CN-370000-HW687-BIL01C.pdf

PDF 1 MB Posted

Attached to
Master Agreement FL|HW687|519929c0c8a00e44396dc1d8f5fa086b
Contract number
HW687
Issued by
Florida

About this file

This Task Assignment (TA) BIL01C is a contract document issued by the State of Florida Department of Environmental Protection (FDEP) to Terracon Consultants, Inc. for groundwater monitoring activities at the Former Rose Printing Company site located at 2503 Jackson Bluff Road, Tallahassee, Leon County, Florida. The contract is executed under the umbrella contract HW687 and is funded through federal grant money from the U.S. Environmental Protection Agency's State & Tribal Response Program Bipartisan Infrastructure Law (BIL) funding cooperative agreement administered by FDEP. The Department Project Manager is Megan Johnson (850-245-8994), and the Contractor's Project Manager is Sid O'Neal (850-692-7186).

The scope of work consists of four subtasks: Project Management ($2,735.50), development of a Site-Specific Quality Assurance Project Plan, Work Plan, and updated Health and Safety Plan ($1,800.87), and two quarters of groundwater monitoring and reporting (Subtask 3: $11,748.77 and Subtask 4: $11,508.77), for a total TA value of $27,793.91. The contract uses a fixed unit rate payment structure with invoicing triggered by Department approval of deliverables. The first deliverable—the Site Specific QAPP/Work Plan and updated HASP—is due November 21, 2025, with approval required before the first invoice of $1,800.87 is processed. The 1st Quarterly Groundwater Monitoring Report is due February 13, 2026 (invoice: $11,748.77), and the 2nd Quarterly Groundwater Monitoring Report with Project Management is due May 15, 2026 (invoice: $14,244.27). The work involves sampling from 12 monitoring wells at four depth intervals, analyzing samples for BTEXM compounds, and preparing comprehensive quarterly monitoring reports to assess groundwater plume stability in accordance with Florida Department of Environmental Protection remedial closure requirements under Chapter 62-780, F.A.C.

View the file

Other files

File Type Posted
CN-370000-HW687-BF01A.pdf PDF
CN-370000-HW687-BF01B.pdf PDF
CN-370000-HW687-BF02A.pdf PDF
CN-370000-HW687-BF04A.pdf PDF
CN-370000-HW687-BF04ACO3.pdf PDF
CN-370000-HW687-BIL01B.pdf PDF
CN-370000-HW687-BIL02B.pdf PDF
CN-370000-HW687-BIL03B.pdf PDF
CN-370000-HW687-BIL1BCO2.pdf PDF
CN-370000-HW687-BIL2CCO2.pdf PDF
CN-370000-HW687-CSS02.pdf PDF
CN-370000-HW687-CSS03.pdf PDF
CN-370000-HW687-DC002A.pdf PDF
CN-370000-HW687-DC002G.pdf PDF
CN-370000-HW687-DC006C.pdf PDF
CN-370000-HW687-DC008B.pdf PDF
CN-370000-HW687-DC008D.pdf PDF
CN-370000-HW687-DC009B.pdf PDF
CN-370000-HW687-DC010C.pdf PDF
CN-370000-HW687-DC012A.pdf PDF
CN-370000-HW687-DC014B.pdf PDF
CN-370000-HW687-DC014D.pdf PDF
CN-370000-HW687-DC014H.pdf PDF
CN-370000-HW687-DC015D.pdf PDF
CN-370000-HW687-DC016C.pdf PDF
CN-370000-HW687-DC01ACO9.pdf PDF
CN-370000-HW687-DC021A.pdf PDF
CN-370000-HW687-DC021C.pdf PDF
CN-370000-HW687-DC022A.pdf PDF
CN-370000-HW687-DC023B.pdf PDF
CN-370000-HW687-DC023D.pdf PDF
CN-370000-HW687-DC024B.pdf PDF
CN-370000-HW687-DC024E.pdf PDF
CN-370000-HW687-DC024F.pdf PDF
CN-370000-HW687-DC027A.pdf PDF
CN-370000-HW687-DC028A.pdf PDF
CN-370000-HW687-DC028D.pdf PDF
CN-370000-HW687-DC029C.pdf PDF
CN-370000-HW687-DC02ACO1.pdf PDF
CN-370000-HW687-DC02HCO2.pdf PDF
CN-370000-HW687-DC030A.pdf PDF
CN-370000-HW687-DC031A.pdf PDF
CN-370000-HW687-DC035A.pdf PDF
CN-370000-HW687-DC037A.pdf PDF
CN-370000-HW687-DC03CCO2.pdf PDF
CN-370000-HW687-DC044A.pdf PDF
CN-370000-HW687-DC045B.pdf PDF
CN-370000-HW687-DC049A.pdf PDF
CN-370000-HW687-DC054A.pdf PDF
CN-370000-HW687-DC056A.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

HW687

BIL01C Completion June 19, 2026

The Department approves this Task Assignment (TA), based upon the Cost Proposal and Level of Effort (CP/LOE), for two quarters of groundwater monitoring at the below project site, submitted to the Department on October 24, 2025, by Terracon Consultants, Inc. The final deliverable will be the 2nd quarterly groundwater monitoring report received by the Department no later than May 15, 2026.

