This document is a Task Assignment Change Order (TACO #2) between the State of Florida Department of Environmental Protection (FDEP) and Terracon Consultants, Inc., a contractor providing environmental consulting services for a brownfield site assessment project located at 2402 Market Street in Jacksonville, Florida. The change order amends the original task assignment (BF04A) under Contract Number HW687 and addresses modifications to the scope of work, staffing, and associated costs for the project, which is identified by Site ID ERIC_18247.
TACO #2 reduces the total task assignment value from $50,227.18 to $49,838.98, representing a cost decrease of $388.20 due to several operational efficiencies and modifications. The changes include: reduction of labor time in Subtask 1 (Project Management) by $16.93; completion of Subtask 3 (Field Preparation and Off-Site Access) in one day instead of 1.5 days, resulting in a $858.34 cost decrease through reduced drilling subcontractor costs and labor hours; and completion of Subtask 4 (Field Work) with two IDW drums instead of three, generating a $336.87 savings through staff substitution and equipment reduction. Offsetting these decreases, Subtask 5 (Site Assessment Report) includes the addition of an INOC Package for soil BaPs and BTEX, PAHs, and TRPH analysis for the East 14th Street right of way, adding $823.94 to the cost. Staff substitutions were made with Cali May and Ralph Mongillo replacing Darryl Williams on certain field tasks. The project completion date was extended from November 7, 2025 to February 27, 2026, providing an additional 112 days. Deliverables include quality assurance project plans, analytical reports from soil and groundwater sampling events, a site assessment report, and an INOC package, with invoicing tied to departmental approval of each deliverable phase.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/17/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:
1. TA Number: TACO Number: Contract Number:
TACO Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department’s Project Manager: Department’s Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number) Project Name:
4. There are no changes to the TA compensation.
The compensation of the TA is changed to the amounts indicated below:
Amended Price Price Prior to TACO Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. There are no changes to the TA Expiration Date.
The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).
6. There are no changes to the Attachments.
Attachment ___ is replaced with Attachment -____.
7. No Additional Changes.
Additional Changes:
8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.
IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
Additional signatures attached on separate page.
BF04A 2 HW687
This Task Assignment Change Order authorizes the reduction of labor time, the reduction of subcontractor cost, reduces the number of IDW drums generated, makes staff substitutions, and adds an INOC Package as the final
Megan Johnson 850.245.8994 Contractor Terracon Consultants, Inc. Contractor
Contractor Ralph Mongillo, Jr., P.G. Contractor 904.479.7411
ERIC_18247
2402 Market Street Project
✔ $ 49,838.98 $ 50,227.18
$ 49,838.98 $ 50,227.18 ✔ Completion
Completion 0
✔ 1 1 1
Terracon Consultants, Inc.
Contractor Donna Cline, P.E.
Senior Remediation Engineer Digitally signed by Cline, Donna L DN: cn=Cline, Donna L, ou=Domain Users, email=Donna.Cline@terracon.com Date: 2025.12.01 18:44:39 -05'00'
Cline, Donna L
Jennifer Farrell
Digitally signed by Jennifer Farrell Date: 2025.12.01 11:25:18 -05'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
HW687
BF04A
$ 49,838.98
QAPP/Work Plan and HASP (Subtask 2)
Field notes, photographic log, chain of custody, sampling logs, and analytical report from soil sampling event (Subtask 2)
Field notes, photographic log, chain of custody, sampling logs, and analytical report from well installation and groundwater sampling event (Subtasks 3 and 4)
Site Assessment Report (Subtask 5)
INOC Package; Project Management (Subtasks 1 and 5)
Department approval of QAPP/Work Plan and HASP and approval of field notes, photographic log, chain of custody, sampling logs, and analytical report from soil sampling event (Subtask 2)
Department approval of Project Management, Site Assessment Report, and INOC Package (Subtasks 1 and 5)
Department approval of field notes, photographic log, chain of custody, sampling logs, and analytical report from well installation and groundwater sampling event (Subtasks 3 and 4)
07/18/2025
10/31/2025
10/31/2025
12/12/2025
01/16/2026
$ 19,452.09
$ 20,659.60
$ 9,727.29
Memorandum TO: Terracon Consultants, Inc. HW687 Contract File
FROM: Megan Johnson, Contract Manager
DATE: November 24, 2025
SUBJECT: Negotiation Summary – SRP28 Task Assignment (TA) Change Order #2 – TA BF04A CO2 2402 Market Street Project - Site ID #: ERIC_18247 Site Assessment Activities
This Task Assignment Change Order (TACO) authorizes Terracon staff substitutions, reductions in labor time, subcontractor costs, and IDW drums generated, and adds an INOC Package to the final deliverable. Specific changes are detailed below:
Subtask 1: Project Management Under this subtask there was a decrease in project management hours due to changes in field staff under Subtask 4, a reduction in labor hours under Subtask 3, and an addition of labor hours under Subtask 5. These changes resulted in a cost actual decrease of ($16.93).
Subtask 2: Update QAPP/Work Plan and HASP There are no scope or cost changes associated with this Subtask.
Subtask 3: Field Preparation and Off-Site Access Work was completed under this subtask in one long day instead of the 1.5 days that was included in the proposal. Labor time was reduced accordingly. This also reduced the drilling subcontractor cost, vehicle usage, and equipment needs. Terracon labor time for IDW mobilization was also removed due to it being accounted for in Subtask 4. Ralph Mangillo (RM) performed field work in place of Darryl Williams (DW), but no cost change was made due to RM’s labor rate exceeding DW’s. These changes resulted in a cost actual decrease of ($858.34).
Subtask 4: Field Work Under this subtask only two drums of IDW were generated while three were proposed, therefore one was removed. Cali May (CM) performed field work in place of DW, therefore CM’s labor rate was used instead of DW’s. These changes resulted in a cost actual decrease of ($336.87).
Subtask 5: Site Assessment Report Addendum Under this subtask Terracon will prepare an INOC Package for soil BaPs and BTEX, PAHs, and TRPH for East 14th Street right of way. This change resulted in a cost actual increase of $823.94.
Negotiation Summary – Task Assignment Change Order #2 TA BF04A CO2 2402 Market Street Project – Site ID # ERIC_18247 November 24, 2025
Summary The Department’s SRP Contract Manager and Terracon’s Contract Manager have both agreed to the above changes. All changes noted above represent a total overall cost decrease of ($388.20), as shown in the Final/Cost Actual LOE. Due to a rounding error in Excel, the Delta LOE states an overall cost decrease of ($388.24), however this was addressed in the Cost Actual LOE. The changes were noted in the TACO Request received from Terracon on November 6, 2025, revised on November 13, 2025. The final cost associated with this TA decreased from $50,227.18 to $49,838.98. Documentation of the changes is included in the attached TACO Request, the Delta LOE spreadsheet and the Cost Actual LOE spreadsheet, and the TACO form for BF04A CO2 prepared by the Department.
FD
EP
C O
S T
ES
TI
M A
TE
C on tra ct or
Te rra co n
FI
N
AL
T
AC
O
#0
ER
IC
_1
D at e:
/1
3/
Ta sk
BF
A
Su bT as k
Pr oj ec t M an ag em en t Su bT as k
Si te
M ar ke t S tre et P ro je ct (F
AC
ID
: 9
Su bT as k
Q
AP
P, H
AS
P, a nd
S oi l S am pl in g Su bT as k
Ac tiv ity /P ha se
Si te A ss es sm en t W or kp la n In ve st ig at io n
Su bT as k
Li th ol og ic
B or in g an d
M on ito rin g w el l I ns ta lla tio n Su bT as k
Pr oj ec t M an ag er
M s.
M eg an R
. J oh ns on as k
G ro un dw at er
S am pl in g, ID
W M an ag em en t Su bT as k
Su bT as k
Si te A ss es sm en t R ep or t
Su bT as k
To ta ls
La bo r R at e
Ca te go ry
$5 7.
