This is a Task Assignment (TA) document issued by the State of Florida Department of Environmental Protection (FDEP) to Terracon Consultants, Inc., a contractor operating under the existing DEP Waste Cleanup Program Contract No. HW687. The task assignment, designated as DC005A, authorizes work at the Fountain Cleaners facility (ERIC_5118) located at 4602 Jog Road, Greenacres, Palm Beach County, Florida. The FDEP project manager is Dean Cox, and the contractor's project manager is Donna Cline.
The task assignment approves costs for the development of an Interim Source Removal (ISR) Plan and a site visit to evaluate the condition of existing wells for a proposed Soil Vapor Extraction (SVE) system. The scope of work consists of three subtasks: project management, a site visit coordinated during mobilization activities at a nearby facility to locate monitoring well MW-2 and evaluate the remedial system layout, and preparation of the ISR SVE Plan with design specifications and construction drawings sealed by a professional engineer. The total task assignment value is $8,150.97, representing 70 hours of labor, with a fixed unit rate payment structure. The primary deliverable is the ISR-SVE Plan, due by May 31, 2022, with invoicing to occur upon FDEP approval of the complete plan including all three subtasks. The task assignment is effective with a completion date of August 31, 2022.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection
(Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection CONTRACTOR Department Name:
Title:
Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW687
DC005A Completion August 31, 2022
This task assignment (TA) approves costs for an ISR Plan and for a site visit to evaluate the condition of existing wells. The total cost of this TA is $8,150.97, with 70 hours of labor.
Dean Cox 850-245-8969 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Terracon Consultants, Inc.
Terracon Consultants, Inc.
Donna Cline 813-321-0340
ERIC_5118
4602 Jog Road, Greenacres, Palm Beach County
Fountain Cleaners
✔ $ 8,150.97
$ 8,150.97
Scope of Work
William E. Burns, Jr.
William E. Burns, Jr. Digitally signed by William E. Burns, Jr.
Date: 2022.04.06 11:28:19 -04'00'
N/A
Task Assignment Notification/Change Order
Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Interim Source Removal (ISR) Plan 05/31/2022
FDEP approval of ISR Plan (Subtask 1 Project Management and Subtask 2 Site Visit and Subtask 3 ISR Report) $ 8,150.97
$ 8,150.97
HW687
DC005A
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Interim Secretary
Memorandum
TO: HW687 Contract File FROM: Dean Cox, Contract Manager SUBJECT: DC005A ISR Plan TA for Fountain Cleaners (ERIC_5118)
DATE: 4/5/2022
This task assignment (TA) approves costs for an ISR (SVE) Plan and for a site visit from nearby Village Cleaners (ERIC_5205). Village Cleaners will be scheduled for an O&M visit the same day as this Fountain Cleaners site visit. The Fountain Cleaners site visit purpose is to evaluate the condition of existing wells for SVE installation use and the potential to uncover and rehabilitate monitoring well MW-2 inside the drycleaning (drop-off) facility. The total cost of this TA is $8,150.97, with 70 hours of labor.
Invoicing will include the total TA cost, which includes Subtask 1 Project Management and Subtask 2 Site Visit and Subtask 3 ISR Plan deliverable.