Megan Johnson 850.245.8994 Contractor Terracon Consultants, Inc. Contractor

Contractor Sid O'Neal Contractor 850.692.7186

ERIC_18047

2503 Jackson Bluff Road, Tallahassee, Leon County

Former Rose Printing Company

Contractor Contractor

✔ $ 27,793.91

$ 27,793.91

Scope of Work

Terracon Consultants, Inc.

Contractor Donna Cline, P.E.

Senior Remediation Engineer

10/31/25

Digitally signed by Cline, Donna L DN: cn=Cline, Donna L, ou=Domain Users, email=Donna.Cline@terracon.com Date: 2025.10.31 07:03:03 -04'00'

Cline, Donna L

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2025.10.29 13:57:17 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WC TAFORM

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Site Specific QAPP/Work Plan and updated HASP.

11/21/2025

1st Quarterly Groundwater Monitoring Report.

02/13/2026

2nd Quarterly Groundwater Monitoring Report; Project Management.

05/15/2026

Department approval of Site Specific QAPP/Work Plan and updated HASP (Subtask

2) $ 1,800.87

Department approval of 1st Quarterly Groundwater Monitoring Report (Subtask 3) $ 11,748.77

Department approval of Project Management and 2nd Quarterly Groundwater Monitoring Report (Subtasks 1 and 4) $ 14,244.27

$ 27,793.91

HW687

BIL01C

www.FloridaDEP.gov

FFLLORIDA DDEEPARTMENTT OOFF

EEnvironmentall Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jay Collins Lt. Governor

Alexis A. Lambert Secretary

Memorandum TO: Terracon Consultants, Inc., HW687 Contract File

FROM: Megan Johnson, Contract Manager

DATE: October 29, 2025

SUBJECT: Negotiation Summary – BIL22 Task Assignment (TA) BIL01C Former Rose Printing Company – Site ID # ERIC_18047 Quarterly Groundwater Monitoring Activities

This TA is intended for conducting quarterly groundwater monitoring activities at the Former Rose Printing Company site, located at 2503 Jackson Bluff Road, Tallahassee, Leon County. The services under this task are being conducted using federal funds from the State & Tribal Response Program Bipartisan Infrastructure Law (BIL) funding cooperative agreement that is administered by the Department on behalf of the U.S. Environmental Protection Agency (EPA).

Subtask 1: Project Management This subtask is a percentage of the overall project fees and has been negotiated as a contract rate. It includes project management, overhead, general and administrative, and fringe. The agreed upon cost of this subtask is $2,735.50.

Subtask 2: Site-Specific QAPP/Work Plan and Updated HASP Under this subtask, Terracon will develop a Work Plan and Site-Specific Quality Assurance Project Plan and updated Health and Safety Plan for this site. The agreed upon cost of this subtask is $1,800.87.

Subtask 3: 1st Quarterly Groundwater Monitoring and Report Under this subtask, Terracon will conduct 1st quarterly groundwater sampling to include: wells screened 15-30 ft bls (MW-3, MW-4, MW-6, MW-7, and MW-8); wells screened 40-45 ft bls (MW- 11, MW-12, and MW-14); wells screened 60-65 ft bls (MW-15 and MW-19); and wells screened 85-90 ft bls (MW-24 and MW-25). Each sample collected will be analyzed for BTEXM. Terracon will also prepare a 1st Quarterly Groundwater Monitoring Report with site history, methodology, conclusions, recommendations, tables, sample locations, and concentration exhibits. The agreed upon cost of this subtask is $11,748.77.

Subtask 4: 2nd Quarterly Groundwater Monitoring and Report Under this subtask, Terracon will conduct 2nd quarterly groundwater sampling to include: wells screened 15-30 ft bls (MW-3, MW-4, MW-6, MW-7, and MW-8); wells screened 40-45 ft bls (MW- 11, MW-12, and MW-14); wells screened 60-65 ft bls (MW-15 and MW-19); and wells screened 85-90 ft bls (MW-24 and MW-25). Each sample collected will be analyzed for BTEXM. Terracon will also prepare a 2nd Quarterly Groundwater Monitoring Report with site history, methodology, conclusions, recommendations, tables, sample locations, and concentration exhibits. The agreed upon cost of this subtask is $11,508.77.

Negotiation Summary – Task Assignment (TA) BIL01C Former Rose Printing Company

ERIC_18047

October 29, 2025 www.FloridaDEP.gov

Summary The Department’s BIL Contract Manager and Terracon’s Contract Manager have both agreed to the scope of work and associated costs. The final cost associated with this TA is $27,793.91.

Documentation of these costs is included in the Cost Proposal/Level of Effort (CP/LOE) Form and CP/LOE narrative provided by Terracon on October 24, 2025, and the TA Form for BIL01C prepared by the Department. The final deliverable for this TA must be received by the Department no later than May 15, 2026.