Pr oj ec t M an ag er
R al ph
M on gi llo
.6
.6
$3 2.
Ad m in is tra tiv e
Ju lie
B ro w n
2.
0.
0.
0.
2.
0.
0.
0.
0.
0.
$0 .0
Br ow nf ie ld
C on su lta nt 0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$3
6.
C ad d Sp ec ia lis t
C he ls ea
F ug at e
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$2 5.
Fi el d
Sc ie nt is t Fr an ki e G ild ay
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$3 1.
St af f S ci en tis t
N ic ol e
Ko va ch 0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$3
3.
Fi el d Sc ie nt is t
D ar ry l W illi am s
.5
.0
8.
1.
0.
0.
0.
0.
0.
0.
$4
8.
Se ni or G eo lo gi st
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$4 5.
Se ni or
S ci en tis t An ge llic a R od -B az
.0
.0
0.
0.
4.
0.
0.
0.
0.
0.
$0
.0
Pr in ci pa l C on su lta nt 0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$4
5.
Se ni or P
M / E ng in ee r
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0 .0
Pr oj ec t I nd us tri al H yg ie ni st
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0 .0
Pr oj ec t S ci en tis t 0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$7
2.
Se ni or E ng in ee r
D on na C lin e
9.
2.
0.
0.
7.
0.
0.
0.
0.
0.
$5 7.
Se ni or
G eo lo gi st R al ph
M on gi llo
.0
.0
.0
6.
.0
0.
0.
0.
0.
0.
$2 9.
Pr oj ec t G eo lo gi st C al i M ay
.0
4.
0.
.0
9.
0.
0.
0.
0.
0.
$0
.0
Se ni or In du st ria l H yg ie ni st
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0 .0
Se ni or
E ng in ee r 0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0
.0
Se ni or S ci en tis t
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$2 4.
En vi ro nm en ta l T ec hn ic ia n Ty le r C oz ar t 0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$1
8.
En vi ro nm en ta l T ec hn ic ia n
R ay ve n
D en ve r
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$2 2.
Fi el d
Sc ie nt is t Av er y
Bl is s
.0
.0
0.
0.
0.
0.
0.
0.
0.
0.
$0
.0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0 .0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0
.0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0 .0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
To ta l H ou rs
9.
.6
.0
.5
.0
.0
0.
0.
0.
0.
0.
D ire ct L ab or
$7
,8
.0
$9
.2
$2 ,7
.9
$9
.2
$8
.8
$2
,3
.6
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
O ve rh ea d
6.
$9
,0
.5
$1 ,0
.4
$3
,2
.3
$1 ,0
.3
$1
,0
.1
$2 ,7
.1
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
G en
A dm in
0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fr in ge
.2
$4
,4
.6
$5
.0
$1 ,5
.7
$5
.2
$4
.3
$1
,3
.3
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l L
$2
1, 9.
$2 ,4
.8
$7
,5
.0
$2 ,5
.8
$2
,3
.4
$6 ,3
.1
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
R
EV
C
EF
T
ER
R A
C O
N P ag e
C O
S T
ES
TI
M A
TE
C on tra ct or
Te rra
FI
N
AL
T
AC
O
#0
ER
IC
_1
3/
BF
as k
Pr oj ec t M an ag em en t Su bT as k
Si te
M ar ke t S tre et P ro je ct (F
AC
ID
: 9
Su bT as k
Q
AP
P, H
AS
P, a nd
S oi l S am pl in g Su bT as k
Ac tiv ity /P ha se
Si te A ss es sm en t W or kp la n In ve st ig at io n
Su bT as k
Li th ol og ic
B or in g an d
M on ito rin g w el l I ns ta lla tio n Su bT as k
Pr oj ec t M an ag er
M s.
M eg an R
. J oh as k
G ro un dw at er
S am pl in g, ID
W M an ag em en t Su bT as k
Su bT as k
Si te A ss es sm en t R ep or t
Su bT as k
To ta ls
Tr av el
Ve hi cl e ch ar ge $7
.0
0.
0.
0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
M ile ag e
C os ts $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Ai r F ar e $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Pe r d ie m
H ot el $0
.0
$0 .0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l T ra ve l $7
.0
$3
.0
$2
.0
$2
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Su bc on tr ac to r
(S er vi ce s Pr oc ur em en t) ril lin g
(C on ve nt io na l)
- G
W P
$6 ,7
.0
$0
.0
6, 0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
D ril lin g
(N on
-c on ve nt io na
l) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
M ob ile
L ab or at or y
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Su rv ey in g $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
ID
W
Er w in $2
.0
$0
.0
$0 .0
0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
G eo
T ek
$7
.0
0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
R
O W
P er m its
$5
.0
0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Fi le w ith C le rk
$1
.0
9.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
M
O T
Pl an s $1
,1
.5
$0 .0
1, 3.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Su bc on tra ct or S ub to ta l
$9 ,4
.5
$1
,3
.0
$7 ,8
.5
$2
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
H an dl in g
Fe e
$9
.2
$1
.9
$7
.3
$2 2.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l S ub co nt ra ct or
C os t $1
0, 1.
$1 ,5
.9
$8
,6
.8
$2
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
La bo ra to ry
An yt ic al C os ts
$1 2, 5.
.0
$0
.0
3, 3.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Fa st T ur na ro un d C ha rg es $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Sa m pl e Sh ip pi ng $4
.0
0.
$0 .0
0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
To ta l L ab or at or y
$1 2, 5.
$8
,9
.0
$0 .0
$3
,6
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fi el d Ex pe es
Pe rs on al
P ro te ct io n
$0 .0
$0
.0
$0 .0
$0
.0
0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Ex pe nd ab le s $3
.0
2.
.0
6.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Eq ui pm en t ( D ril lin g re la te
d) $9
.5
0.
7.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Eq ui pm en t ( An al yt ic al re la te d)
$1 ,1
.5
6.
3.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Eq ui pm en t (
ID
W re la te
d) $0
.0
0.
$0 .0
$0
.0
0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Eq ui pm en t (
O th er
$2
.0
5.
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
To ta l F ie ld E xp en se s
$2 ,6
.0
$1
,5
.0
$6
.5
$4
.5
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Su bt ot al
$4 7, 6.
$2
,4
.8
$1 9, 9.
$1
1, 1.
$6 ,9
.9
$6
,3
.1
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Co m pl et io n Fe e $2
,1
.9
$2
.3
$7
.6
$2
.2
$2
.7
$6
.9
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l E st im at ed C os t
$4 9, 8.
$2
,6
.2
$2 0, 9.
$1
2, 1.
$7 ,2
.6
$7
,0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T TA
C
O #1
$5 0, 7.
$2
,7
.1
$2 0, 9.
$1
3, 9.
$7 ,5
.5
$6
,2
.1
$0 .0
DD
el ta
#2
8.
.9
$0
.0
8.
6.
$8
.9
$0 .0
RR
ou nd in g
$0 .0
$0
.0
$0 .0
$0
.0
0.
$0
.0
$0 .0
TTA
C O
#2 $4
9, 8.
$2 ,6
.2
$2
0, 9.
$1 2, 1.
