This is a Task Assignment (TA) DC014G issued by the State of Florida Department of Environmental Protection (FDEP) to Terracon Consultants, Inc. for environmental remediation services at the Village Laundry & Dry Cleaners site located at 10325 Lake Carroll Way, Tampa, Hillsborough County, Florida. The TA is issued pursuant to Contract Number HW687 and is effective through January 22, 2027. Gabriel Sostre serves as the FDEP Department Project Manager, while Donna Cline represents Terracon as the contractor's project manager.
The contract authorizes Terracon to conduct four quarters of soil vapor extraction (SVE) operation and maintenance services over a 12-month period, with a total TA value of $34,190.35. This comprises $27,950.35 in fixed unit rate charges for labor-intensive O&M activities and $6,240.00 in cost reimbursement for utility expenses (TECO electric services). Deliverables include three monthly O&M visits per quarter with quarterly SVE system sampling, quarterly email summaries, and semiannual Remedial Action System Status (RASS) reports. Sampling includes collection of air samples for TO-15 analysis from the Total Influent and additional sample points (VEW-1, VEW-2, VEW-3) in the final quarter. Invoicing is contingent upon FDEP approval of quarterly reports, with individual subtask amounts ranging from $5,049.55 to $10,494.18. Services are estimated to commence in October or November 2025.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O.
Object Code
Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department
Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature)
Date:
Additional signatures attached on separate page.
HW687
DC014G January 22, 2027
This TA authorizes 4 Quarters of SVE O&M at the Village Laundry & Dry Cleaners site.
Gabriel Sostre 850-245-8749 Terracon Consultants, Inc.
Donna Cline 904-479-7415
ERIC_4743
10325 Lake Carroll Way, Tampa, Hillsborough County
Village Laundry & Dry Cleaners
$ 27,950.35
$ 6,240.00
$ 34,190.35
Scope of Work
Terracon Consultants, Inc.
Donna Cline
Senior Associate / Remediation Engineer
10.23.2025
Digitally signed by Cline, Donna L DN: cn=Cline, Donna L, ou=Domain Users, email=Donna.Cline@terracon.com Date: 2025.10.24 09:29:10 -04'00'
Cline, Donna L
Mubeen Darji
Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.
Date: 2025.10.23 15:16:44 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
BWC TAFORM 01/18
Memorandum
F D
E P
C O
S T E
S T
IM
A T E
C on tr ac to r:
T e rr a co n
D at e:
/2
3/
T a sk
S ub T as k
P ro je ct M an a ge m e nt
S ub
T as k
U til iti es
S ite
V ill a ge L a un dr y
D ry C le an e rs
E
R
IC
_4
S ub
T as k
Q ua rt er
O
M
S ub
T as k
A ct iv ity
/P h a se
S
V E
O p er at io n
M ai nt en an ce
S ub
T as k
Q ua rt er
O
M
S ub
T as k
P ro je ct
M an a ge r:
G ab rie l S o st re
S ub
T as k
Q ua rt er
O
M
S ub
T as k
S ub
T as k
Q ua rt er
O
M
S ub
T as k
T o ta ls
L a b o r R at e
C at e g o ry
$5
.7
P ro je ct
M an a g e r
F a bi o
F or te s
.4
.4
$3
.0
C A
D D
S pe ci a lis t
C he ls ea
F ug a te
6.
0.
3.
0.
3.
$4
.4
S e ni or
S ci e nt is t
M ic h a el M u i
.0
6.
.0
6.
.0
$7
.7
S e ni or
E n gi n ee r
D on n a
C lin e 4.
0.
2.
0.
2.
$3
.3
S e ni or
S ci e nt is t
E dd y Le on
.0
.5
.5
.5
.5
T o ta l
H o u rs
.4
2.
.5
.5
.5
.5
D ire ct L ab o r $6
,1
.4
$7
.1
$8
8.
$1
,8
.2
$8
8.
$1 ,8
.2
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
O ve rh ea d
.0
0% $7
,0
.7
$8
.7
$1
,0
9.
$2
,1
.9
$1 ,0
9.
$2 ,1
.9
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
G en
A dm in
0.
0% $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
F ri n ge
6.
6%
$3 ,4
.3
$3
.1
$4
4.