3559 Timberlane School Rd Tallahassee, FL 32312

P (850) 692-7185 F (850) 692-7186

Terracon.com

October 24, 2025

Florida Department of Environmental Protection Waste Cleanup Program-Waste Management Division 2600 Blair Stone Road Tallahassee, Florida 32399-2400

Attn: Ms. Megan R. Johnson, Environmental Consultant Brownfields and CERCLA Site Screening Section E: Megan.R.Johnson@floridadep.gov W: 850-245-8994

Re: Proposal for 2 Quarters of Groundwater Monitoring Former Rose Printing Company 2503 Jackson Bluff Road Tallahassee, Leon County, Florida Terracon Proposal No. PHF257008

Dear Ms. Johnson:

Terracon Consultants, Inc. (Terracon) appreciates the opportunity to submit this proposal to the Florida Department of Environmental Program (FDEP) Waste Cleanup Section to conduct two (2) Quarters of Groundwater Monitoring at the Former Rose Printing Company facility located at 2503 Jackson Bluff Road in Tallahassee, Florida. These activities will be performed as approved by both FDEP and the U.S. Environmental Protection Agency (U.S.

EPA) for utilizing Targeted Brownfield Assessment/Site Specific Activities (TBA/SSA) federal funding administered by FDEP.

Scope of Services (see Section 2.0 of attached Proposal Detail)

Develop a Workplan / Site Specific Quality Assurance Project Plan (SSQAPP) and updated Health and Safety Plan (HASP) and conduct 2 quarters of groundwater monitoring to include wells screened 15-30 ft bls (MW-3, MW-4, MW-6, MW-7, and MW-8); wells screened 40-45 ft bls (MW-11, MW-12, and MW- 14); wells screened 60-65 ft bls (MW-15 and MW-19); and wells screened 85-90 ft bls (MW-24 and MW-25).

Review data and prepare a Quarterly Monitoring Report summarizing each quarterly sampling event.

See attached LOE for details

Schedule (see Section 4.0 of attached Proposal Detail)

Deliverable of Workplan and SSQAPP within 10 business days of authorization;

Proposal for 2 Quarters of Groundwater Monitoring Former Rose Printing Company ■ Tallahassee, FL October 24, 2025 ■ Terracon Proposal No. PHF257187

Deliverable No. 1 (Subtask 3): 1st Quarterly Groundwater Monitoring Report within 20 business days following receipt of laboratory results.

Deliverable No. 2 (Subtask 4): 2nd Quarterly Groundwater Monitoring Report within 20 business days following receipt of laboratory results.

Compensation (see Section 4.0 of attached Proposal Detail)

$27,793.91 (See attached CEF for details).

PROJECT INFORMATION

Prior to being redeveloped as a printing shop in the late 1950s, the site was occupied by the Dale Mabry Army Airfield during the 1940s and 1950s to train pilots and air crews during World War II. During site operations as Dale Mabry Army Airfield, the area of the site served as location for bunkered underground storage tanks (USTs) that transported fuel in an underground pipeline to a fuel depot adjacent to a runway northwest of the site.

According to the Final Site Assessment Report - Site Assessment and Pipeline Abandonment Former Dale Mabry Army Airfield Tallahassee, Leon County, Project No. I04FL0117-01, dated May 2016, prepared by Aerostar SES, LLC (Aerostar), this specific area of the fueling operations was identified as “Site B”. Site B consisted of thirteen (13) 25,000-gallon USTs.

It is believed that the north portion of this former tank area is north of the former Rose Printing Building and under the northwest corner of the former Rose Printing Building. Prior assessments performed at the site confirmed exceedances above the FDEP Cleanup Target Levels for soil and groundwater have been identified in this area. The reports reviewed suggest that the USTs and the pipeline were abandoned sometime prior to the site being occupied by Rose Printing. Only benzene, toluene, ethylbenzene, xylenes (BTEX) and lead were analyzed for in this prior groundwater assessment.

In a May 19, 2017 letter from FDEP to the U.S. Army Corp of Engineers (USACE), FDEP did not concur with the USACE recommendation for Site B and indicated the USACE “needs to conduct additional assessment activities at the site, and fully characterize and define the site’s groundwater plume, before the Department can determine if Site B qualifies for non-eligibility status”. This investigation was not performed.

In November fall of 2019, utilizing funds available from their US EPA Community Brownfield Assessment grant, the City of Tallahassee (City) contracted Terracon to perform Phase I and II Environmental Site Assessment (ESA) activities prior to acquiring the site for redevelopment. Direct push sampling inside the building indicated significant groundwater impacts extended south of the former tank area under the building.

On March 3, 2022, FDEP approved the City’s application for further assessment and cleanup of this former airfield site.

October 24, 2025 ■ Terracon Proposal No. PHF257187

On June 16, 2022, groundwater samples were collected from nine (9) temporary monitoring wells (GW-1 thru GW-8, and GW-15); and analyzed for benzene, toluene, ethylbenzene, total xylenes, and methyl tert-butyl ether (BTEXM) by Environmental Protection Agency (EPA) 8260B, PAHs by EPA Method 8270C, TRPH using the State of Florida Petroleum Range Organics (FL-PRO), and lead by EPA Method 6010B to assess the previously identified petroleum-impacted groundwater at the site.