$7
,2
.6
$7 ,0
.0
$0
.0
R
EV
C
EF
T
ER
R A
C O
N P ag
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : 2402 Market Street Project (FAC ID: 9819289)
SUBTASK 2:
PROPOSAL NO. PEQ257222 FINAL TACO#02 ERIC_18274
DATE: 11/13/2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Preparation Work Plan, QAPP, and HASP Senior Scientist ARB 11.00
GIS Technician CM Prepare Exhibits for QAPP 4.00 Senior Geologist DC 2.00 Preparation Field Task Planning and Pre-Drilling Tasks Senior Geologist RFM 5.00
Senior Geologist RFM 5.00
Senior Scientist ARB 1.00
Install Borings and Collecting Soil Samples for Laboratory Testing
Time Duration: 2 days Environmental Technician DW Load/unload and calibrate equipment (0.5 hour/day) 1.00 Environmental Technician DW 18.00
Environmental Technician TC 18.00
Environmental Technician TC -18.00
Environmental Technician AB 18.00
Senior Geologist RFM 2.00 Environmental Technician TC Daily IDW management (0.5 hrs. a day) 1.00 Environmental Technician TC Daily IDW management (0.5 hrs. a day) -1.00 Environmental Technician AB Daily IDW management (0.5 hrs. a day) 1.00 Environmental Technician DW Finalize field notes at end of day for PM evaluation (1 hour/day) 2.00
Mobilization / Demobilizations Senior Geologist RFM 1.00 Environmental Technician DW 2.00 Environmental Technician TC 2.00 Environmental Technician TC -2.00 Field Scientist AB 2.00
AB CM
21.00 4.00
Personnel: ARB DC RFM DW TC Hours: 12.00 2.00 13.00 23.00 0.00 TOTAL LABOR 75.00
VEHICLE TYPE RATE UNIT USEAGE
Car (RFM) 80.00$ Day 1 80.00$ Truck DW / TC 120.00$ day 2 240.00$
TOTAL VEHICLE 320.00$
Daily safety debrief, collect samples at 0.5, 2, and 4 ft bgs for soil vapor readings and laboratory analysis (VOCs and SPLP prep sample, PAHs, RCRA metal, and TRPH) Daily safety debrief, collect samples at 0.5, 2, and 4 ft bgs for soil vapor readings and laboratory analysis (VOCs and SPLP prep sample, PAHs, RCRA metal, and TRPH)
1 hours per Mobe/Demobe, 2 days 1 hours per Mobe/Demobe, 2 days 1 hours per Mobe/Demobe, 2 days
Senior geologist to oversee field crew/ technical QA/QC of operations
QAPP, HASP, and Soil Sampling
QA/QC Quality Assurance Project Plan (QAPP)
Prepare a Quality Assurance Project Plan (QAPP), and Health and Safety Plan (HASP) for completion of the work. No field tasks will be completed until the QAPP is approved.
Contact owner/tenant and conduct pre-drilling site walk with property owner, current tenants, utility locator.
Complete applications for City of Jacksonville Right-of-Way Permit for Market Street and E. 14th Street for monitoring well installation. Designate IDW staging areas. Attend initial site visit, identify sample locations on-site geophysical survey for boring, groundwater screening locations.
Review preliminary soil VOC, PAH, TRPH data to determine if SPLP or TPHCWG tests need to be completed (3 Hrs.) and prepare the Subtask 2 Deliverable Submittal to the FDEP to include field notes, sampling forms, and laboratory reports (2 Hrs.).
1 hours per Mobe/Demobe, 1 day 1 hours per Mobe/Demobe, 2 days
Request laboratory sample kit (soil sampling)
Scope: Installing 10 soil borings collecting three samples per boring (30 Soil Samples).
Direct work, daily safety debrief, record lithological descriptions, install of 10 soil borings to a depth of 4 feet through concrete, asphalt and grass surfaces, and coordinate lab pickup of soil samples.
Daily safety debrief, collect samples at 0.5, 2, and 4 ft bgs for soil vapor readings and laboratory analysis (VOCs and SPLP prep sample, PAHs, RCRA metal, and TRPH)
SUBTASK 2:
PROPOSAL NO. PEQ257222 FINAL TACO#02 ERIC_18274
DATE: 11/13/2025
QAPP, HASP, and Soil Sampling
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE
Revocable Permit Filing First Page - Market Street 10.00$ Page 1 10.00$ Revocable Permit Filing Additional Pages - Market Street 8.50$ Page 9 76.50$ Revocable Permit Filing Additional Pages - Market Street 8.50$ Page -9 (76.50)$ Revocable Permit Filing Additional Pages - Market Street 8.50$ Page 7 WCD#1 59.50$ Revocable Permit Filing First Page - E. 14th Street 10.00$ Page 1 10.00$ Revocable Permit Filing Additional Pages - E. 14th Street 8.50$ Page 9 76.50$ Revocable Permit Filing Additional Pages - E. 14th Street 8.50$ Page -9 (76.50)$ Revocable Permit Filing Additional Pages - E. 14th Street 8.50$ Page 7 WCD#01 59.50$ COJ ROW Permit Market Street 191.00$ Page 1 191.00$ COJ ROW Permit Market Street 191.00$ Page -1 (191.00)$ COJ ROW Permit Market Street 255.00$ Page 1 WCD#01 255.00$ COJ ROW Permit E. 14th Street 191.00$ Page 1 191.00$ COJ ROW Permit E. 14th Street 191.00$ Page -1 (191.00)$ COJ ROW Permit E. 14th Street 255.00$ Page 1 WCD#01 255.00$ Geo Tek GPR and EM Survey 750.00$ day 1 750.00$
TOTAL SUBCONTRACTOR 1,399.00$
LABORATORY COSTS
PARAMETER RATE # SAMPLES
VOCs (VOAs and VOHs) EPA Method 8260 (full list) 110.00$ 30 3,300.00$ VOCs (VOAs and VOHs) EPA Method 8260 (full list) 110.00$ -2 (220.00)$ PAHs EPA 8270SIM 110.00$ 15 1,650.00$
PAHs EPA 8270SIM 110.00$ -2 (220.00)$
TRPH FL-PRO 88.00$ 30 2,640.00$
TRPH FL-PRO 88.00$ -2 (176.00)$
RCRA Metals Various Methods 126.00$ 15 1,890.00$
RCRA Metals Various Methods 126.00$ -2 (252.00)$
SPLP Extraction EPA Method 1311/1312 45.00$ 1 45.00$ Barium EPA 6010 13.00$ 1 13.00$ TRPH Fractionation EPH/VPH 250.00$ 0 -$ Sample Shipping Large Cooler (overnight) 150.00$ 2 300.00$
TOTAL LAB 8,970.00$
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables Expendables 40.00$ day 2 2 field days 80.00$
Ice (Sample Preservation) 6.50$ each 8 52.00$ Drilling related Soil Assessment Kit (concrete) 235.00$ day 2 Soil Sampling 470.00$ Analytical related Encore Sampler (25 gram) 16.00$ each 30 (SPLP samples - hold) 480.00$
Encore Sampler (25 gram) 16.00$ each -2 (SPLP samples - hold) (32.00)$ Terra Core Sampler 11.00$ each 30 (VOH samples) 330.00$ Terra Core Sampler 11.00$ each -2 (VOH samples) (22.00)$
IDW related 55-Gallon drum 100.00$ each 1 100.00$ 55-Gallon drum 100.00$ each -1 (100.00)$
Other Global Positioning System 175.00$ day 1 175.00$
TOTAL EQUIPMENT 1,533.00$
All ten soil borings for SB003, SB007, SB008, SB009, and SB010
All ten soil borings
All ten soil borings All ten soil borings for SB003, SB007, SB008, SB009, and SB010
WCD#02
WCD#02
for SB003, SB007, SB008, SB009, and SB010 for SB003, SB007, SB008, SB009, and SB010
SUBTASK 3:
PROPOSAL NO. PEQ257222 FINAL TACO#02 ERIC_18274
DATE: 11/13/2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Field Task Planning Senior Geologist RFM 3.00
Time Duration: 1.5 days Geologist DW Load/unload and calibrate equipment (1 hour) One day install one day clean up ROW wells 1.00 Geologist DW 10.00
Geologist DW (6.00)
Senior Geologist RFM 1.50 Senior Geologist RFM Senior geologist oversight of One day of well install (0.50) Field Scientist DW Containerize IDW (0.5/hours per day) 1.00 Field Scientist DW Containerize IDW (0.5/hours per day) One day of well install (0.50)
Exterior Oversee Deep Lithological Boring
Senior Geologist RFM 5.00 Senior Geologist RFM Finalize boring logs and field notes at end of day (1 hr./day) 1.00 Mobilization / Demobilizations Senior Geologist RFM 1.00 Geologist DW 2.00 Geologist DW 1 hours per mobe/demobe 2 One day less -1.00 Field Scientist (IDW run) DW 1.00 Field Scientist (IDW run) DW 1 hours per mobe/demobe 1 Covered in Subtask 4 1.00
Personnel: DW RFM Hours: 8.50 11.00 TOTAL LABOR 19.50
VEHICLE TYPE RATE UNIT USEAGE
Truck (DW) 120.00$ Day 2 240.00$ Truck (DW) 120.00$ Day -1 (120.00)$ Car (RFM) 80.00$ days 1 80.00$
TOTAL VEHICLE 200.00$
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM -$
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE
JAEE 6,750.00$ each 1 6,750.00$
JAEE 6,750.00$ each -1 (6,750.00)$
JAEE 5,150.00$ each 1 5,150.00$
MOT Plans 1,123.50$ each 1 WCD#1 1,123.50$
TOTAL SUBCONTRACTOR 6,273.50$
LABORATORY COSTS ]
PARAMETER RATE # SAMPLES IDW
TOTAL LAB -$
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables Expendables 40.00$ day 2 2 field days 80.00$
Ice (Sample Preservation) 6.50$ each 0 -$ Drilling related Monitoring Well Installation Kit 325.00$ day 1.5 Well Install 487.50$
Monitoring Well Installation Kit 325.00$ day -0.5 Well Install (162.50)$ Analytical related IDW related (Drums provided by Driller) Other Total Survey Station 50.00$ day 1 50.00$
TOTAL EQUIPMENT 455.00$
1 hours per mobe/demobe 1 day
Shoulder set up of signs and cones by qualified person
Lithologic Boring and Monitoring well Installation
Scope: Install Four Shallow Zone Monitoring Wells to a depth of 15 ft bgs
1 hours per mobe/demobe 2 days 1 hours per mobe/demobe 1 day
Direct work, safety debriefs, well development, survey top of casing elevation of wells to assess gw flow direction, and elevation survey of well top of casings.