$1 ,0
.1
$4
4.
$1
,0
.1
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T o ta l
L ab o r
$1 6, .6
$1 ,9
.0
$2
,3
.9
$4 ,9
.3
$2
,3
.9
$4 ,9
.3
$0
.0
$0 .0
$0
.0
0.
$0 .0
T ra ve l
V e hi cl e R en ta l $1
,6
.0
.0
0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
M ile a ge
C os ts $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
A ir
F a re $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
P e r d ie m
H ot el
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T o ta l T ra ve l $1
,6
.0
$3
0.
$4
0.
$3
0.
$4
0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S u b co n tr ac to r (E q u ip m en t
P ro c u re m e n t)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S u bc on tr ac to r
S u bt o ta l
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
P ro cu re m e nt F ee $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T o ta l
S u b co n tr ac to r C o s t $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S u b co n tr ac to r (S er v ic e s P ro cu re m en t)
D ril lin g
(C on ve nt io n al
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
D ril lin g
(N on
-c o nv en tio na
l) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
M o bi le
L ab or at or y
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S u rv ey in g
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
ID
W
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
U til iti e s $6
,0
.0
$0 .0
$0
.0
$0 .0
$0
.0
6, 0.
$0 .0
$0
.0
$0 .0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S e ns ap ho ne
$2
9.
$2
.4
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S u bc on tr ac to r
S u bt o ta l
$6 ,2
.4
$2
9.
$0
.0
$0 .0
$0
.0
$6 ,0
0.
$0 .0
$0
.0
$0 .0
$0
.0
H an d lin g F e e
$2
9.
$2
.9
$0 .0
$0
.0
$0 .0
$2
0.
$0
.0
$0 .0
$0
.0
$0 .0
T o ta l
S u b co n tr ac to r C o s t $6
,5
.3
$3
9.
$0 .0
$0
.0
$0 .0
$6
,2
.0
$0 .0
$0
.0
$0 .0
$0
.0
L a b o ra to ry
A n al yt ic al
C os ts $1
,6
.0
.0
3.
3.
2.
$0
.0
$0 .0
$0
.0
$0 .0
F a st T u rn ar o un d
C ha rg es
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S a m pl e S h ip p in g $2
0.
.0
$0
.0
$0 .0
$0
.0
$0 .0
T o ta l
L ab o ra to ry
$1 ,9
.0
$3
3.
$3
3.
$3
3.
$1
,0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
F ie ld E xp en se s
P e rs on a l P ro te ct io n $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E xp en d ab le s $4
0.
.0
$0 .0
$0
.0
$0 .0
$0
.0
E q ui pm en t (
D ril lin g re la te d)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E q ui pm en t (
A n al yt ic al r el a te
d) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E q ui pm en t (
ID
W r el at e
d) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E q ui pm en t (
O th er
$5 ,2
.0
1, .0
1, .0
1, .0
$1 ,3
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T o ta l
F ie ld E xp en se s
$5 ,7
.0
$1
,4
.0
$1 ,4
5.
$1 ,4
.0
$1
,4
5.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S u b to ta l
$3
,5
.9
1, .0
$4 ,8
0.
$7 ,1
.3
$4
,4
0.
$7
,8
.3
$6 ,2
0.
$0 .0
$0
.0
$0 .0
$0
.0
C o m p le ti o n
F ee
$1 ,6
.3
$1
1.
$2
9.
$4
8.
$2
9.
$4
8.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T o ta l
E s ti m at ed
C o s t
$3
,1
.3
2, .7
$5 ,0
9.
$7 ,6
.4
$4
,7
0.
$8
,3
.4
$6 ,2
0.
