Pensacola) 1.00 Project Scientist KP Oversee Replacement Monitoring Well Installation 6.00 Field Task Planning and Groundwater Sampling Senior Scientist SO 0.50 Project Scientist KP Mobilization/Demobilization (from Pensacola) 1.00 Project Scientist KP Measure depth to groundwater (6 wells, 10 minutes each) 1.00 Project Scientist KP Collect groundwater samples (4 wells, 1.5 hours each) 6.00 Project Scientist KP Containerize IDW 0.50 Project Scientist KP Survey top of casing for replacement monitoring well MW039R 2.00 Coordinate IDW T&D Project Scientist KP 1.50 Staff Total hours

SO 5

KP 20 TOTAL LABOR 25.00

VEHICLE TYPE RATE UNIT USEAGE

Truck (well install, gw sampling) 120 day 2 $240.00 Truck (IDW pickup) 120 day 1 $120.00

TOTAL VEHICLE $360.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE

Singley Environmental Drilling 1,771.00$ each 1 $1,771.00 Erwin Remediation IDW Disposal 110.00$ each 1 $110.00

TOTAL SUBCONTRACTOR $1,881.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

VOCs EPA 8260D (short list) 63.00$ 4 $252.00 Sample Shipping Small Cooler (1 day) 52.00$ 1 $52.00 Sample Shipping Ice 6.50$ 1 $6.50

TOTAL LAB $310.50

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

expendables Expendables 40.00$ day 2 $80.00 equipment (drilling) 55-gallon drum, new 100.00$ (driller provided)

Monitor Well Installation Kit 325.00$ day 0 $0.00 GPS 175.00$ day 1 $175.00 Lock, key operated 7.00$ ea 1 $7.00 equipment (anlytical) Shallow groundwater sampling k 290.00$ day 1 $290.00 Tubing, HDPE 0.30$ ft 200 $60.00 Tubing, silicon (3/16 x 3/8) 3.00$ ft 2 $6.00 equipment (other) Total Survey Station 50.00$ day 1 $50.00

TOTAL EQUIPMENT $668.00

Update Health and Safety Plan

Coordinate IDW T&D: Meet transporter to unlock secure area for pickup

Request sample kit

PreTask Coordination Obtain ROW access agreement

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Vicks Cleaners, ERIC_4650 SUBTASK 3: Supplemental Site Assessment Report

PROPOSAL NO. PHF227021

DATE: 6/22/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Report Project Scientist KP Prepare report tables and figures 3.00 Project Scientist KP Prepare report 6.00 Data Evaluation, Interpretation and Summarization Senior Geologist TL QA/QC field and laboratory data 1.00 Senior Geologist TL Summarize groundwater geochemical parameters 1.00 Senior Geologist TL Summarize Groundwater Analytical Results 1.50 Senior Geologist TL Prepare Conclusions and recommendations 1.50 CADD Specialist CF Prepare base figures and Exhibits (4 MW's concentration, 4 MW's elevation) 4.00 Staff Total hours

TL 5

SO 0

CF 4

KP 9 TOTAL LABOR 18.00

3559 Timberlane School Rd

Tallahassee, FL 32312

P (850) 692-7185

F (813) 692-7186

Terracon.com

June 22, 2023

Florida Department of Environmental Protection

Waste Cleanup Program

Waste Management Division

2600 Blair Stone Road

Tallahassee, Florida 32399-2400

Attn: Mr. Dean Cox, Environmental Consultant

E: Dean.Cox@FloridaDep.gov

W: 850-245-8969

M: 727-686-6502

Re: Proposal for Replacement Monitoring Well Installation, Groundwater Monitoring and

Reporting

Vicks Cleaners

8645 Pensacola Blvd

Pensacola, Escambia County, Florida

ERIC_4650

Task Assignment HW687 HW003A

Terracon Proposal No. PHF227090

Dear Mr. Cox:

Terracon Consultants, Inc. (Terracon) appreciates the opportunity to submit this proposal to the

Florida Department of Environmental Program (FDEP) Waste Cleanup Program to install a replacement monitoring well and perform groundwater monitoring and reporting for the Vicks Cleaners

(ERIC_4650) facility located at 8645 Pensacola Blvd in Pensacola, Escambia County, Florida.