Scope: Lithological Boring to 50 feet bgs litho boring, well installation, and boring abandonment
Prepare the Subtask 3 Deliverable Submittal to the FDEP to include field notes, sampling forms, and laboratory reports (3 Hrs.).
Senior geologist oversight of deep lithological boring and abandonment, records lithological descriptions
Senior geologist oversight of well installation (1 hour/day) litho boring, well installation, and boring abandonment litho boring, well installation, and boring abandonment
Direct work, safety debriefs, well development, survey top of casing elevation of wells to assess gw flow direction, and elevation survey of well top of casings.
SUBTASK 4: Groundwater Sampling, IDW Management
PROPOSAL NO. PEQ257222 FINAL TACO#02 ERIC_18274
DATE: 11/13/2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Field Task Planning and Pre-GW and MAGS Tasks Senior Geologist RFM 2.00 Senior Geologist RFM 1.00
Senior Geologist RFM 3.00
Groundwater Sampling
Time Duration: 1 day Environmental Technician DW Load/unload equipment (1 hour/day) 1.00 Environmental Technician DW Load/unload equipment (1 hour/day) (1.00) Project Geologist CM Load/unload equipment (1 hour/day) 1.00 Environmental Technician DW Collect water levels (7 wells, 10 minutes/well) 1.00 Environmental Technician DW Collect water levels (7 wells, 10 minutes/well) (1.00) Project Geologist CM Collect water levels (7 wells, 10 minutes/well) 1.00 Environmental Technician DW 10.50
Environmental Technician DW (10.50)
Project Geologist CM 10.50
Environmental Technician DW 1.00 Environmental Technician DW (1.00) Project Geologist CM 1.00 Environmental Technician DW Collect soil and groundwater IDW samples from the 55-gallon drum 0.50 Environmental Technician DW Collect soil and groundwater IDW samples from the 55-gallon drum (0.50) Project Geologist CM Collect soil and groundwater IDW samples from the 55-gallon drum 0.50 Environmental Technician DW 2.00 Environmental Technician DW (2.00) Project Geologist CM 2.00 Mobilization / Demobilizations Environmental Technician DW 1.00 Environmental Technician DW -1.00 Project Geologist CM 1.00 Environmental Technician DW 1.00
Personnel: RFM DW CM Hours: 6.00 1.00 17.00 TOTAL LABOR 24.00
VEHICLE TYPE RATE UNIT USEAGE
Truck (DW) GW Sampling 120 day 1 120.00$ Truck (DW) IDW Pickup sign manifest 120 day 1 120.00$
TOTAL VEHICLE 240.00$
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE
Erwin 110.00$ drum 2 220.00$ Erwin 110.00$ drum -1 (110.00)$ Erwin 110.00$ drum 1 110.00$
TOTAL SUBCONTRACTOR 220.00$
LABORATORY COSTS
PARAMETER Method RATE # SAMPLES IDW VOCs (VOAs and VOHs) EPA Method 8260 (full list) 110.00$ 7 1 880.00$ PAHs EPA 8270SIM 110.00$ 7 770.00$
TRPH FL-PRO 88.00$ 7 616.00$
RCRA Metals Various Methods 126.00$ 7 882.00$ TCLP RCRA Metals (IDW Soil) 135.00$ 1 135.00$ TCLP VOCs Full List (IDW Soil) 210.00$ 1 210.00$ Sample Shipping Large Cooler (overnight) 150.00$ 1 150.00$
TOTAL LAB 3,643.00$
Coordinate IDW T&D: Mobilize to site, meet transporter to sign manifests
1 hour per mobe/demobe (GW Sampling), 1 day
IDW waste profile and manifesting
Safety meeting, calibrate instruments, collect groundwater samples for VOCs, PAHs, RCRA metals, and TRPH (7 wells, 1.5 hrs/well)
Liquid soil
1 hour per mobe/demobe ( IDW pickup), 1 day
Prepare GW sampling/calibration logs/field notes for PM evaluation (1 hr./day)
Request laboratory sample kit (groundwater and IDW sampling), verify property owner is the same as on the access agreement, contact property owner and FDEP of field activity
Scope: 7 Monitoring Wells
Prepare the Subtask 4 Deliverable submittal for groundwater sampling and IDW disposal to the FDEP to include field notes, sampling forms, laboratory reports, and Manifests (3 Hrs.).