FDEP COST ESTIMATE
Contractor: Terracon
Date: 4/4/2022
Task #: DC005A SubTask 1 Project Management SubTask 6
Site: Fountain Cleaners, ERIC_5118 SubTask 2 Site Visit (from Viking Cleaners) SubTask 7
Activity/Phase: Site Visit and ISR SVE SubTask 3 ISR SVE SubTask 8
Project Manager: Dean Cox SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10
Labor Rate Category
$62.02 Project Manager Donna Cline 5 5.0
$0.00 Administrative 0 0 0 0 0 0 0 0 0 0
$0.00 Brownfield Consultant 0 0 0 0 0 0 0 0 0 0
$21.25 CADD Specialist Andy Schifano 7 0 7 0 0 0 0 0 0 0
$0.00 Data Analyst & Visualization Specialist 0 0 0 0 0 0 0 0 0 0
$24.00 Environmental Technician Pete Christianson 2 2 0 0 0 0 0 0 0 0
$0.00 Field Geologist 0 0 0 0 0 0 0 0 0 0
$0.00 Field Scientist 0 0 0 0 0 0 0 0 0 0
$0.00 GIS Technician 0 0 0 0 0 0 0 0 0 0
$0.00 Principal Consultant 0 0 0 0 0 0 0 0 0 0
$0.00 Project Geologist 0 0 0 0 0 0 0 0 0 0
$0.00 Project Industrial Hygienist 0 0 0 0 0 0 0 0 0 0
$0.00 Project Scientist 0 0 0 0 0 0 0 0 0 0
$62.02 Senior Engineer Donna Cline 19 3 16 0 0 0 0 0 0 0
$0.00 Senior Geologist 0 0 0 0 0 0 0 0 0 0
$0.00 Senior GIS Analyst 0 0 0 0 0 0 0 0 0 0
$0.00 Senior Industrial Hygienist 0 0 0 0 0 0 0 0 0 0
$0.00 Senior Scientist 0 0 0 0 0 0 0 0 0 0
$27.93 Staff Engineer Ricker Lamphier 37 0 37 0 0 0 0 0 0 0
$0.00 Staff Scientist 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
Total Hours 70 5 5 60 0 0 0 0 0 0 0
Direct Labor $2,721.65 $313.11 $234.06 $2,174.48 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 116.00% $3,157.12 $363.21 $271.51 $2,522.40 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Fringe 56.26% $1,531.20 $176.16 $131.68 $1,223.36 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Labor $7,409.97 $852.48 $637.25 $5,920.24 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF TERRACON Page 1
FDEP COST ESTIMATEContractor: Terracon
Date: 4/4/2022
Task #: DC005A SubTask 1 Project Management SubTask 6
Site: Fountain Cleaners, ERIC_5118 SubTask 2 Site Visit (from Viking Cleaners) SubTask 7
Activity/Phase: Site Visit and ISR SVE SubTask 3 ISR SVE SubTask 8
Project Manager: Dean Cox SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10
Travel
Vehicle Rental $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Travel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement)
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement)
Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory
Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses
Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Expendables $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Field Expenses $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $7,409.97 $852.48 $637.25 $5,920.24 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Completion Fee $741.00 $85.25 $63.73 $592.02 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $8,150.97 $937.73 $700.98 $6,512.26 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF TERRACON Page 2
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Fountain Cleaners ERIC_5118
SUBTASK 2: Site Visit (From Viking Cleaners)
PROPOSAL NO. PH8227027
DATE: 4/4/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Prepare ISR - SVE
Senior Engineer DC Roundtrip travel time from Viking Cleaners 1
Senior Engineer DC On-site walk-about, locate MW-2 inside building 1
Senior Engineer DC Site access verification/ower-operator appointment 1
Senior Engineer PC Travel time from Viking Cleaners 1
Senior Engineer PC On-site walk-about, evaluate location for remedial system 1
TOTAL LABOR 5
VEHICLE TYPE RATE UNIT USEAGE
No vehicle (included in Viking Proposal) -$
TOTAL VEHICLE -$
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM -$
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE
TOTAL -$
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC #IDW
TOTAL LAB -$
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT -$
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Fountain Cleaners ERIC_5118
SUBTASK 3: ISR SVE
PROPOSAL NO. PH8227027
DATE: 4/4/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Prepare ISR - SVE
Senior Engineer DC Remediation calculations 2
Senior Engineer DC RAP Text 4
Senior Engineer DC Tables 2
Senior Engineer DC Exhibits/Drawings 3
Senior Engineer DC Sign and seal documents 1
Senior Engineer DC Design evaluation and determination 4
Staff Engineer RL Prepare remediation calculations 6
Staff Engineer RL Evaluate existing equipment and provide recommendations 8