$0 .0
$0
.0
$0 .0
$0
.0
R E
V
C
E F T
E R
R A
C O
N P a g e
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Village Laundry & Dry Cleaners (ERIC_4743) SUBTASK 2: Quarter 1 O&M PROPOSAL No. PH4257301
DATE: 10/23/2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Quarter 1 O&M Month 1 and 2 visits Senior Scientist MM PreTask Planning, O&M checklist, verify property owner (0.5 hr/ visit) 1.00
Senior Scientist EL Mobilization/ Demobilization (from Tampa) (1 hr/ visit) 2.00
Senior Scientist EL Load/unload equiptment, pre and post calibrations (1 hrs/ visit) 2.00
Senior Scientist EL System O&M, optimize system (3.5 hrs/ visit) 7.00
Senior Scientist MM Update data tables, including runtime, flow rate, and ROI calcs (1 hr/ visit) 2.00
Quarter 1 O&M Month 3 visit � Sampling event Senior Scientist MM PreTask Planning, O&M checklist, verify property owner, request sample kit 1.00
Senior Scientist EL Load/unload equiptment, pre and post calibrations 1.00
Senior Scientist EL Mobilization/ Demobilization (from Tampa) 1.00
Senior Scientist EL System O&M, optimize system 3.50
Senior Scientist MM Mobilization and System Maintenance (to be included as WCD) Senior Scientist MM Update data tables, including runtime, flow rate, and ROI calcs 1.00
Reporting by Email Senior Scientist MM 1.00
Personnel: EL MM DC Hours: 16.50 6.00 0.00 TOTAL LABOR 22.50
VEHICLE TYPE RATE UNIT USEAGE
Truck (EL) 120 day 3 360.00$ Truck (MM) 120 day -$
TOTAL VEHICLE 360.00$
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE
Sensaphone Subscription 299.40$ Year 1 299.40$
TOTAL SUBCONTRACTOR 299.40$
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC* #IDW TOTALS
VOCs 200.00$ 1 200.00$
Summa Canister 33.00$ 1 33.00$ Sample Shipping Large (2 day) 70.00$ 1 70.00$
TOTAL LAB 303.00$
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Other Construction / O&M / Pilot Test Kit 360.00$ day 3 1,080.00$ Construction / O&M Supplies 75.00$ day 3 225.00$
Expendables Expendables 40.00$ day 3 120.00$
TOTAL EQUIPMENT 1,425.00$
TO-15 (Total Influent)
Quarterly field deliverable (O&M data logs and lab report sent in an email)
SUBTASK 3: Quarter 2 O&M PROPOSAL No. PH4257301
DATE: 10/23/2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Quarter 2 O&M Month 1 and 2 visits Senior Scientist MM PreTask Planning, O&M checklist, verify property owner (0.5 hr/ visit) 1.00
Senior Scientist EL Mobilization/ Demobilization (from Tampa) (1 hr/ visit) 2.00
Senior Scientist EL Load/unload equiptment, pre and post calibrations (1 hrs/ visit) 2.00
Senior Scientist EL System O&M, optimize system (3.5 hrs/ visit) 7.00
Senior Scientist MM Update data tables, including runtime, flow rate, and ROI calcs (1 hr/ visit) 2.00
Quarter 2 O&M Month 3 visit � Sampling event Senior Scientist MM PreTask Planning, O&M checklist, verify property owner, request sample kit 1.00
Senior Scientist EL Load/unload equiptment, pre and post calibrations 1.00
Senior Scientist EL Mobilization/ Demobilization (from Tampa) 1.00
Senior Scientist EL System O&M, optimize system 3.50
Senior Scientist MM Mobilization/ Demobilization (from Tampa) 1.00
Senior Scientist MM Oversee semiannual O&M, collect air samples 3.50
RASS Reporting Senior Scientist MM Quarterly table updates: Runtime, mass recovery, flow rate, and ROI calcs; Charts 3.00
Senior Scientist MM Data reduction/evaluation 2.00
Senior Scientist MM Draft report 3.00
Senior Scientist MM Draft drawings of system layout, vacuum influence 2.00
CADD Specialist CF Prepare summary drawings for report submittal 3.00
Senior Scientist MM Quarterly system evaluation and recommendations 2.50
Senior Engineer DC Develop conclusions and recommendations, prepare final RASS Report 2.00
Personnel: EL MM DC CF Hours: 16.50 21.00 2.00 3.00 TOTAL LABOR 42.50
VEHICLE TYPE RATE UNIT USEAGE