1 hour per mobe/demobe (GW Sampling), 1 day
Coordinate IDW T&D: Mobilize to site, meet transporter to sign manifests
Liquid
Safety meeting, calibrate instruments, collect groundwater samples for VOCs, PAHs, RCRA metals, and TRPH (7 wells, 1.5 hrs/well)
Prepare GW sampling/calibration logs/field notes for PM evaluation (1 hr./day)
Coordinate IDW T&D: Mobilize to site, meet transporter to sign manifests
1 hour per mobe/demobe (GW Sampling), 1 day
Safety meeting, calibrate instruments, collect groundwater samples for VOCs, PAHs, RCRA metals, and TRPH (7 wells, 1.5 hrs/well)
Prepare GW sampling/calibration logs/field notes for PM evaluation (1 hr./day)
SUBTASK 4: Groundwater Sampling, IDW Management
PROPOSAL NO. PEQ257222 FINAL TACO#02 ERIC_18274
DATE: 11/13/2025
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables Expendables 40.00$ day 2 80.00$
Ice (Sample Preservation) 6.50$ each 4 26.00$ Analytical related Groundwater Sampling Kit 290.00$ day 1 290.00$
Tubing, HDPE 0.30$ ft 175 52.50$ Tubing, silicon (3/16 x 3/8) 3.00$ ft 7 21.00$
IDW related 55-Gallon drum (driller) -$
TOTAL EQUIPMENT 469.50$
SUBTASK 5: Site Assessment Report
PROPOSAL NO. PEQ257222 FINAL TACO#02 ERIC_18274
DATE: 11/13/2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Report Deliverable Senior Scientist ABR 4.00 Geologist RFM 8.00 Senior Geologist RFM 3.00 Senior Geologist RFM Evaluate data in report text, raw soil and groundwater data, tables and exhibits 5.00 Senior Geologist RFM preparation of INOC Package for E 14th Street ROW owned by COJ. (WCD#3) 3.00 Senior Engineer DC Soil Analytical Results and Summary Evaluation 2.00 Senior Engineer DC Groundwater Analytical Results and Summary Evaluation 1.00 Senior Engineer DC Conclusions/Recommendations 2.00 Senior Engineer DC Sign and Seal the Site Assessment Report 1.00 Senior Engineer DC review of INOC package and add text to the email for submittal. (WCD#3) 1.00 Geologist RFM 4.00
GIS Technician CM 8.00
GIS Technician CM 1.00 Admin JB 2.00
Personnel: RFM DC CM JB ABR Hours 23 7 9 2 4 TOTAL LABOR 45.00
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE -$
Prepare draft report introduction, site history, recent activities summary, Prepare discussion of soil, groundwater, and soil vapor results QA/QC field and laboratory data (30 soil and 8 groundwater samples)
Prepare Appendices including boring logs (10 soil locations and 1 lithological), to include well construction diagrams (4 wells), and prepare cross section with detected GW COCs Prepare base Exhibits (site setting, groundwater flow, soil detection maps for 0.5, 2, and 4 ft bgs samples for VOCs, PAHs, metals, and TRPH, cross section, and groundwater concentrations maps for shallow zone monitoring wells (VOCs, PAHs, metals, and TRPH).
Formatting report and tables, assembling of exhibits and appendices to be assembled in a pdf format preparation of figure with seal box and adjacent property boundaries. (WCD#3)
C O
S T
ES
TI
M A
TE
C on tra ct or
Te rra el ta T
AC
O
#0
ER
IC
_1
3/
BF
as k
Pr oj ec t M an ag em en t Su bT as k
Si te
M ar ke t S tre et P ro je ct (F
AC
ID
: 9
Su bT as k
Q
AP
P, H
AS
P, a nd
S oi l S am pl in g Su bT as k
Ac tiv ity /P ha se
Si te A ss es sm en t W or kp la n In ve st ig at io n
Su bT as k
Li th ol og ic
B or in g an d
M on ito rin g w el l I ns ta lla tio n Su bT as k
Pr oj ec t M an ag er
M s.
M eg an R
. J oh as k
G ro un dw at er
S am pl in g, ID
W M an ag em en t Su bT as k
Su bT as k
Si te A ss es sm en t R ep or t
Su bT as k
To ta ls
La bo r R at e
Ca te go ry
$5 7.
Pr oj ec t M an ph
M on gi llo
-0 .1
-0
.1
$3 2.
Ad m in is tra tiv e
Ju lie
B ro w n
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0 .0
Br ow nf ie ld
C on su lta nt 0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$3
6.
C ad d Sp ec ia lis t
C he ls ea
F ug at e
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$2 5.
Fi el d
Sc ie nt is t Fr an ki e G ild ay
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$3 1.
St af f S ci en tis t
N ic ol e
Ko va ch 0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$3
3.
Fi el d Sc ie nt is t
D ar ry l W illi am s -2
3.
0.
-6 .5
-1
7.
0.
0.
0.
0.
0.
0.
$4 8.
Se ni or
G eo lo gi st 0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$4
5.
Se ni or S ci en tis t
An ge llic a
R od
-B az
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0 .0
Pr in ci pa l C on su lta nt
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$4 5.
Se ni or
P M
/ E ng in ee r 0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0
.0
Pr oj ec t I nd us tri al
H yg ie ni st 0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0
.0
Pr oj ec t S ci en tis t
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$7 2.
Se ni or
E ng in ee r D on na
C lin e 1.
0.
0.
0.
1.
0.
0.
0.
0.
0.
$5
7.
Se ni or G eo lo gi st
R al ph M on gi llo 2.
0.
-0
.5
0.
3.
0.
0.
0.
0.
0.
$2 9.
Pr oj ec t G eo lo gi st C al i M ay
.0
0.
0.
.0
1.
0.
0.
0.
0.
0.
$0
.0
Se ni or In du st ria l H yg ie ni st
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0 .0
Se ni or
E ng in ee r 0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0
.0
Se ni or S ci en tis t
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$2 4.
En vi ro nm en ta l T ec hn ic ia n Ty le r C oz ar t 0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$1
8.
En vi ro nm en ta l T ec hn ic ia n
R ay ve n
D en ve r
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$2 2.
Fi el d
Sc ie nt is t Av er y
Bl is s 0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0
.0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0 .0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0
.0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0 .0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
To ta l H ou rs
-2 .1
-0
.1
0.
-7 .0
0.
5.
0.
0.
0.
0.
0.
D ire ct L
.1
7)
5.
$0
.0
6.
.0
8) $2
.1
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
O ve rh ea d
6.
.0
4)
6.
$0
.0
5.
.6
1) $3
.1
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
G en
A dm in
0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fr in ge
.2
.6
5)
3.
$0
.0
8.
.5
5) $1
.7
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
To ta l L
3.
.4
1) $0
.0
1.
6.
$7
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
R
EV
C
EF
T
ER
R A
C O
N P ag
C O
S T
ES
TI
M A
TE
C on tra ct or
Te rra el ta T
AC
O
#0
ER
IC
_1
3/
BF
as k
Pr oj ec t M an ag em en t Su bT as k
Si te
M ar ke t S tre et P ro je ct (F
AC
ID
: 9
Su bT as k
Q
AP
P, H
AS
P, a nd
S oi l S am pl in g Su bT as k
Ac tiv ity /P ha se
Si te A ss es sm en t W or kp la n In ve st ig at io n
Su bT as k
Li th ol og ic
B or in g an d
M on ito rin g w el l I ns ta lla tio n Su bT as k
Pr oj ec t M an ag er
M s.
M eg an R
. J oh as k
G ro un dw at er
S am pl in g, ID
W M an ag em en t Su bT as k
Su bT as k
Si te A ss es sm en t R ep or t
Su bT as k
To ta ls
Tr av el
Ve hi cl e ch ar ge
0.
0.
(1
.0 0)
$0
.0
$0 .0
$0
.0
$0 .0
M ile ag e C os ts
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Ai r F ar e
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Pe r d ie m
H ot el
$0 .0
$0
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
To ta l T ra ve l
0.
$0
.0
0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Su bc on tr ac to r (S er vi ce s
Pr oc ur em lin g (C on ve nt io na l)
- G W
P $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
D ril lin g (N on -c on ve nt io na l)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
M ob ile L ab or at or y $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Su rv ey in g
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
ID
W
Er w in
0.
$0
.0
$0 .0
(1
.0
0)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
G eo T ek $0
.0
0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
R O
W P er m its $0
.0
0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fi le w ith
C le rk $0
.0
0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
M O
T Pl an s
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Su bc on tra ct or
S ub to ta l
0.
$0 .0
$0
.0
0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
H an dl in g
Fe e
.0 0)
$0 .0
$0
.0
.0 0)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
To ta l S ub co nt ra ct or C os t
1.