Benzene concentrations detected in the June 2022 supplemental sampling event exceeded the FDEP GCTL of 1 μg/L set in Chapter 62-777, F.A.C. at GW-1 (3.1 μg/L), GW-15 (12 μg/L), GW-3 (1.1 μg/L), GW-4 (4.1 μg/L), GW-5 (77 μg/L), and GW-8 (3.2 μg/L). At all other sampling locations, Benzene concentrations were either below FDEP GCTLs and/or laboratory detection limits.

Toluene concentrations detected in the June 2022 supplemental sampling event exceeded the FDEP GCTL of 40 μg/L set in Chapter 62-777, F.A.C. at GW-5 (78 μg/L). At all other sampling locations, Toluene concentrations were either below FDEP GCTLs and/or laboratory detection limits.

Ethylbenzene concentrations detected in the June 2022 supplemental sampling event exceeded the FDEP GCTL of 30 μg/L set in Chapter 62-777, F.A.C. at GW-4 (70 μg/L), GW-5 (250 μg/L), and GW-8 (69 μg/L). At all other sampling locations, Ethylbenzene concentrations were either below FDEP GCTLs and/or laboratory detection limits.

Total Xylene concentrations detected in the June 2022 supplemental sampling event exceeded FDEP Natural Attenuation Default Concentrations of 200 μg/L set in Chapter 62- 777, F.A.C. at GW-5 (760 μg/L). Total Xylene concentrations exceeded the FDEP GCTL of 20 μg/L set in Chapter 62-777, F.A.C. at GW-4 (41.1 μg/L). At all other sampling locations, Total Xylene concentrations were either below FDEP GCTLs and/or laboratory detection limits.

Lead concentrations detected in the June 2022 supplemental sampling event exceeded FDEP Natural Attenuation Default Concentrations of 150 μg/L set in Chapter 62-777, F.A.C. at GW- 1 (433 μg/L). Lead concentrations exceeded the FDEP GCTL of 15 μg/L set in Chapter 62- 777, F.A.C. at GW-2 (61.8 μg/L), GW-3 (30.6 μg/L), GW-4 (118 μg/L), GW-5 (48.5 μg/L), and GW-15 (66.8 μg/L). At all other sampling locations, lead was below the GCTLs or below the laboratory detection limits.

On March 21, 2023, FDEP issued Task Assignment BIL01A to conduct supplemental site assessment including soil sampling, monitoring well installations, and groundwater sampling.

On May 17, 2023, FDEP approved the Supplemental Site Assessment Workplan/Quality Assurance Project Plan, prepared by Terracon dated April 21, 2023.

October 24, 2025 ■ Terracon Proposal No. PHF257187

On June 5th through June 8th, 2023, Preferred Drilling Solutions, Inc. (PDS) under the supervision of Terracon personnel advanced twelve (12) soil borings (MW-1 through MW-

12) using a Geoprobe® direct-push rig. This assessment concluded:

Soil contaminant concentrations of benzene, ethylbenzene, and total xylenes were detected above Leachability based on Groundwater Criteria SCTL at soil boring MW- 12 location from depth interval of 15 feet to 17 feet bgs.

The average depth-to-water measurements collected from the site monitoring wells screened 15-ft to 30-feet below top-of-casing (BTOC) on June 27, 2023, averaged

18.01 feet BTOC. The groundwater flow direction was interpreted towards the northeast.

Volatile Organic Compounds were detected above the FDEP GCTLs in the samples collected from monitoring wells screened 15 feet to 30 feet at MW-3, MW-5, MW-6, and MW-8. Additionally, wells MW-5, MW-6, and MW-8 exceeded the FDEP NADCs.

Volatile Organic Compounds were detected above the FDEP GCLTs in the samples collected from monitoring wells screened 40 feet to 45 feet at MW-11 and MW-12. All other constituents analyzed were below their respective FDEP GCTLs and/or laboratory method detection limits.

On September 1, 2023, FDEP approved deliverables for Subtasks 1, 2, 3 and 4, Task Assignment of BIL01A.

On February 1, 2024, FDEP authorized Task Assignment BF01B to initiate SSA activities including soil sampling, monitoring well installations, and groundwater sampling of monitoring wells. This SSA concluded:

No exceedances were detected above their Leachability Based on Groundwater Criteria in the soil samples SB-22, SB-23, SB-24 collected for laboratory analysis during this event.

Seven (7) monitoring wells (MW-13 through MW-19) were installed

The average depth-to-water measurements collected from the site monitoring wells screened 15-ft to 30-feet BTOC on April 22, 2023, was 15.02 feet BTOC. The shallow monitoring wells groundwater flow direction was interpreted towards the northeast.

The average depth-to-water measurements collected from the site monitoring wells screened 40-ft to 45-feet BTOC on April 22, 2024, was 31.62 feet BTOC. Based on the groundwater elevation the groundwater flow direction could be interpreted to be variable of monitoring MW-11.