Scope of Services

◼ Field preparation, mobilize to site, perform replacement monitoring well installation, collect water levels from six (6) monitoring wells, groundwater sampling and laboratory analysis of three (3) existing monitoring and one (1) replacement monitoring well (MW039R).

◼ Survey top of casing (MW039R), relative to a known monitoring well elevation.

◼ Review data and prepare a Supplemental Site Assessment

Report including updated tables and groundwater flow and concentration exhibits.

See attached LOE for details

Schedule

Deliverable of a Supplemental Site Assessment Report within 20 business days following receipt of laboratory results.

Compensation

See attached CEF for details.

mailto:Dean.Cox@FloridaDep.gov

Proposal for Supplemental Site Assessment

Vicks Cleaners, ERIC_4650 ■ Pensacola, FL

June 22, 2023 ■ Terracon Proposal No. PHF227090

SITE RECOMMENDATIONS

Recent site assessment activities were conducted in by Terracon on May 5, 2022. Nine monitoring wells (MW023, MW029, MW030A, MW033, MW034, MW035, MW036, MW037, MW038) were sampled on May 5, 2022 for drycleaning COIs. Monitoring well MW039 could not be located and is believed to have been destroyed due to recent road expansion construction. The groundwater flow direction was towards the northeast and the groundwater samples collected from the monitoring wells were below their respective FDEP groundwater cleanup target levels.

Terracon recommends collecting water levels from six (6) monitoring wells. Terracon recommends sampling three existing monitoring wells (MW026, MW033, and MW035) and one (1) replacement monitoring well (MW039R) for VOH (short list) analysis. An additional round of sampling of these existing monitoring wells and replacement monitoring well sampling will provide quality data as to the offsite migration of the previously identified contaminant plume.

Terracon will request Escambia County/FDOT right-of-way access. Following Escambia County/FDEP review of ROW permit application, Terracon will submit a Work Direct Change to the DSCP to obtain a

Maintenance of Traffic Plan to include FDOT right of way traffic barricades. Replacement monitoring well MW039R will be constructed of 1-inch diameter polyvinyl chloride (PVC) with 29-feet of PVC riser and 5-feet of 0.01-inch slotted screen and completed with an 8-inch flush-mounted manhole and concrete pad. Singley Environmental provided the lowest well installation bid, and Terracon confirmed the 2022 bid from Walker-Hill Environmental is still valid. Following well installation, the top-of-casing elevation will be surveyed to an existing known well elevation.

DELIVERABLES

The Supplemental Site Assessment report will detail and summarize the replacement well installation and groundwater sampling activities, field observations, and results of monitoring well analysis and will include updates to the site’s historical data tables and updated exhibits of groundwater flow and well concentrations. Conclusions and recommendations will include a summary of results and recommendations for future sampling or remedial activities should the results indicate the onsite and previously identified offsite plume is nearing eligibility for Risk Management Option (RMO) I closure.

SCHEDULE

It is estimated that the wells could be sampled within two weeks from TA authorization and report issued within 20 business days of receipt of analytical data.

CLOSING REMARKS

Terracon services will be conducted in accordance with the terms and conditions, contained within DEP

Waste Cleanup Program (WCP) Contract No. HW687, executed January 5, 2022. It is understood that a Task Assignment will be issued to authorize us to perform this work.

Proposal for Supplemental Site Assessment

Vicks Cleaners, ERIC_4650 ■ Pensacola, FL

June 22, 2023 ■ Terracon Proposal No. PHF227090

We appreciate the opportunity to provide this proposal and look forward to working with you on this project. If you should have any questions or comments regarding this proposal, please contact either of the undersigned at 813-221-0050.

Sincerely, Terracon Consultants, Inc.

Sid O’Neal. Tom Lewis, P.G.