$0
.0
$0 .0
1.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
La bo ra yt ic al C os ts
$0 .0
0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Fa st T ur na ro un d C ha rg es $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Sa m pl e Sh ip pi ng $0
.0
0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
To ta l L ab or at or y
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fi el d Ex pe on al
P ro te ct io n
$0 .0
$0
.0
$0 .0
$0
.0
0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Ex pe nd ab le s $0
.0
0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Eq ui pm en t (
D ril lin g re la te d)
$0 .0
0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Eq ui pm en t (
An al yt ic al re la te
d) $0
.0
0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Eq ui pm en t (
ID
W re la te
d) $0
.0
0.
$0 .0
$0
.0
0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Eq ui pm en t (
O th er
$0 .0
0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l F ie ld
E xp en se s $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Su bt ot al
4.
.4
1) $0
.0
1.
7.
$7
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Co m pl et io n Fe e
.3
8)
1.
$0
.0
.1 2)
.6 2)
$7 4.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
To ta l E st im at ed C os t
8.
.9
5) $0
.0
8.
6.
$8
.9
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
R
EV
C
EF
T
ER
R A
C O
N P ag
SUBTASK 2:
PROPOSAL NO. PEQ257222 Delta TACO#02 ERIC_18274
DATE: 11/13/2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Preparation Work Plan, QAPP, and HASP Senior Scientist ARB 0.00
GIS Technician CM Prepare Exhibits for QAPP 0.00 Senior Geologist DC 0.00 Preparation Field Task Planning and Pre-Drilling Tasks Senior Geologist RFM 0.00
Senior Geologist RFM 0.00
Senior Scientist ARB 0.00
Install Borings and Collecting Soil Samples for Laboratory Testing
Time Duration: 2 days Environmental Technician DW Load/unload and calibrate equipment (0.5 hour/day) 0.00 Environmental Technician DW 0.00
Environmental Technician TC 0.00
Environmental Technician TC 0.00
Environmental Technician AB 0.00
Senior Geologist RFM 0.00 Environmental Technician TC Daily IDW management (0.5 hrs. a day) 0.00 Environmental Technician TC Daily IDW management (0.5 hrs. a day) 0.00 Environmental Technician AB Daily IDW management (0.5 hrs. a day) 0.00 Environmental Technician DW Finalize field notes at end of day for PM evaluation (1 hour/day) 0.00
Mobilization / Demobilizations Senior Geologist RFM 0.00 Environmental Technician DW 0.00 Environmental Technician TC 0.00 Environmental Technician TC 0.00 Field Scientist AB 0.00
AB CM
0.00 0.00
Personnel: ARB DC RFM DW TC Hours: 0.00 0.00 0.00 0.00 0.00 TOTAL LABOR 0.00
VEHICLE TYPE RATE UNIT USEAGE
Car (RFM) 80.00$ Day 0 -$ Truck DW / TC 120.00$ day 0 -$
TOTAL VEHICLE -$
Daily safety debrief, collect samples at 0.5, 2, and 4 ft bgs for soil vapor readings and laboratory analysis (VOCs and SPLP prep sample, PAHs, RCRA metal, and TRPH) Daily safety debrief, collect samples at 0.5, 2, and 4 ft bgs for soil vapor readings and laboratory analysis (VOCs and SPLP prep sample, PAHs, RCRA metal, and TRPH)
1 hours per Mobe/Demobe, 2 days 1 hours per Mobe/Demobe, 2 days 1 hours per Mobe/Demobe, 2 days
Senior geologist to oversee field crew/ technical QA/QC of operations
QAPP, HASP, and Soil Sampling
QA/QC Quality Assurance Project Plan (QAPP)
Prepare a Quality Assurance Project Plan (QAPP), and Health and Safety Plan (HASP) for completion of the work. No field tasks will be completed until the QAPP is approved.
Contact owner/tenant and conduct pre-drilling site walk with property owner, current tenants, utility locator.
Complete applications for City of Jacksonville Right-of-Way Permit for Market Street and E. 14th Street for monitoring well installation. Designate IDW staging areas. Attend initial site visit, identify sample locations on-site geophysical survey for boring, groundwater screening locations.
Review preliminary soil VOC, PAH, TRPH data to determine if SPLP or TPHCWG tests need to be completed (3 Hrs.) and prepare the Subtask 2 Deliverable Submittal to the FDEP to include field notes, sampling forms, and laboratory reports (2 Hrs.).
1 hours per Mobe/Demobe, 1 day 1 hours per Mobe/Demobe, 2 days
Request laboratory sample kit (soil sampling)
Scope: Installing 10 soil borings collecting three samples per boring (30 Soil Samples).
Direct work, daily safety debrief, record lithological descriptions, install of 10 soil borings to a depth of 4 feet through concrete, asphalt and grass surfaces, and coordinate lab pickup of soil samples.
Daily safety debrief, collect samples at 0.5, 2, and 4 ft bgs for soil vapor readings and laboratory analysis (VOCs and SPLP prep sample, PAHs, RCRA metal, and TRPH)
SUBTASK 2:
PROPOSAL NO. PEQ257222 Delta TACO#02 ERIC_18274
DATE: 11/13/2025
QAPP, HASP, and Soil Sampling
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE
Revocable Permit Filing First Page - Market Street 10.00$ Page 0 -$ Revocable Permit Filing Additional Pages - Market Street 8.50$ Page 0 -$ Revocable Permit Filing Additional Pages - Market Street 8.50$ Page 0 -$ Revocable Permit Filing Additional Pages - Market Street 8.50$ Page 0 WCD#1 -$ Revocable Permit Filing First Page - E. 14th Street 10.00$ Page 0 -$ Revocable Permit Filing Additional Pages - E. 14th Street 8.50$ Page 0 -$ Revocable Permit Filing Additional Pages - E. 14th Street 8.50$ Page 0 -$ Revocable Permit Filing Additional Pages - E. 14th Street 8.50$ Page 0 WCD#01 -$ COJ ROW Permit Market Street 191.00$ Page 0 -$ COJ ROW Permit Market Street 191.00$ Page 0 -$ COJ ROW Permit Market Street 255.00$ Page 0 WCD#01 -$ COJ ROW Permit E. 14th Street 191.00$ Page 0 -$ COJ ROW Permit E. 14th Street 191.00$ Page 0 -$ COJ ROW Permit E. 14th Street 255.00$ Page 0 WCD#01 -$ Geo Tek GPR and EM Survey 750.00$ day 0 -$
TOTAL SUBCONTRACTOR -$
LABORATORY COSTS
PARAMETER RATE # SAMPLES
VOCs (VOAs and VOHs) EPA Method 8260 (full list) 110.00$ 0 -$ VOCs (VOAs and VOHs) EPA Method 8260 (full list) 110.00$ 0 -$ PAHs EPA 8270SIM 110.00$ 0 -$
PAHs EPA 8270SIM 110.00$ 0 -$
TRPH FL-PRO 88.00$ 0 -$
TRPH FL-PRO 88.00$ 0 -$
RCRA Metals Various Methods 126.00$ 0 -$
RCRA Metals Various Methods 126.00$ 0 -$
SPLP Extraction EPA Method 1311/1312 45.00$ 0 -$ Barium EPA 6010 13.00$ 0 -$ TRPH Fractionation EPH/VPH 250.00$ 0 -$ Sample Shipping Large Cooler (overnight) 150.00$ 0 -$
TOTAL LAB -$
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables Expendables 40.00$ day 0 2 field days -$