October 24, 2025 ■ Terracon Proposal No. PHF257187

The depth-to-water measurements from the site monitoring wells screened 60-ft to 65-feet BTOC were collected on different dates due to MW-19 being installed at a later date. The average depth-to-water was 30.99 feet BTOC. A groundwater flow direction map could not accurately be generated.

BTEX concentrations were detected in the wells screened 15-ft to 30-ft BTOC at MW- 2 MW-6, MW-8, and MW-13. Additionally, VOC concentrations detected in the groundwater collected from MW-6, MW-8, and MW-13 exceeded the FDEP NADCs.

BTEX concentrations were detected above the FDEP GCLTs in the samples collected from monitoring wells screened 40-ft to 45-ft at MW-11, MW-12, and MW-14.

Benzene concentrations detected in the groundwater collected from MW-12 exceeded the FDEP NADCs.

BTEX concentrations were detected above the FDEP GCTL in the samples collected from MW-15 and MW-19. Additionally, Benzene concentrations detected in the groundwater collected from MW-19 exceeded the FDEP NADCs.

Carcinogenic PAHs including Benzo(a)anthracene, Benzo(B)fluoranthene, Dibenzo(a,h)anthracene were detected at concentrations slightly above their respective GCTLs in the groundwater samples collected from shallow wells MW-17, MW-22, and MW-23.

Carcinogenic PAHs including Indeno(1,2,3-cd) pyrene was detected at concentrations slightly above its respective GCTLs in the groundwater sample collected from deep well MW-19, screened 60’ to 65’ bgs.

TRPH concentrations was detected slightly above its respective GCTLs in the groundwater sample collected from deep well MW-6.

The horizontal extent of groundwater contamination has been delineated as two distinct plumes, one smaller plume near the northeast boundary of the site that extends slightly north into the Jackson Bluff Road right-of-way and one larger onsite plume underneath the former building.

The vertical extent of the groundwater contamination was still not fully defined with benzene concentrations at MW-19 screened at 60-65’ bgs elevated above NADC levels.

In May of 2025, in accordance with TA# BIL01B, Terracon installed three (3) monitoring wells (MW-24 through MW-26) using rotary sonic drilling.

October 24, 2025 ■ Terracon Proposal No. PHF257187

The average depth-to-water measurements collected from the new monitoring wells screened 85-90 ft below top of casing (BTOC) was 35.20 ft BTOC. The groundwater flow direction was interpreted towards the southeast.

No exceedances of GCTLS for any contaminants analyzed in the samples collected from the newly installed wells screened 85-90 ft BTOC .

In response to the Department’s Memorandum dated September 22, 2025, in review of Terracon’s SSA Report dated August 7, 2025, the following scope has been prepared to provide both an update to current onsite monitoring well data as well as perform quarterly groundwater monitoring to determine if the groundwater plume is stable and/or shrinking to satisfy RMO II or RMO III Chapter 62-780, F.A.C. closure requirements.

SCOPE OF SERVICES

Based on prior discussions on phone and email, the proposed scope of services consists of subtasks involving Project Management, developing a Workplan / SSQAPP and HASP, and quarterly groundwater monitoring, and preparation of Quarterly Groundwater Monitoring Reports.

Subtask Description

Subtask 1: Project Management

This scope is provided for in the template worksheets

Subtask 2:

Workplan/SSQAPP/Updated

HASP

Develop a Workplan and Site-Specific Quality Assurance Project Plan and Updated Health and Safety Plan prior to field work for approval by FDEP and EPA.

Subtask 3. Quarterly Groundwater Monitoring and Reporting

Mobilization/Demobilization to and from site.

Conduct quarterly sampling to include: wells screened 15-30 ft bls (MW-3, MW-4, MW-6, MW-7, and MW-8); wells screened 40-45 ft bls (MW-11, MW-12, and MW-14); wells screened 60-65 ft bls (MW-15 and MW-19); and wells screened 85-90 ft bls (MW-24 and MW-25). Each sample collected will be analyzed by BTEXM (8260). The analysis will be performed using a NELAC approved laboratory.

Prepare a 1st Quarterly Groundwater Monitoring Report with site history, methodology, conclusions, recommendations, tables, sample locations and concentration exhibits.

October 24, 2025 ■ Terracon Proposal No. PHF257187

Subtask Description

Subtask 4. Quarterly Groundwater Monitoring and Reporting

Mobilization/Demobilization to and from site.

Conduct quarterly sampling to include: wells screened 15-30 ft bls (MW-3, MW-4, MW-6, MW-7, and MW-8);

wells screened 40-45 ft bls (MW-11, MW-12, and MW- 14); wells screened 60-65 ft bls (MW-15 and MW-19);

and wells screened 85-90 ft bls (MW-24 and MW-25).

Each sample collected will be analyzed by BTEXM (8260). The analysis will be performed using a NELAC approved laboratory.

Prepare a 2nd Quarterly Groundwater Monitoring Report with site history, methodology, conclusions, recommendations, tables, sample locations and concentration exhibits.