Truck (EL) 120 day 3 360.00$ Truck (MM) 120 day 1 120.00$
TOTAL VEHICLE 480.00$
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC* #IDW TOTALS
VOCs 200.00$ 1 200.00$
Summa Canister 33.00$ 1 33.00$ Sample Shipping Large 70.00$ 1 70.00$
TOTAL LAB 303.00$
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Other Construction / O&M / Pilot Test Kit 360.00$ day 3 1,080.00$ Construction / O&M Supplies 75.00$ day 3 225.00$
Expendables Expendables 40.00$ day 3 120.00$
TOTAL EQUIPMENT 1,425.00$
TO-15 (Total Influent)
SUBTASK 4: Quarter 3 O&M PROPOSAL No. PH4257301
DATE: 10/23/2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Quarter 3 O&M Month 1 and 2 visits Senior Scientist MM PreTask Planning, O&M checklist, verify property owner (0.5 hr/ visit) 1.00
Senior Scientist EL Mobilization/ Demobilization (from Tampa) (1 hr/ visit) 2.00
Senior Scientist EL Load/unload equiptment, pre and post calibrations (1 hrs/ visit) 2.00
Senior Scientist EL System O&M, optimize system (3.5 hrs/ visit) 7.00
Senior Scientist MM Update data tables, including runtime, flow rate, and ROI calcs (1 hr/ visit) 2.00
Quarter 3 O&M Month 3 visit � Sampling event Senior Scientist MM PreTask Planning, O&M checklist, verify property owner, request sample kit 1.00
Senior Scientist EL Load/unload equiptment, pre and post calibrations 1.00
Senior Scientist EL Mobilization/ Demobilization (from Tampa) 1.00
Senior Scientist EL System O&M, optimize system 3.50
Senior Scientist MM Mobilization and System Maintenance (to be included as WCD) Senior Scientist MM Update data tables, including runtime, flow rate, and ROI calcs 1.00
Reporting by Email Senior Scientist MM 1.00
Personnel: EL MM DC Hours: 16.50 6.00 0.00 TOTAL LABOR 22.50
VEHICLE TYPE RATE UNIT USEAGE
Truck (EL) 120 day 3 360.00$ Truck (MM) 120 day -$
TOTAL VEHICLE 360.00$
LABORATORY COSTS
PARAMETER ITEM RATE COSTING UNIT USEAGE TOTALS
VOCs 200.00$ 1 200.00$
Summa Canister 33.00$ 1 33.00$ Sample Shipping Large (2 day) 70.00$ 1 70.00$
TOTAL LABORATORY 303.00$
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Other Construction / O&M / Pilot Test Kit 360.00$ day 3 1,080.00$ Construction / O&M Supplies 75.00$ day 3 225.00$
Expendables Expendables 40.00$ day 3 120.00$
TOTAL EQUIPMENT 1,425.00$
TO-15 (Total Influent)
Quarterly field deliverable (O&M data logs and lab report sent in an email)
SUBTASK 5: Quarter 4 O&M PROPOSAL No. PH4257301
DATE: 10/23/2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Quarter 4 O&M Month 1 and 2 visits Senior Scientist MM PreTask Planning, O&M checklist, verify property owner (0.5 hr/ visit) 1.00
Senior Scientist EL Mobilization/ Demobilization (from Tampa) (1 hr/ visit) 2.00
Senior Scientist EL Load/unload equiptment, pre and post calibrations (1 hr/ visit) 2.00
Senior Scientist EL System O&M, optimize system (3.5 hrs/ visit) 7.00
Senior Scientist MM Update data tables, including runtime, flow rate, and ROI calcs (1 hr/ visit) 2.00
Quarter 4 O&M Month 3 visit � Annual sampling event Senior Scientist MM PreTask Planning, O&M checklist, verify property owner, request sample kit 1.00
Senior Scientist EL Load/unload equiptment, pre and post calibrations 1.00
Senior Scientist EL Mobilization/ Demobilization (from Tampa) 1.00
Senior Scientist EL System O&M, optimize system 3.50
Senior Scientist MM Mobilization/ Demobilization (from Tampa) 1.00
Senior Scientist MM Oversee semiannual O&M, collect air samples 3.50
RASS Reporting Senior Scientist MM Quarterly table updates: Runtime, mass recovery, flow rate, and ROI calcs; Charts 3.00
Senior Scientist MM Data reduction/evaluation 2.00
Senior Scientist MM Draft report 3.00
Senior Scientist MM Draft drawings of system layout, vacuum influence 2.00
CADD Specialist CF Prepare summary drawings for report submittal 3.00
Senior Scientist MM Quarterly system evaluation and recommendations 2.50