Senior Scientist Principal

Attachments: Cost Spreadsheet

Level of Effort

Summary Quote Forms

QUOTES – Subtask 2

408 Ditmar Street

Pensacola, FL 32503

ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562

(850) 292-6511

To: Ms. Rachael Greller Terracon 1675 Lee Road Winter Park, FL 32789

March 24, 2023

Re: Non-Hazardous Drum Disposal of Dry-Cleaning Solvents Impacted Materials

Ms. Greller:

The price for the transportation and disposal (T&D) of 55-gallon drum of non-hazardous soil and water impacted with dry-cleaning solvents is $110.00 per drum.

The prices listed are all inclusive without any additional fees or charges (fuel surcharge, low volume stop fee etc.) and are valid for all regions in the State of Florida except for the Florida Keys. Pricing for sites located in the Florida Keys will be bid on a case-by-case basis dependent on the volume of drums and the location.

A single False Mobilization fee will apply if our driver is not able to locate a drum on site.

There is no charge for manifesting onsite, subject to change. Prior notice will be sent to Terracon for any pricing change and will only be applied upon agreement between both parties.

Respectfully, Robert Donado Erwin Remediation, Inc.

Email: Robert@erwinremediation.com

Whatever Waste, LLC 3834 Mandarin Woods Dr. No.

Jacksonville, FL 32223 United States 904.881.1957

Rachael Greller Staff Scientist Terracon 1675 Lee Road Winter Park 32789 United States

Proposal Number 033023.1

Overview RE: Drycleaner Waste Drum Cleanup Program Non-haz IDW Drum Transport & Disposal LOC: Statewide including Florida Keys

Good day Ms. Greller, Whatever Waste is pleased to provide non-haz IDW soil and water drum transport & disposal services to you and Terracon in regions throughout Florida including the Keys

Pricing

Notes

Proposal Date 03/30/2023

Description Rate Qty Line Total

North Region: NH IDW Soil & Water 55-gallon drums - each (No Stop Fee)

$140.00 1 $140.00

Central Region:NH IDW Soil & Water 55-gallon drums - each (South of Ocala; North of Sarasota/Port St. Lucie) (Stop fee $150; 2 drums or less)

$140.00 1 $140.00

South Region: NH IDW Soil & Water 55-gal drums - each (South of Sarasota/Port St. Lucie) (Stop fee $200; 2 drums or less)

$225.00 1 $225.00

Florida Keys: NH IDW Soil & Water 55-gal drums - each (Stop Fee - $250)

$275.00 1 $275.00

Subtotal

Tax

780.00

0.00

Proposal Total (USD) $780.00

Whatever Waste will assist with IDW profiling and require VOCs, and RCRA 4 metals for IDW drycleaner site soils; and VOCs only for IDW drycleaner site water.

DOT shippable drums at each location must be accessible in one area and on a hard surface.

No-load run charges to locations if called off in transit or upon arrival would be the stop fee in Central, South Regions and the Keys. In the North Region the no-load charge would be $100.

Terms

Actual amounts will be invoiced unless minimum quantities and associated fees apply Rates under contract are valid for 6 months Payment terms are 30 days after receiving emailed invoice with associated documents

Indemnification: Each party agrees to indemnify, defend and hold harmless each other for and from any loss or liability arising out of the party's breach of this agreement except for gross negligence, willful misconduct or bad faith.

Capitol 200 Biddle Ave, Suite 205 Environmental Newark, DE 19702 Services, Inc. 302-380-3737 www.capitolenv.com

EXPERTISE SUSTAINABILITY SOLUTIONS

Rachael Greller Terracon 3-28-2023 1675 Lee RD Winter Park FL 32789

Scope of Work: Provide transportation and disposal of Non Hazardous drill cuttings, and Purged waters. Drums to be located on a hard surface for loading, or additional charges could apply. Quote good for sites in Central FL North areas. With approved profile and analytical.