SCHEDULE

It is estimated that the workplan, SSQAPP, and updated HASP can be submitted within ten days of authorization, and the quarterly groundwater monitoring can be implemented by early December 2025, or earlier should the Task Assignment be issued by mid-November 2025. Each Quarterly Groundwater Monitoring Report can be issued within 20 business days of receipt of laboratory analytical results.

CLOSING REMARKS

Terracon services will be conducted in accordance with the terms and conditions, contained within DEP Waste Cleanup Program (WCP) Contract No. HW687, executed January 5, 2022.

It is understood that a Task Assignment will be issued to authorize us to perform this work.

We appreciate the opportunity to provide this proposal and look forward to working with you on this project. If you should have any questions or comments regarding this proposal, please contact either of the undersigned at 850-692-7185.

Sincerely, Terracon Consultants, Inc.

Sid O’Neal. Donna Cline, P.E.

Environmental Group Manager Contract Manager

Attachments: Exhibit 1 Cost Spreadsheet Level of Effort

SB-4

M

ABR

Y ST

MW-8

JACKSON BLUFF RD

MW-7

MW-21

MW-1

MW-2

MW-17

MW-3

MW-5

MW-12

GW-6

MW-22

MW-9

MW-6

TW-3

MW-13 TW-4

GW-5

MW-9

MW-4

GW-2

GW-7

GW-3

GW-8/15

MW-19MW-14

GW-4

GW-1

AREA OF

REFUSAL/

FORMER

USTs

SB-11/TW-2

SB-12

SB-13

SB-21

SB-7

SB-10

ROSE PRINTING

FORMER

MW-20

MW-11

MW-16

MW-18

SB-22

SB-24

SB-3

SB-20

SB-14/TW-3

SB-8 MW-10

SB-5/TW-4

SB-1

SB-19

SB-9

SB-17

SB-18

SB-15

SB-16

SB-23

SB-25

MW-1

MW-2

MW-5

MW-12

MW-15

MW-4

MW-11

MW-3

MW-8

MW-14

MW-7MW-6

MW-19

MW-13

MW-17

MW-23

MW-10

MW-15

MW-18

MW-16

SB-6/TW-1 MW-24

MW-26

MW-25

MONITORING WELL LOCATION

LEGEND

APPROXIMATE SUBJECT PROPERTY BOUNDARY

AREA OF REFUSAL/FORMER USTs

ABANDONED/DESTROYED TEMPORARY

MONITORING WELL LOCATION

HISTORICAL SOIL BORING LOCATION INSTALLED

BY TERRACON

ABANDONED/DESTROYED MONITORING WELL

SOIL BORING LOCATION

N

Drawn By:

Checked By:

Approved By:

Project Mngr:

File No.

Date:

Scale:

Project No. EXHIBIT

CF

SO

AS SHOWN

SO

SO

HF257042

06/11/25

HF257042

SITE DIAGRAM

FORMER ROSE PRINTING

2503 JACKSON BLUFF ROAD

TALLAHASSEE, LEON COUNTY, FLORIDA3559 Timberlane School Road Tallahassee, Florida

PH. (850) 692-7185 FAX (850) 692-7186

PROPOSED VERTICAL EXTENT MONITORING

WELL LOCATION SCREENED 85-90' (TEMPORARY

OVERRIDE CASING TO 65' BLS)

FD

E

P C

O S

T E

S

TI

M A

TE

C on tra ct or

Te rra co n

D at e:

/2 4/

Ta sk

Su bT as k

Pr oj ec t M an ag em en t Su bT as k

Si te

Fo rm er

R os e Pr in tin g C om pa ny Su bT as k

SS

Q

AP

P an d

U pd at ed

H

AS

P Su bT as k

Ac tiv ity /P ha se

Q ua rte rly M on ito rin g

(2 qt rs ) a nd R ep or tin g

Su bT as k

1s t Q ua rte r G ro un dw at er M on ito rin g

R ep or t

Su bT as k

Pr oj ec t M an ag er

M eg an

J oh ns on as k

2n d

Q ua rte r G ro un dw at er M on ito rin g

R ep or t

Su bT as k

Su bT as k

Su bT as k

To ta ls

La bo r R at e

Ca te go ry

$5 3.

Pr oj ec t M an ag er

Si d O

'N ea l

.0

.0

$2

5.

Ad m in is tra tiv e Ta nj a

Pr oi et to

2.

2.

0.

0.

0.

$0

.0

Br ow nf ie ld C on su lta nt

0.

0.

0.

0.

0.

$3

6.

C

AD

D S pe ci al is t C he ls ea F ug at e

.0

0.

6.

6.

0.

$0

.0

D at a An al ys t & V is ua liz at io n

Sp ec ia lis t 0.

0.

0.

0.

0.

$0 .0

En vi ro nm en ta l T ec hn ic ia n 0.

0.

0.

0.

0.

$2 5.

Fi el d

Sc ie nt is t Fr an ki e G ild ay

.0

2.

.0

.0

0.