Staff Engineer RL Prepare RAP text 7
Staff Engineer RL Develop Tables 3
Staff Engineer RL Develop Exhibits/Construction Drawings (trench details, SVE cross sections, treatment 11
Staff Engineer RL system layout, P&ID, electrical detail, equipment list, and components)
Staff Engineer RL Prepare RAP Checklist 2
Cadd Support AS ISR Plan (SVE) - Create and prepare final Exhibits/Drawings 7
TOTAL LABOR 60
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE -$
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM -$
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE
TOTAL -$
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC #IDW
TOTAL LAB -$
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT -$
5463 West Waters Avenue
Tampa, FL 33634
P (813) 221-0050
F (813) 221-0051
Terracon.com
April 4, 2022
Florida Department of Environmental Protection
Waste Cleanup Program
Waste Management Division
2600 Blair Stone Road
Tallahassee, Florida 32399-2400
Attn: Mr. Dean Cox, Environmental Consultant
E: Dean.Cox@FloridaDep.gov
W: 850-245-8969
M: 727-686-6502
Re: Proposal for Interim Source Removal Plan for Soil Vapor Extraction System
Fountain Cleaners
4602 Jog Road
Greenacres, Palm Beach County, Florida
ERIC_5118
Task Assignment HW687 DC005A
Terracon Proposal No. PH8227027
Dear Mr. Cox:
Terracon Consultants, Inc. (Terracon) appreciates the opportunity to submit this proposal to the
Florida Department of Environmental Program (FDEP) Waste Cleanup Program to prepare an Interim
Source Removal (ISR) Plan for a Soil Vapor Extraction (SVE) System for the Fountain Cleaners
(ERIC_5118) facility located at 4602 Jog Road, Greenacres, Palm Beach County, Florida. Also included in this proposal is a site visit to meet with owner of Fountain Cleaners and discuss the remedial system layout and to locate monitoring well MW-2 located inside the former drycleaner. The SVE
Presumptive Remedy Approval was signed by the FDEP Waste Site Cleanup Section in October 2020.
Scope of Services
◼ Subtask 1: Project management
◼ Subtask 2: Coordinate site visit and discussion with owner during the mobilization of the SVE system startup at Village
Cleaners (16 miles from site).
◼ Subtask 3: Evaluate existing Modified Active Gas survey results in the Site Assessment Report 1 prepared by Tetra Tech on March
24, 2021.
◼ Utilize the existing MAGs wells and data in the design of the SVE system.
◼ Prepare an ISR Plan for a SVE (signed and sealed by a
Professional Engineer).
See attached LOE for details
Schedule Deliverable is an ISR-SVE Plan, completed within 20 – 30 business days of receipt of Task Assignment
Compensation See attached CEF for details.
mailto:Dean.Cox@FloridaDep.gov
Proposal for ISR SVE
Fountain Cleaners, ERIC_5118 ■ Greenacres, FL
April 4, 2022 ■ Terracon Proposal No. PH8227027
DELIVERABLES
The ISR SVE Plan will detail and summarize the MAGS results of the soil gas wells, as reported by
Tetra Tech in the Site Assessment Report 1, dated March 24, 2021. The report will include a brief summary of the assessment findings, to include the soil assessment summary and estimated soil contaminant mass, sensitive receptors, the SVE design, to include air emissions treatment discussion, system startup, and general operation and maintenance. The ISR SVE report will also include the
FDEP RAP Checklist, the proposed construction schedule, a cost estimate for construction and O&M, and Construction Drawings (signed and sealed by a Professional Engineer).
SCHEDULE
The ISR-SVE Plan will be completed within 20 – 30 business days of receipt of Task Assignment.
CLOSING REMARKS
Terracon services will be conducted in accordance with the terms and conditions, contained within DEP
Waste Cleanup Program (WCP) Contract No. HW687, executed January 5, 2022. It is understood that a Task Assignment will be issued to authorize us to perform this work.
We appreciate the opportunity to provide this proposal and look forward to working with you on this project. If you should have any questions or comments regarding this proposal, please contact either of the undersigned at 813-221-0050.
Sincerely, Terracon Consultants, Inc.
Donna Cline, P.E. Tom Lewis, P.G.
Senior Remediation Engineer Principal
Attachments: Cost Spreadsheet
Level of Effort
| Pages from proposal DC005A 220404-2.pdf |
| Pages from proposal DC005A 220404.pdf |
| memo DC005A.pdf |
| DC005A.pdf |
File details come from the government source that posted it. Updated .