DESCRIPTION

Estimated Quantity

UM Price $ Total $

Drill cuttings from drilling operation solids 30 drums Per Drum $140.00

Drums Purge waters ( 55 GL drum ) 30 drums Per Drum $135.00

Additional loading time after 1-hour site. Per Hour $155.00

Actual time

Rachael, I appreciate the opportunity to submit this proposal and hope that Capitol Environmental Services, Inc. can be of service to Terracon. Should you require additional information, or have any questions at all, please do not hesitate to contact me at 813-613-0452 Manderson@capitolenv.com

Sincerely Yours, Mike Anderson www.capitolenv.com mailto:Manderson@capitolenv.com file://CESIFP01/Users/TSRedirections/bfrenchman/AppData/Roaming/Microsoft/Word/www.capitolenv.com

FDEP Waste Cleanup Program

COMPETITIVE BID WORKSHEET

Project Name/Address: Vicks Cleaners ERIC_4650, 8645 Pensacola, FL Date: 6/22/23

Detailed description of goods or services required (including total quantity, size, delivery requirements, and all other specifications):

Installation of replacement well MW039R - DPT well installation of 1-inch diameter, screened 29-34 feet bgs with prepacked 0.010-inch screen - 1/2 hour development, no soil sampling, hand clear to 5 feet bgs, drum water IDW

Vendor Name: Quantity / Description Walker-Hill Singley Environmental PDS Contact Name: Frank Harrington Pattie Eckerle Kevin Bonacum Contact Number: 601-441-0180 850-944-7779 727-561-7477

Written Quote (yes/no): Yes Yes Yes Telephone Quote (yes/no): No No No

Mobilization Roundtrip 400.00$ 650.00$ Direct Push Daily Rate 1/2 Day 1,500.00$ 1,450.00$ Well Material 1" x 29' PVC; screened 29'-34') 694.00$ 1,254.00$ 445.00$ Well Completion (Development, 8-inch manhole, 2x2 pad, locking well cap) DOT 55-gallon drum 1 each 90.00$ 77.00$ 70.00$ Permits 1 each 55.00$ 40.00$ 55.00$

Service/Good Cost:

Taxes (7.5%):

Shipping:

Handling/Drop Fees:

TOTAL COST: 2,339.00$ 1,771.00$ 2,670.00$

VENDOR SELECTED: Singley Environmental Basis of Selection: Lowest bid

Note: All items costing $1,000 or more will be 3-bid. More than three bids will be necessary if any vendor no-bids a request.

If adequate bids cannot be obtained, a full explanation must be included with this bid form.

Date: June 22, 2023

Quote # : SERS6189

FDEP Facility ID No.:

Project No.:

Purchase Order No.:

To: Sid O'Neal

Terracon Consultants, Inc.

3559 Timberlane School Rd.

Tallahassee, FL

(850) 692-7189

Sid.O'Neal@terracon.com

Job Payment Terms

Net 60 Days

Qty Unit Price Line Total

34.00 $31 1,054.00$

1.00 $77 77.00$

1.00 $40 40.00$

1.00 $200 200.00$

1.00 $400 400.00$

Subtotal 1,771.00$

Sales Tax

Total 1,771.00$

QUOTE

Singley Environmental & Remediation Services Singley Construction Company

6741 Pine Forest Road Pensacola, Florida 32526

1) 1" X 34' Monitor Well Screened from 29'-34'

Salesperson

Pattie Eckerle Vicks Dry Cleaners 8645 Pensacola Blvd, Pensacola, FL, Escambia County well completion; 2'x2' well pad w/ 8" manhole

Description

Note: Cost Estimate is valid for 30 days

Mobilization rig and crew

55 gallon drum if needed well permit

Estimated days to complete scope of work 1-day

6741 Pine Forest Road Pensacola, Florida 32526 Office:850-944-7799 Fax:850-944-0704 Email: pensacola@singleycc.com

Thank you for your business!

due to the ever changing cost of materials and fuel

Quotation prepared by: Pattie Eckerle

This is a quotation on the goods named, subject to the conditions noted below:

(Describe any conditions pertaining to these prices and any additional terms of the agreement.

You may want to include contingencies that will affect the quotation.)

To accept this quotation, sign here and return: _______________________________________________

Cost Proposal Date

6/22/2023

Proposal #

17073

Name / Address

TERRACON CONSULTANTS, INC.