$0 .0

Fi el d

Sc ie nt is t 0.

0.

0.

0.

0.

$0 .0

G

IS

T ec hn ic ia n 0.

0.

0.

0.

0.

$0 .0

Pr in ci pa l C on su lta nt

0.

0.

0.

0.

0.

$0

.0

Pr oj ec t G eo lo gi st

0.

0.

0.

0.

0.

$0

.0

Pr oj ec t I nd us tri al

H yg ie ni st 0.

0.

0.

0.

0.

$0 .0

Pr oj ec t S ci en tis t

0.

0.

0.

0.

0.

$7

2.

Se ni or E ng in ee r

D on na C lin e

9.

1.

4.

4.

0.

$0

.0

Se ni or G eo lo gi st

0.

0.

0.

0.

0.

$0

.0

Se ni or G

IS

A na lys t 0.

0.

0.

0.

0.

$0 .0

Se ni or

In du st ria l H yg ie ni st 0.

0.

0.

0.

0.

$5 3.

Se ni or

S ci en tis t Si d O

'N ea l

.0

8.

.0

.0

0.

$0

.0

St af f E ng in ee r 0.

0.

0.

0.

0.

$0 .0

En v Te ch ni ci an

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

To ta l H ou rs

2.

.0

.0

.0

.0

0.

D ire ct L ab or

$7

,9

.4

$9

.3

$6

.3

$3 ,2

.3

$3

,2

.3

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

O ve rh ea d

6.

$9

,2

.7

$1 ,0

.5

$6

.5

$3

,7

.3

$3 ,7

.3

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

G en

A dm in 0.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Fr in ge

.2

$4 ,4

.0

$5

.9

$3

.3

$1

,8

.3

$1 ,8

.3

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l L ab or

$2

1, 6.

$2 ,4

.8

$1

,6

.1

$8 ,7

.1

$8

,7

.1

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

R

EV

C

EF

T

ER

R A

C O

N P ag e

BI

L0 1C

FD

E

P C

O S

T E

S

TI

M A

TE

C on tra ct or

Te rra co n at e:

/2 4/

Ta sk as k

Pr oj ec t M an ag em en t Su bT as k

Si te

Fo rm er

R os e Pr in tin g C om pa ny Su bT as k

SS

Q

AP

P an d

U pd at ed

H

AS

P Su bT as k

Ac tiv ity /P ha se

Q ua rte rly M on ito rin g

(2 qt rs ) a nd R ep or tin g

Su bT as k

1s t Q ua rte r G ro un dw at er M on ito rin g

R ep or t

Su bT as k

Pr oj ec t M an ag er

M eg an

J oh on as k

2n d

Q ua rte r G ro un dw at er M on ito rin g

R ep or t

Su bT as k

Su bT as k

Su bT as k

To ta ls

Tr av el

Ve hi cl e

R en ta l

$2

.0

$0 .0

$2

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

M ile ag e

C os ts $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Ai r F ar e $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Pe r d ie m

H ot el $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l T ra ve l $2

.0

$0

.0

$2

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Su bc on tr ac to r

(E qu ip m en t P ro cu re m en t)

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Su bc on tra ct or S ub to ta l

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Pr oc ur em en t F ee $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l S ub co nt ra ct or

C os t $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Su bc on tr ac to r

(S er vi ce s Pr oc ur em en t) ril lin g

(C on ve nt io na l)

PD

S $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

D ril lin g (N on -c on ve nt io na l)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

M ob ile L ab or at or y $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Su rv ey in g

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

ID

W

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

U til iti es

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Su bc on tra ct or

S ub to ta l $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

H an dl in g

Fe e

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l S ub co nt ra ct or C os t

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

La bo ra to ry

An al yt ic al C os ts

$1 ,4

.0

$0

.0

$7

.0

$7

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fa st

T ur na ro un d

C ha rg es

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Sa m pl e

Sh ip pi ng

$1

.0

$0 .0

$7

0.

$7 0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l L ab or at or y $1

,5

.0

$0 .0

$7

.0

$7

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Fi el d

Ex pe es

Pe rs on al P ro te ct io n $1

.0

$0

.0

$7 0.

$7

0.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Ex pe nd ab le s

$1

.0

$0 .0

$8

0.

$8 0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Eq ui pm en t (

D ril lin g re la te d)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Eq ui pm en t ( An al yt ic al re la te d)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Eq ui pm en t (

ID

W P ur ge

W at er

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Eq ui pm en t ( O th er

$1

,8

.0

$0 .0

$9

.0

$9

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l F ie ld

E xp en se s $2

,1

.0

$0 .0

$1

,0

.0

$1 ,0

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Su bt ot al

$2 5, 2.

$2

,4

.8

$1 ,6

.1

$1

0, 4.

$1 0, 4.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Co m pl et io n Fe e $2

,1

.6

$2

.6

$1

.7

$8

.6

$8

.6

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l E st im at ed C os t

$2 7, 3.

$2

,7

.5

$1 ,8

.8

$1

1, 8.