Senior Engineer DC Develop conclusions and recommendations, prepare final RASS Report 2.00
Personnel: EL MM DC CF Hours: 16.50 21.00 2.00 3.00 TOTAL LABOR 42.50
VEHICLE TYPE RATE UNIT USEAGE
Truck (EL) 120 day 3 360.00$ Truck (MM) 120 day 1 120.00$
TOTAL VEHICLE 480.00$
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC* #IDW TOTALS
VOCs 200.00$ 4 800.00$
Summa Canister 33.00$ 4 132.00$ Sample Shipping Large 70.00$ 1 70.00$
TOTAL LAB 1,002.00$
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Other Construction / O&M / Pilot Test Kit 360.00$ day 3 1,080.00$ Construction / O&M Supplies 75.00$ day 3 225.00$
Expendables Expendables 40.00$ day 3 120.00$
TOTAL EQUIPMENT 1,425.00$
TO-15 (VEW-1, -2, -3, Influent)
SUBTASK 6: Utilities Proposal No. PH4257301
DATE: 10/23/2025
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE
TECO Electric 500.00$ Month 12 6,000.00$
Subcontractor Handling Fee 20.00$ Month 12 240.00$
TOTAL SUBCONTRATOR 6,240.00$
5463 W. Waters Avenue, Suite 830 Tampa, FL 33634
P (813) 221-0050 F (813) 221-0051
Terracon.com
October 23, 2025
Florida Department of Environmental Protection Waste Cleanup Program, Waste Management Division 2600 Blair Stone Road Tallahassee, Florida 32399-2400
Attn: Mr. Gabriel Sostre, Environmental Specialist II E: gabriel.sostre@floridadep.gov W: (850) 245-8749
Re: Proposal for Annual O&M Monitoring and Reporting Village Laundry & Dry Cleaners 10325 Lake Carroll Way Tampa, Hillsborough County, Florida
ERIC_4743
WCP Contract No. HW687 Terracon Proposal No. PH4257301
Dear Mr. Sostre:
Terracon Consultants, Inc. (Terracon) appreciates the opportunity to submit this proposal to Florida Department of Environmental Program (FDEP) Waste Cleanup Program (WCP) to conduct 12 months of SVE system operation and maintenance (O&M) visits with preparation of quarterly email summaries and semiannual reports for the above-referenced site.
Scope of Services
Subtask 1: The costs associated with this subtask are calculated automatically at 13% of the change in the direct labor costs of the remaining subtasks Subtask 2: Three monthly O&M visits and Quarter 1 (Q1) SVE system sampling. Collect one soil gas (air) sample from the Total Influent during the third monthly visit for TO-15 analysis. Prepare field deliverable for Q1 O&M visits.
Subtask 3: Three monthly O&M visits and Q2 SVE system sampling. Collect one air sample (Total Influent) during the third monthly visit for TO-15 analysis. Prepare Remedial Action System Status (RASS) Report for Q1-Q2 reporting period.
Subtask 4: Three monthly O&M visits and Q3 SVE system sampling. Collect one air sample (Total Influent) during the third monthly visit for TO-15 analysis. Prepare field deliverable for Q3 O&M visits.
Subtask 5: Three monthly O&M visits and Q4 SVE system sampling. Collect four air samples (Total Influent, VEW-1, VEW-2, VEW-3) during the third monthly visit for TO-15 analysis. Prepare RASS Report for Q3-Q4 reporting period.
Subtask 6: Utilities (TECO)
See attached LOE for details.
Schedule Deliverable to include an email summary within 20 business days following each quarterly O&M visit.
Compensation See attached CEF for details.
Schedule
It is estimated that the first monthly system O&M will be conducted in October or November 2025, subject to TA authorization.
Closing Remarks
Terracon services will be conducted in accordance with the terms and conditions contained within DEP Waste Cleanup Program (WCP) Contract No. HW687, executed January 5, 2022. It is understood that a Task Assignment will be issued to authorize us to perform this work.
We appreciate the opportunity to provide this proposal and look forward to working with you on this project. Please contact us if you have any questions or comments regarding this proposal.