Ice (Sample Preservation) 6.50$ each 0 -$ Drilling related Soil Assessment Kit (concrete) 235.00$ day 0 Soil Sampling -$ Analytical related Encore Sampler (25 gram) 16.00$ each 0 (SPLP samples - hold) -$
Encore Sampler (25 gram) 16.00$ each 0 (SPLP samples - hold) -$ Terra Core Sampler 11.00$ each 0 (VOH samples) -$ Terra Core Sampler 11.00$ each 0 (VOH samples) -$
IDW related 55-Gallon drum 100.00$ each 0 -$ 55-Gallon drum 100.00$ each 0 -$
Other Global Positioning System 175.00$ day 0 -$
TOTAL EQUIPMENT -$
All ten soil borings for SB003, SB007, SB008, SB009, and SB010
All ten soil borings
All ten soil borings All ten soil borings for SB003, SB007, SB008, SB009, and SB010
WCD#02
WCD#02
for SB003, SB007, SB008, SB009, and SB010 for SB003, SB007, SB008, SB009, SUBTASK 3:
PROPOSAL NO. PEQ257222 Delta TACO#02 ERIC_18274
DATE: 11/13/2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Field Task Planning Senior Geologist RFM 0.00
Time Duration: 1.5 days Geologist DW Load/unload and calibrate equipment (1 hour) One day install one day clean up ROW wells 0.00 Geologist DW 0.00
Geologist DW (6.00)
Senior Geologist RFM 0.00 Senior Geologist RFM Senior geologist oversight of One day of well install (0.50) Field Scientist DW Containerize IDW (0.5/hours per day) 0.00 Field Scientist DW Containerize IDW (0.5/hours per day) One day of well install (0.50)
Exterior Oversee Deep Lithological Boring
Senior Geologist RFM 0.00 Senior Geologist RFM Finalize boring logs and field notes at end of day (1 hr./day) 0.00 Mobilization / Demobilizations Senior Geologist RFM 0.00 Geologist DW 0.00 Geologist DW 1 hours per mobe/demobe 2 One day less -1.00 Field Scientist (IDW run) DW 0.00 Field Scientist (IDW run) DW 1 hours per mobe/demobe 1 Covered in Subtask 4 1.00
Personnel: DW RFM Hours: (6.50) (0.50) TOTAL LABOR -7.00
VEHICLE TYPE RATE UNIT USEAGE
Truck (DW) 120.00$ Day 2 -$ Truck (DW) 120.00$ Day -1 (120.00)$ Car (RFM) 80.00$ days 1 -$
TOTAL VEHICLE (120.00)$
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM -$
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE
JAEE 6,750.00$ each 1 -$
JAEE 6,750.00$ each -1 (6,750.00)$
JAEE 5,150.00$ each 1 5,150.00$
MOT Plans 1,123.50$ each 1 WCD#1 -$
TOTAL SUBCONTRACTOR (1,600.00)$
LABORATORY COSTS ]
PARAMETER RATE # SAMPLES IDW
TOTAL LAB -$
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables Expendables 40.00$ day 2 2 field days -$
Ice (Sample Preservation) 6.50$ each 0 -$ Drilling related Monitoring Well Installation Kit 325.00$ day 1.5 Well Install -$
Monitoring Well Installation Kit 325.00$ day -0.5 Well Install (162.50)$ Analytical related IDW related (Drums provided by Driller) Other Total Survey Station 50.00$ day 1 -$
TOTAL EQUIPMENT (162.50)$
1 hours per mobe/demobe 1 day
Shoulder set up of signs and cones by qualified person
Lithologic Boring and Monitoring well Installation
Scope: Install Four Shallow Zone Monitoring Wells to a depth of 15 ft bgs
1 hours per mobe/demobe 2 days 1 hours per mobe/demobe 1 day
Direct work, safety debriefs, well development, survey top of casing elevation of wells to assess gw flow direction, and elevation survey of well top of casings.
Scope: Lithological Boring to 50 feet bgs litho boring, well installation, and boring abandonment
Prepare the Subtask 3 Deliverable Submittal to the FDEP to include field notes, sampling forms, and laboratory reports (3 Hrs.).
Senior geologist oversight of deep lithological boring and abandonment, records lithological descriptions
Senior geologist oversight of well installation (1 hour/day) litho boring, well installation, and boring abandonment litho boring, well installation, and boring abandonment
Direct work, safety debriefs, well development, survey top of casing elevation of wells to assess gw flow direction, and elevation survey of well top of casings.
SUBTASK 4: Groundwater Sampling, IDW Management PROPOSAL NO. PEQ257222 Delta TACO#02 ERIC_18274
DATE: 11/13/2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Field Task Planning and Pre-GW and MAGS Tasks Senior Geologist RFM 0.00 Senior Geologist RFM 0.00
Senior Geologist RFM 0.00
Groundwater Sampling
Time Duration: 1 day Environmental Technician DW Load/unload equipment (1 hour/day) 0.00 Environmental Technician DW Load/unload equipment (1 hour/day) (1.00) Project Geologist CM Load/unload equipment (1 hour/day) 1.00 Environmental Technician DW Collect water levels (7 wells, 10 minutes/well) 0.00 Environmental Technician DW Collect water levels (7 wells, 10 minutes/well) (1.00) Project Geologist CM Collect water levels (7 wells, 10 minutes/well) 1.00 Environmental Technician DW 0.00
Environmental Technician DW (10.50)
Project Geologist CM 10.50
Environmental Technician DW 0.00 Environmental Technician DW (1.00) Project Geologist CM 1.00 Environmental Technician DW Collect soil and groundwater IDW samples from the 55-gallon drum 0.00 Environmental Technician DW Collect soil and groundwater IDW samples from the 55-gallon drum (0.50) Project Geologist CM Collect soil and groundwater IDW samples from the 55-gallon drum 0.50 Environmental Technician DW 0.00 Environmental Technician DW (2.00) Project Geologist CM 2.00 Mobilization / Demobilizations Environmental Technician DW 0.00 Environmental Technician DW -1.00 Project Geologist CM 1.00 Environmental Technician DW 0.00
Personnel: RFM DW CM Hours: 0.00 (17.00) 17.00 TOTAL LABOR 0.00
VEHICLE TYPE RATE UNIT USEAGE
Truck (DW) GW Sampling 120 day 0 -$ Truck (DW) IDW Pickup sign manifest 120 day 0 -$
TOTAL VEHICLE -$
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE
Erwin 110.00$ drum 0 -$ Erwin 110.00$ drum -1 (110.00)$ Erwin 110.00$ drum 0 -$
TOTAL SUBCONTRACTOR (110.00)$
LABORATORY COSTS
PARAMETER Method RATE # SAMPLES IDW VOCs (VOAs and VOHs) EPA Method 8260 (full list) 110.00$ 0 0 -$ PAHs EPA 8270SIM 110.00$ 0 -$
TRPH FL-PRO 88.00$ 0 -$
RCRA Metals Various Methods 126.00$ 0 -$ TCLP RCRA Metals (IDW Soil) 135.00$ 0 -$ TCLP VOCs Full List (IDW Soil) 210.00$ 0 -$ Sample Shipping Large Cooler (overnight) 150.00$ 0 -$
TOTAL LAB -$
soil
1 hour per mobe/demobe ( IDW pickup), 1 day
Prepare GW sampling/calibration logs/field notes for PM evaluation (1 hr./day)
Request laboratory sample kit (groundwater and IDW sampling), verify property owner is the same as on the access agreement, contact property owner and FDEP of field activity
Scope: 7 Monitoring Wells
Prepare the Subtask 4 Deliverable submittal for groundwater sampling and IDW disposal to the FDEP to include field notes, sampling forms, laboratory reports, and Manifests (3 Hrs.).