10841 S Ridgeview Road Olathe, KS 66061

Re:

Sid O'Neal sid.o'neal@terracon.com 8645 Pensacola Blvd,Pensacola,Fl

S/R PO

Environmental Services

PO Box 1147 Foxworth, MS 39483

Total

Subtotal

Tax (0.0%)

Customer Acceptance of Cost Proposal

Authorized Signature Date

*Payment Terms NTE 30 days upon project completion.

*1.5% Interest will be charged monthly to all overdue invoices.

Walker-Hill Environmental, Inc Milton, FL Office

Phone: (850) 564-1876 Email: terry@whenv.com

Description Unit Qty Rate Total

DPT Rig & Crew for One (1) 1"x 34' MW with 10' of .010 pre-pack screen

Half Day 1 1,500.00 1,500.00T

1" PVC Temporary Well Material Per Foot 24 6.00 144.00T Pre-Pack Screen 1"X5' Ea 2 175.00 350.00T Flush Well Completion with 8" Manhole Cover Per 1 200.00 200.00T Permits Ea 1 55.00 55.00T 55 Gallon Drums Ea 1 90.00 90.00T

$2,339.00

$2,339.00

$0.00

Preferred Drilling Solutions, Inc.

8820 66th St. North, Pinellas Park, FL 33782

Ph: 727-561-7477 Fax: 727-561-9028 www.pdsflorida.com

DIRECT PUSH TECHNOLOGY QUOTE FORM

Date: 6/22/23 FAC ID#: ERIC_4650

Unit Unit Rate Number of Units Extended Price whole day $1,850.00 -$ half day $1,450.00 1 1,450.00$ per foot $25.00 -$ each $110.00 1 110.00$ each $55.00 -$ each $35.00 6 210.00$ per well $125.00 1 125.00$ roundtrip $650.00 1 650.00$ per crew / per night $475.00 -$ each $70.00 1 70.00$ each $55.00 1 55.00$

TOTAL QUOTE PRICE $2,670.00

Notes: 1. Includes expendables, tubing, points, liners, caps, plugs, saw cuts, development, standby time, steam cleaning decon, and grouting.

Project No.:

Subcontract Company Name: Preferred Drilling Solutions, Inc. (727) 561-7477

Subcontract Mailing Address: 8820 66th St, Pinellas Park, FL 33782

Signature and Title of Person Submitting Quote: ___________________________________Austin Bonacum, Estimator Date: 6/22/23

Days to Complete Scope of Work: 0.5

Direct Push Daily Rate 1 - on-site day

Equipment Type: Geoprobe 8040DT, Geoprobe 3230DT, Geoprobe 7822DT

*Note: It is against PDS policy to drill in Pea Gravel. Borings in Pea Gravel will be terminated or can proceed solely at the risk of the consultant, DEP or Property Owner

Other (specify)

Other (specify)

Other (specify)

Permits

DOT Approved 55-gal Drum

Per Diem Mobilization

DIRECT PUSH TECHNOLOGY

MISCELLANEOUS

Other (specify)

Site Name and Location: Vicks Cleaners

Consultant Name: Terracon

PROPOSED SCOPE OF WORK:

(1) 1" x 34' MW with 5' .010 prepacked screen, soil sampling as needed, drum cuttings, pad and 8" manhole

8645 Pensacola Blvd, Pensacola, Escambia County, FL

Well Completion (includes MH w/ cover, concrete pad, and locking well cap)

Well Riser (includes all materials) ID 1" 5' Length

Slotted PVC Well Screen (includes all materials) 5' Length Pack OD 3.5"

Pre-Packed Well Screen (includes all materials) ID 1" 5' Length Pack OD 3.5"

Auger Attachment, 1" Well Install

Direct Push Half-Day Rate 1 - on-site half day

DC003B.pdf
DC003B NS.pdf
DC003B CEF-LOEproposal230622_DEPcomments231109.pdf
Cost Estimate
LOE Subtask 2
LOE Subtask 3

DC003Bproposal230622.pdf

File details come from the government source that posted it. Updated .