$1 1, 8.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

R

EV

C

EF

T

ER

R A

C O

N P ag e

BI

L0 1C

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Former Rose Printing Company SUBTASK 2: SSQAPP and Updated HASP

PROPOSAL NO. PHF257187

DATE: 10/24/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Updated HASP Staff Scientist FG 2.0

SSQAPP

Senior Scientist SO 8.0 Senior Engineer DC 1.0

Admin Admin TP Project files set-up 2.0

Staff Total hours

DC 1.0

SO 8.0

FG 2.0

TP 2.0 TOTAL LABOR 13.0

Prepare Updated Health and Safety Plan

Prepare SSQAPP

QA/QC SSQAPP

SUBTASK 3: 1st Qtr Groundwater Monitoring

PROPOSAL NO. PHF257187

DATE: 10/24/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

1st Quarterly Monitoring Well Groundwater Sampling Senior Scientist SO 1.00 Field Scientist FG 2 day loading/unload mobilization/demobilization 1.00 Senior Scientist SO 2 day loading/unload mobilization/demobilization 1.00 Field Scientist FG Collect water levels at 12 monitoring well locations (10min/per well) 2.00 Field Scientist FG 2 day of monitoring welll sampling at 12 locations 16.00 Senior Scientist SO 2 day of monitoring well sampling at 12 locations 16.00

Deliverable - 1st Quarter Groundwater Monitoring Report Field Scientist FG 10.00 Senior Scientist/Geolog SO Review and Summarize Water Quality Parameters 3.00 Senior Scientist/Geolog SO Review and Summarize Groundwater Analytical Results 4.00 Senior Scientist SO 12.00

QA/QC and Review Senior Engineer DC Conclusions and Recommendations 4.00

CADD

CADD Specialist CF Create updated exhibits 6.00

Staff Total hours

DC 4.00

SO 37.00

FG 29.00

CF 6.00 TOTAL LABOR 76.00

VEHICLE TYPE RATE UNIT USEAGE

$0.00

Truck (IDW pickup) 120 day 2 $240.00

TOTAL VEHICLE $240.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE

-$ each 0 $0.00 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

Sample Shipping Large Cooler (2 day) 70.00$ 1 $70.00 Aromatic VOCs EPA 8260D (groundwater) 60.00$ 12 $720.00

TOTAL LAB $790.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables 40.00$ day 2 $80.00 Personal Protection 35.00$ day 2 $70.00 Shallow groundwater sampling kit 290.00$ day 1 $290.00 Deep groundwater sampling kit 415.00$ day 1 $415.00 Tubing, HDPE 0.30$ ft 750 $225.00 Tubing, silicon (3/16 x 3/8) 3.00$ ft 6 $18.00

TOTAL EQUIPMENT $1,098.00

Data reduction/evaluation/Tables

Prep of Report

PreTask Planning, prepare field sampling SOW/coordinate site access, kit

SUBTASK 4: 2nd Quarter Groundwater Monitoring

PROPOSAL NO. PHF257187

DATE: 10/24/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

2nd Quarterly Monitoring Well Groundwater Sampling Senior Scientist SO 1.00 Field Scientist FG 2 day loading/unload mobilization/demobilization 1.00 Senior Scientist SO 2 day loading/unload mobilization/demobilization 1.00 Field Scientist FG Collect water levels at 12 monitoring well locations (10min/per well) 2.00 Field Scientist FG 2 day of monitoring welll sampling at 12 locations 16.00 Senior Scientist SO 2 day of monitoring well sampling at 12 locations 16.00

Deliverable - 2nd Quarter Groundwater Monitoring Report Field Scientist FG 10.00 Senior Scientist/Geolog SO Review and Summarize Water Quality Parameters 3.00 Senior Scientist/Geolog SO Review and Summarize Groundwater Analytical Results 4.00 Senior Scientist SO 12.00

QA/QC and Review Senior Scientist/Geolog DC Review and Seal Report 4.00

CADD

CADD Specialist CF Create updated exhibits 6.00

Staff Total hours

DC 4

SO 37

FG 29

CF 6 TOTAL LABOR 76

VEHICLE TYPE RATE UNIT USEAGE

$0.00

Truck (IDW pickup) 120 day 2 $240.00

TOTAL VEHICLE $240.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE

-$ each 0 $0.00 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

Sample Shipping Large Cooler (2 day) 70.00$ 1 $70.00 Aromatic VOCs EPA 8260D (groundwater) 60.00$ 12 0 0 $720.00

TOTAL LAB $790.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables 40.00$ day 2 $80.00 Personal Protection 35.00$ day 2 $70.00 Shallow groundwater sampling kit 290.00$ day 1 $290.00 Deep groundwater sampling kit 415.00$ day 1 $415.00 Tubing, HDPE 0.30$ ft 750 $225.00 Tubing, silicon (3/16 x 3/8) 3.00$ ft 6 $18.00

$0.00

TOTAL EQUIPMENT $1,098.00

Prep of Report

Data reduction/evaluation/Tables

PreTask Planning, prepare field sampling SOW/coordinate site access, kit

File details come from the government source that posted it. Updated .