1 hour per mobe/demobe (GW Sampling), 1 day
Coordinate IDW T&D: Mobilize to site, meet transporter to sign manifests
Liquid
Safety meeting, calibrate instruments, collect groundwater samples for VOCs, PAHs, RCRA metals, and TRPH (7 wells, 1.5 hrs/well)
Prepare GW sampling/calibration logs/field notes for PM evaluation (1 hr./day)
Coordinate IDW T&D: Mobilize to site, meet transporter to sign manifests
1 hour per mobe/demobe (GW Sampling), 1 day
Safety meeting, calibrate instruments, collect groundwater samples for VOCs, PAHs, RCRA metals, and TRPH (7 wells, 1.5 hrs/well)
Prepare GW sampling/calibration logs/field notes for PM evaluation (1 hr./day)
Coordinate IDW T&D: Mobilize to site, meet transporter to sign manifests
1 hour per mobe/demobe (GW Sampling), 1 day
IDW waste profile and manifesting
Safety meeting, calibrate instruments, collect groundwater samples for VOCs, PAHs, RCRA metals, and TRPH (7 wells, 1.5 hrs/well)
Liquid
SUBTASK 4: Groundwater Sampling, IDW Management PROPOSAL NO. PEQ257222 Delta TACO#02 ERIC_18274
DATE: 11/13/2025
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables Expendables 40.00$ day 0 -$
Ice (Sample Preservation) 6.50$ each 0 -$ Analytical related Groundwater Sampling Kit 290.00$ day 0 -$
Tubing, HDPE 0.30$ ft 0 -$ Tubing, silicon (3/16 x 3/8) 3.00$ ft 0 -$
IDW related 55-Gallon drum (driller) -$
TOTAL EQUIPMENT -$
SUBTASK 5: Site Assessment Report PROPOSAL NO. PEQ257222 Delta TACO#02 ERIC_18274
DATE: 11/13/2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Report Deliverable Senior Scientist ABR 0.00 Geologist RFM 0.00 Senior Geologist RFM 0.00 Senior Geologist RFM Evaluate data in report text, raw soil and groundwater data, tables and exhibits 0.00 Senior Geologist RFM preparation of INOC Package for E 14th Street ROW owned by COJ. (WCD#3) 3.00 Senior Engineer DC Soil Analytical Results and Summary Evaluation 0.00 Senior Engineer DC Groundwater Analytical Results and Summary Evaluation 0.00 Senior Engineer DC Conclusions/Recommendations 0.00 Senior Engineer DC Sign and Seal the Site Assessment Report 0.00 Senior Engineer DC review of INOC package and add text to the email for submittal. (WCD#3) 1.00 Geologist RFM 0.00
GIS Technician CM 0.00
GIS Technician CM 1.00 Admin JB 0.00
Personnel: RFM DC CM JB ABR Hours 3 1 1 0 0 TOTAL LABOR 5.00
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE -$
Prepare draft report introduction, site history, recent activities summary, Prepare discussion of soil, groundwater, and soil vapor results QA/QC field and laboratory data (30 soil and 8 groundwater samples)
Prepare Appendices including boring logs (10 soil locations and 1 lithological), to include well construction diagrams (4 wells), and prepare cross section with detected GW COCs Prepare base Exhibits (site setting, groundwater flow, soil detection maps for 0.5, 2, and 4 ft bgs samples for VOCs, PAHs, metals, and TRPH, cross section, and groundwater concentrations maps for shallow zone monitoring wells (VOCs, PAHs, metals, and TRPH).
Formatting report and tables, assembling of exhibits and appendices to be assembled in a pdf format preparation of figure with seal box and adjacent property boundaries. (WCD#3)
C O
S T
ES
TI
M A
TE
C on tra ct or
Te rra
O rig in al
E R
IC
_1
6/
BF
as k
Pr oj ec t M an ag em en t
Su bT as k
Si te
M ar ke t S tre et
P ro je ct
(F
AC
ID
: 9
Su bT as k
Q
AP
P, H
AS
P, a nd S oi l S am pl in g
Su bT as k
Ac tiv ity
/P ha se
Si te
A ss es sm en t W or kp la n
In ve st ig at io n Su bT as k
Li th ol og ic B or in g an d M on ito rin g w el l I ns ta lla tio n
Su bT as k
Pr oj ec t M an ag er
M s.
M eg an
R . J oh as k
G ro un dw at er S am pl in g, ID
W
M an ag em en t
Su bT as k
Su bT as k
Si te
A ss es sm en t R ep or t Su bT as k
To ta ls
La bo r R at e
Ca te go ry
$5 7.
Pr oj ec t M an ph
M on gi llo
.7
.7
$3 2.
Ad m in is tra tiv e
Ju lie
B ro w n
2.
0.
0.
0.
2.
0.
0.
0.
0.
0.
$0 .0
Br ow nf ie ld
C on su lta nt 0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$3
6.
C ad d Sp ec ia lis t
C he ls ea
F ug at e
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$2 5.
Fi el d
Sc ie nt is t Fr an ki e G ild ay
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$3 1.
St af f S ci en tis t
N ic ol e
Ko va ch 0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$3
3.
Fi el d Sc ie nt is t
D ar ry l W illi am s
.0
.0
.0
.0
0.
0.
0.
0.
0.
0.
$4
8.
Se ni or G eo lo gi st
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$4 5.
Se ni or
S ci en tis t An ge llic a R od -B az
.0
.0
0.
0.
4.
0.
0.
0.
0.
0.
$0
.0
Pr in ci pa l C on su lta nt 0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$4
5.
Se ni or P
M / E ng in ee r
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0 .0
Pr oj ec t I nd us tri al H yg ie ni st
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0 .0
Pr oj ec t S ci en tis t 0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$7
2.
Se ni or E ng in ee r
D on na C lin e
8.
2.
0.
0.
6.
0.
0.
0.
0.
0.
$5 7.
Se ni or
G eo lo gi st R al ph
M on gi llo
.5
.0
.5
6.
.0
0.
0.
0.
0.
0.
$2 9.
G
IS
A na lys t C al i M ay
.0
4.
0.
0.
8.
0.
0.
0.
0.
0.
$0 .0
Se ni or
In du st ria l H yg ie ni st 0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0
.0
Se ni or E ng in ee r
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0 .0
Se ni or
S ci en tis t 0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$2
4.
En vi ro nm en ta l T ec hn ic ia n
Ty le r C oz ar t
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$1 8.
En vi ro nm en ta l T ec hn ic ia n R ay ve n D en ve r 0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$2
2.
Fi el d Sc ie nt is t
Av er y Bl is s
.0
.0
0.
0.
0.
0.
0.
0.
0.
0.
$0 .0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0
.0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0 .0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0
.0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
To ta l H ou rs
1.
.7
.0
.5
.0
.0
0.
0.
0.
0.
0.
D ire ct L
$7
,8
.2
$9
.9
$2 ,7
.9
$1
,1
.7
$9
.9
$2 ,0
.5
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
O ve rh ea d
6.
$9
,1
.5
$1 ,0
.0
$3
,2
.3
$1 ,3
.3
$1
,1
.7
$2 ,4
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
G en
A dm in
0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fr in ge
.2
$4
,4
.3
$5
.2
$1 ,5
.7
$6
.9
$5
.9
$1
,1
.5
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l L
$2
1, 3.
$2 ,4
.2
$7
,5
.0
$3 ,1
.0
$2
,5
.6
$5 ,6
.1
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
R
EV
C
EF
T
ER
R A
C O
N P ag
C O
S T
ES
TI
M A
TE
C on tra ct or
Te rra
O rig in al
E R
IC
_1
6/
BF
as k
Pr oj ec t M an ag em en t
Su bT as k
Si te
M ar ke t S tre et
P ro je ct
(F
AC
ID
: 9
Su bT as k
Q
AP
P, H
AS
P, a nd S oi l S am pl in g
Su bT as k
Ac tiv ity
/P ha se
Si te
A ss es sm en t W or kp la n
In ve st ig at io n Su bT as k
Li th ol og ic B or in g an d M on ito rin g w el l I ns ta lla tio n
Su bT as k
Pr oj ec t M an ag er
M s.
M eg an
R . J oh as k
G ro un dw at er S am pl in g, ID
W
M an ag em en t
Su bT as k
Su bT as k
Si te
A ss es sm en t R ep or t Su bT as k
To ta ls
Tr av el
Ve hi cl e ch ar ge $8
.0
0.
0.
$0 .0
$0
.0
$0 .0
$0
.0
M ile ag e
C os ts…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .